Wage Determination - NC20250009 - 1.3.25.pdf

PDF 2 MB Posted

Attached to
Replace Cab Window Washdown System at Wilmington, NC, ATCT Federal contract opportunity
Solicitation number
697DCK-25-R-00196
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This is a Department of Labor Wage Determination (No. NC20250009) effective January 3, 2025 for building construction projects in New Hanover County, North Carolina, excluding single family homes and apartments up to 4 stories. The wage determination establishes minimum wage rates and fringe benefits for various construction trades under the Davis-Bacon Act.

The document specifies that contracts entered into after January 30, 2022 must pay covered workers at least $17.75 per hour under Executive Order 14026, while contracts awarded between January 1-29, 2022 must pay at least $13.30 per hour under Executive Order 13658. Specific wage rates are provided for multiple trades, including ironworkers ($28.75 plus $17.50 fringe), pipefitters ($33.96 plus $13.48 fringe), electricians ($22.15 plus $5.93 fringe), and various other construction trades. The determination includes provisions for paid sick leave under EO 13706 and details the process for wage determination appeals through the Department of Labor's Wage and Hour Division.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Cab Window Washdown System at Wilmington, NC, ATCT, newest first.
File Type Posted
Drawings - Replace Window Washdown - Wilmington ATCT.pdf PDF
Combined Specifications -ILM window washdown Rev1.pdf PDF
697DCK-25-R-00194.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .