Wareing Roofing Replacement Bid Specs.pdf
PDF 453 KB Posted
- Solicitation number
- RFP TAY 270000000080 1
- Issued by
- Michigan
About this file
This is a bid specification document for Taylor Public Schools in Michigan detailing requirements for roof removal and replacement work at the K-9 Academy Training Facility located at 24800 Hayes St, Taylor, MI 48180. The project encompasses the complete replacement of Roof A, totaling 11,550 square feet with a slope of 1 inch per 12 inches. The scope of work includes full roof tear-off of the existing aggregate-surfaced built-up roofing system, removal and reinstallation of roof components, installation of a new three-ply cold-applied built-up asphalt roofing system with polyisocyanurate insulation, and installation of sheet metal flashing and trim. The specification is based on Tremco roofing products and requires compliance with NRCA and FM standards. The contractor must provide a qualified installer with a minimum of five years' experience, and the roofing system includes a 20-year manufacturer's warranty and a 2-year installer's warranty. Work is restricted to normal business hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with 72 hours' notice required for activities affecting owner operations, and the facility will remain occupied during construction.
The specification establishes five unit price categories for potential change orders: deck material replacement (per square foot), re-tap drain bolts (per set), roof drain replacement (per unit), new clamping rings (per unit), and existing wood nailer replacement (per board foot in 2"x4", 2"x6", and 2"x8" sizes). All unit prices must include material, delivery, installation, insurance, overhead, and profit. The contractor is responsible for all demolition waste removal and disposal, temporary roofing protection during work, and protection of the occupied building. The document mandates compliance with EPA notification regulations for asphalt removal, environmental protection requirements, dust and noise control measures, drug and background screening of contractor personnel, and employee identification badges. Manufacturer's inspection services are included in the contract sum, with inspections scheduled for years 2, 5, 10, and 15 following completion. The project document date is October 8, 2026, and the roofing advisor is Jamie O'Shee at Tremco, (800) 562-2728.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WAREING INVITATIONN TO BID.pdf | ||
| Wareing Roof Replacement.docx (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Taylor Public Schools Date of Issue (10/08/2026)
K-9 Academy Training Facility
Roof A Roofing Replacement
000110 - Page 1 of 1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary
012200 Unit Prices
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
070150.19 Preparation for Re-Roofing
075113.13 Built-Up Asphalt Roofing, Cold-Applied
076200.02 Sheet Metal Flashing and Trim (Short Form)
000100 - Page 1 of 1
COPYRIGHT
COPYRIGHT: 2020 by The American Institute of Architects (AIA). Exclusively published and distributed by
Deltek, Inc., for the AIA. Tremco modifications were made with permission and Tremco Canada Division, RPM
Canada reserves all rights thereto.
DESIGN PROFESSIONAL: The attached PRODUCT MASTERSPEC section(s) are licensed by Deltek, Inc., for limited distribution by Tremco Canada Division, RPM Canada and are prepared as a courtesy for use by design professional of record on a single project. Review and accept changes and modify according to project require-ments and design professional's practice, who assumes responsibility for document contents consistent with li-censing statutes of the Project state.
FACILITY OWNER: The attached PRODUCT MASTERSPEC section(s) are licensed by Deltek, Inc., for lim-ited distribution by Tremco Canada Division, RPM Canada and are prepared as a courtesy for use by facility owner on a single project.
For more information about Tremco roofing products, contact Tremco Roofing and Building Maintenance Divi-sion, Beachwood, OH 44122, (800) 562 - 2728, Web address: www.tremcoroofing.com http://www.tremcoroofing.com/
011000 - Page 1 of 4
SUMMARY
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Access to site.
4. Coordination with occupants.
5. Work restrictions.
6. Specification and drawing conventions.
1.2 PROJECT INFORMATION
A. Facility Owner Information:
1. Owner Name: Taylor Public Schools.
2. Roofing Advisor:
a. Roof Consultant: Jamie O'Shee; Senior Field Advisor;;; Joshee@tremcoinc.com.
3. Direct technical questions to Roofing Advisor.
a. Where individual specification sections refer to Owner, Owner may elect to delegate submittal and response responsibilities to Roofing Advisor.
B. Facility Information:
1. Building Name: K-9 Academy Training Facility.
2. Building Location: 24800 Hayes St, Taylor MI 48180.
C. Project Information:
1. Project Name: Roof A Roofing Replacement.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
011000 - Page 2 of 4
1. Roof Area(s) / Section(s): A.
a. Total Area of Roof(s): 11,550 sq. ft.
b. Slope of Existing Deck: 1 inch per 12 inches.
c. The Work of the Project includes:
1) Re-roofing preparation specified in Division 07 Section "Preparation for Re-
Roofing."
2) Replacement roofing specified in Division 07 Section 075113.13 - Built-Up
Asphalt Roofing, Cold-Applied.
B. Type of Contract:
1. Project will be constructed under a single prime contract.
1.4 ACCESS TO SITE
A. Use of Site, Limited: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
1. Use of Site: Limit use of Project site to work in areas indicated and as directed by Owner.
Do not disturb portions of Project site beyond areas in which the Work is indicated, including designated lay-down areas.
2. Driveways, Walkways and Entrances: Keep driveways, facility loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
1.5 COORDINATION WITH OCCUPANTS
A. Owner Occupancy: Owner will occupy site including existing and adjacent building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.
2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.
011000 - Page 3 of 4
1.6 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of
7:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated or approved by Owner.
1. Weekend Hours: As authorized by Owner.
2. Early Morning Hours: As authorized by Owner.
3. Hours for Utility or Services Shutdowns: Insert Owner's restrictions.
4. Hours for noisy or disruptive activity: As authorized by Owner.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify Owner not less than two days in advance of proposed utility interruptions.
2. Obtain Owner's written permission before proceeding with utility interruptions.
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.
1. Notify Owner not less than two days in advance of proposed disruptive operations.
2. Obtain Owner's written permission before proceeding with disruptive operations.
E. Nonsmoking Project: Use of tobacco products on the Project site is not permitted.
F. Controlled Substances: Use of other controlled substances on the Project site is not permitted.
G. Employee Identification: Provideidentification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.
H. Employee Screening: Comply with Owner's requirements for drug and background screening of
Contractor personnel working on Project site.
1. Maintain list of approved screened personnel with Owner's representative.
1.7 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
011000 - Page 4 of 4
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations scheduled on
Drawings.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
012200 - Page 1 of 2
UNIT PRICES
SECTION 012200 - UNIT PRICES
1.1 SUMMARY
A. Section includes administrative and procedural requirements for unit prices.
1.2 DEFINITIONS
A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
1.3 PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.
B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF UNIT PRICES
A. Unit Price No. 1: Deck material replacement:
1. Description: Remove existing deck material and replace with new material according to
Division 07 Section "Preparation for Re-roofing".
2. Unit of Measurement: 1 sq. ft.
B. Unit Price No. 2: Re-tap drain bolts:
1. Description: Provide new ring bolts to clamping ring.
012200 - Page 2 of 2
UNIT PRICES
2. Unit of Measurement: 1 set of drain bolts.
3. Quantity Allowance: Coordinate unit price with allowance adjustment requirements in
Division 01 Section "Allowances."
C. Unit Price No. 3: Replacing roof drain:
1. Description: Provide new roof drain including associated sump, flashing, patching, and piping, according to Division 07 roofing section.
2. Unit of Measurement: 1 roof drain.
D. Unit Price No. 4: New Clamping Ring:
1. Description: Provide new clamping ring according to Division 7 roofing section
2. Unit of Measurement: 1 clamping ring .
E. Unit Price No. 5: Existing wood nailer replacement
1. Description: Provide new pressure-treated wood nailers according to Division 06 Section
"Miscellaneous Rough Carpentry."
2. Unit of Measurement: 1 board ft 2"X4".
3. Unit of Measurement: 1 board ft 2"x6".
4. Unit of Measurement: 1 board ft 2"x8".
5. Quantity Allowance: Coordinate unit price with allowance adjustment requirements in
Division 01 Section "Allowances."
END OF SECTION 012200
070150.19 - Page 1 of 9
PREPARATION FOR RE-ROOFING
SECTION 070150.19 - PREPARATION FOR RE-ROOFING
1.1 SUMMARY
A. Section Includes:
1. Roof replacement preparation consisting of full roof tear-off of roof system at designated roof areas.
2. Removal of flashings and counterflashings.
3. Temporary roofing.
4. Temporary roof drainage.
B. Related Information:
1. Division 01 Section "Summary" for use of the premises and phasing requirements, and for restrictions on use of the premises due to Owner or tenant occupancy.
2. Division 07 Section "Sheet Metal Flashing and Trim" for formed metal roof flashings and counterflashings.
1.2 DESCRIPTION OF WORK
A. Re-roofing preparation Work consists of the following:
1. Preparation for Roof replacement:
a. Roof Area(s): A.
b. Existing Roof Type: Aggregate surfaced BUR.
c. Existing Deck Type: Cementitious wood fiber deck.
d. Roof tear-off.
e. Removal and reinstallation of indicated components, accessories, and equipment.
f. Removal of base flashings.
g. Temporary roof membrane.
070150.19 - Page 2 of 9
1.3 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, reinstalled, or otherwise indicated to remain
Owner's property, demolished materials shall become Contractor's property and shall be removed from Project site.
1.4 DEFINITIONS
A. Roofing Terminology: Refer to ASTM D1079 "Standard Terminology Relating to Roofing and
Waterproofing" and applicable edition of NRCA's "The NRCA Roofing Manual: Membrane Roof
Systems" and NRCA’s Glossary for definition of terms related to roofing work in this Section.
B. Existing Roofing System: Roofing system identified above, including roof covering/membrane, roof insulation, surfacing, and components and accessories between deck and roof covering/membrane.
C. Full Roof Tear-Off: Removal of existing membrane roofing system from deck.
D. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and reinstalled.
E. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
F. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.
G. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.
1.5 PREINSTALLATION MEETINGS
A. Preliminary Roofing Conference: Before starting removal Work, conduct conference at Project site.
1. Coordinate with roofing preinstallation meetings specified in Division 07 roofing section(s).
2. Review methods and procedures related to roofing tear-off, including, but not limited to, the following:
a. Reroofing preparation, including roofing system manufacturer's written instructions.
b. Temporary protection requirements for existing roofing system components that are to remain.
c. Existing roof drains and roof drainage during each stage of reroofing, and roof-drain plugging and plug removal.
070150.19 - Page 3 of 9
d. Construction schedule and availability of materials, Installer's personnel, equipment, and facilities needed to avoid delays.
e. Existing roof deck conditions and other conditions requiring Owner notification.
f. Existing roof deck removal procedures and Owner notifications.
g. Condition and acceptance of existing roof deck and base flashing substrate for reuse.
h. Structural loading limitations of roof deck during reroofing.
i. Base flashings, special roofing details, drainage, penetrations, equipment curbs, and condition of other construction that affect reroofing.
1.6 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.7 INFORMATIONAL SUBMITTALS
A. Digital Images or Videos: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces, which might be misconstrued as having been damaged by reroofing operations. Submit before Work begins.
B. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property for environmental protection, for dust control and for noise control. Indicate proposed locations and construction of barriers.
C. Schedule of Re-Roofing Preparation Activities: Indicate the following:
1. Detailed sequence of re-roofing preparation work, with starting and ending dates for each activity. Ensure occupants' on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Coordination of Owner's continuing occupancy of portions of existing building.
1.8 CLOSEOUT SUBMITTALS
A. Certified statement from manufacturer of existing warranted roof system stating that existing roof warranty has not been affected by Work performed under this Section.
1.9 QUALITY ASSURANCE
A. Installer Qualifications: Installer of new membrane roofing system.
070150.19 - Page 4 of 9
B. Regulatory Requirements:
1. Comply with governing EPA notification regulations before beginning membrane roofing removal.
2. Comply with hauling and disposal regulations of authorities having jurisdiction.
1.10 PROJECT / FIELD CONDITIONS
A. Owner will occupy portions of building immediately below reroofing area.
1. Conduct reroofing so Owner's operations will not be disrupted.
2. Provide Owner with not less than 72 hours' written notice of activities that may affect
Owner's operations.
3. Coordinate work activities daily with Owner so Owner can place protective dust or water leakage covers over sensitive equipment or furnishings, shut down HVAC and fire-alarm or -detection equipment if needed, and evacuate occupants from below the work area.
4. Before working over structurally impaired areas of deck, notify Owner to evacuate occupants from below the affected area.
a. Verify that occupants below the work area have been evacuated before proceeding with work over the impaired deck area.
B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
C. Limit construction loads on roof to rooftop equipment wheel loads and uniformly distributed loads not exceeding recommendations of Contractor's professional engineer based upon site inspection and analysis.
D. Weather Limitations: Proceed with reroofing preparation only when existing and forecasted weather conditions permit Work to proceed without water entering existing roofing system or building.
1. Remove only as much roofing in one day as can be made watertight in the same day.
E. Daily Protection: Coordinate installation of roofing so insulation and other components of roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.
F. Hazardous Materials: It is not expected that hazardous materials such as asbestos-containing materials will be encountered in the Work.
1. If materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify Owner.
a. Hazardous materials will be removed by Owner under a separate contract.
070150.19 - Page 5 of 9
PART 2 - PRODUCTS
2.1 TEMPORARY PROTECTION MATERIALS
A. EPS Insulation: Molded (expanded) polystyrene, ASTM C578.
B. Plywood: NIST DOC PS 1, Grade CD, Exposure 1.
C. Oriented Strand Board (OSB): NIST DOC PS 2, Exposure 1.
2.2 DECK REPAIR/REPLACEMENT MATERIALS
A. Cementitious Wood Fiber Deck Repair Materials:
1. Cementitious Deck Panels: Aspen wood fibers bonded with inorganic hydraulic cement.
a. Acceptable Manufacturer: Tectum, Inc.
b. Panel Thickness: Match existing panels.
2. Sub-Purlins: Bulb Tees produced from prime billet steel, ASTM A499.
3. Grout: Gypsum cement grout, ready for mixing with potable water.
4. Fasteners: Material: Steel, 14 ga. (2.1 mm) Dekfast screw with 2-inch (50-mm) diameter washer.
2.3 TEMPORARY ROOFING MATERIALS
A. Design and selection of materials for temporary roofing are responsibilities of Contractor.
2.4 TEMPORARY ROOF DRAINAGE
A. Design and selection of materials for temporary roof drainage are responsibilities of the
Contractor.
2.5 AUXILIARY RE-ROOFING MATERIALS
A. General: Auxiliary reroofing preparation materials recommended by roofing system manufacturer for intended use and compatible with components of new membrane roofing system.
B. Fasteners: Factory-coated steel fasteners with metal or plastic plates listed in FM Approvals'
RoofNav, and acceptable to new roofing system manufacturer.
C. Metal Flashing Sheet: Metal flashing sheet is specified in Division 07 Section "Sheet Metal
Flashing and Trim."
070150.19 - Page 6 of 9
PART 3 - EXECUTION
3.1 PREPARATION, GENERAL
A. Protection of In-Place Conditions: Protect existing roofing system that is indicated not to be reroofed.
1. Protect existing roofing system that is indicated not to be reroofed.
2. Loosely lay 1 inch (25 mm) minimum thick, molded expanded polystyrene (EPS) insulation over the roofing membrane in areas indicated.
a. Loosely lay 15/32-inch (12-mm) plywood or OSB panels over EPS. Extend EPS past edges of plywood or OSB panels a minimum of 1 inch (25 mm).
3. Limit traffic and material storage to areas of existing roofing membrane that have been protected.
4. Maintain temporary protection and leave in place until replacement roofing has been completed. Remove temporary protection on completion of reroofing.
B. Seal or isolate windows that may be exposed to airborne substances created in removal of existing materials.
C. Shut off rooftop utilities and service piping before beginning the Work.
D. Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work.
1. Cover air-intake louvers before proceeding with reroofing work that could affect indoor air quality or activate smoke detectors in the ductwork.
E. Pollution Control: Comply with environmental regulations of authorities having jurisdiction.
Limit spread of dust and debris.
1. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
2. Remove debris from building roof by chute, hoist, or other device that will convey debris to grade level.
F. Temporary Weather Protection: During removal operations, have sufficient and suitable materials on-site to facilitate rapid installation of temporary protection in the event of unexpected rain.
3.2 ROOF TEAR-OFF
A. Notify Owner each day of extent of roof tear-off proposed for that day and obtain authorization to proceed.
B. Lower removed roofing materials to ground and onto lower roof levels, using dust-tight chutes or other acceptable means of removing materials from roof areas.
070150.19 - Page 7 of 9
C. Remove loose aggregate from aggregate-surfaced built-up bituminous roofing using a power broom.
D. Roof Drainage: Remove roof drainage items indicated for removal.
E. Remove Flashings: Remove roof flashings indicated for removal.
1. Remove perimeter edge flashings and gravel stops.
2. Remove flashings at pipes, curbs, mechanical equipment, and other penetrations.
F. Full Roof Tear-Off: Remove existing roofing membrane and other membrane roofing system components down to the deck.
1. Remove cover boards, roof insulation and base sheets.
2. Remove fasteners from deck.
G. Roof Edge Specialties: Replace existing perimeter metal systems with new perimeter metal systems.
1. New perimeter metal systems (fascia and coping) are specified in Division 07 Section
"Sheet Metal Flashing and Trim."
H. Inspect wood blocking, curbs, and nailers for deterioration and damage.
1. Remove deteriorated or unsuitable wood blocking, curbs, and nailers.
2. Replace existing wood components that exhibit signs of deterioration or other conditions detrimental to securement of roofing system components, including roof edge flashings.
3. Reuse of Existing Wood Nailers: Permitted where type, size and securement are in accordance with ANSI/SPRI/FM 4435 ES-1; and existing wood nailers exhibit no signs of deterioration or other conditions detrimental to securement of new roofing system in conformance with specified requirements.
3.3 DECK PREPARATION
A. Inspect deck after tear-off of membrane roofing system.
B. Verify that deck is sound and dry.
C. If broken or loose fasteners that secure deck panels to one another or to structure are observed or if deck appears or feels inadequately attached, immediately notify Owner. Do not proceed with installation until directed by Owner.
D. Unsuitable Deck: If deck surface is not suitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify Owner.
1. Do not proceed with installation until directed by Owner.
070150.19 - Page 8 of 9
3.4 DECK REPAIR/REPLACEMENT
A. Repair existing deck to provide smooth working surface for installation of roof system.
1. Replace deck that cannot be repaired to sound condition.
B. Cementitious Wood Fiber Deck Replacement
1. Remove damaged or deteriorated cementitious wood fiber deck panels.
2. Repair or replace damaged or deteriorated subpurlin tees.
3. Comply with manufacturer's written instructions for installing cementitious wood-fiber deck and fastenings.
a. Install fastenings according to manufacturer's written instructions unless otherwise indicated.
4. Deck Interruptions: Provide barrier seals or blocking at overhangs to form wind seals and at partitions and walls to form sound seals unless otherwise indicated.
5. Install deck panels progressively with long dimension perpendicular to supports and with end joints in alternate rows, staggered and centered over supports unless otherwise indicated. Tightly nest tongue-and-groove edges and tightly butt end joints.
a. Place panels with not less than 1-inch (25-mm) bearing.
b. Cut panels to provide starter units, and around penetration and openings.
c. Continuously support panel edges and ends at perimeter of building and at openings in deck.
1) Support panels by bent steel plates at roof transitions, including but not limited to ridges, valleys, perimeter and panel direction change.
d. Secure panels to supports and perimeter members in accordance with manufacturer's instructions.
1) Adhere and mechanically fasten panels at transitions.
e. Fill voids with gypsum concrete grout where edge joints meet subpurlins. Strike grout flush with top of plank and feather uneven top surfaces to a plane.
6. Do not allow foot traffic on planks until after screws are installed.
3.5 TEMPORARY ROOFING MEMBRANE
A. Install approved temporary roofing membrane over area to be reroofed.
B. Remove temporary roofing membrane before installing new roofing membrane.
070150.19 - Page 9 of 9
3.6 BASE FLASHING REMOVAL
A. Remove existing base flashings around parapets, curbs, walls, and penetrations.
1. Clean substrates of contaminants, such as asphalt, sheet materials, dirt, and debris.
B. Do not damage metal counterflashings that are to remain.
1. Replace metal counterflashings damaged during removal with counterflashings specified in Division 07 Section "Sheet Metal Flashing and Trim."
3.7 DISPOSAL
A. Collect demolished materials and place in containers. Promptly dispose of demolished materials.
Do not allow demolished materials to accumulate on-site.
1. Storage or sale of demolished items or materials on-site is not permitted.
B. Transport and legally dispose of demolished materials off Owner's property.
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by preparation for re-roofing operations. Return adjacent areas to condition existing before operations began.
END OF SECTION 070150.19
075113.13 - Page 1 of 18
BUILT-UP ASPHALT ROOFING, COLD-APPLIED
SECTION 075113.13 - BUILT-UP ASPHALT ROOFING, COLD-APPLIED
1.1 SUMMARY
A. Section Includes:
1. Cold-applied, three, built-up asphalt roofing system on cementitious wood fiber deck, including but not limited to:
a. Base Sheet (Anchor Sheet).
b. Roof insulation.
c. Roof insulation cover board.
d. Roof membrane ply sheet(s).
e. Base flashings.
f. Roof surfacing consisting of surfacer with stone aggregate.
g. Walkway material.
B. Related Sections:
1. Division 07 Section "Preparation for Re-Roofing" for removal of existing roofing;
inspection, repair and replacement of existing deck/substrate, if required to receive new roofing.
2. Division 07 Section "Sheet Metal Flashing and Trim" for shop-formed sheet metal items including roof drainage system items, roof penetration flashings, roof drainage systems, counterflashings and reglets, and formed copings and roof edge metal items.
1.2 DEFINITIONS
A. Roofing Terminology: Refer to ASTM D1079 "Standard Terminology Relating to Roofing and
Waterproofing" and NRCA's Glossary for definition of terms related to roofing work in this
Section.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Roofing Conference: Conduct conference at Project site.
1. Meet with Owner, Owner's insurer if applicable, testing and inspecting agency representative, roofing Installer, roofing manufacturer's representative, and installers
075113.13 - Page 2 of 18 whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment.
2. Review drawings and specifications.
3. Review methods and procedures related to roofing installation, including manufacturer's written instructions.
4. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
5. Examine substrate conditions and finishes for compliance with requirements, including flatness and fastening.
6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that will affect roofing.
7. Review temporary protection requirements for roofing during and after installation.
8. Review roof observation and repair procedures after roofing installation.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: For roofing system, include plans, elevations, sections, details, and attachments to other work. Provide roof plan showing orientation and types of roof deck, orientation of membrane roofing, and fastening spacings and patterns for mechanically fastened components.
1. Base flashings and membrane terminations.
a. Indicate that details meet requirements of NRCA and FM required by this Section.
2. Layout and thickness of insulation.
3. Insulation fastening patterns for corner, perimeter, and field-of-roof locations.
4. Membrane securement, fastening or adhesion requirements.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Statements: For Installer.
1. Include letter from Manufacturer written for this Project indicating approval of Installer.
B. Contractor's Product Certificate: Submit signed certification, on company letterhead, indicating products intended for Work of this Section, including product names and numbers and manufacturers' names, with statement indicating that products to be provided meet the requirements of the Contract Documents.
075113.13 - Page 3 of 18
C. Manufacturer's Instructions: Submit copy of manufacturer's written installation instructions for specified roofing system.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: To include in maintenance manuals.
B. Warranties: Executed copies of warranties.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: An employer of workers trained and certified by manufacturer, including a full-time on-site supervisor with a minimum of five years' experience installing similar work, able to communicate verbally with Contractor,, and employees, and qualified by the manufacturer to furnish warranty of type specified.
B. Manufacturer Qualifications: Approved manufacturer with roofing systems comparable to those specified for this Project, with minimum five years' experience in manufacture of comparable products in successful use in similar applications, and able to furnish warranty with provisions matching specified requirements.
C. Roofing Inspector Qualifications: A technical representative of manufacturer, not engaged in the sale of products, and experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality Control
Article to determine Installer's compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be one of the following:
1. An authorized full-time technical employee of the manufacturer.
2. An independent party certified as a Registered Roof Observer by the International Institute of Building Enclosure Consultants (formerly the Roof Consultants Institute) retained by the Contractor or the Manufacturer and approved by the Manufacturer.
D. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.
B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing manufacturer.
1. Protect stored liquid material from direct sunlight.
2. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.
075113.13 - Page 4 of 18
C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.
D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck.
1.9 PROJECT / FIELD CONDITIONS
A. Protect building, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from roofing operations. Repair damaged areas to the satisfaction of the Owner.
B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
C. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing to be installed according to manufacturer's written instructions and warranty requirements.
D. Daily Protection: In accordance with "Cold-Applied Built-Up Roofing Installation, General"
Article.
E. Owner will occupy portions of building immediately below roofing area. Conduct roofing so
Owner's operations will not be disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.
1.10 WARRANTY
A. Manufacturer's Warranty: Roof System Manufacturer's standard form in which Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within warranty period, as follows.
1. Form of Warranty: Manufacturer's standard warranty form.
2. Scope of Warranty: Work of this Section and including sheet metal details and termination details installed by the roof system Installer and approved by the Roof System
Manufacturer.
3. Warranty Period: 20 years from date of completion.
B. Manufacturer Inspection Services: By manufacturer's technical representative, to report maintenance responsibilities to Owner necessary for preservation of Owner's warranty rights. The cost of manufacturer's inspections is included in the Contract Sum.
1. Inspections to occur in following years: 2, 5, 10 and 15 following completion.
C. Installer Warranty: Installer's warranty signed by Installer, as follows.
1. Form of Warranty: Form acceptable to Roofing Manufacturer and Owner.
075113.13 - Page 5 of 18
2. Scope of Warranty: Work of this Section.
3. Warranty Period: 2 years from date of completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis of Design: The roof system specified in this Section is based upon products of Tremco CPG
Inc, Beachwood, OH, (800) 562-2728, www.tremcoroofing.com that are named in other Part 2 articles. Provide specified products.
2.2 PERFORMANCE REQUIREMENTS
A. General Performance: Roofing shall withstand exposure to weather without failure or leaks due to defective manufacture or installation.
1. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155.
2. Impact Resistance: Roof membrane shall resist impact damage when tested according to
ASTM D3746/D3746M, ASTM D4272/D4272M, or the "Resistance to Foot Traffic Test" in FM Approvals 4470.
B. Material Compatibility: Roofing system materials to be compatible with one another and adjacent materials under conditions of service and installation required, as demonstrated by roofing membrane manufacturer based on testing and field experience.
C. Roofing System Design: Provide roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency in accordance with ANSI/FM
4474, UL 580, or UL 1897, and to resist uplift pressures calculated in accordance with ASCE-7 and applicable code.
D. SPRI Wind Design Standard: Manufacture and install copings and roof edge flashings tested according to ANSI/SPRI/FM 4435 ES-1, capable of resisting design pressures calculated in accordance with ASCE-7 and applicable code.
E. Flashings and Fastening: Provide base flashings, perimeter flashings, detail flashings and component materials and installation techniques that comply with requirements and recommendations of the following:
1. Roofing system manufacturer’s details and recommendations.
2. NRCA Roofing Manual for construction details and recommendations.
3. Comply with requirements of Division 07 Section "Sheet Metal Flashing and Trim".
075113.13 - Page 6 of 18
2.3 MATERIALS, GENERAL
A. Material Compatibility: Roofing materials shall be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roof membrane manufacturer based on testing and field experience.
2.4 BASE SHEET (ANCHOR SHEET) MATERIALS
A. Base Sheet (Anchor Sheet):
1. SBS-modified asphalt coated composite polyester/fiberglass/fiberglass mat reinforced high tensile strength base sheet, ASTM D4601 Type II.
a. Basis of design product: Tremco, BURmastic Composite Ply HT.
b. Tensile Strength at 77 deg. F (25 deg. C), minimum, ASTM D5147: Machine direction, 165 lbf/in (725 N); Cross machine direction, 150 lbf/in (660 N).
c. Tear Strength at 77 deg. F (25 deg. C), minimum, ASTM D5147: Machine direction, 260 lbf (1150 N); Cross machine direction, 230 lbf (1120 N).
d. Thickness, minimum, ASTM D5147: 0.060 inch (1.5 mm).
2.5 ROOFING MEMBRANE MATERIALS
A. Ply Sheet:
1. SBS-modified asphalt coated composite polyester/fiberglass/fiberglass mat reinforced high tensile strength base sheet, ASTM D4601 Type II.
a. Basis of design product: Tremco, BURmastic Composite Ply HT.
b. Tensile Strength at 77 deg. F (25 deg. C), minimum, ASTM D5147: Machine direction, 165 lbf/in (725 N); Cross machine direction, 150 lbf/in (660 N).
c. Tear Strength at 77 deg. F (25 deg. C), minimum, ASTM D5147: Machine direction, 260 lbf (1150 N); Cross machine direction, 230 lbf (1120 N).
d. Thickness, minimum, ASTM D5147: 0.060 inch (1.5 mm).
2.6 BASE FLASHING MATERIALS
A. Elastomeric Flashing Sheet:
1. Flashing Sheet, Thermoset: Elastomeric polyester reinforced sheet with EPDM and SBR elastomers.
a. Basis of design product: Tremco, TRA Elastomeric Sheeting.
075113.13 - Page 7 of 18
b. Breaking Strength, minimum, ASTM D751: Machine direction 350 lbf (1550 N);
Cross machine direction 300 lbf (1330 N).
c. Tear Strength, minimum, ASTM D751: Machine direction 77 lbf (342 N); Cross machine direction 77 lbf (342 N).
d. Elongation at Failure, minimum, ASTM D751: Machine direction 30 percent; Cross-machine direction 35 percent.
e. Low Temperature Flexibility, minimum, ASTM D2136: -40 deg. F (-40 deg. C).
f. Thickness, minimum, ASTM D751: 0.045 inch (1.1 mm).
g. Color: Black.
2.7 COLD-APPLIED ADHESIVE MATERIALS
A. General: Adhesive and sealant materials recommended by roofing manufacturer for intended use and compatible with built-up roofing.
1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.
B. Interply Sheet Adhesive:
1. Cold-applied roofing adhesive and surfacer, one-part, formulated for compatibility and use with specified roofing membranes and flashings.
a. Basis of design product: Tremco, BURmastic Adhesive.
b. Volatile Organic Compounds (VOC), maximum, ASTM D6511: 250 g/L.
c. Nonvolatile Content, minimum, ASTM D6511: 72 percent.
C. Base Flashing Sheet Adhesive:
1. Bonding and Flashing Adhesive, SEBS/SIS modified asphalt, for elastomeric flashing membranes.
a. Basis of design product: Tremco, Sheeting Bond.
b. VOC, maximum, ASTM D3960: 250 g/L.
c. Adhesion in peel, minimum, ASTM D1876: 3 lbf/in (0.5 N/mm).
d. Lap shear adhesion, minimum, ASTM D816: 18 psi (124 kPa).
e. Color: White.
D. Asphalt Primer:
075113.13 - Page 8 of 18
1. Primer for Self-Adhering Sheet Air and Vapor Control Membrane: quick drying SIS primer.
a. Basis of design product: Tremco, AVC Membrane Primer.
b. Solids: Not less than 50 percent.
2.8 AUXILIARY ROOFING MATERIALS
A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with roofing membrane.
B. Detailing Fabric:
1. Woven Glass Fiber Mesh, Vinyl-Coated: Non-shrinking, non-rotting, vinyl-coated woven glass mesh for reinforcing flashing seams, membrane laps, and other roof system detailing.
a. Basis of design product: Tremco, BURmesh.
b. Tensile strength, 70 deg. F, min ASTM D146: Warp, 65 lbf/in (285 N); fill, 75 lbf/in
(310 N).
c. Color: Aqua green.
C. Asphalt Roofing Cement:
1. Roof Cement, Asphalt-Based: ASTM D4586, Type II, Class I, fibrated roof cement formulated for use in installation and repair of asphalt ply and modified bitumen roofing plies and flashings; UL-classified for fire resistance.
a. Basis of design product: Tremco, ELS.
b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 190 g/L.
c. Non-Volatile Matter, ASTM D4586: 85 percent.
d. Resistance to sag ASTM D4586: 1/8 in. (3 mm).
2. Flashing Adhesive, Solvent-free: Single component, multipurpose elastomeric flashing adhesive and multipurpose roof mastic, specially formulated for use with specified roofing membranes and flashings, moisture curing, low odor.
a. Basis of design product: Tremco, Burmastic Flashing Adhesive MC.
b. Viscosity at 77 deg. F (25 deg. C), ASTM D2916: 260,000 cP (260 Pa*s).
c. Density at 77 deg. F (25 deg. C), ASTM D1475: 8.2 lb/gal (982 kg/m3).
d. Lap Shear Adhesion at 77 deg. F (25 deg. C), minimum, ASTM D146: 77 lbf (104.4
Nm).
075113.13 - Page 9 of 18
e. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 222 g/L.
D. Pitch Pocket Sealer:
1. Pitch Pocket Sealer: Urethane two-component, ASTM C920, Type M, Grade P, Class 12.5, Use O, fast setting, solvent-free, low-odor, formulated for compatibility and use with specified roofing membranes and flashings.
a. Basis of design product: Tremco, TremSEAL Pitch Pocket Sealer.
b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 0 g/L.
c. Hardness, Shore A, minimum ASTM C661: 40.
E. Stripping Reinforcing Fabric:
1. Same product as Detailing Fabric.
F. Joint Sealant: Elastomeric joint sealant compatible with roofing materials, with movement capability appropriate for application.
1. Joint Sealant, Polyurethane: ASTM C920, Type S, Grade NS, Class 50 single-component moisture curing sealant, formulated for compatibility and use in dynamic and static joints;
paintable.
a. Basis of design product: Tremco, TremSEAL Pro.
b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 40 g/L.
c. Hardness, Shore A, ASTM C661: 40.
d. Adhesion to Concrete, ASTM C794: 35 pli.
e. Tensile Strength, ASTM D412: 350 psi (2410 kPa).
f. Color: Aluminum Stone.
G. Fasteners: Factory-coated steel fasteners and metal plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening built-up roofing components to substrate, tested by manufacturer for required pullout strength, and acceptable to roofing manufacturer.
1. Use fasteners of type listed in manufacturer’s tested assembly for required wind uplift resistance.
H. Metal Flashing Sheet: Metal flashing sheet is specified in Division 07 Section "Sheet Metal
Flashing and Trim."
I. Metal Termination Bars: Manufacturer's standard, predrilled stainless steel or aluminum bars, approximately 1- by 1/8- inch (25 by 3 mm) thick; with anchors.
075113.13 - Page 10 of 18
J. Miscellaneous Accessories: Provide miscellaneous accessories recommended by built-up roofing manufacturer.
2.9 ROOF INSULATION AND INSULATION ACCESSORIES
A. Roofing Insulation, General: Preformed roof insulation boards manufactured or approved by roofing manufacturer, selected from manufacturer's standard sizes suitable for application, of thicknesses indicated.
1. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated, not less than two times the roof slope.
B. Roof Insulation:
1. Board Insulation, Polyisocyanurate: CFC- and HCFC- free, with recycled content glass-fiber mat facer on both major surfaces, ASTM C1289 Type II Class 1.
a. Basis of design product: Tremco, Trisotech Insulation.
b. Compressive Strength, ASTM D1621: Grade 3: 25 psi (172 kPa).
c. Conditioned Thermal Resistance at 75 deg. F (24 deg. C): 14.4 at 2.5 inches (50.8
mm) thick.
C. Insulation Cover Board:
1. Gypsum panel, glass-mat-faced, ASTM C1177/C1177M.
a. Basis of design product: Tremco/GP Gypsum DensDeck.
b. Thickness: 1/4 inch (6 mm).
D. Wood Cant Strips: Comply with requirements in Division 06 rough carpentry Section.
E. Tapered Edge Strips: ASTM C208, Type II, Grade 1, cellulosic-fiber insulation board.
F. Substrate Joint Tape: 6- or 8-inch- (150- or 200-mm-) wide, coated, glass fiber.
2.10 SURFACING AND COATING MATERIALS
A. Cold-Applied Adhesive Surfacer:
1. Cold-applied roofing adhesive and surfacer, one-part, formulated for compatibility and use with specified roofing membranes and flashings.
a. Basis of design product: Tremco, BURmastic Adhesive.
b. Volatile Organic Compounds (VOC), maximum, ASTM D6511: 250 g/L.
075113.13 - Page 11 of 18
c. Nonvolatile Content, minimum, ASTM D6511: 72 percent.
B. Aggregate Roofing Surfacing Material:
1. Aggregate Stone Surfacing: Clean, dry, opaque, water-worn or crushed stone, free of sharp edges.
a. Basis of design product: Aggregate Stone Surfacing.
b. Size, ASTM D 1863: No. 6 or 67.
c. Aggregate application rate, average: 400 lb/100 sq ft (19.5 k/m2).
C. Aluminized Flashing Coating Material:
1. Cold-Applied Reflective Aluminum Roof Coating: ASTM D2824 Type III metallic-pigmented, fibrated asphalt-based roof coating.
a. Basis of design product: Tremco, Alumanation 301.
b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 400 g/L.
c. Reflectance, minimum, ASTM C1549: 0.66 initial; 0.49 3-year aged.
d. Solids, percent by volume: 47.
2.11 WALKWAYS
A. Walkway Material:
1. Walkway pads, ceramic-granule-surfaced reinforced asphaltic composition slip-resisting pads, manufactured as a traffic pad for foot traffic, 1/2 inch (13 mm) thick minimum.
a. Basis of design product: Tremco, Trem-Tred.
b. Flexural Strength at max. load, minimum, ASTM C203: 218 psi (1.5 kPa).
c. Granule adhesion (weight loss), maximum, ASTM D4977: 1.1 gram.
d. Impact Resistance at 77 deg. F (25 deg. C), ASTM D3746: No Damage to Roof.
e. Pad Size: 36 by 48 inch (914 by 1220 mm).
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with the following requirements and other conditions affecting performance of roofing system:
075113.13 - Page 12 of 18
1. Verify that roof openings and penetrations are in place and curbs are set and braced and that roof drain bodies are securely clamped in place.
2. Verify that, blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation. wood cants
a. Verify that perimeter nailers for copings and roof edge flashings are securely fastened according to ANSI/SPRI/FM 4435/ES-1, FM DS 1-49, and applicable code, to resist uplift pressures.
3. Steel Roof Deck:
a. Verify that deck is securely fastened with no projecting fasteners and with no adjacent units in excess of 1/16 inch (1.6 mm) out of plane relative to adjoining deck.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Remove existing roofing and protect existing building in accordance with requirements of
Division 07 Section "Preparation for Re-Roofing."
B. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing manufacturer's written instructions. Remove sharp projections.
C. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.
1. Limit traffic and material storage to areas of existing roofing membrane that have been protected.
2. Maintain temporary protection and leave in place until replacement roofing has been completed.
D. Verify that rooftop utilities and service piping affected by the Work have been shut off before commencing Work.
E. Shut down air intake equipment in the vicinity of the Work in coordination with the Owner. Cover air intake louvers before proceeding with roofing work that could affect indoor air quality or activate smoke detectors in the ductwork.
F. Protect existing roofing system that is indicated to remain, and adjacent portions of building and building equipment.
G. Acoustical Steel Deck Insulation: Install acoustical roof deck rib insulation strips, according to acoustical roof deck manufacturer's written instructions, immediately before installation of overlying construction and to remain dry.
075113.13 - Page 13 of 18
3.3 INSTALLATION, GENERAL
A. Install roofing system in accordance with manufacturer’s written instructions, approved shop drawings, and Contract Documents.
B. Install wood cants, blocking, curbs, and nailers in accordance with requirements of Division 06
Section "Miscellaneous Rough Carpentry."
C. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast.
Remove and discard temporary seals before beginning work on adjoining roofing.
D. Cooperate with testing agencies engaged or required to perform services for installing roofing system.
3.4 ROOFING INSTALLATION DETAILS
A. FM Installation Details: Install roofing membrane, base flashings, wood cants, blocking, curbs, and nailers and component materials in compliance with requirements in FM 4470 as part of a membrane roofing system as listed in FM's "Approval Guide" for fire/windstorm classification indicated. Comply with recommendations in FM Loss Prevention Data Sheet 1-49.
B. NRCA Installation Details: Install roofing system in accordance with applicable NRCA Manual
Plates and NRCA recommendations; modify as required to comply with manufacturer's approved details.
3.5 BASE SHEET (ANCHOR SHEET) INSTALLATION
A. Loosely lay one course of…
This is the start of the file's text. The full file is on GovTribe.