Attachment 6_Quality Assurance Surveillance Plan.pdf

PDF 84 KB Posted

Attached to
Fords Farm Maintenance and Repair
Solicitation number
W91ZLK-25-R-6844
Issued by

About this file

This document is a Quality Assurance Surveillance Checklist for a federal contract related to maintenance and repair services. The checklist outlines specific performance requirements with 100% compliance expectations across multiple areas, including quarterly/regular inspections, defect notification, preventive maintenance, repairs, estimates, replacement parts/materials, and documentation. Surveillance methods involve periodic assessments by the Contracting Officer's Representative (COR), Technical Point of Contact (TPOC), or Facility Manager, with evaluation criteria spanning adherence to safety protocols, industry standards, timely reporting, and documentation maintenance. The document provides a structured framework for monitoring and evaluating contractor performance, with compliance levels designated as Exceeds (E), Met (M), Partially Met (PM), Not Met (NM), or Not Applicable (NA).

View the file

Other files

File Type Posted
Attachment 1_Combined SynopsisAndSolicitation Description_W91ZLK-25-R-6844_16May25.docx DOCX document
Attachment 8_Questions and Answers_W91ZLK-25-R-6844_As of 13May25.docx DOCX document
Attachment 3_Contract Provisions and Clauses.pdf PDF
Attachment 1_Combined SynopsisAndSolicitation Description_W91ZLK-25-R-6844_8May25.docx DOCX document
Attachment 8_Questions and Answers_W91ZLK-25-R-6844_As of 8May25.docx DOCX document
Attachment 10_Wage Determination 2015-4265.txt TXT text file
Attachment 1_Combined SynopsisAndSolicitation Description_W91ZLK-25-R-6844_8May25.docx DOCX document
Attachment 2_Performance Work Statement_With Exhibits_8May25.pdf PDF
Attachment 4 Pricing Worksheet_Schedule of Services 8May25.xlsx XLSX spreadsheet
Attachment 9 _Sample_Field_Notes.pdf PDF
Attachment 7_Contract Data Requirements List_Fords Farm.pdf PDF
Attachment 1_Combined SynopsisAndSolicitation Description_W91ZLK-25-R-6844_25Apr25_Clean.docx DOCX document
Attachment 1_Combined SynopsisAndSolicitation Description_W91ZLK-25-R-6844_25Apr25_Tracked Changes.docx DOCX document
Attachment 1_Combined SynopsisAndSolicitation Description_W91ZLK-25-R-6844_16Apr25.docx DOCX document
Attachment 5_Site Visit Notice_W91ZLK-25-R-6844.docx DOCX document
Attachment Five_Site Visit Notice_W91ZLK-25-R-6844.docx DOCX document
Attachment 2_Performance Work Statement.pdf PDF
Attachment 1_Combined SynopsisAndSolicitation Description_W91ZLK-25-R-6844_9Apr25.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. Contract Number: Compliance:

B. Contractor: E: Exceeds NM: Not Met C. Task Order: M: Met NA: Not Applicable

PM: Partially Met

Performance Requirement Performance Standard Method of

Surveillance

Acceptable Performance Level (APL)

Compliance:

E, M, PM, NM,

NA

Quarterly /Regular Inspections (4)

Adherence to ATC Safety Protocols and industry standards (e.g., NEC).

COR, TPOC, or Facility Manager periodic assessment.

100% Compliance

Defect Notification

Documentation of defects on the inspection record with notation of violations. Tag out of unsafe equipment.

COR, TPOC, or Facility Manager periodic assessment.

100% Compliance

Preventive Maintenance Service Adherence to industry standards.

COR, TPOC, or Facility

Manager periodic assessment.

100% Compliance

Repairs

As required at any time by the COR, and Facility Manager. If defect requiring urgent repair is noted during inspection/maintenance service, the contractor will notifiy the COR immediately after completing maint/inspection procedures. Work shall adhere to industry standards.

COR, TPOC, or Facility Manager periodic assessment.

100% Compliance

Estimates Written estimates will be provided to

COR within 5 working days after repair request.

COR periodic assessment. 100% Compliance

Replacement Parts/Material

Contractor will obtain all repair parts and materials for inspection, preventive maintenance, repair, and modification services.

Contractor shall strive to obtain parts and materials as quickly as reasonable.

COR periodic assessment. 100% Compliance

Documentation/Records

Produce and maintain records in accordance with industry standards

(e.g., NEC). Documentation of scheduled inspections and PMs will be provided to the COR within 5 working days after the end of the period. Documentation of repair and modification services will be provided to the COR within five (5) working days after the completion of the action.

COR and/or TPOC periodic assessment. 100% Compliance

Summary and / or General Observations:

Recommendations:

COTR / COR: Name: Signature:

Date:

Chief, ATC Contracts Team: Name: Signature:

Date:

QUALITY ASSURANCE SURVEILLANCE CHECKLIST

COMMENTS

Sheet1

File details come from the government source that posted it. Updated .