waa-pacifi12800-2_plans.pdf

PDF 7 MB Posted

Attached to
WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR
Solicitation number
69056724B000018
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRENT L COE Digitally signed by BRENT L COE Date: 2025.01.08 15:15:45 -08'00'

Sheet and Description

Section D Section E Section F Section G Section H Section I

Plan-Profile Soil Erosion and Sediment Control

Drainage Cellular

Confinement System

Temporary Traffic Control

Plan

Permanent Traffic Control

Plan Allowance

Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15702-5000 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM LPSM All ALL

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 145 15 160

A0160 20103-0000 CLEARING AND GRUBBING SQYD 545 35 580

A0180 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1

A0200 20401-0000 ROADWAY EXCAVATION CUYD 637 63 700

A0220 20410-0000 SELECT BORROW CUYD 10 5 15

A0240 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE A (WOVEN) SQYD 1,152 148 1,300

A0260 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,

TYPE D (NON-WOVEN) SQYD 1,053 147 1,200

A0280 20802-0000 FOUNDATION FILL CUYD 293 17 310

A0300 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 484 667 99 1,250

A0320 40302-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (3-INCH DEPTH) SQYD 1,944 106 2,050

A0340 60201-0600 18-INCH PIPE CULVERT LNFT 64 6 70

A0360 60201-0800 24-INCH PIPE CULVERT LNFT 32 8 40

A0380 61108-1000 ADJUST WATER VALVE EACH 1 1

A0400 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 60

A0420 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 60

A0440 62201-3000 HYDRAULIC EXCAVATOR HOUR 40

A0460 62301-0000 GENERAL LABOR HOUR 80

A0480 62502-0000 TURF ESTABLISHMENT SQYD 510 30 540

A0500 62903-0000 CELLULAR CONFINEMENT SYSTEM (8-INCH) SQYD 1,152 48 1,200

A0520 62903-0000 CELLULAR CONFINEMENT SYSTEM (6-INCH) SQYD 977 23 1,000

A0540 63302-0000 SIGN SYSTEM SQFT 18 18

A0560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 3,130 70 3,200

A0580 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL

A0600 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM EACH 2 2

A0620 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,340 70 1,410

A0640 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL

SUPERVISOR DAY 72 72

A0660 64502-0000 LOCATE UTILITIES (POTHOLING) EACH 5 5

MileStone: 100% PS&E Date Completed: 01/06/25 Report Date: 01/15/25

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES

-J a n -2

:5

A

M

Remarks and/or Determination of Estimated Quantity

Pay Item Description Unit

Estimated Quantities c:

\p w -w o rk

\d su m m a ry

.x ls m

]S h ee t

PROJECT

B.1WA FLAP PACIFI 12800(2)

SHEET

NUMBER

PROJECT UNITS : US SURVEY FOOT

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

23101 394714.356 758125.172 9.167 46°21'43.620831"N 123°59'45.243170"W -69.6814 0.999925464 5/8" ir w/FHWA Alum cap 1.

23102 394215.576 757718.423 10.813 46°21'38.523708"N 123°59'50.722284"W -68.0659 0.999925483 5/8" ir w/FHWA Alum cap

23103 393806.250 757387.670 11.285 46°21'34.342010"N 123°59'55.175122"W -67.6185 0.99992554 5/8" ir w/FHWA Alum cap

23104 393464.676 757167.014 25.935 46°21'30.876669"N 123°59'58.102329"W -52.9848 0.999924907 5/8" ir w/FHWA Alum cap

23105 393158.417 756946.623 50.108 46°21'27.759713"N 124°00'01.047996"W -28.8281 0.999923812 5/8" ir w/FHWA Alum cap

23106 392879.490 756761.672 61.367 46°21'24.927819"N 124°00'03.506048"W -17.5827 0.999923329 5/8" ir w/FHWA Alum cap

23107 392775.556 756572.008 66.008 46°21'23.819694"N 124°00'06.141892"W -12.956 0.99992313 5/8" ir w/FHWA Alum cap

23108 392836.401 756300.486 69.000 46°21'24.300791"N 124°00'10.047993"W -9.9847 0.999922979 5/8" ir w/FHWA Alum cap

23109 392940.819 755958.719 58.002 46°21'25.180789"N 124°00'14.982287"W -21.0089 0.999923488 5/8" ir w/FHWA Alum cap

23110 393024.259 755646.067 54.010 46°21'25.866604"N 124°00'19.488614"W -25.0247 0.999923667 5/8" ir w/FHWA Alum cap

23111 393153.916 755386.734 44.346 46°21'27.031571"N 124°00'23.264768"W -34.7085 0.999924107 5/8" ir w/FHWA Alum cap

23112 393255.606 754669.522 15.244 46°21'27.719690"N 124°00'33.545430"W -63.8638 0.999925487 5/8" ir w/FHWA Alum cap

23113 393186.662 754083.513 16.150 46°21'26.782354"N 124°00'41.848977"W -63.0018 0.999925464 5/8" ir w/FHWA Alum cap

23114 392853.352 753814.088 15.832 46°21'23.376748"N 124°00'45.475160"W -63.3396 0.999925545 5/8" ir w/FHWA Alum cap

23115 392644.780 753678.523 22.641 46°21'21.260160"N 124°00'47.273737"W -56.5405 0.999925261 5/8" ir w/FHWA Alum cap

PROJECT : 67th Place Public Enhancement to Willapa NWR DATE OF FIELD WORK : March 2023 DATE OF FINAL ADJUSTMENT : March 2023

COORDINATE SYSTEM : Washington South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.0000

CADD COORDINATE SYSTEM : WA83/2011-SF NSRS11(NAD83/2011) Washington, South Zone, US Foot

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

C

M yF ile s\

Pr oj ec ts

\6 7t h Pl ac e\

Pl an se t\

D _S he et s_ P&

P\ [C op y of

-A pr -2

:5

W

FL

H

D S ur ve y

W

FL

H

D S ur ve y

D es ig ne d by

C he ck ed b y:

PROJECT

D.1

SHEET

NUMBER

WA FLAP PACIFI 12800(2)

SURVEY CONTROL

10.4 x 16 20301 -1900

60201 -0600

60201 -0800

Station

ES

TI

M A

TE

D M

A X

IM

U M

C O

V

ER

S

TR

U C

TU

R A L

EX

C

A V A

TI

O N

R

EM

O V A L

O F

PI

PE

C U

LV

ER

T

-I

N C H

P

IP

E C

U

LV

ER

T

-I

N C H

P

IP

E C

U

LV

ER

T

S K

EW

A N

G

LE

A llo w ab le P ip e

M at er ia l (S ee k ey b el ow

B

EV

EL

S

1V :n

H

B

EV

EL

S

1V :n

H

REMARKS

See below for numbered notes

FEET CUYD EACH LNFT LNFT Lt Rt 14+61.13 1 13 1 32 P 15+90.00 2 12 32 P 16+60.00 2 13 32 P

PROJECT TOTAL 38 1 64 32

Allowable Pipe Material

NOTE: A Aluminum

1. Structural excavation quantity based on material excavated inside the vertical planes located AS Aluminized steel 18 inches outside and parallel to the limits of footings or foundations. C Concrete

GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __

PAY ITEM NUMBER

-D ec -2

9:

P M c:

\p w

-w or k\ d0 w aa

-p ac ifi

0-

2_ to q_ dr ai na ge .x ls x]

Sh ee t

TABULATION OF DRAINAGE QUANTITIES

PROJECT

F.1WA FLAP PACIFI 12800(2)

SHEET

NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.

File details come from the government source that posted it. Updated .