A8aa_B10480_SOW.doc

DOC document 33 KB Posted

Attached to
FXSB1100136, Repair Services Building B10480
Solicitation number
W91ZRU-10-R-T001
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
A9_B10480_Site Visit.pdf PDF
A8_B10480_!READ ME FIRST_A02.docx DOCX document
A8a_B10480_TOC proposal form_A02.docx DOCX document
A8a_B10480_TOC proposal form_A01.docx DOCX document
A8b_B10480_AK MATOC POCs.xls XLS spreadsheet
A8_B10480_!READ ME FIRST.docx DOCX document
A8ab_B10480 dwg.jpg JPG image
A8a_B10480_TOC proposal form_final.docx DOCX document
A8ac_B10480 details.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION SERVICES

STATEMENT OF WORK

Repair Services, Bldg 10480

FXSB1100136

1. GENERAL

1. The work covered by this Statement of Work (SOW) includes providing all plant, labor, equipment, and materials required to perform design of the tasks outlined below. The contractor shall be responsible for necessary travel and services required to perform the work.

2. The contract procedures and project objective provide only general direction of what is required and does not constitute a complete explanation of the work involved. The government is relying on the contractor’s expertise in providing products that meet the intent of the task. The contractor shall work closely with designated government representative to work out details.

3. Work shall comply with local, state, and federal codes and applicable ANG Engineering Technical Letters (ETLs).

4. Materials incorporated into the work shall be new.

5. Asbestos Containing Materials (ACM) are present in this facility.

2. CONTRACT PROCEDURES

1. This contract shall be awarded on a firm fixed price basis. The contractor shall provide a base bid and additive item bids.

2. The government has attached copies of all available as-built drawings of the building to aid the contractor.

3. The contractor shall verify accuracy of information on as-built drawings before using this information to formulate plan/recommendations.

4. The contractor will meet with contracting officer’s technical representative to discuss general parameters of project.

5. The contractor will need to phase work in the basement to do one side at a time with hallway delineating the sides. The contractor will allow for one week of down time between phases to enable third party to shift equipment being stored in the other portion, not yet worked on, to the side that the contractor just completed.

3. PROJECT OBJECTIVE

1. As part of base bid item, contractor shall accomplish the following:

a. Re-build existing return air duct system that has been partially disassembled and is located in the basement under the project area. Existing serviceable portions of return air system can be re-used if cleaned. Each room in project area shall have a functioning and adjustable return air register. In addition, contractor will need to extend air return ducting through original walls to new registers in furred out walls.

b. Replace existing air supply diffusers with new adjustable diffusers throughout project area. Inspect supply air ducting system for serviceability and repair as needed. Government is not aware of any major deficiencies with this system.

Clean air supply ducting system from where it branches from main to service project area wing of building to new air supply diffusers.

c. Balance air supply and return systems to maintain acceptable temperature and air exchange comfort parameters for administrative office functions.

d. Contractor shall repair all wall openings associated with installation of air return registers to match the surrounding wallboard.

2. As part of additive bid items, contractor shall accomplish the following:

a. Replace all prismatic acrylic lens covers on existing overhead lighting fixtures with new similar to existing type.

b. Replace all acoustical overhead ceiling tiles with new similar to existing type.

12 Jan 11

File details come from the government source that posted it. Updated .