Ormsby_Building_Plans.pdf

PDF 885 KB Posted

Attached to
Lead Abatement for Various Public Works Facilites
Solicitation number
2023-IFB-195
Issued by
Allegheny County, Philadelphia City, Pennsylvania

About this file

These architectural drawings depict the detailed floor plans and site layout for the Ormsby Pool and Recreation Center located at 200 Sidney Street in Pittsburgh, Pennsylvania. The multi-level building consists of a basement, three floors, and a roof/play deck, with comprehensive architectural documentation prepared by Massaro Design Build, LLP in August 2016 and January 2017. The site plan and floor plans meticulously detail the building's spatial configuration, including specific room designations such as gymnasium, lobby, offices, dressing rooms, mechanical spaces, and various support areas across different levels.

The floor plans reveal a complex facility design with electrical service specifications, including multiple electrical panels with varying amperage and voltage ratings. The basement level contains mechanical equipment like boilers, domestic water heaters, and chlorine exhaust fans, while other levels feature activity spaces, restrooms, offices, and circulation areas. The drawings are explicitly marked as schematic renditions of existing facility conditions, with a note recommending verification of exact field conditions before any construction or renovation work. The architectural documentation provides a comprehensive overview of the building's spatial organization, mechanical infrastructure, and structural layout, offering detailed insights into the facility's design and functional zones.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h P

A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

SS

A

R O

D E

SI

G

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/1

/2

:1

:5

A M

C1.01

SITE PLAN

MLK

MLK 08/16/16

08/16/16

O rm s b y P o o l a n d R e c re a ti o n C e n te r

B

S id n e y S t.

P it ts b u rg h P

A

1" = 60'-0"

Site Plan

SIDNEY ST

S

N

D S

T

E CARSON ST

BOILER

DOMESTIC WATER

HEATER

CHLORINE

EXHAUST FAN

EXHAUST FAN 1

EXHAUST FAN 2

EXHAUST FAN 3

EXHAUST FAN 4

PANEL 'MDP' - 300A,

120/240V, 3Ø,4W, M.C.B

PANEL - 400A, 120/

208V, 1Ø, 4W, M.L.O.

Activity

Activity

Restroom

Restroom

Service

RestroomRestroom

Break rm

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h

P A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro co rp o ra ti o n .c o m

M A

S S A

R O

D E

S

IG

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/2

/2

:3

:5

A

M

S id n e y S tr e e t, P it ts b u rg h P

A

MEP1.00

BASEMENT

FLOOR PLAN

TB

CJL 01/20/17

01/20/17

O rm b s y P o o l a n d R e c re a ti o n B

1/16" = 1'-0"

Basement

PANEL - 200A M.L.O.,

120/240V, 1Ø, 3W, 42 POLE

ELECTRICAL

SERVICE METER

PANEL - 200A M.L.O.,

120/240V, 1Ø, 3W, 42 POLE

Gym

Office Office

Room Lobby

Room

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro co rp o ra ti o n .c o m

M A

S S A

R O

D E

S

IG

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/2

/2

:3

:5

A

M

S id n e y S tr e e t, P it ts b u rg h P

A

MEP1.10

LEVEL 1 PLAN

TB

CJL 01/20/17

01/20/17

O rm b s y P o o l a n d R e c re a ti o n B

1/16" = 1'-0"

Level 1

Office Office Office Office

Toilet

Open Below

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

S S A

R O

D E

S

IG

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/2

/2

:3

:5

A

M

S id n e y S tr e e t, P it ts b u rg h P

A

MEP1.20

LEVEL 2 PLAN

TB

CJL 01/20/17

01/20/17

O rm b s y P o o l a n d R e c re a ti o n B

1/16" = 1'-0"

Level 2

UP

DN UP

UP

Director's Dressing Rm

Men's

Entry

Stair Hall

Storage

017Room

Women's Shower

018 Basket Rm

Women's

Men's

Men's Shower

Toilet

Guards Rm

Stair

Apparatus Rm

Heating Rm

Stair

Basket Rm

Men's Dressing Rm

Women's Dressing Rm

Stair Hall

Matron's Rm

Women's

Closet

Stair

Storage

Stair

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h P

A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

SS

A

R O

D E

SI

G

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/1

/2

:1

:5

A M

A1.00

BASEMENT

FLOOR PLAN

MLK

MLK 08/16/16

08/16/16

O rm s b y P o o l a n d R e c re a ti o n C e n te r

B

S id n e y S t.

P it ts b u rg h P

A

1/16" = 1'-0"

Basement Floor Plan

DN UP

DN

UP

DN

Vesitbule

Lobby

Club Rm No 1

Closet

Kitchen

Gymnasuim

Stair

Stage

Stair

Closet

Director's Rm

Club Rm No 2

Storage

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h P

A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

SS

A

R O

D E

SI

G

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/1

/2

:1

:5

A M

A1.10

LEVEL 1 FLOOR

PLAN

MLK

MLK 08/16/16

08/16/16

O rm s b y P o o l a n d R e c re a ti o n C e n te r

B

S id n e y S t.

P it ts b u rg h P

A

1/16" = 1'-0"

Level 1 Floor Plan

UP

Stairs

Closet

Room

Closet

Room

Closet

Room

Corridor

Toilet

Girls' Dressing Rm

Stair

Club Rm No 3

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h P

A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

SS

A

R O

D E

SI

G

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/1

/2

:1

:5

A M

A1.20

LEVEL 2 FLOOR

PLAN

MLK

MLK 08/16/16

08/16/16

O rm s b y P o o l a n d R e c re a ti o n C e n te r

B

S id n e y S t.

P it ts b u rg h P

A

1/16" = 1'-0"

Level 2 Floor Plan

Roof/Play Deck

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h P

A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

SS

A

R O

D E

SI

G

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/1

/2

:1

:4

A M

A1.3

LEVEL 3/ PLAY

DECK FLOOR

PAN

MLK

MLK 08/16/16

08/16/16

O rm s b y P o o l a n d R e c re a ti o n C e n te r

B

S id n e y S t.

P it ts b u rg h P

A

1/16" = 1'-0"

Level 3/Play Deck Floor Plan

BOILER

DOMESTIC WATER

HEATER

CHLORINE

EXHAUST FAN

EXHAUST FAN 1

EXHAUST FAN 2

EXHAUST FAN 3

EXHAUST FAN 4

PANEL 'MDP' - 300A,

120/240V, 3Ø,4W, M.C.B

PANEL - 400A, 120/

208V, 1Ø, 4W, M.L.O.

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O

JE

C T:

D el ta D r.

Pi tts bu rg h, P A

-2

Ph on e:

2)

-2

Fa x:

2)

-2 w w w

.m as sa ro co rp or at io n.

co m

M A

SS

A

R O

D

ES

IG

N

B

UI

LD

, L

LP

C

O N

S U

LT

AN

T

DRAWING TITLE:

1/

/2

:5 0:

P

M

MEP1.00

BASEMENT

FLOOR MEP

PLAN

Checker

Author 01/18/16

01/18/16

Pr oj ec t N am e

En te r a dd re ss h er e

1/16" = 1'-0"1 Basement

PANEL - 200A M.L.O.,

120/240V, 1Ø, 3W, 42 POLE

ELECTRICAL

SERVICE METER

PANEL - 200A M.L.O.,

120/240V, 1Ø, 3W, 42 POLE

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O

JE

C T:

D el ta D r.

Pi tts bu rg h, P A

-2

Ph on e:

2)

-2

Fa x:

2)

-2 w w w

.m as sa ro co rp or at io n.

co m

M A

SS

A

R O

D

ES

IG

N

B

UI

LD

, L

LP

C

O N

S U

LT

AN

T

DRAWING TITLE:

1/

/2

:5 0:

P

M

MEP1.10

LEVEL 1 MEP

PLAN

Checker

Author 01/18/16

01/18/16

Pr oj ec t N am e

En te r a dd re ss h er

1/16" = 1'-0"1 Level 1

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O

JE

C T:

D el ta D r.

Pi tts bu rg h, P A

-2

Ph on e:

2)

-2

Fa x:

2)

-2 w w w

.m as sa ro co rp or at io n.

co m

M A

SS

A

R O

D

ES

IG

N

B

UI

LD

, L

LP

C

O N

S U

LT

AN

T

DRAWING TITLE:

1/

/2

:5 0:

P

M

MEP1.20

LEVEL 2 MEP

PLAN

Checker

Author 01/18/16

01/18/16

Pr oj ec t N am e

En te r a dd re ss h er

1/16" = 1'-0"1 Level 2

B049 - Ormsby Rec Center - C1-01 - SITE PLAN
Sheets
A1.00 - BASEMENT FLOOR PLAN
A1.10 - LEVEL 1 FLOOR PLAN
A1.20 - LEVEL 2 FLOOR PLAN
C1.01 - SITE PLAN
B049 - Ormbsy Pool and Recreation MEP1-00 - BASEMENT FLOOR PLAN
Sheets
MEP1.00 - BASEMENT FLOOR PLAN
MEP1.10 - LEVEL 1 PLAN
MEP1.20 - LEVEL 2 PLAN
B049 - Ormbsy Pool and Recreation MEP1-10 - LEVEL 1 PLAN
Sheets
MEP1.00 - BASEMENT FLOOR PLAN
MEP1.10 - LEVEL 1 PLAN
MEP1.20 - LEVEL 2 PLAN
B049 - Ormbsy Pool and Recreation MEP1-20 - LEVEL 2 PLAN
Sheets
MEP1.00 - BASEMENT FLOOR PLAN
MEP1.10 - LEVEL 1 PLAN
MEP1.20 - LEVEL 2 PLAN
B049 - Ormsby Rec Center - A1-00 - BASEMENT FLOOR PLAN
Sheets
A1.00 - BASEMENT FLOOR PLAN
A1.10 - LEVEL 1 FLOOR PLAN
A1.20 - LEVEL 2 FLOOR PLAN
C1.01 - SITE PLAN
B049 - Ormsby Rec Center - A1-10 - LEVEL 1 FLOOR PLAN
Sheets
A1.00 - BASEMENT FLOOR PLAN
A1.10 - LEVEL 1 FLOOR PLAN
A1.20 - LEVEL 2 FLOOR PLAN
C1.01 - SITE PLAN
B049 - Ormsby Rec Center - A1-20 - LEVEL 2 FLOOR PLAN
Sheets
A1.00 - BASEMENT FLOOR PLAN
A1.10 - LEVEL 1 FLOOR PLAN
A1.20 - LEVEL 2 FLOOR PLAN
C1.01 - SITE PLAN
B049 - Ormsby Rec Center - A1-30 - LEVEL 3 PLAYDECK PLAN
Sheets
A1.3 - LEVEL 3/ PLAY DECK FLOOR PAN
Ormbsy Pool and Recreation MEP - BASEMENT FLOOR MEP PLAN
Sheets
MEP1.00 - BASEMENT FLOOR MEP PLAN
MEP1.10 - LEVEL 1 MEP PLAN
MEP1.20 - LEVEL 2 MEP PLAN
Ormbsy Pool and Recreation MEP - Sheet - LEVEL 1 MEP PLAN
Sheets
MEP1.00 - BASEMENT FLOOR MEP PLAN
MEP1.10 - LEVEL 1 MEP PLAN
MEP1.20 - LEVEL 2 MEP PLAN
Ormbsy Pool and Recreation MEP - Sheet - LEVEL 2 MEP PLAN
Sheets
MEP1.00 - BASEMENT FLOOR MEP PLAN
MEP1.10 - LEVEL 1 MEP PLAN
MEP1.20 - LEVEL 2 MEP PLAN

File details come from the government source that posted it. Updated .