This is a preliminary construction plan set for the Olympic National Park ERFO (Emergency Relief for Federally Owned Roads) Repairs 2022 project, prepared by the Federal Highway Administration's Western Federal Lands Highway Division. The project involves bank stabilization, riprap installation, road reconstruction, and embankment work along a 189.78-foot section of North Shore Road in Jefferson County, Washington.
The plans detail specific construction requirements including roadway excavation (72 CUYD), roadway aggregate method 2 (74 CUYD), bank stabilization with placed riprap method A class 5 (626 CUYD), untreated timber pile installation (18 EACH), mitigation measures including log barriers (18 EACH) and root wads (21 EACH), and streambed material placement (78 CUYD). The design includes a 20-foot wide roadway (two 10-foot travel lanes) with 2% crown and government-furnished plantings of 150 willow poles, 75 cottonwood poles, and 20 western red cedar 1-gallon pots. Traffic control plans indicate full road closure during construction. The project location is at MP 10.2 on North Shore Road near Lake Quinault, with coordinates 47°32'11.460665"N, 123°45'20.254279"W.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Description WA ERFO NPS OLYM 2022-1(1).pdf | ||
| Prelim Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANAGER
J.DAVIS
N O
T
FO
R
CO
N
STRU
CTI
O
N
R
E N
OR
A I
N
N
ST F
R
I
D
D E P A
T
NT
OFT A SP
T T
O
U
TE
ATESO
AMER
IC
A
M
NATIONAL
PARK
SERVICE
PARK
NATIONAL
CASCADES
NORTH
u n d o S t e g u
P
P A
C I F I C
O C
A E
N tS raitof Juan de Fuca
OC
LU
MBIA
R
IV
ER
A S N
KE
R
VERI
M
COLU B
I A
V R I
E R
Lakes
Banks
Lakes
Moses
Reservoir
Potholes
PARK
NATIONAL
OLYMPIC
N.P.
RAINIER
MOUNT
MON.
NAT'L VOLC.
ST. HELENS
MOUNT
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee
Lake
Moses
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
ANGELES
PORT
Townsend
Port Vernon
Mt.
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
BRITISH COLUMBIA
I D
A H
O
OREGON
UNITED STATES
CANADA
PROJECT LOCATION
N
S. SHORE Rd.
PRELI
M
IN
ARY
WA ERFO NPS OLYM 2022-1 (1)
OLYMPIC NATIONAL PARK
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
OLYMPIC NPS ERFO REPAIRS 2022
TYPE OF CONSTRUCTION:
and embankment excavation, road reconstruction, Bank Stabilization, Riprap, DESIGN DESIGNATION:
e (max)
V
ADT (2044)
ADT (2024)
North Shore Road:
match existing
25 MPH
SPECIFICATION:
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
LENGTH 189.78 FEET
PLANS FOR PROPOSED PROJECT
WASHINGTON
JEFFERSON COUNTY
See Sheet A.3
Scale in miles
2 0 2 4 6
APPROVED:
Western Federal Lands Highway Division
Chief of Engineering, DATE
RECOMMENDED:
Olympic National Park
Park Superintendent DATE
NPS Interior Regions 8, 9, 10, and 12
Associate Regional Director, DATE
NEILTON
QUINAULT
LAKE
N O
R
TH
SHORE
R d
OLYMPIC
NATIONAL
FOREST
Quinault
River
WILDERNESS
COLONEL BOBNORWOOD
NFD
R O
A D
E.
F or k Hum pt ul ip s
Ri ve r
N F D R
O A D
F in le y C re e k
B ig C re ek
:5
P
M
N o v e m b e r
T it le S h e e t
N
S c p w w o r k \d
\w a e p o ly m C o v e r S h e e t_
N S
.d g n
PROJECT
NUMBER
SHEET
A.1
NPS DRWG. No. 149/195306 NPS PMIS No. 335200
WA ERFO NPS OLYM 2022-1 (1)
PRELIMINARY - N
OT FOR CONSTRUCTION
BH TP
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000EL. 1234.56
TP
TP
SEC.
SEC.
NO SCALE
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
DI
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
11/2001 DETAIL APPROVED FOR USE
6/2022
10/2014 10/2009 1/2007 9/2005 REVISED: 101-1W
WFLHD DETAIL
ABBREVIATIONS
PLAN SYMBOLS AND 3
:4
N o v e m b e r
D e t W
-1 p w
-w o rk \d
\w a -e p -o ly m
-1 p ln s -s y m b a b b s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) A.2
NPS PMIS No. 335200 NPS DRWG. No. 149/195306
01 1 32
Scale in miles
Site 104 - MP 10.2
N
LOCATION MAP
1000 FT
Site 104 - MP 10.2
(Lat. 47.535793, Long. -123.758372)
Site 104 - MP 10.2
Quinault River
Q u in a u lt R ive r
South Shore Rd.
LAKE QUINAULT
Qui na ul t
R iv e r
OLYMPIC
NATIONAL
FOREST
WILDERNESS
COLONEL BOB
N O
RTH
SHORE ROAD
F in le y C re e k
B ig C re e k
E a s t
F o rk
H u m p tu li p s
Riv er
W e st
Fo rk
Hum pt ul ips
River
Big Cr ee k
N F D
R o a d
North Shore Rd.
:2
N o v e m b e r
V ic in it y M a p
N o rt h S h o re p w w o r k
\d
\w a e p o ly m v ic in it y m a p
.d g n
VICINITY MAP
PROJECT
A.3
NPS PMIS No. 335200 NPS DRWG. No. 149/195306
WA ERFO NPS OLYM 2022-1 (1)
LC
Existing ground
Existing ground details bank stabilization
See Sheet F.2 for
Traveled lane Traveled lane
6-inch compacted depth
Roadway aggregate, method 2, 101+47.00 to 103+36.78
"MAIN 01"
1:
10'10' li m it
C o n s tr u c ti o n
Turf establishment
2% Crown2% Crown
:3
A
N o v e m b e r
T y p ic a l
S e c ti o n p w w o r k
\d
\w a n p o ly m ty p ic a l-s e c ti o n
.d g n
TYPICAL SECTION
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) C.1
PROJECT UNITS : International Foot
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER
NORTH EAST ELEVATION LATITUDE LONGITUDE
ELLIPSOID
HEIGHT
COMBINED
FACTOR
DESCRIPTION NOTE:
23201 209267.514 918303.871 279.622 47°32'09.896004"N 123°45'26.485172"W 208.6436 0.999983497 5/8" ir w/fhwa alum cap 1.
23202 209359.933 918542.561 278.640 47°32'10.896932"N 123°45'23.060215"W 207.6916 0.999983494 5/8" ir w/fhwa alum cap
23203 209409.701 918737.123 279.713 47°32'11.460665"N 123°45'20.254279"W 208.775 0.999983414 hub&tack
23204 209437.137 918877.078 278.965 47°32'11.783678"N 123°45'18.231237"W 208.0341 0.999983434 hub&tack
23205 209460.958 919079.808 279.155 47°32'12.094541"N 123°45'15.291968"W 208.2337 0.999983409 5/8" ir w/fhwa alum cap
23206 209535.536 919396.157 281.466 47°32'12.948496"N 123°45'10.726061"W 210.5609 0.999983256 5/8" ir w/fhwa alum cap
PROJECT :NPS ERFO Repairs 2022 Big Creek Culvert DATE OF FIELD WORK :April 2023
DATE OF FINAL ADJUSTMENT :4/18/2023
COORDINATE SYSTEM : Washington North SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.0000
CADD COORDINATE SYSTEM :WA83/2011-NIF NSRS11(NAD83/2011) Washington, North Zone, International foot
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\O
LY
M N
PS
E
R
FO
R E
PA
IR
S
\N or th
S h or e (B ig C re ek
P ac ka g e\
D
-N ov -2
:1
W
FL
H D
S u rv ey
W
FL
H
D S u rv ey
D es ig n ed b y:
C h ec ke d b y:
PROJECT
D.1
SHEET
NUMBER
WA ERFO NPS OLYM 2022-1 (1)
SURVEY CONTROL
NPS PMIS No. 335200 NPS DRWG. No. 149/195306
:3
N o v e m b e r
E A
R T
H W
O R
K S
U M
M A
R Y p w w o r k
\d
\w a e p o ly m to q .d g n
SHEET 1 OF 2
TABULATION OF QUANTITIES
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) D.2
:5
N o v e m b e r
T A
B U
L A
T
IO
N O
F R
O A
D W
A Y
Q U
A N
T
IT
IE
p w w o r k
\d
\w a e p o ly m to q .d g n
SHEET 2 OF 2
TABULATION OF QUANTITIES
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) D.3
N71°35'35" E
PI 101+17.64
Δ = 03°17'15" (RT)
R = 2,023.46' T = 58.07' L = 116.10' e = N/A
PI 102+44.12
Δ = 08°48'28" (LT)
R = 888.68' T = 68.44' L = 136.61' e = N/A
A P P
R O
X
IM
A T
E L
O C
A T
IO
N
" C
M P
A P P
R O
X
IM
A T
E L
O C
A T
IO
N
" C
M P
" C
M P
" C
M P
N
BEGIN CONSTRUCTION
BEGIN PROJECT/
END CONSTRUCTION
END PROJECT/
to be constructed "MAIN 01" Line
Construction limit limit Slope stake of gravel Proposed edge of gravel Proposed edge limit Slope stake
(match existing) Profile grade
Existing ground
99+50 100+00100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00
270 270
272 272
274 274
276 276
278 278
280 280
282 282
284 284
286 286
.4
.1
"MAIN 01" 101+47.00
"MAIN 01" 103+36.78
E= 918720.2762 N= 209386.8745
E= 918904.1821 N= 209432.4949
NORTH SHORE ROAD
:2
N o v e m b e r
M
A
IN
P la n
S h e e t] p w
-w o rk \d
\w a -e p -o ly m
-1 p ln
-p ro fi le
.d g n
PROJECT
D.4
WA ERFO NPS OLYM 2022-1 (1)
:4
N o v e m b e r
T A
B U
L A
T
IO
N O
F E
C Q
U A
N T
IT
IE
p w w o r k
\d
\w a e p o ly m to q .d g n
CONTROL QUANTITIES
TABULATION OF EROSION
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) E.1
P T
.2
P C
.5
P R
C
.6
P C
.2
CP
23202
GPS
23204
CP
23205
GPS
23203
N
BEGIN CONSTRUCTION
BEGIN PROJECT/
END CONSTRUCTION
END PROJECT/
Fiber roll
Install SEC, of gravel
Proposed edge limit
Slope stake of gravel
Proposed edge
Ordinary high water: 277.5'Protect vegetation
Temporary stream diversion
Install SEC, jams
Existing log Ordinary high water: 277.5'
Ordinary high water: 277.5' channel
Excavated diversion
Construction limit
SEC
LEGEND:
See Sheet E.4 for details
Soil Erosion Control, Fiber Roll.
Soil Erosion Control
Soil Erosion Control, Temporary Stream Diversion
Water Flow Direction
"MAIN 01" 101+47.00
"MAIN 01" 103+36.78
by CO to construct diversion channel.
2. Remove portions of existing log jams as directed the time of construction.
is determined to be needed to plug leaks during methods of the contractor and where the most material gravel bar is entirely subject to the means and height of the excavated gravel material left on the so no berms or gravel piles remain. The width and the sacks are removed, but must be spread uniformly will be left on the bar after work is complete and super sacks/sand bags. The excavated gravel used to form the diversion berm and fill the material excavated from gravel bar will be
1. The length of the diversion berm is 350 ft, NOTE:
:3
N o v e m b e r
M A
I N
P la n
S h e t] p w w o r k
\d
\w a e p o ly m e c .d g n
CONTROL PLAN
DIVERSION & EROSION
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) E.2
m in
4'-6" min.
6" (min.) freeboard. Submit temporary stream diversion m in
NO SCALE
Existing ground
Water surface elevation
OPTION B
OPTION A
Sandbag (typ.)
Sandbag (typ.)
Portable water bladder
Water surface elevation
Existing abutment or pier elevation (min.)
Top of berm
Existing ground at time of construction
Diverted water level
Limit of work zone at time of construction
Diverted water level
(anchoring method to be approved)
Waterproof membrane stream flow side of diversion berm.
Impervious sheeting. Place on elevation (min.)
Top of berm manufacturer's recommendations.
handling bags. Fill and place per
Machine-placed large material temporary diversion berm.
extent practicable when placing existing streambed material to the
Minimize leveling or trenching of sandbags (as needed)
Hand-placed streambed grade
Existing elevation
Water surface
OPTION C
NPS PMIS No. 335200 NPS DRWG. No. 149/195306
NOTE:
5.
4.
3.
2.
1.
membrane
Waterproof discretion.
Use as needed when constructing the isolation barrier, per CO height of the sandbag barrier.
directed. Remove sediment when deposits reach half the berm daily. Repair as needed after rainfall events or as
While in use, inspect and maintain the temporary diversion given time.
Place a maximum of one diversion in the stream at any upper rows of sandbags above the joints in lower rows.
of bottom rows as there are vertical course. Overlap the
Place sandbags to form a pyramid by laying equal numbers plans for approval prior to installation.
minimum height equal to the water surface elevation with
As a minimum, provide a temporary diversion berm with a prefabricated or portable diversion berms, dams, etc.).
methods may be chosen (including any approved during construction operations. Alternate stream diversion
These options suggest configurations for diverting a stream
:4
N o v e m b e r
T e m p o r a r y D iv e r s io n B e r m
M e th o d s p w w o r k \d
\w a e p o ly m te m p d iv e r s io n .d g n
METHODS
TEMPORARY DIVERSION BERM
PROJECT
NUMBER
E.3
WA ERFO NPS OLYM 2022-1 (1)
NO SCALE
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
FIBER ROLL
(FT)
(FT)
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
WFLHD DETAIL
DETAIL APPROVED FOR USE 10/2014
7/2016 REVISED:
157-21W
:4
N o v e m b e r
D e t
W p w w o r k \d
\w a e p o ly m f ib e r r o ll s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
E.4
WA ERFO NPS OLYM 2022-1 (1)
:5
N o v e m b e r
T A
B U
L A
T
IO
N O
F B
A N
K S
T
B p w w o r k
\d
\w a e p o ly m to q .d g n
STABILIZATION QUANTITIES
TABULATION OF BANK
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) F.1
N71°45'51"E
[2]
Untreated timber pile
20' length (18 EACH)
18" to 24" dia., 24' lengths (432 LNFT)
18" to 24" dia. , minimum
Mitigation, log barrier
(see typical)
3 foot spacing
Plantings (Government Furnished) streambed material
Backfill with conserved method A, class 5
Placed riprap, :1
1:
1.
El. 268.0
Grading control point debris (2' min.) over logs
Place coarse woody class 1, type B
Geotextile filter, Grading control point
El. 278.5
Existing ground
[1]
(18 EACH)
25' length including root wad
18" to 24" diameter - DBH
Mitigation, root wad
48" Culverts
NORTH SHORE ROAD
FOOTNOTE:
Refer to SCR 648.03[3]
Untreated timber pile: Cut conical shoe on log pile if required.[2]
Maximize trunk embedment, but allow the rootwad end to project into flow from bank line.[1]
[3] together with chains to timber pile and log barrier
Wrap mitigation root wad
Finish Contour Existing Contour method A, class 5
Placed riprap, 24' lengths (432 LNFT)
18" to 24" dia. , minimum
Mitigation, log barrier
[1]
(18 EACH)
25' length including root wad
18" to 24" diameter - DBH
Mitigation, root wad
[2]
Untreated timber pile
20' length (18 EACH)
18" to 24" dia., BIG CREEK
N
5'
7'
A
A
SECTION A-A
See typical below
Plantings (Government furnished)
Coarse woody debris
NO SCALE
Rootball fan
T r u n k d ia a t c u t e n d
Trunk length
ROOTWAD DIAGRAM
d ia m e te r
' m in
6'
PLANTING DIAGRAM
Space every 3'
Elevation: 278.50
Offset: -29.0650
Station: 101+47.26
Riprap
Elevation: 279.1344
Offset: -27.3946
Station: 103+40.81
Corner of excavation limits
Elevation: 278.50
Offset: -26.5639
Station: 103+38.87
Riprap
Elevation: 278.50
Offset: -10.0000
Station: 103+17.06
Riprap
Elevation: 278.50
Offset: -9.9961
Station: 101+79.49
Riprap
No plantings in vicinity of culverts.
width away from culverts.
Avoid excavation at least 1 culvert
Leave existing culverts in place.
Existing Ordinary High Water: 277.5 feet from upstream edge on surface of rip rap 3 feet
Place root wads (3 EACH)
Mitigation, root wad
LC
Ordinary high water: 277.5 ft
PLAN
270'
270'
:1
N o v e m b e r
P la n P la n
S h e t p w
-w o rk \d
\W
A -E
R F
O
N P
S
O L
Y M
P la n .d g n
GRADING PLAN AND DETAILS
BANK STABILIZATION
PROJECT
NUMBER
SHEET
F.2
NPS PMIS No. 335200 NPS DRWG. No. 149/195306
WA ERFO NPS OLYM 2022-1 (1)
:4
N o v e m b e r
T O
Q p w w o r k \d
\w a e p o ly m tt c .d g n
TRAFFIC CONTROL QUANTITIES
TABULATION OF TEMPORARY
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) G.1
ROAD
CLOSED
CLOSED
ROAD
AHEAD
WORK
ROAD
AHEAD
message sign portable changeable
Temporary traffic control, message sign portable changeable
Temporary traffic control, BARRICADE, TYPE 3
ROAD CLOSED
TO
THRU TRAFFIC
ROAD
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
PROJECT LOCATION
BARRICADE, TYPE 3
ROAD
CLOSED
ROAD
CLOSED
NORTH
SHORE
ROAD
LAKE QUINAULT
S O
U
TH
S
H O
R E R
O A D
Scale in miles
00.5 0.5 1 1.5
W20-3
W20-3
R11-2
R11-4
R11-2
R11-4
See Sheet A.3
N F
D R o a d
Ingram Rd
H aa s
R d
R11-2
R11-2
:4
N o v e m b e r
U n ti tl e d
S h e t p w w o r k \d
\w a e p o ly m tt c .d g n
CLOSURE SIGNING
CONTROL ROAD
TEMPORARY TRAFFIC
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) G.2
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD NAME
WORK
ROAD
AHEAD
ROAD WORK
END
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
WORK
ROAD
AHEAD
xx
MPH
ROAD NAME
ROAD WORK
END
WORK
ROAD
xxxxxxx
ROAD WORK
END
xx
MPH
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD TYPE
DISTANCE BETWEEN
A B C
NOTE:
M in o r R o a d
M a jo r R o a
C
B as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
A
B
C
A
A
A
A
Pr oje ct Lim its
See Note 8 W16-8P W20-1 over
W20-1
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1
G20-2
See Note 8 W16-8P W20-1 over
G20-2
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1 specify the distance to the work area in feet or in miles. Install an The message on the W20-1 signs may be ROAD WORK AHEAD or may roads only).
name of the road on which the construction does occur (applies to major construction work occurs, include a supplementary plaque indicating the If W20-1 is placed on a roadway other than that on which the actual
Cover post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use.
Maintain two-way traffic during all non-work hours except as approved.
Ensure all sign supports exposed to traffic are crashworthy.
construction area.
needed to indicate a maximum recommended speed through the Install advisory speed plaques under the W20 series warning signs as messages as required.
signs, locate the warning signs to fit field conditions as approved. Vary Where advance warning signs, placed as shown, interfere with permanent operations.
and details in this traffic control plan as necessary to accommodate actual applicable to this project. The Contractor may add or delete information Not all details shown on the temporary traffic control sheets may be
Erect all project advance warning signs before starting construction work.
State standards may be used as an alternative if approved.
verify that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, nearest whole mile.
at each end of the project. Show the distance on the G20-1 sign to the
Ro ad N ame
SIGN SPACING TABLE
For work zones that are 2 miles or more in length, install G20-1 signs
Sign Spacing Table.
When used, place the two W20-1 signs "B" feet apart according to the additional W20-1 sign when approach speeds exceed 50 mph.
Expressway / Freeway
NO SCALE
SIGNS IN FEET
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
635-1
FP-24, FP-14
2/2024
FLH STANDARD
:3
S e p te m b e r
S td p w
-w o rk
\d \S td -1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) G.3
See post detail (typ.)
Breakaway holes
See table for hole size parallel to sign face.
Field drill holes through post
Bottom of sign panel
Post�
Local tangent
< 10
" diameter4 1Attach sign panels with a minimum of two a minimum lateral distance of 1 ft behind the face of lateral offset of 2 ft may be used. In areas with curbs, 6" x 6" or larger.
Use 7 ft minimum spacing between posts for sign posts and 6 ft minimum mounting height for secondary sign.
use 7 ft minimum mounting height for main sign
NOTE:
90°
93°
WOOD POST SELECTION TABLE
X X
0.75X
H
H
X
0.2X0.6X 0.2X
Y
H
D
H
D
H
D
Long side of post
D
7.
6.
5.
4.
3.
2.
1.
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
bolts per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
State standards may be used as an alternative if approved.
S e e N o te m in
S e e N o te m in
See Note 4
6' - 12'
On tangent alignment
200'
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
(INCH) (INCH) (INCH)
Diamond ≤ 48"
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
> 30'
> 17'
12' - 16'
> 13'
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
1.5
1.5
1.5
1.5
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
635-14
FP-24, FP-14
2/2024
FLH STANDARD
:3
N o v e m b e r
S td p w
-w o rk
\d \S td -1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1 (1) G.4
Existing embankment
INSTALLATION DETAILS
WILLOW AND COTTONWOOD
OHWOHW
2'-0" 8'-0"
NO SCALE
:2
N o v e m b e r
S ta n d a r p w w o r k
\d
\w a e p o ly m w il lo w c o tt o n w o o d d e ta il s .d g n
PROJECT
NUMBER
SHEET
WA ERFO NPS OLYM 2022-1(1) H.1
Stream bottomStream bottom
Set hingeline at OHW trench method
Pole plantings, trench method single group or
Pole plantings, Bank toe at OHW thoroughly with water the ball of earth by soaking it
Settle the loose soil around or outside ball
3.
2.
1.
BALLED AND BURLAPPED TREES AND SHRUBS
METHOD OF PLANTING CONTAINER OR
AND METHOD OF GUYING DECIDUOUS TREES
METHOD OF PLANTING BARE ROOT TREES AND SHRUBS
METHOD OF STAKING
x 6' dia.
Place mulch around base of all trees and shrubs, 4" deep or Pine stakes.
Provide construction grade, rough or dressed Douglas Fir hose and wire guying.
Approved commerical plant ties may be used in lieu of anchors driven firmly into the ground wood stakes or approved metal galvanized wire and scarify sides to prevent sealing
Roughen subsoil in bottom of hole as it stood in nursery level to the natural ground
Set plant in hole same the center point the tree and twisted at two-thirds the height of trunk at least equal to
Wire anchored from the marker conspicuous
Approved deciduous trees where required
Wrapping material on
Depression to collect water completely saturated and filled on top until all voids are the roots by pouring water roots. Soak the topsoil around
Work topsoil carefully around
Place roots in natural position.
and scarify sides to prevent sealing
Roughen subsoil in bottom of hole
Prune any broken roots prior to placing around roots conditioner and throughly mixed
Topsoil mixed with specified soil deciduous trees where required
Wrapping material on
Topsoil to collect water around plant on level ground or slope container or ball diameter
Make a depression twice the prior to placing around ball conditioner and throughly mixed
Topsoil mixed with specified soil down upper half of burlap
Cut bindings, and peel
Place mulch as directed
Trees and shrubs.
stood in nursery or container to the natural ground as it
Set plant in hole same level wrapping paper under hose plastic hose with tree, nylon, rubber or reinforced
1/2" dia. 12" long driven prior to backfilling
2" x 2" wood stake wrapping paper under hose or reinforced plastic hose with tree, 1/2" dia. x 12" long nylon, rubber, at which ties are to be made
Cut stake off about 12" above the point ground and stapled or tied to the stake.
a point two-thirds the height of tree above approved plastic ties tied to the tree at
14 gage or heavier galvanized wire or a b o u t tw o th ir d s t h e h e ig h t o f t h e t r e e g u y c a b le s r e q u ir e d indicated by dotted lines. Do not cut leader
For bare root trees and shrubs, prune for nursery stock and3 branches about for collected material as 2 about
12" max., 6" min.
around planted tree.
perimeter consisting of slash, to base of plant. Install a 8'
Mulch to a depth of 4" feather around planted tree.
perimeter consisting of slash, to base of plant. Install a 8'
Mulch to a depth of 4" feather
NOTE:
PLANTING METHODS
TREES AND SHRUBS
:1 a y
S ta n d a r p w w o r k \d
\w a e p o ly m r e v e g d e ta il s .d g n
PROJECT
H.2
WA ERFO NPS OLYM 2022-1(1)
File details come from the government source that posted it. Updated .