This document is an Amendment (A001) to a federal solicitation for a construction project. The amendment modifies the original solicitation (No. 69056724B000018) for the WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR, issued by the Department of Transportation Federal Highway Administration. Key updates include revisions to multiple Federal Acquisition Regulation (FAR) provisions and clauses, specifically updating sections related to annual representations, certifications, wage requirements, sustainable products, and subcontract standards. The amendment is dated 03/07/2025 and applies to a highway, street, and bridge construction project with a small business size standard of $45 million, meaning businesses with average annual gross receipts above $45 million are considered large businesses for this solicitation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 03/07/2025 N/A WA FLAP PACIFI 12800(2)

67th Place Public Enhancement to

Willapa NWR

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056724B000018

9B. DATED (SEE ITEM 11)

02/24/2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

See page 2

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 03/07/2025 Project No: WA FLAP PACIFI 12800(2)

Solicitation No. 69056724B000018 Project Name: 67th Place Public

Enhancement to Willapa NWR

REVISIONS ARE AS FOLLOWS:

SOLICITATION PROVISIONS

Page B-1. Deletes FAR Provision 52.252-3 Alterations in Solicitation (Apr 1984)

Page B-1. Updates FAR Provision 52.204-8 Annual Representations and Certifications

(Jan 2025)(Deviation FEB 2025)

Page B-19. Adds FAR Provision 52.252-5 Authorized Deviations in Provisions (NOV

2020)

CONTRACT CLAUSES

Pages C-32 and C-33. Updates FAR Clause 52.222-6 Construction Wage Rate

Requirements (Aug 2018)(DEVIATION FEB 2025)

Page C-36. Updates FAR Clause 52.222-11 Subcontracts (Labor Standards) (May

2014)(DEVIATION FEB 2025)

Page C-37. Updates FAR Clause 52.222-12 Contract Termination- Debarment (May

2014)(DEVIATION FEB 2025)

Page C-55. Updates FAR Clause 52.223-2 Reporting of Biobased Products Under

Service and Construction Contracts. (May 2024)(DEVIATION FEB 2025)

Page C-57. Updates FAR Clause 52.223-23 Sustainable Products and Services (May

2024)(Deviation FEB 2025)

Page C-93. Updates FAR Clause 52.244-6 Subcontracts for Commercial Projects and

Commercial Services (Jan 2025)(DEVIATION FEB 2025)

Pages C-103 and C-104. Adds FAR Clause 52.252-6 Authorized Deviations in Clauses

(Nov 2020)

ENCLOSURES

Pages:

B-1

B-19

C-32 through C-33

C-36 through C-37

C-55

C-57

C-93

C-103 through C-104

B-1

Revised by Amendment A001

Solicitation Provisions

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

FEDERAL ACQUISITION REGULATION

SOLICITATION PROVISIONS

Representations, Certifications and Other Statements of Bidders

The bidder makes the following representations and certifications as a part of its bid.

NOTICE:

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-3 Alterations in Solicitation (Apr 1984)

Portions of this solicitation are altered as follows:

In accordance with Executive Orders 14173, 14148, and 14208 and CAAC Letter 2025-01 and CAAC

Letter 2025-02, the following provisions and clauses have been amended:

(a) 52.204-8 Annual Representations and Certifications (JAN 2025) (DEVIATION XXX 2025)

(b) 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024)

(DEVIATION XXX 2025)

(c) 52.223-23, Sustainable Products and Services (MAY 2024) (DEVIATION XXX 2025)

(d) 52.244-6, Subcontracts for Commercial Products and Commercial Services (JAN 2025)

(DEVIATION XXX 2025)

52.204-8 Annual Representations and Certifications. (Jan 2025) (DEVIATION XXX FEB 2025)

(a)

(1) The North American Industry Classification System (NAICS) code for this acquisition is__

NAICS 237310 – Highway, Street & Bridge Construction.

(2) The small business size standard is $45 million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself

Completing FAR provision 52.204-8 Annual Representation and Certifications.

• This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $45 million. If your average annual gross receipts for the past 3 years are above $45 million you are a large business for this solicitation. If they are below $45 million you are a small business. Please complete the certification listed in paragraph (d).

• Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the System for Award Management (SAM) website: https://www.sam.gov https://www.sam.gov/

B-19

Solicitation Provisions

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (May 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage

Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.

52.233-2 Service of Protest (Sep 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office

(GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Contracting Officer, Contracts Section, Federal Highway

Administration, 610 East Fifth Street, Vancouver, WA 98661-3801.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 Site Visit (Construction) (Feb 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and

Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation.

Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

There will be no government arranged site visits. The site is readily available for inspection. Prospective offerors are encouraged to make their own arrangements to inspect the site.

52.252-5 Authorized Deviations in Provisions (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Transportation Acquisition Regulations (48 CFR Chapter 12 provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

C-32

Contract Clauses

52.222-4 Contract Work Hours and Safety Standards—Overtime Compensation (May 2018)

(a) Overtime requirements. No Contractor or subcontractor employing laborers or mechanics (see Federal

Acquisition Regulation 22.300) shall require or permit them to work over 40 hours in any workweek unless they are paid at least 1 and 1/2 times the basic rate of pay for each hour worked over 40 hours.

(b) Violation; liability for unpaid wages; liquidated damages. The responsible Contractor and subcontractor are liable for unpaid wages if they violate the terms in paragraph (a) of this clause. In addition, the Contractor and subcontractor are liable for liquidated damages payable to the

Government. The Contracting Officer will assess liquidated damages at the rate specified at 29 CFR

5.5(b)(2) per affected employee for each calendar day on which the employer required or permitted the employee to work in excess of the standard workweek of 40 hours without paying overtime wages required by the Contract Work Hours and Safety Standards statute (found at 40 U.S.C. chapter 37). In accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990 (28 U.S.C. 2461 Note), the Department of Labor adjusts this civil monetary penalty for inflation no later than January 15 each year.

(c) Withholding for unpaid wages and liquidated damages. The Contracting Officer will withhold from payments due under the contract sufficient funds required to satisfy any Contractor or subcontractor liabilities for unpaid wages and liquidated damages. If amounts withheld under the contract are insufficient to satisfy Contractor or subcontractor liabilities, the Contracting Officer will withhold payments from other Federal or federally assisted contracts held by the same Contractor that are subject to the Contract Work Hours and Safety Standards statute.

(d) Payrolls and basic records.

(1) The Contractor and its subcontractors shall maintain payrolls and basic payroll records for all laborers and mechanics working on the contract during the contract and shall make them available to the Government until 3 years after contract completion. The records shall contain the name and address of each employee, social security number, labor classifications, hourly rates of wages paid, daily and weekly number of hours worked, deductions made, and actual wages paid.

The records need not duplicate those required for construction work by Department of Labor regulations at 29 CFR 5.5(a)(3) implementing the Construction Wage Rate Requirements statute.

(2) The Contractor and its subcontractors shall allow authorized representatives of the Contracting

Officer or the Department of Labor to inspect, copy, or transcribe records maintained under paragraph (d)(1) of this clause. The Contractor or subcontractor also shall allow authorized representatives of the Contracting Officer or Department of Labor to interview employees in the workplace during working hours.

(e) Subcontracts. The Contractor shall insert the provisions set forth in paragraphs (a) through (d) of this clause in subcontracts that may require or involve the employment of laborers and mechanics and require subcontractors to include these provisions in any such lower tier subcontracts. The Contractor shall be responsible for compliance by any subcontractor or lower-tier subcontractor with the provisions set forth in paragraphs (a) through (d) of this clause.

52.222-6 Construction Wage Rate Requirements (Aug 2018) (DEVIATION FEB 2025)

(a) Definition.—“Site of the work”—

(1) Means—

(i) The primary site of the work. The physical place or places where the construction called for in the contract will remain when work on it is completed; and

(ii) The secondary site of the work, if any. Any other site where a significant portion of the building or work is constructed, provided that such site is—

(A) Located in the United States; and

(B) Established specifically for the performance of the contract or project;

C-33

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

(2) Except as provided in paragraph (3) of this definition, includes any fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., provided—

(i) They are dedicated exclusively, or nearly so, to performance of the contract or project; and

(ii) They are adjacent or virtually adjacent to the “primary site of the work” as defined in paragraph (a)(1)(i), or the “secondary site of the work” as defined in paragraph (a)(1)(ii) of this definition;

(3) Does not include permanent home offices, branch plant establishments, fabrication plants, or tool yards of a Contractor or subcontractor whose locations and continuance in operation are determined wholly without regard to a particular Federal contract or project. In addition, fabrication plants, batch plants, borrow pits, job headquarters, yards, etc., of a commercial or material supplier which are established by a supplier of materials for the project before opening of bids and not on the

Project site, are not included in the “site of the work.” Such permanent, previously established facilities are not a part of the “site of the work” even if the operations for a period of time may be dedicated exclusively or nearly so, to the performance of a contract.

(b)(1) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of

Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, or as may be incorporated for a secondary site of the work, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics.

Any wage determination incorporated for a secondary site of the work shall be effective from the first day on which work under the contract was performed at that site and shall be incorporated without any adjustment in contract price or estimated cost. Laborers employed by the construction Contractor or construction subcontractor that are transporting portions of the building or work between the secondary site of the work and the primary site of the work shall be paid in accordance with the wage determination applicable to the primary site of the work.

(2) Contributions made or costs reasonably anticipated for bona fide fringe benefits under section

1(b)(2) of the Construction Wage Rate Requirements statute on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (e) of this clause; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such period.

(3) Such laborers and mechanics shall be paid not less than the appropriate wage rate and fringe benefits in the wage determination for the classification of work actually performed, without regard to skill, except as provided in the clause entitled Apprentices and Trainees. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein; provided that the employer’s payroll records accurately set forth the time spent in each classification in which work is performed.

(4) The wage determination (including any additional classifications and wage rates conformed under paragraph (c) of this clause) and the Construction Wage Rate Requirements (Davis-Bacon Act) poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at the primary site of the work and the secondary site of the work, if any, in a prominent and accessible place where it can be easily seen by the workers.

(c) (1) The Contracting Officer shall require that any class of laborers or mechanics which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The Contracting Officer shall approve an additional classification and wage rate and fringe benefits therefor only when all the following criteria have been met:

C-36

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

(3) The weekly submission of a properly executed certification set forth on the reverse side of

Optional Form WH-347 shall satisfy the requirement for submission of the “Statement of

Compliance” required by subparagraph (b)(2) of this clause.

(4) The falsification of any of the certifications in this clause may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 3729 of

Title 31 of the United States Code.

(c) The Contractor or subcontractor shall make the records required under paragraph (a) of this clause available for inspection, copying, or transcription by the Contracting Officer or authorized representatives of the Contracting Officer or the Department of Labor. The Contractor or subcontractor shall permit the Contracting Officer or representatives of the Contracting Officer or the

Department of Labor to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit required records or to make them available, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.

52.222-10 Compliance with Copeland Act Requirements (Feb 1988)

The Contractor shall comply with the requirements of 29 CFR Part 3, which are hereby incorporated by reference in this contract.

52.222-11 Subcontracts (Labor Standards) (May 2014) (DEVIATION FEB 2025)

(a) Definition. “Construction, alteration or repair,” as used in this clause, means all types of work done by laborers and mechanics employed by the construction Contractor or construction subcontractor on a particular building or work at the site thereof, including without limitation—

(1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated off-site;

(2) Painting and decorating;

(3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work;

(4) Transportation of materials and supplies between the site of the work within the meaning of paragraphs (a)(1)(i) and (ii) of the “site of the work” as defined in the FAR clause at 52.222-6, Construction Wage Rate Requirements of this contract, and a facility which is dedicated to the construction of the building or work and is deemed part of the site of the work within the meaning of paragraph (2) of the “site of the work” definition; and

(5) Transportation of portions of the building or work between a secondary site where a significant portion of the building or work is constructed, which is part of the “site of the work” definition in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, and the physical place or places where the building or work will remain (paragraph (a)(1)(i) of the

FAR clause at 52.222-6, in the “site of the work” definition).

(b) The Contractor shall insert in any subcontracts for construction, alterations and repairs within the

United States the clauses entitled—

(1) Construction Wage Rate Requirements;

(2) Contract Work Hours and Safety Standards—Overtime Compensation (if the clause is included in this contract);

(3) [Reserved] Apprentices and Trainees;

(4) Payrolls and Basic Records;

(5) Compliance with Copeland Act Requirements;

(6) Withholding of Funds;

(7) Subcontracts (Labor Standards);

C-37

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

(8) Contract Termination—Debarment;

(9) Disputes Concerning Labor Standards;

(10) Compliance with Construction Wage Rate Requirements and Related Regulations; and

(11) Certification of Eligibility.

(c) The prime Contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor performing construction within the United States with all the contract clauses cited in paragraph (b).

(d)

(1) Within 14 days after award of the contract, the Contractor shall deliver to the Contracting Officer a completed Standard Form (SF) 1413, Statement and Acknowledgment, for each subcontract for construction within the United States, including the subcontractor’s signed and dated acknowledgment that the clauses set forth in paragraph (b) of this clause have been included in the subcontract.

(2) Within 14 days after the award of any subsequently awarded subcontract the Contractor shall deliver to the Contracting Officer an updated completed SF 1413 for such additional subcontract.

(e) The Contractor shall insert the substance of this clause, including this paragraph (e) in all subcontracts for construction within the United States.

52.222-12 Contract Termination—Debarment (May 2014) (DEVIATION FEB 2025)

A breach of the contract clauses entitled Construction Wage Rate Requirements, Contract Work Hours and

Safety Standards—Overtime Compensation, Apprentices and Trainees, Payrolls and Basic Records, Compliance with Copeland Act Requirements, Subcontracts (Labor Standards), Compliance with

Construction Wage Rate Requirements and Related Regulations, or Certification of Eligibility may be grounds for termination of the contract, and for debarment as a Contractor and subcontractor as provided in 29 CFR 5.12.

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May

2014)

All rulings and interpretations of the Construction Wage Rate Requirements and related statutes contained in 29 CFR parts 1, 3, and 5 are hereby incorporated by reference in this contract.

52.222-14 Disputes Concerning Labor Standards (Feb 1988)

The United States Department of Labor has set forth in 29 CFR parts 5, 6, and 7 procedures for resolving disputes concerning labor standards requirements. Such disputes shall be resolved in accordance with those procedures and not the Disputes clause of this contract. Disputes within the meaning of this clause include disputes between the Contractor (or any of its subcontractors) and the contracting agency, the

U.S. Department of Labor, or the employees or their representatives.

52.222-15 Certification of Eligibility (May 2014)

(a) By entering into this contract, the Contractor certifies that neither it nor any person or firm who has an interest in the Contractor’s firm is a person or firm ineligible to be awarded Government contracts by virtue of 40 U.S.C. 3144(b)(2) or 29 CFR 5.12(a)(1).

(b) No part of this contract shall be subcontracted to any person or firm ineligible for award of a

Government contract by virtue of 40 U.S.C. 3144(b)(2) or 29 CFR 5.12(a)(1).

(c) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001.

C-55

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

(l) Disputes concerning labor standards. Disputes related to the application of E.O. 13706 to this contract shall not be subject to the general disputes clause of the contract . Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR Part 13.

Disputes within the meaning of this contract clause include disputes between the Contractor (or any of its subcontractors) and the contracting agency , the Department of Labor, or the employees or their representatives.

(m) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (m), in all subcontracts, regardless of dollar value, that are subject to the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction ) statute, and are to be performed in whole or in part in the United States.

52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (May 2024)

(DEVIATION XXX FEB 2025)

(a) Definitions. As used in this clause—

Biobased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. ( 7 U.S.C. 8101) ( 7 CFR 3201.2 [7 CFR 4270.2]).

USDA-designated product category means a generic grouping of products that are or can be made with biobased materials—

(1) That are listed by USDA in a procurement guideline ( 7 CFR part 3201, subpart B) available at https://www.biopreferred.gov/resources/categories.html; and

(2) For which USDA has provided purchasing recommendations (available at https://www.biopreferred.gov [or 7 CFR part 4270].

(b) The Contractor shall report to https://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any biobased products in USDA-designated product categories purchased by the Contractor during the previous Government fiscal year, between October

1 and September 30; and

(c) Submit this report no later than—

(1) October 31 of each year during contract performance; and

(2) At the end of contract performance.

52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021)

Alternate I (July 1995).

(a) "Hazardous material," as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No.313 (including revisions adopted during the term of the contract).

(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

https://www.govinfo.gov/link/uscode/7/8101 https://www.ecfr.gov/current/title-7/section-3201.2 https://www.ecfr.gov/current/title-7/part-3201/subpart-B https://www.biopreferred.gov/resources/categories.html https://www.biopreferred.gov/ https://www.sam.gov/

C-57

52.223-21 Foams (May 2024)

(a) Definitions. As used in this clause–

Global warming potential means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide’s global warming potential is defined as 1.0.

High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables of alternatives available at ( https://www.epa.gov/snap/).

Hydrofluorocarbons means compounds that only contain hydrogen, fluorine, and carbon.

(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, and emissions of high global warming potential hydrofluorocarbons and refrigerant blends containing hydrofluorocarbons, when feasible, from foam blowing agents, under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as–

(1) In-use emission rates, energy efficiency, and safety;

(2) Ability to meet performance requirements; and

(3) Commercial availability at a reasonable cost.

(c) The Contractor shall refer to EPA’s SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables available at https://www.epa.gov/snap/.

52.223-23 Sustainable Products and Services (May 2024) (DEVIATION XXX FEB 2025)

Biobased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. ( 7 U.S.C. 8101) ( 7 CFR 3201.2[7 CFR part 4270.2]).

Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process. ( 42 U.S.C. 6903).

Sustainable products and services means products and services that are subject to and meet the following applicable statutory mandates and directives for purchasing:

(1) Statutory purchasing programs.

(i) [(1)]Products containing recovered material designated by the U.S. Environmental Protection

Agency (EPA) under the Comprehensive Procurement Guidelines ( 42 U.S.C. 6962) ( 40 CFR part 247) ( https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).

(ii) [(2)]Energy- and water-efficient products that are ENERGY STAR® certified or Federal

Energy Management Program (FEMP)-designated products ( 42 U.S.C. 8259b) ( 10 CFR part

436, subpart C) ( https://www.energy.gov/eere/femp/search-energy-efficient-products and https://www.energystar.gov/products?s=mega).

https://www.epa.gov/snap/ https://www.epa.gov/snap/ https://www.govinfo.gov/link/uscode/7/8101 https://www.ecfr.gov/current/title-7/section-3201.2 https://www.govinfo.gov/link/uscode/42/6903 https://www.govinfo.gov/link/uscode/42/6962 https://www.ecfr.gov/current/title-40/part-247 https://www.ecfr.gov/current/title-40/part-247 https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products https://www.govinfo.gov/link/uscode/42/8259b https://www.ecfr.gov/current/title-10/part-436/subpart-C https://www.ecfr.gov/current/title-10/part-436/subpart-C https://www.energy.gov/eere/femp/search-energy-efficient-products https://www.energy.gov/eere/femp/search-energy-efficient-products https://www.energystar.gov/products?s=mega

C-93

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

Contractor and the subcontractor; and the effect of any such defective data on the total price negotiated;

(F) The reasons for any significant difference between the Contractor’s price objective and the price negotiated; and

(G) A complete explanation of the incentive fee or profit plan when incentives are used. The explanation shall identify each critical performance element, management decisions used to quantify each incentive element, reasons for the incentives, and a summary of all trade-off possibilities considered.

(2) The Contractor is not required to notify the Contracting Officer in advance of entering into any subcontract for which consent is not required under paragraph (b), (c), or (d) of this clause.

(f) Unless the consent or approval specifically provides otherwise, neither consent by the Contracting

Officer to any subcontract nor approval of the Contractor’s purchasing system shall constitute a determination-

(1) Of the acceptability of any subcontract terms or conditions;

(2) Of the allowability of any cost under this contract; or

(3) To relieve the Contractor of any responsibility for performing this contract.

(g) No subcontract or modification thereof placed under this contract shall provide for payment on a cost-plus-a-percentage-of-cost basis, and any fee payable under cost-reimbursement type subcontracts shall not exceed the fee limitations in FAR 15.404-4(c)(4)(i).

(h) The Contractor shall give the Contracting Officer immediate written notice of any action or suit filed and prompt notice of any claim made against the Contractor by any subcontractor or vendor that, in the opinion of the Contractor, may result in litigation related in any way to this contract, with respect to which the Contractor may be entitled to reimbursement from the Government.

(i) The Government reserves the right to review the Contractor’s purchasing system as set forth in FAR subpart 44.3.

(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated during negotiations:

52.244-6 Subcontracts for Commercial Products and Commercial Services (Jan

2025)(DEVIATION XXX FEB 2025)

Commercial product, commercial service and commercially available off-the-shelf item have the meanings contained in Federal Acquisition Regulation (FAR) 2.101.

Subcontract includes a transfer of commercial products or commercial services between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.

(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial products, commercial services, or non-developmental items as components of items to be supplied under this contract.

(c)

(1) The Contractor shall insert the following clauses in subcontracts for commercial products or commercial services:

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) ( 41 U.S.C. 3509), if the subcontract exceeds the threshold specified in FAR 3.1004(a) on the date of subcontract award, and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil

False Claims Act or of Federal criminal law shall be directed to the agency Office of the

Inspector General, with a copy to the Contracting Officer.

https://www.acquisition.gov/far/part-2#FAR_2_101 https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-3#FAR_3_1004

C-103

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

(c) If the Contractor submits a computer generated version of a form that is different than the required form, then the rights and obligations of the parties will be determined based on the content of the required form.

52.252-6 Authorized Deviations in Clauses (Nov 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Transportation Acquisition Regulations (48 CFR

Chapter 12) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

TRANSPORTATION ACQUISITION REGULATIONS

CONTRACT CLAUSES

1252.201-70 Contracting Officer’s Representative (Nov 2022)

(a) The Contracting Officer may designate Government personnel to act as the Contracting Officer's

Representative (COR) to perform functions under the contract such as review and/or inspection and acceptance of supplies, services, including construction, and other functions of a technical nature. The

Contracting Officer will provide a written notice of such designation to the Contractor within five working days after contract award or for construction, not less than five working days prior to giving the contractor the notice to proceed. The designation letter will set forth the authorities and limitations of the

COR under the contract.

(b) The Contracting Officer cannot authorize the COR or any other representative to sign documents (i.e., contracts, contract modifications, etc.) that require the signature of the Contracting Officer.

1252.211-70 Index for Specifications (Nov 2022)

If an index or table of contents is furnished in connection with specifications, such index or table of contents is for convenience only. Its accuracy and completeness is not guaranteed, and it is not a part of the specification. In case of discrepancy between the index or table of contents and the specifications, the specifications shall govern.

1252.223-71 Accident and Fire Reporting (Nov 2022)

(a) The Contractor shall report to the Contracting Officer any accident or fire occurring at the site of the work which causes—

(1) A fatality or as much as one lost workday on the part of any employee of the Contractor or subcontractor at any tier;

(2) Damage of $1,000 or more to Government-owned or leased property, either real or personal;

(3) Damage of $1,000 or more to Contractor or subcontractor owned or leased motor vehicles or mobile equipment; or

(4) Damage for which a contract time extension may be requested.

(b) Accident and fire reports required by paragraph (a) of this section shall be accomplished by the following means:

(1) Accidents or fires resulting in a death, hospitalization of five or more persons, or destruction of

Government-owned or leased property (either real or personal), the total value of which is estimated at $100,000 or more, shall be reported immediately by telephone to the Contracting

C-104

Project: WA FLAP PACIFI 12800(2), 67th Place Public Enhancement to Willapa NWR

Officer or his/her authorized representative and shall be confirmed in writing within 24 hours to the Contracting Officer. Such report shall state all known facts as to extent of injury and damage and as to cause of the accident or fire.

(2) Other accident and fire reports required by paragraph (a) of this section may be reported by the

Contractor using a state, private insurance carrier, or Contractor accident report form which provides for the statement of—

(i) The extent of injury; and

(ii) The damage and cause of the accident or fire.

Such report shall be mailed or otherwise delivered to the Contracting Officer within 48 hours of the occurrence of the accident or fire.

(c) The Contractor shall assure compliance by subcontractors at all tiers with the requirements of this clause.

1252.223-73 Seat Belt Use Policies and Programs (Nov 2022)

In accordance with Executive Order 13043, Increasing Seat Belt Use in the United States, dated April 16, 1997, the Contractor is encouraged to adopt and enforce on-the-job seat belt use policies and programs for its employees when operating company-owned, rented, or personally-owned vehicles. The National

Highway Traffic Safety Administration (NHTSA) is responsible for providing leadership and guidance in support of this Presidential initiative. For information on how to implement such a program or for statistics on the potential benefits and cost-savings to your company or organization, please visit the Click it or Ticket seat belt safety section of NHTSA's website at https://www.nhtsa.gov/campaign/click-it-or-ticket and https://www.nhtsa.gov/risky-driving/seat-belts.

https://www.federalregister.gov/executive-order/13043 https://www.nhtsa.gov/campaign/click-it-or-ticket https://www.nhtsa.gov/campaign/click-it-or-ticket https://www.nhtsa.gov/risky-driving/seat-belts

File details come from the government source that posted it. Updated .