Project Description WA ERFO NPS OLYM 2022-1(1).pdf

PDF 139 KB Posted

Attached to
WA ERFO NPS OLYM 2022‐1 (1), OLYMPIC NPS ERFO REPAIRS 2022
Solicitation number
69056725B000006
Issued by

About this file

This is a project description document detailing requirements for road repairs and stabilization work at Olympic National Park in Washington state. The project is being managed by the Federal Highway Administration with an estimated price range of $700,000 to $2,000,000.

The scope includes road reconstruction, bank stabilization, riprap installation, and engineered log jam construction over 0.05 miles located 9 miles northeast of Amanda Park in Jefferson County. Key requirements include 690 cubic yards of Class 5 riprap, 80 cubic yards each of roadway excavation and aggregate, 18 untreated timber piles, and various mitigation elements including 20 log barriers, 21 root wads, 80 cubic yards of streambed material, and 260 cubic yards of coarse woody debris. The project also requires temporary traffic control measures, erosion control (200 linear feet of fiber roll), turf establishment over 410 square yards, and various contractor quality control measures. The tentative completion date is set for Winter 2025.

View the file

Other files

File Type Posted
Prelim Letter.pdf PDF
wa-ep-olym2022-1--1_plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA ERFO NPS OLYM 2022‐1 (1), OLYMPIC NPS ERFO REPAIRS 2022

This work consists of: Road reconstruction, bank stabilization, riprap, and engineered log jam.

Project Location: 9 Miles NE of Amanda Park, Jefferson County, Washington

Project Length: 0.05 Miles

Estimated Price Range: Between $700,000.00 and $2,000,000.00

Tentative Fixed Completion Date: Winter 2025

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

O n e S ch ed u le

S ch

N am e

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no)

Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion & Sediment Control (Fiber Roll) 200 LNFT

157 Soil Erosion & Sediment Control (Temporary Diversion Berm) LPSM

DIVISION 200 – Earthwork

204 Roadway Excavation 80 CUYD

One Schedule Sch Name

DIVISION 250 – Slope

Reinforcement and Retaining Walls

251 Riprap, Class 5

690 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate 80 CUYD

DIVISION 550 – Bridge

Construction

551 Untreated Timber Piles 18 EACH

DIVISION 600 – Incidental Construction

622 Rental Equipment (yes/no) Yes

623 General Labor (yes/no) Yes

625 Turf Establishment

(indicate seeding or mulching separately)

410 SQYD

626 Plants LPSM

635 Temporary Traffic Control – Barricade Type

4 EACH

635 Temporary Traffic Control – Portable Changeable Message Signs

2 EACH

635 Temporary Traffic Control – Construction Sign

90 SQFT

647 Mitigation, Log Barrier 20 EACH

647 Mitigation, Root Wad 21 EACH

647 Mitigation, Streambed Material 80 CUYD

647 Mitigation, Coarse Woody Debris 260 CUYD