Wage Determination - Monroe County.txt
TXT text file 57 KB Posted
- Attached to
- 70Z03026QCLEV0068 - U. S. Coast Guard Station Rochester Replacement of Drop Celling Tile & Lighting
- Solicitation number
- 70Z03026QCLEV0068
About this file
This is a Wage Determination document for Monroe County, New York, establishing prevailing wage rates for federal construction contracts in the county, effective through May 18, 2026. The document lists hourly wage rates and fringe benefit costs across multiple construction trades and classifications, including building construction, heavy construction, and highway construction project types.
The wage determination specifies rates for numerous skilled trades such as asbestos workers, boilermakers, carpenters, electricians, elevator mechanics, operating engineers, ironworkers, laborers, painters, plumbers, roofers, sheet metal workers, and truck drivers, among others. Rates vary by classification and construction type, with hourly wages ranging from approximately $20.53 to $64.59, plus fringe benefits ranging from approximately $6.39 to $42.92 per hour. The document includes multiple rate identifiers with effective dates, footnotes regarding paid holidays (typically New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day), and special provisions such as paid sick leave requirements under Executive Order 13706 and minimum wage requirements under Executive Order 13658 ($13.65 per hour through December 31, 2026). The wage determination applies to federal contracts subject to the Davis-Bacon Act and its related acts, and unlisted classifications may be added after award through the labor standards contract clauses.
Text of this file
"General Decision Number: NY20260010 05/18/2026
State: New York
Construction Types: Building, Heavy and Highway
Counties: New York Counties of Monroe
Building Construction Projects
Heavy Construction Projects
Highway Construction Projects
Modification Number Publication Date 1 01/30/2026 2 05/18/2026
ASBE0026-001 06/01/2025
Rates Fringes
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO
PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING, DISPOSING OF ALL
INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS
OR NOT FROM MECHANICAL SYSTEMS).....................$ 40.26 25.41
ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF
MECHANICAL SYSTEMS. ALSO THE APPLICATION OF
FIRESTOPPING MATERIAL OPENINGS AND PENETRATIONS IN
WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD
ABATEMENT)..........................................$ 40.26 25.41
BOIL0007-001 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 39.35 33.18
BRNY0003-004 07/01/2024
Rates Fringes
MARBLE/TERRAZZO/TILE FINISHER (ROCHESTER CHAPTER)...$ 29.56 22.36
MARBLE, TILE & TERRAZZO WORKERS (ROCHESTER CHAPTER).$ 37.45 26.82
BUILDING CONSTRUCTION: BRICKLAYERS, STONE MASONS,
PLASTERERS, CEMENT MASONS POINTER, CAULKER/CLEANER
(ROCHESTER CHAPTER).................................$ 35.81 27.65
BRNY0003-004 07/01/2025
Rates Fringes
MARBLE/TERRAZZO/TILE FINISHER (ROCHESTER CHAPTER)...$ 29.56 22.36
MARBLE, TILE & TERRAZZO WORKERS (ROCHESTER CHAPTER).$ 37.45 26.82
BUILDING CONSTRUCTION: BRICKLAYERS, STONE MASONS,
PLASTERERS, CEMENT MASONS POINTER, CAULKER/CLEANER
(ROCHESTER CHAPTER).................................$ 35.81 27.65
BRNY0003-005 07/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY
CONSTRUCTION (ROCHESTER CHAPTER)....................$ 38.63 25.05
CARP0042-002 06/01/2015
Rates Fringes
CARPENTERS: (SOFT FLOOR LAYERS).....................$ 26.36 17.70
CARP0276-006 07/01/2024
Rates Fringes
CARPENTERS: (HEAVY & HIGHWAY CONSTRUCTION)
FOOTNOTE: A. PAID HOLIDAYS - NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 38.18 26.11
CARPENTER BUILDING CONSTRUCTION FOOTNOTE: A.
PAID HOLIDAYS - NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY.......................................$ 33.24 23.46
CARP1163-001 07/01/2014
Rates Fringes
CARPENTERS: PILEDRIVERS (HEAVY & HIGHWAY
CONSTRUCTION).......................................$ 29.00 18.89
CARPENTERS: PILEDRIVERS (BUILDING CONSTRUCTION).....$ 29.00 18.89
ELEC0086-002 05/26/2025
Rates Fringes
ELECTRICIAN.........................................$ 44.30 30.20
ELEC1249-003 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER
UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 31.72 29.87
ELEC1249-004 05/05/2025
Rates Fringes ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
(Substation:).......................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable ins..................................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Substation:)............................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable installat............................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).........................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cab........................................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Substation:)......................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)....$ 55.40 31.78 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
(Substation:).......................................$ 35.34 30.12 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable installation)........................$ 64.59 42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Substation:).......................................$ 63.14 33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;
RAILROAD CATENARY INSTALLATION AND MAINTENANCE,
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND
MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99
ELEV0027-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTE: A.VACATION:
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR
ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR
HOURLY RATE FOR ALL HOURS WORKED. B. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; AND CHRISTMAS DAY..............................$ 61.52 38.44
ENGI0158-032 07/01/2025
Rates Fringes
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND
SHAFT). FOR EXCAVATION AND PAVING: FOOTNOTE: A.
PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING
THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND
PAVING CLASSIFICATIONS..............................$ 60.84 35.00
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND
PAVING). FOR EXCAVATION AND PAVING: FOOTNOTE: A.
PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING
THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND
PAVING CLASSIFICATIONS..............................$ 43.26 34.85
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY)
MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW
YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 56.81 35.75
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY)
CRANES 49 TONS AND FOOTNOTE: B. PAID HOLIDAYS:
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 58.38 35.75
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY)
GROUP 5: CRANES 50 TONS AND OVER FOOTNOTE: B.
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY ..........................................$ 59.88 35.75
OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT):
CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH
200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE
HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 51.41 35.00
OPERATING ENGINEER: GROUP 4 (HEAVY AND
HIGHWAY)TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS:
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 61.38 35.75
OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING)
COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER
PROVISIONS FOR COMPRESSORS); DUST COLLECTORS;
GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE
OR COMBINATION); CONCRETE MIXER (16S AND UNDER),
CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER;
MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS
OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO
EXCEED 12"" IN TOTAL CAPACITY; REVINIUS WIDENER;
STEAM CLEANER; TRACTOR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING
THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 36.61 34.85
OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT):
""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON);
COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED
CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT
NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST
COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES;
LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION);
CONCRETE PAVEMENT SPREADERS AND FINISHERS;
CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP
USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM
TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK
LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT
(MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS
(HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON);
HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED
FORM CARRIER; POST HOLE DIGGER AND POST DRIVER;
POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER
(RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC
PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER
(RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER
(RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER
(RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH
TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP;
WELL POINT AGGREGATE PLANT; BOILER (USED IN
CONJUNCTION WITH PRODUCTION); CEMENT AND BIN
OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200
CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST
COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES;
LIGHT PLANTS (3 OR LESS OF ANY TYPE OR
COMBINATION); CONCRETE PAVER OR MIXER (16S AND
UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN;
FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING
SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING
MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT
GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN
USED FOR PRODUCTION); REVINIUS WIDENER; SHELL
WINDER; STEAM CLEANER; TRACTOR FOOTNOTE: B.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS THE WORKING DAY BEFORE AND THE WORKING DAY
AFTER THE HOLIDAY .................................$ 54.42 35.00
OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A
FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY
HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE
GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR,
RIDE-ON BOILER (USED IN CONJUNCTION WITH
PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED,
BOAT (POWERED), CEMENT AND BIN OPERATOR,
COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS,
WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF
EQUIPMENT), CONCRETE PAVEMENT SPREADER AND
FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER),
CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND,
DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE),
DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE
GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR,
RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER,
RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK
LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED
ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL
POINT FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 51.81 35.75
OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING)
COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED
CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT
NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST
COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY
TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS
AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL
(WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL
POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE
GRADE MACHINE; FORK LIFT; GUNITE MACHINE;
HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST
HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF
MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO
EXCEED 20"" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC
PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR
WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO
TAMP; WELL POINT FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR
DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF
THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,
PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 40.10 34.85
OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT):
AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE
(TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED);
BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON
AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR
MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX
PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING
PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER);
COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED
CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE
PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT;
DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER
(UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE;
HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE
DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN
PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK
BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER
(TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR
STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE;
PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY
MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM
SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL
ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE;
SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER;
TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER;
WINCH; WINCH CAT FOOTNOTE: B. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE
HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY ...........................................$ 57.21 35.00
OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY)
ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED),
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED),
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS,
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED,
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.),
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE,
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS,
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE,
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER),
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER,
REVINIUS WIDENER, ROLLER (GRADE AND FILL),
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE
PLANT REFRIGERATION EQUIPMENT (FOR SOIL
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER,
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE),
WINCH, WINCH CAT FOOTNOTE: B. PAID HOLIDAYS:
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 54.68 35.75
OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING)
BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS
SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED);
BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON
AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY
PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS)
EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE
PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS
(TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU.
YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST
(ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE
LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE
MAN; MECHANICAL SLURRY MACHINE; MIXER FOR
STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE;
PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP
CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER;
ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR
SCRAPER; TRACTOR WITH DOZER AND OR PUSHER;
TRENCHER; WINCH FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR
DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF
THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,
PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 40.79 34.85
OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT)
AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT);
AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT
PLACER (CMI OR SIMILAR); BLACKTOP SPREADER
(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX
PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE
CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE
PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES
AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE;
DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY
OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY
RATED 15' AND OVER); FRONT END LOADER (4CU YD AND
OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST;
SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER;
MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE
HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES);
MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR
STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9,
QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL;
SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE
ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN
BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER
MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR
(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL
FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE
DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,
PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY .........$ 58.43 35.00
OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY)
AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT);
AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT
PLACER (CMI OR SIMILAR); BLACKTOP SPREADER
(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX
PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE
CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE
PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES
AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE;
DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY
OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY
RATED 15' AND OVER); FRONT END LOADER (4CU YD AND
OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST;
SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER;
MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE
HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES);
MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR
STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9,
QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL;
SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE
ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN
BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER
MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR
(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL
FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 55.38 35.75
OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING)
ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE
(EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP
PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL
MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER
5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL
ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END
LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM);
PILE DRIVER; POWER GRADER WITH ELEVATION LOADER
ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL;
SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER;
TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE
HYDRAULICALLY OPERATED FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING
THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 41.26 34.85
ENGI0158-038 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: GROUP 8 (BUILDING
CONSTRUCTION) TOWER CRANES FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE
WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON
THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 50.14 35.20
POWER EQUIPMENT OPERATORS: GROUP 7 (BUILDING
CONSTRUCTION) CRANES 251 AND OVER TONS FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE
WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON
THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 50.64 35.20
POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING
CONSTRUCTION) CRANES 25-250 TONS FOOTNOTE: A.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE
WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON
THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 49.64 35.20
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING
CONSTRUCTION) CRANES UP TO AND INCLUDING 25 TONS
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY
PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 47.64 35.20
POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING
CONSTRUCTION) FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED
THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY
PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 39.64 35.20
POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING
CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE
(3) PIECES OF EQUIPMENT) COMPRESSORS ¬THREE (3) OR
LESS, OR NOT TO EXCEED 1200 CFM COMBINED CAPACITY,
FIREMAN, LONGITUDINAL FLOAT, MECHANICAL HEATER
PUMPS (REGARDLESS OF MOTIVE POWER) NO MORE THAN
THREE (3) IN NUMBER, NOT TO EXCEED TWELVE (12)
INCHES TOTAL CAPACITY, ROLLER (FILL AND
GRADE)RUBBER TIRED TRACTOR WELDING MACHINE OR
MECHANICAL CONVEYOR (OVER 12FT. IN LENGTH)
EXCEPTION: SINGLE GASOLINE DRIVEN WELDING MACHINE
UP TO 300AMPS NEED NOT BE MANNED. FOOTNOTE: A.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE
WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON
THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 39.64 35.20
POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING
CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE,
BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR
TYPE MACHINES, BELT CRETE AND SIMILAR TYPE
MACHINES, BITUMINOUS SPREADING MACHINE 3/8 YD.
CAPACITY OR LESS(FACTORY RATING), BULLDOZER,
CARRY-ALL TYPE SCRAPER, COMPRESSORS: FOUR (4) NOT
TO EXCEED 2000 CFM COMBINED CAPACITY; OR THREE (3)
OR LESS WITH MORE THAN1200 CFM BUT NOT TO EXCEED
2000 CFM, CONCRETE MIXER, CONCRETE PLACER, CONCRETE
PUMP, DINKY LOCOMOTIVES (ALL TYPES), ELEVATING
GRADER, ELEVATOR FINE GRADE AND FINISH, ROLLERS,
FINE GRADE MACHINES(ALL KINDS), FORKLIFT WITH
FACTORY RATING OF LESS THAN FIFTEEN(15) FEET OF
LIFT, FRONT END LOADER, GUNITE PUMPING MACHINE,
HIGH PRESSURE BOILER, HOIST (1 OR 2 DRUMS),
MAINTENANCE ENGINEER (MECHANIC), MECHANICAL SLURRY
MACHINE (ALL KINDS), MEGA MIXERS AND SIMILAR TYPE
MACHINES, MOTOR GRADER, POST HOLE DIGGER, PUMPS
(REGARDLESS OF MOTIVE POWER) NO MORE THAN FOUR (4)
IN NUMBER NOT TO EXCEED TWENTY (20) INCHES IN TOTAL
CAPACITY, SHOT CRETE PUMPING MACHINE, SIDE BOOM
TRACTOR, SKID STEER LOADER WITH ATTACHMENTS, STONE
CRUSHER TOURNADOZER AND SIMILAR TYPES TOURNAPULL
AND SIMILAR TYPES, TRENCHING MACHINES, WELL DRILL,
WELLPOINT SYSTEM EXCEPTION: SINGLE ELECTRIC PUMPS
UP TO AND INCLUDING FOUR (4) INCHES NEED NOT BE
MANNED. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY
PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 42.34 35.20
POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING
CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING
MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND
SIMILAR MACHINES OVER THREE EIGHTHS CU.YD. CAPACITY
(FACT. RATING);CARRIER MOUNTED BACKHOES THAT SWING
360 DEGREES BIG GENERATOR PLANT HOIST (ON STEEL
ERECTION) BRIDGE CRANE (ALL TYPES), CABLEWAY,
CAISSON AUGER AND SIMILAR TYPE MACHINE, CRANE,
DERRICK, DREDGE, EXCAVATOR ALL PURPOSE
HYDRAULICALLY OPERATED, FORKLIFT (WITH FACTORY
RATING OF FIFTEEN FT. OR MORE OF LIFT),HOIST (ON
STEEL ERECTION), HYDRAULIC/KRUPP DRILL TYPE MUCKING
MACHINES, REMOTE CONTROLLED EXCAVATOR WITH
ATTACHMENTS (BROKK TYPE OR SIMILAR), ROSS CARRIER
(AND SIMILAR TYPE), THREE-DRUM HOIST(WHEN ALL THREE
DRUMS ARE IN USE) FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 43.14 35.20
IRON0033-001 07/01/2025
Rates Fringes
IRONWORKERS: (SHEETER)..............................$ 36.00 30.80
IRONWORKERS: (ORNAMENTAL, REINFORCING STONE
DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY
MOVERS FENCE ERECTORS, PRECAST CONCRETE ERECTOR)....$ 35.75 30.80
LABO0435-002 07/01/2018
Rates Fringes
TUNNEL AND SHAFT LABORERS: TUGGER, MINER
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 31.24 18.62
TUNNEL AND SHAFT LABORERS: HAZARDOUS WASTE
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 35.24 18.62
TUNNEL AND SHAFT LABORERS: CHANGE HOUSE MAN
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 31.04 18.62
LABO0435-003 07/01/2024
Rates Fringes
LABORERS: GROUP 5 (HEAVY AND HIGHWAY) HAZARDOUS
WASTE REMOVAL. FOOTNOTES: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY
BEFORE AND THE WORKING DAY AFTER THE HOLIDAY........$ 35.44 25.30
LABORERS: GROUP 4 (HEAVY AND HIGHWAY) BLASTERS
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 34.69 25.30
LABORERS: GROUP 3 (HEAVY AND HIGHWAY) RAKERS,
DRILLERS, PIPELAYERS AND TORCH OPERATORS
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 33.86 25.30
LABORERS: GROUP 2 (HEAVY AND HIGHWAY) LABORERS
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 33.66 25.30
LABORERS: GROUP 1 (HEAVY AND HIGHWAY) FLAGGERS
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 32.96 25.30
PAIN0004-028 05/01/2024
Rates Fringes
PAINTERS: WALLCOVERING (BUILDING CONSTRUCTION)......$ 28.02 26.23
PAINTERS: SPRAY (BUILDING CONSTRUCTION).............$ 27.77 26.23
PAINTERS: SANDBLASTING (BUILDING CONSTRUCTION)......$ 27.77 26.23
PAINTERS: DRYWALL TAPER (BUILDING CONSTRUCTION).....$ 28.02 26.23
PAINTERS: BRUSH & ROLL (BUILDING CONSTRUCTION)......$ 27.27 26.23
PAIN0677-001 05/01/2025
Rates Fringes
GLAZIER.............................................$ 31.05 31.55
PLUM0013-001 05/06/2025
Rates Fringes
PLUMBER AND STEAMFITTER.............................$ 42.68 27.88
ROOF0022-001 06/01/2025
Rates Fringes
ROOFER..............................................$ 34.10 28.20
SFNY0669-001 01/01/2026
Rates Fringes
SPRINKLER FITTER....................................$ 47.85 28.94
SHEE0046-001 05/05/2025
Rates Fringes
SHEET METAL WORKER..................................$ 43.01 28.66
TEAM0118-003 07/01/2025
Rates Fringes
TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK
DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED
EQUIPMENT SHERE NOT SELF-LOADED. HAZARDOUS WASTE
SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL
DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY;
CHRISTMAS DAY .....................................$ 31.79 27.77
TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING
EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY
EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS)
CARRIER; SELF-CONTAINED CONCRETE UNIT. HAZARDOUS
WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER
HOUR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY;
MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY;
THANKSGIVING DAY; CHRISTMAS DAY.....................$ 31.64 27.77
TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY
TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER
TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC;
FUEL TRUCK. HAZARDOUS WASTE SITE WORK RECEIVES AN
ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.49 27.77
TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCK;
MECHANICS. HAZARDOUS WASTE SITE WORK RECEIVES AN
ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.44 27.77
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS;
FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE
AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS;
TRUCK TIREMAN. HAZARDOUS WASTE SITE WORK RECEIVES
AN ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.39 27.77
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than """"SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The """"SU"""" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The """"SA"""" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| REFERENCE INFORMATION.pdf | ||
| REQUEST FOR INFORMATION.pdf | ||
| SF 1442 -70Z03026QCLEV0068.pdf | ||
| SOW - Ceiling Tile and LED.pdf | ||
| RFQ 70Z03026QCLEV0068.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .