This Performance Work Statement (PWS) details requirements for a security and camera monitoring system for the Trinity River Island Recreation Area of the Wallisville Lake Project in Wallisville, TX. The project requires a comprehensive electronic security system including a 360-degree surveillance system with 4K resolution cameras, video storage capabilities, access control systems, intrusion detection, and fire detection for the Administration Building and Maintenance Bays.

Key technical requirements include establishing a server operation center to track access points, implementing cameras with color and night vision capabilities that can capture license plate and biometric details, installing personnel access control systems using CAC (Common Access Card) key controls, and creating intrusion and fire detection systems. The system must be standalone, using a Starlink satellite system, with all equipment manufactured in 2025 or newer. The contract includes a base year for installation and two service years for warranty work, system preventive maintenance, system updates, and camera inspections. Work will be conducted Monday-Friday during normal business hours, with the project contact being Daniel Hartman from the Houston Project Office.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Trinity River Island Site Security and Camera Monitoring Systems

Wallisville Lake Project, U.S. Army Corps of Engineers, Galveston District

1. General: The contractor is an independent vendor and not an agent of the federal government. They will furnish all personnel, equipment, management, and transportation necessary to accomplish services required unless otherwise noted. They will comply with all aspects of the current Safety and Health Requirements Manual 385-

1-1 and shall follow the guidance for this work proposal.

2. Location of Proposed Work: Trinity River Island Recreation Area of the Wallisville

Lake Project located at 1140 US Army Corps Road, Wallisville TX, 77597.

3. Purpose of Work: Due to increased popularity of recreational facilities and usage of the Wallisville Lake Project and the Trinity River Island Recreation Area, the project site needs additional security measures and monitoring capabilities that are required to help mitigate the theft of property or vandalism. With theft rates on the rise, a full field of vision camera monitoring/recording system is needed to increase security and collect forensic evidence to provide to local authorities. Additionally, the sites need access control measures to stop the public from entering unauthorized areas of the project.

4. Supervision of Work: The contractor will be responsible for the supervision and coordination of their work and will develop Quality Control measures to mitigate cost overruns and substandard services/products that do not meet the contract requirements.

5. Work to be performed:

a. Provide a fully functional security monitoring and access control system with at a minimum:

(1) Establish a server operation center to track and monitor all access points to critical infrastructures on the project site. The security center will collect video storage records and have the ability store digital records for 30 days or more from all camera systems across the project.

(2) The project site needs a 360-degree surveillance system with 4K resolution or greater video recording digital evidence collection data storage from all critical security points.

(3) Video system should have visible color and low light imaging/night vision capabilities that allows collection data for reading license plates characters and biometric details of perpetrators. License plates on vehicles must be legible without manual controls on the project entry point of the camera.

(4) Additionally, the site has two (2) lockhouses that needs cameras for 360-degree operational visibility of the sector gates, the boat ramps and project yard.

b. Personnel Access Control System:

(1) Administration Building has five exterior personnel access point (four (4) exterior personnel doors, two (2) interior Personnel doors which need CAC Key

Controlled system to allow personnel into the building and administrative areas.

(2) Maintenance Bays have two (2) exterior Personnel doors which needs which that need CAC Key Control capabilities to gain access to this structure.

(3) The system should have the ability to grant access of Government CAC cards and issue temporary access cards for Contractors.

(4) The system could have a detection sensor on the vehicle entrance gate.

c. Intrusion Detection System (IDS): Admin Building and Maintenance Bays needs the ability to monitor for motion or detect sound by the intrusion detection system for hallways and office space. The IDS could include but not limited to, sound, light, motion detection, glass break, door alarm.

d. Fire Detection System: Admin Building and Maintenance Bays needs a monitored Fire detection and First Responder notification system. The service will include Fire detection with Heat/smoke monitors and notification to 911 operations when system circuits are activated for Glass break detection is validated.

e. Security Network Support System: The system will be a stand-alone operation with no communication capability to a government-controlled network system. The site has a leased Generation 1 Starlink Satellite system for nongovernment commercial traffic support.

f. Training and a full operational demonstration shall be provided to the Wallisville

Lake Project Staff with scheduling of training to be coordinated with the Project

Manager to maximize full staff availability.

g. All equipment shall be new, manufactured in 2025 or newer and have repair parts and service technicians readily available.

6. Schedule of Work: All work will be conducted Monday- Friday during normal business hours (0800-1630), excluding Federal Holidays unless otherwise coordinated and scheduled with the Project Manager.

7. Contact information: Daniel Hartman with the Houston Project Office at Wallisville

Lake Project, (281) 910-5281.

Email: Daniel.A.Hartman@USACE.Army.mil mailto:Daniel.A.Hartman@USACE.Army.mil

Scope of Work Breakdown

1. Scope of Work - Base Year 1140A Welcome Center/ Administration - Camera System

a. GAMECHANGER 22/4PR CMP PURPLE

b. V2020-WIR-360 - Multi-sensor Starlite Camera 20Mp

c. CORNER MOUNT; supports V1001-WM and V1001-JB

d. V1001-WM - WALL MOUNT; for use with V1000-1/V2000

e. SWITCH 5-PORT GIG ETHERNET POE+ W/SFP PORT 91WATTS OUTPUT 4

PSE POE IEEE 8023 AT/AF DESKTOP/WALL CORNER MOUNT; supports V1

f. 24/4pr SOL CAT 5e CMP BLUE 500 BOX

g. Installation Labor – Security Techs

h. Installation Labor – Installation Team

i. Miscellaneous & Consumable Project Materials

1140B Maintenance Bay/Storage Yard Camera System

a. GAMECHANGER 22/4PR CMP PURPLE

b. V2020-WIR-360 - Multi-sensor Starlite Camera 20MP

c. CORNER MOUNT; supports V1001-WM and V1001-JB

d. V1001-WM - WALL MOUNT; for use with V1000-1/V2000

e. CORNER MOUNT; supports V1001-WM and V1001-JB

f. SWITCH 5-PORT GIG ETHERNET POE+ W/SFP PORT 91WATTS OUTPUT 4

PSE POE IEEE 8023 AT/AF DESKTOP/WALL CORNER MOUNT; supports V1

g. Installation Labor – Security Techs

North and South Sector Gate Lockhouses Camera Systems

a. Camera, day/night, rugged vandal-proof IP66, integral 1/2.8ft CMOS (SN683D-

WIR)

b. WALL MOUNT PENDANT ARM; works with V670-HCM154 for SN680D/SN240D

c. 01633-001 - T8504-R POE Switch 4port managed

d. STARLIGHT CAMERA, 5 MP PTZ DOME; vandal proof IP66, integral 1/2.8" day/night camera with 5.2-148 mm

e. AXIS POE EXTENDER(T8129)

f. Wall mount indoor/outdoor (SVFT-UWM-1) for v940d use with v940-ph

g. V1001-WM - WALL MOUNT; for use with V1000-1/V2000

h. SWITCH 5-PORT GIG ETHERNET POE+ W/SFP PORT 91WATTS OUTPUT 4

PSE POE IEEE 8023 AT/AF DESKTOP/WALL CORNER MOUNT; supports V1

i. Wireless Bridge with 2 Bracket Mounts, 3KM 5.8G Point to Point Outdoor CPE, Adalov (CPE660) Long Range24/4pr SOL CAT 5e CMP BLUE 500 BOX

j. GAMECHANGER 22/4PR CMP PURPLE

k. Installation Labor – Security Techs

l. Installation Labor – Installation Team

m. Miscellaneous & Consumable Project Materials

Administration Building-Access Control and CCURE Head End/Server Equip (1140A)

a. CC9000-SL - CCURE 9000 Series L System License

b. Dell XE3 Optiplex Small Form Factor PC, Windows 10 Professional NVIDIA P620 graphics (config 1). Reco"

c. CC9000-CLWS-NM-A - Client Workstation

d. DELLMON22 - Dell 22 Widescreen Monitor P2214H

e. GSTAR-GCM - ISTAR Ultra G2

f. GSTAR-ACM - ISTAR Ultra G2 ACM Board

g. PSX-WISU08-E4S - Power Supply

h. 920NHRNEK0000C - HID pivCLASS R40 Single Gang Read

i. 8371 DSS 28 SURFACE MINI MAG W/DOOR STATUS

j. DS160 - PIR Request to Exit Light Gray Finish

k. TS-14R - Request-To-Exit (REX) Station Pneumatic

l. 18-6C+18-4C+16-2C+22-4C STR BCFOIL SHDS LSPVC JKT YELLOW COMP

CMP 500 RL

m. CC9000-CLWS-NM-A - Client Workstation

n. Installation Labor

o. Installation Labor

p. Miscellaneous & Consumable Project Materials

1140A Intrusion Detection System (four (4) offices, one (1) Admin room, one (1) Conference Room, one(1) Welcome Center, one(1) Bay Door and two(2) interior access doors)

a. HS32-119 – Control Panel Kit NEO 8-32 Zone Panel

b. TL280E – Internet Alarm Communicator Power Series

c. PG9872 – Power-G Wireless 360 Long Range PIR

d. PG9911B BATT – DSC PowerG Wireless Outdoor Siren W

e. PG9939 – DSC Wireless 4-Button Panic Key Fob

f. PG9309 – PowerG Wireless Commercial Mag Contact

g. Installation Labor – Security Techs

Admin Building - Head End Server Room

a. SV-300E-8T-I5-ARC - SV-300E with 8TB Hardware Only

b. GSC-Om-E-1C - 1 Camera Connection

c. P2314H Dell 23 Screen LED-Lit Monitor

d. SV-CFG-SRV- 5.11

e. Installation Labor – Security Techs

f. Installation Labor – Installation Team

g. Miscellaneous & Consumable Project Materials

1140B Maintenance and Storage Building Access Control (Two Ped doors)

a. iSTAR Edge G2 4-reader motherboard (GSTAR004-MB)

b. ISTAR Ultra G2 (GSTAR-GCM)

c. ISTAR Ultra G2 ACM Board (GSTAR-ACM)

d. 920NHRNEK0000C - HID pivCLASS R40 Single Gang Read

e. 8371 DSS 28 SURFACE MINI MAG W/DOOR STATUS

f. DS160 - PIR Request to Exit Light Gray Finish

g. TS-14R - Request-To-Exit (REX) Station Pneumatic

h. 18-6C+18-4C+16-2C+22-4C STR BCFOIL SHDS LSPVC JKT YELLOW COMP

CMP 500 RL

i. GAMECHANGER 22/4PR CMP PURPLE

j. Installation Labor – Security Techs

k. Installation Labor – Installation Team

l. Miscellaneous & Consumable Project Materials

Support Equipment Lift Rental

Support Material Lift Rental Spill Pad

Administration Total Project Management

2. Scope of Work – Service Years

Service Year One – Warranty Work/System Preventive Maintenance/System Updates/ Camera Inspections

Service Year Two – System Preventive Maintenance/System Updates/ Camera Inspections