BRENT L COE Digitally signed by BRENT L COE Date: 2025.01.08 15:15:45 -08'00'
Sheet and Description
Section D Section E Section F Section G Section H Section I
Plan-Profile Soil Erosion and Sediment Control
Drainage Cellular
Confinement System
Temporary Traffic Control
Plan
Permanent Traffic Control
Plan Allowance
Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-5000 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM LPSM All ALL
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 145 15 160
A0160 20103-0000 CLEARING AND GRUBBING SQYD 545 35 580
A0180 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0200 20401-0000 ROADWAY EXCAVATION CUYD 637 63 700
A0220 20410-0000 SELECT BORROW CUYD 10 5 15
A0240 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE A (WOVEN) SQYD 1,152 148 1,300
A0260 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE D (NON-WOVEN) SQYD 1,053 147 1,200
A0280 20802-0000 FOUNDATION FILL CUYD 293 17 310
A0300 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 484 667 99 1,250
A0320 40302-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (3-INCH DEPTH) SQYD 1,944 106 2,050
A0340 60201-0600 18-INCH PIPE CULVERT LNFT 64 6 70
A0360 60201-0800 24-INCH PIPE CULVERT LNFT 32 8 40
A0380 61108-1000 ADJUST WATER VALVE EACH 1 1
A0400 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 60
A0420 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 60
A0440 62201-3000 HYDRAULIC EXCAVATOR HOUR 40
A0460 62301-0000 GENERAL LABOR HOUR 80
A0480 62502-0000 TURF ESTABLISHMENT SQYD 510 30 540
A0500 62903-0000 CELLULAR CONFINEMENT SYSTEM (8-INCH) SQYD 1,152 48 1,200
A0520 62903-0000 CELLULAR CONFINEMENT SYSTEM (6-INCH) SQYD 977 23 1,000
A0540 63302-0000 SIGN SYSTEM SQFT 18 18
A0560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 3,130 70 3,200
A0580 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL
A0600 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM EACH 2 2
A0620 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,340 70 1,410
A0640 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR DAY 72 72
A0660 64502-0000 LOCATE UTILITIES (POTHOLING) EACH 5 5
MileStone: 100% PS&E Date Completed: 01/06/25 Report Date: 01/15/25
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-J a n -2
:5
A
M
Remarks and/or Determination of Estimated Quantity
Pay Item Description Unit
Estimated Quantities c:
\p w -w o rk
\d su m m a ry
.x ls m
]S h ee t
PROJECT
B.1WA FLAP PACIFI 12800(2)
SHEET
NUMBER
PROJECT UNITS : US SURVEY FOOT
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
23101 394714.356 758125.172 9.167 46°21'43.620831"N 123°59'45.243170"W -69.6814 0.999925464 5/8" ir w/FHWA Alum cap 1.
23102 394215.576 757718.423 10.813 46°21'38.523708"N 123°59'50.722284"W -68.0659 0.999925483 5/8" ir w/FHWA Alum cap
23103 393806.250 757387.670 11.285 46°21'34.342010"N 123°59'55.175122"W -67.6185 0.99992554 5/8" ir w/FHWA Alum cap
23104 393464.676 757167.014 25.935 46°21'30.876669"N 123°59'58.102329"W -52.9848 0.999924907 5/8" ir w/FHWA Alum cap
23105 393158.417 756946.623 50.108 46°21'27.759713"N 124°00'01.047996"W -28.8281 0.999923812 5/8" ir w/FHWA Alum cap
23106 392879.490 756761.672 61.367 46°21'24.927819"N 124°00'03.506048"W -17.5827 0.999923329 5/8" ir w/FHWA Alum cap
23107 392775.556 756572.008 66.008 46°21'23.819694"N 124°00'06.141892"W -12.956 0.99992313 5/8" ir w/FHWA Alum cap
23108 392836.401 756300.486 69.000 46°21'24.300791"N 124°00'10.047993"W -9.9847 0.999922979 5/8" ir w/FHWA Alum cap
23109 392940.819 755958.719 58.002 46°21'25.180789"N 124°00'14.982287"W -21.0089 0.999923488 5/8" ir w/FHWA Alum cap
23110 393024.259 755646.067 54.010 46°21'25.866604"N 124°00'19.488614"W -25.0247 0.999923667 5/8" ir w/FHWA Alum cap
23111 393153.916 755386.734 44.346 46°21'27.031571"N 124°00'23.264768"W -34.7085 0.999924107 5/8" ir w/FHWA Alum cap
23112 393255.606 754669.522 15.244 46°21'27.719690"N 124°00'33.545430"W -63.8638 0.999925487 5/8" ir w/FHWA Alum cap
23113 393186.662 754083.513 16.150 46°21'26.782354"N 124°00'41.848977"W -63.0018 0.999925464 5/8" ir w/FHWA Alum cap
23114 392853.352 753814.088 15.832 46°21'23.376748"N 124°00'45.475160"W -63.3396 0.999925545 5/8" ir w/FHWA Alum cap
23115 392644.780 753678.523 22.641 46°21'21.260160"N 124°00'47.273737"W -56.5405 0.999925261 5/8" ir w/FHWA Alum cap
PROJECT : 67th Place Public Enhancement to Willapa NWR DATE OF FIELD WORK : March 2023 DATE OF FINAL ADJUSTMENT : March 2023
COORDINATE SYSTEM : Washington South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.0000
CADD COORDINATE SYSTEM : WA83/2011-SF NSRS11(NAD83/2011) Washington, South Zone, US Foot
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\6 7t h Pl ac e\
Pl an se t\
D _S he et s_ P&
P\ [C op y of
-A pr -2
:5
W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
PROJECT
D.1
SHEET
NUMBER
WA FLAP PACIFI 12800(2)
SURVEY CONTROL
10.4 x 16 20301 -1900
60201 -0600
60201 -0800
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C
A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
-I
N C H
P
IP
E C
U
LV
ER
T
-I
N C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH LNFT LNFT Lt Rt 14+61.13 1 13 1 32 P 15+90.00 2 12 32 P 16+60.00 2 13 32 P
PROJECT TOTAL 38 1 64 32
Allowable Pipe Material
NOTE: A Aluminum
1. Structural excavation quantity based on material excavated inside the vertical planes located AS Aluminized steel 18 inches outside and parallel to the limits of footings or foundations. C Concrete
GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
-D ec -2
9:
P M c:
\p w
-w or k\ d0 w aa
-p ac ifi
0-
2_ to q_ dr ai na ge .x ls x]
Sh ee t
TABULATION OF DRAINAGE QUANTITIES
PROJECT
F.1WA FLAP PACIFI 12800(2)
SHEET
NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.