This is a Wage Determination document for Monroe County, New York, establishing prevailing wage rates for federal construction contracts in the county, effective through May 18, 2026. The document lists hourly wage rates and fringe benefit costs across multiple construction trades and classifications, including building construction, heavy construction, and highway construction project types.

The wage determination specifies rates for numerous skilled trades such as asbestos workers, boilermakers, carpenters, electricians, elevator mechanics, operating engineers, ironworkers, laborers, painters, plumbers, roofers, sheet metal workers, and truck drivers, among others. Rates vary by classification and construction type, with hourly wages ranging from approximately $20.53 to $64.59, plus fringe benefits ranging from approximately $6.39 to $42.92 per hour. The document includes multiple rate identifiers with effective dates, footnotes regarding paid holidays (typically New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day), and special provisions such as paid sick leave requirements under Executive Order 13706 and minimum wage requirements under Executive Order 13658 ($13.65 per hour through December 31, 2026). The wage determination applies to federal contracts subject to the Davis-Bacon Act and its related acts, and unlisted classifications may be added after award through the labor standards contract clauses.

Text of this file

"General Decision Number: NY20260010 05/18/2026

State: New York

Construction Types: Building, Heavy and Highway

Counties: New York Counties of Monroe

Building Construction Projects

Heavy Construction Projects

Highway Construction Projects

Modification Number Publication Date 1 01/30/2026 2 05/18/2026

ASBE0026-001 06/01/2025

Rates Fringes

HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO

PREPARATION, WETTING, STRIPPING, REMOVAL,

SCRAPPING, VACUUMING, BAGGING, DISPOSING OF ALL

INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS

OR NOT FROM MECHANICAL SYSTEMS).....................$ 40.26 25.41

ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES

APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE

COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF

MECHANICAL SYSTEMS. ALSO THE APPLICATION OF

FIRESTOPPING MATERIAL OPENINGS AND PENETRATIONS IN

WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD

ABATEMENT)..........................................$ 40.26 25.41

BOIL0007-001 01/01/2025

Rates Fringes

BOILERMAKER.........................................$ 39.35 33.18

BRNY0003-004 07/01/2024

Rates Fringes

MARBLE/TERRAZZO/TILE FINISHER (ROCHESTER CHAPTER)...$ 29.56 22.36

MARBLE, TILE & TERRAZZO WORKERS (ROCHESTER CHAPTER).$ 37.45 26.82

BUILDING CONSTRUCTION: BRICKLAYERS, STONE MASONS,

PLASTERERS, CEMENT MASONS POINTER, CAULKER/CLEANER

(ROCHESTER CHAPTER).................................$ 35.81 27.65

BRNY0003-004 07/01/2025

Rates Fringes

MARBLE/TERRAZZO/TILE FINISHER (ROCHESTER CHAPTER)...$ 29.56 22.36

MARBLE, TILE & TERRAZZO WORKERS (ROCHESTER CHAPTER).$ 37.45 26.82

BUILDING CONSTRUCTION: BRICKLAYERS, STONE MASONS,

PLASTERERS, CEMENT MASONS POINTER, CAULKER/CLEANER

(ROCHESTER CHAPTER).................................$ 35.81 27.65

BRNY0003-005 07/01/2025

Rates Fringes

CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY

CONSTRUCTION (ROCHESTER CHAPTER)....................$ 38.63 25.05

CARP0042-002 06/01/2015

Rates Fringes

CARPENTERS: (SOFT FLOOR LAYERS).....................$ 26.36 17.70

CARP0276-006 07/01/2024

Rates Fringes

CARPENTERS: (HEAVY & HIGHWAY CONSTRUCTION)

FOOTNOTE: A. PAID HOLIDAYS - NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY..................$ 38.18 26.11

CARPENTER BUILDING CONSTRUCTION FOOTNOTE: A.

PAID HOLIDAYS - NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY.......................................$ 33.24 23.46

CARP1163-001 07/01/2014

Rates Fringes

CARPENTERS: PILEDRIVERS (HEAVY & HIGHWAY

CONSTRUCTION).......................................$ 29.00 18.89

CARPENTERS: PILEDRIVERS (BUILDING CONSTRUCTION).....$ 29.00 18.89

ELEC0086-002 05/26/2025

Rates Fringes

ELECTRICIAN.........................................$ 44.30 30.20

ELEC1249-003 05/05/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 42.29 30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER

UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF

THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR

OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE

WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 31.72 29.87

ELEC1249-004 05/05/2025

Rates Fringes ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC

(Substation:).......................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable ins..................................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Substation:)............................$ 61.56 36.21

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installat............................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).........................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cab........................................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Substation:)......................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)....$ 55.40 31.78 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN

(Substation:).......................................$ 35.34 30.12 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installation)........................$ 64.59 42.92

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Substation:).......................................$ 63.14 33.82

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;

RAILROAD CATENARY INSTALLATION AND MAINTENANCE,

THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED

TRANSMISSION CONDUIT AND CABLE INSTALLATIONS

(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES), PIPETYPE CABLE INSTALLATION AND

MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE

BONDING OF RAILS; PIPETYPE CABLE INSTALLATION

GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT

OF THE UNITED STATES AND ELECTION DAY FOR THE

GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE

WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE

HOLIDAY.............................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND

MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD

FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING

DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE

PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR

THE GOVERNOR OF NEW YORK STATE, PROVIDED THE

EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER

THE HOLIDAY.........................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND

UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND

ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK

INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,

FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,

MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21

ELEC1249-008 01/01/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT INSTALLER

REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT

OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW

YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.

NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99

ELEV0027-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC FOOTNOTE: A.VACATION:

6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR

ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR

HOURLY RATE FOR ALL HOURS WORKED. B. PAID

HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;

THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING

DAY; AND CHRISTMAS DAY..............................$ 61.52 38.44

ENGI0158-032 07/01/2025

Rates Fringes

OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND

SHAFT). FOR EXCAVATION AND PAVING: FOOTNOTE: A.

PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;

CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON

WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE

WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING

THE HOLIDAY OR ON THE SCHEDULED WORK DAY

IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND

PAVING CLASSIFICATIONS..............................$ 60.84 35.00

OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND

PAVING). FOR EXCAVATION AND PAVING: FOOTNOTE: A.

PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;

CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON

WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE

WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING

THE HOLIDAY OR ON THE SCHEDULED WORK DAY

IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND

PAVING CLASSIFICATIONS..............................$ 43.26 34.85

OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY)

MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW

YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE

EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY ....................$ 56.81 35.75

OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY)

CRANES 49 TONS AND FOOTNOTE: B. PAID HOLIDAYS:

NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED

THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY ....................$ 58.38 35.75

OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY)

GROUP 5: CRANES 50 TONS AND OVER FOOTNOTE: B.

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE

WORKING DAY BEFORE AND THE WORKING DAY AFTER THE

HOLIDAY ..........................................$ 59.88 35.75

OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT):

CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH

200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,

REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE

HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE

WORKING DAY BEFORE AND THE WORKING DAY AFTER THE

HOLIDAY.............................................$ 51.41 35.00

OPERATING ENGINEER: GROUP 4 (HEAVY AND

HIGHWAY)TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS:

NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED

THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY ....................$ 61.38 35.75

OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING)

COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER

PROVISIONS FOR COMPRESSORS); DUST COLLECTORS;

GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE

OR COMBINATION); CONCRETE MIXER (16S AND UNDER),

CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER;

MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS

OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO

EXCEED 12"" IN TOTAL CAPACITY; REVINIUS WIDENER;

STEAM CLEANER; TRACTOR FOOTNOTE: A. PAID

HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;

CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON

WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE

WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING

THE HOLIDAY OR ON THE SCHEDULED WORK DAY

IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 36.61 34.85

OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT):

""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON);

COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED

CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT

NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT

SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST

COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES;

LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION);

CONCRETE PAVEMENT SPREADERS AND FINISHERS;

CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP

USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM

TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK

LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT

(MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS

(HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON);

HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED

FORM CARRIER; POST HOLE DIGGER AND POST DRIVER;

POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER

(RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC

PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER

(RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER

(RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER

(RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH

TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP;

WELL POINT AGGREGATE PLANT; BOILER (USED IN

CONJUNCTION WITH PRODUCTION); CEMENT AND BIN

OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200

CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT

SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST

COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES;

LIGHT PLANTS (3 OR LESS OF ANY TYPE OR

COMBINATION); CONCRETE PAVER OR MIXER (16S AND

UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN;

FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING

SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING

MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT

GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN

USED FOR PRODUCTION); REVINIUS WIDENER; SHELL

WINDER; STEAM CLEANER; TRACTOR FOOTNOTE: B.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON

WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE

WORKS THE WORKING DAY BEFORE AND THE WORKING DAY

AFTER THE HOLIDAY .................................$ 54.42 35.00

OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A

FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY

HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE

GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR,

RIDE-ON BOILER (USED IN CONJUNCTION WITH

PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED,

BOAT (POWERED), CEMENT AND BIN OPERATOR,

COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS,

WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF

EQUIPMENT), CONCRETE PAVEMENT SPREADER AND

FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER),

CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND,

DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE),

DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE

GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR,

RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER,

RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK

LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED

ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL

POINT FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS

DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE

EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY ....................$ 51.81 35.75

OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING)

COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED

CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT

NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT

SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST

COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY

TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS

AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL

(WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL

POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE

GRADE MACHINE; FORK LIFT; GUNITE MACHINE;

HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST

HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF

MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO

EXCEED 20"" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC

PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR

WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO

TAMP; WELL POINT FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR

DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF

THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,

PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY

IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE

SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE

HOLIDAY.............................................$ 40.10 34.85

OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT):

AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE

(TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED);

BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON

AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR

MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX

PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING

PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER);

COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED

CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE

PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT;

DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER

(UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE;

HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE

DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN

PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK

BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER

(TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR

STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE;

PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY

MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM

SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL

ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE;

SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER;

TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER;

WINCH; WINCH CAT FOOTNOTE: B. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,

REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE

HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE

WORKING DAY BEFORE AND THE WORKING DAY AFTER THE

HOLIDAY ...........................................$ 57.21 35.00

OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY)

ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER

TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS

SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED),

BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED),

BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT

(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS,

CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE

PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED,

CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR

MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.),

GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER

(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE,

KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS,

L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR

STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE,

PLANT ENGINEER, PROFILER (105 H.P. AND UNDER),

GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER

BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER,

REVINIUS WIDENER, ROLLER (GRADE AND FILL),

SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER

(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM

CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE

PLANT REFRIGERATION EQUIPMENT (FOR SOIL

STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE

SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK

DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER,

TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER

HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE),

WINCH, WINCH CAT FOOTNOTE: B. PAID HOLIDAYS:

NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED

THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY ....................$ 54.68 35.75

OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING)

BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS

SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED);

BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON

AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY

PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS)

EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE

PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS

(TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU.

YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST

(ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE

LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE

MAN; MECHANICAL SLURRY MACHINE; MIXER FOR

STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE;

PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP

CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER;

ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR

SCRAPER; TRACTOR WITH DOZER AND OR PUSHER;

TRENCHER; WINCH FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR

DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF

THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,

PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY

IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE

SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE

HOLIDAY.............................................$ 40.79 34.85

OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT)

AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT);

AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT

PLACER (CMI OR SIMILAR); BLACKTOP SPREADER

(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX

PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE

CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE

PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES

AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE;

DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY

OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY

RATED 15' AND OVER); FRONT END LOADER (4CU YD AND

OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST;

SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER;

MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE

HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES);

MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR

STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9,

QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL;

SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE

ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN

BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER

MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR

(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE

DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,

PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE

AND THE WORKING DAY AFTER THE HOLIDAY .........$ 58.43 35.00

OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY)

AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT);

AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT

PLACER (CMI OR SIMILAR); BLACKTOP SPREADER

(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX

PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE

CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE

PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES

AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE;

DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY

OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY

RATED 15' AND OVER); FRONT END LOADER (4CU YD AND

OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST;

SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER;

MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE

HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES);

MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR

STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9,

QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL;

SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE

ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN

BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER

MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR

(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE

EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY ....................$ 55.38 35.75

OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING)

ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE

(EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP

PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL

MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER

5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL

ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END

LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM);

PILE DRIVER; POWER GRADER WITH ELEVATION LOADER

ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL;

SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER;

TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE

HYDRAULICALLY OPERATED FOOTNOTE: A. PAID

HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;

CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON

WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE

WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING

THE HOLIDAY OR ON THE SCHEDULED WORK DAY

IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 41.26 34.85

ENGI0158-038 07/01/2025

Rates Fringes

POWER EQUIPMENT OPERATORS: GROUP 8 (BUILDING

CONSTRUCTION) TOWER CRANES FOOTNOTE: A. PAID

HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND

CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE

WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON

THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE

HOLIDAY.............................................$ 50.14 35.20

POWER EQUIPMENT OPERATORS: GROUP 7 (BUILDING

CONSTRUCTION) CRANES 251 AND OVER TONS FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND

CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE

WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON

THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE

HOLIDAY.............................................$ 50.64 35.20

POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING

CONSTRUCTION) CRANES 25-250 TONS FOOTNOTE: A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND

CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE

WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON

THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE

HOLIDAY.............................................$ 49.64 35.20

POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING

CONSTRUCTION) CRANES UP TO AND INCLUDING 25 TONS

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY

PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY

IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 47.64 35.20

POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING

CONSTRUCTION) FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED

THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY

PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY

IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 39.64 35.20

POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING

CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE

(3) PIECES OF EQUIPMENT) COMPRESSORS ¬THREE (3) OR

LESS, OR NOT TO EXCEED 1200 CFM COMBINED CAPACITY,

FIREMAN, LONGITUDINAL FLOAT, MECHANICAL HEATER

PUMPS (REGARDLESS OF MOTIVE POWER) NO MORE THAN

THREE (3) IN NUMBER, NOT TO EXCEED TWELVE (12)

INCHES TOTAL CAPACITY, ROLLER (FILL AND

GRADE)RUBBER TIRED TRACTOR WELDING MACHINE OR

MECHANICAL CONVEYOR (OVER 12FT. IN LENGTH)

EXCEPTION: SINGLE GASOLINE DRIVEN WELDING MACHINE

UP TO 300AMPS NEED NOT BE MANNED. FOOTNOTE: A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND

CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE

WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON

THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE

HOLIDAY.............................................$ 39.64 35.20

POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING

CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE,

BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR

TYPE MACHINES, BELT CRETE AND SIMILAR TYPE

MACHINES, BITUMINOUS SPREADING MACHINE 3/8 YD.

CAPACITY OR LESS(FACTORY RATING), BULLDOZER,

CARRY-ALL TYPE SCRAPER, COMPRESSORS: FOUR (4) NOT

TO EXCEED 2000 CFM COMBINED CAPACITY; OR THREE (3)

OR LESS WITH MORE THAN1200 CFM BUT NOT TO EXCEED

2000 CFM, CONCRETE MIXER, CONCRETE PLACER, CONCRETE

PUMP, DINKY LOCOMOTIVES (ALL TYPES), ELEVATING

GRADER, ELEVATOR FINE GRADE AND FINISH, ROLLERS,

FINE GRADE MACHINES(ALL KINDS), FORKLIFT WITH

FACTORY RATING OF LESS THAN FIFTEEN(15) FEET OF

LIFT, FRONT END LOADER, GUNITE PUMPING MACHINE,

HIGH PRESSURE BOILER, HOIST (1 OR 2 DRUMS),

MAINTENANCE ENGINEER (MECHANIC), MECHANICAL SLURRY

MACHINE (ALL KINDS), MEGA MIXERS AND SIMILAR TYPE

MACHINES, MOTOR GRADER, POST HOLE DIGGER, PUMPS

(REGARDLESS OF MOTIVE POWER) NO MORE THAN FOUR (4)

IN NUMBER NOT TO EXCEED TWENTY (20) INCHES IN TOTAL

CAPACITY, SHOT CRETE PUMPING MACHINE, SIDE BOOM

TRACTOR, SKID STEER LOADER WITH ATTACHMENTS, STONE

CRUSHER TOURNADOZER AND SIMILAR TYPES TOURNAPULL

AND SIMILAR TYPES, TRENCHING MACHINES, WELL DRILL,

WELLPOINT SYSTEM EXCEPTION: SINGLE ELECTRIC PUMPS

UP TO AND INCLUDING FOUR (4) INCHES NEED NOT BE

MANNED. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S

DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY

PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY

IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 42.34 35.20

POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING

CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING

MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND

SIMILAR MACHINES OVER THREE EIGHTHS CU.YD. CAPACITY

(FACT. RATING);CARRIER MOUNTED BACKHOES THAT SWING

360 DEGREES BIG GENERATOR PLANT HOIST (ON STEEL

ERECTION) BRIDGE CRANE (ALL TYPES), CABLEWAY,

CAISSON AUGER AND SIMILAR TYPE MACHINE, CRANE,

DERRICK, DREDGE, EXCAVATOR ALL PURPOSE

HYDRAULICALLY OPERATED, FORKLIFT (WITH FACTORY

RATING OF FIFTEEN FT. OR MORE OF LIFT),HOIST (ON

STEEL ERECTION), HYDRAULIC/KRUPP DRILL TYPE MUCKING

MACHINES, REMOTE CONTROLLED EXCAVATOR WITH

ATTACHMENTS (BROKK TYPE OR SIMILAR), ROSS CARRIER

(AND SIMILAR TYPE), THREE-DRUM HOIST(WHEN ALL THREE

DRUMS ARE IN USE) FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,

PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY

IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE

SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE

HOLIDAY.............................................$ 43.14 35.20

IRON0033-001 07/01/2025

Rates Fringes

IRONWORKERS: (SHEETER)..............................$ 36.00 30.80

IRONWORKERS: (ORNAMENTAL, REINFORCING STONE

DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY

MOVERS FENCE ERECTORS, PRECAST CONCRETE ERECTOR)....$ 35.75 30.80

LABO0435-002 07/01/2018

Rates Fringes

TUNNEL AND SHAFT LABORERS: TUGGER, MINER

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY.......................$ 31.24 18.62

TUNNEL AND SHAFT LABORERS: HAZARDOUS WASTE

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY.......................$ 35.24 18.62

TUNNEL AND SHAFT LABORERS: CHANGE HOUSE MAN

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY.......................$ 31.04 18.62

LABO0435-003 07/01/2024

Rates Fringes

LABORERS: GROUP 5 (HEAVY AND HIGHWAY) HAZARDOUS

WASTE REMOVAL. FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,

PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY

BEFORE AND THE WORKING DAY AFTER THE HOLIDAY........$ 35.44 25.30

LABORERS: GROUP 4 (HEAVY AND HIGHWAY) BLASTERS

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY.......................$ 34.69 25.30

LABORERS: GROUP 3 (HEAVY AND HIGHWAY) RAKERS,

DRILLERS, PIPELAYERS AND TORCH OPERATORS

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY.......................$ 33.86 25.30

LABORERS: GROUP 2 (HEAVY AND HIGHWAY) LABORERS

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY.......................$ 33.66 25.30

LABORERS: GROUP 1 (HEAVY AND HIGHWAY) FLAGGERS

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE

EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE

WORKING DAY AFTER THE HOLIDAY.......................$ 32.96 25.30

PAIN0004-028 05/01/2024

Rates Fringes

PAINTERS: WALLCOVERING (BUILDING CONSTRUCTION)......$ 28.02 26.23

PAINTERS: SPRAY (BUILDING CONSTRUCTION).............$ 27.77 26.23

PAINTERS: SANDBLASTING (BUILDING CONSTRUCTION)......$ 27.77 26.23

PAINTERS: DRYWALL TAPER (BUILDING CONSTRUCTION).....$ 28.02 26.23

PAINTERS: BRUSH & ROLL (BUILDING CONSTRUCTION)......$ 27.27 26.23

PAIN0677-001 05/01/2025

Rates Fringes

GLAZIER.............................................$ 31.05 31.55

PLUM0013-001 05/06/2025

Rates Fringes

PLUMBER AND STEAMFITTER.............................$ 42.68 27.88

ROOF0022-001 06/01/2025

Rates Fringes

ROOFER..............................................$ 34.10 28.20

SFNY0669-001 01/01/2026

Rates Fringes

SPRINKLER FITTER....................................$ 47.85 28.94

SHEE0046-001 05/05/2025

Rates Fringes

SHEET METAL WORKER..................................$ 43.01 28.66

TEAM0118-003 07/01/2025

Rates Fringes

TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK

DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED

EQUIPMENT SHERE NOT SELF-LOADED. HAZARDOUS WASTE

SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL

DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY;

CHRISTMAS DAY .....................................$ 31.79 27.77

TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING

EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY

EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS)

CARRIER; SELF-CONTAINED CONCRETE UNIT. HAZARDOUS

WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER

HOUR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY;

MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY;

THANKSGIVING DAY; CHRISTMAS DAY.....................$ 31.64 27.77

TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY

TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER

TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC;

FUEL TRUCK. HAZARDOUS WASTE SITE WORK RECEIVES AN

ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID

HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE

DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.49 27.77

TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCK;

MECHANICS. HAZARDOUS WASTE SITE WORK RECEIVES AN

ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID

HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE

DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.44 27.77

TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS;

FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE

AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS;

TRUCK TIREMAN. HAZARDOUS WASTE SITE WORK RECEIVES

AN ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID

HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE

DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.39 27.77

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than """"SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The """"SU"""" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The """"SA"""" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor…

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
REFERENCE INFORMATION.pdf PDF
REQUEST FOR INFORMATION.pdf PDF
SF 1442 -70Z03026QCLEV0068.pdf PDF
SOW - Ceiling Tile and LED.pdf PDF
RFQ 70Z03026QCLEV0068.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .