A02-Justification for OTFOC.Building Boards(update)._Redacted.pdf
PDF 704 KB Posted
- Solicitation number
- W91ZLK-23-Q-0062A
About this file
This document is a Justification for Other Than Full and Open Competition (JOFOC) for a federal contract opportunity to procure building boards. The JOFOC explains that the requirement is limited to a single source due to the proprietary and specialized nature of the product, and that continuing the incumbent contract will avoid duplication of costs. The related federal contract opportunity is a solicitation for 2,112 sheets of 1/2" x 4' x 8' building boards that are low density cellulose fiberboard, primed white on one side. The requirement is set-aside for small businesses, with a Firm-Fixed Price contract to be awarded to the lowest priced, technically acceptable offer. Proposals are due by November 14, 2023, and the Government intends to award without discussions. Technical evaluation will be based on compliance with the purchase description, and responsibility will be determined per FAR 9.1. The procuring agency is the Army Contracting Command Aberdeen Proving Ground.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PURCHASE DESCRIPTION.Technical Requirements..pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 4, DEC 2020 PREVIOUS VERSION IS OBSOLETE
Section 3- Unique salient characteristics that limit availability to only one source, with the reason no other supplies or services can be used:
a. Explain factors/unique qualifications such as proprietary data or exclusive licensing rights, if applicable.
b. If brand name, explain why an adequate purchase description or other information suitable to solicit by full and open competition has not been developed or are not available.
Section 4- Reason why contractor is the only source capable of meeting mission requirements; specifically, the reason no other source can meet the unique capabilities in section 3:
a. Has the vendor provided a statement verifying the unique/specialized/proprietary nature of the requirement?
b. Follow-On Contracts: Defined as a separate, new contract action for which the price and terms are non-competitively negotiated with the incumbent contractor to continue or augment a specific program which is necessitated by prior procurement decisions. Discuss how the sole source action will avoid duplication of costs that is not expected to be recovered through competition, or discuss the unacceptable delays to the government. Provide an estimate of the costs that will be duplicated and explain how such estimate was derived.
c. If urgency is the basis for the justification, explain the chronological events leading up to the requirement and explain why time constraints cannot permit even a limited competition. Describe impact of required delivery/performance date. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source contractor.
Section 5- Market Research:
a. Reference FAR Part 10
b. Describe the extent of the market research conducted to identify all qualified sources and the results thereof. "Market Research" is defined as those attempts you made to ascertain whether other qualified sources exist, and can include contact with knowledgeable experts regarding similar or duplicate requirements, contact with industry, results of a sources sought synopsis, or draft solicitations. Research of the marketplace may consist of written, telephonic, or world wide web inquiries.
c. Procurement History: Identify contract numbers and whether those actions were competed or not.
Section 7- Actions to Increase Competition (for completion by ACC-APG Acquisition Personnel):
a. What supplemental market research has been done?
b. Has a sources sought, RFI, or notice of intent been posted?
c. Have any contractors identified their interest in this requirement?
d. Has the proposed contractor been contacted for verification of the information presented?
e. Have resellers/distributors been researched and identified?
f. Have the mandatory sources of FAR Part 8 been screened? (FPI/UNICOR, AbilityOne, GSA, FSS)
Brand Name or Equal (FAR 11.104)-
- Brand name or equal purchase descriptions must include, in addition to the brand name, a general description of those salient physical, functional, or performance characteristics of the brand name item that an “equal” item must meet to be acceptable for award.
- Use brand name or equal descriptions when the salient characteristics are firm requirements.
- The below chart details the difference between “Brand Name or Equal” and “Brand Name” actions under $250K:
Brand Name or Equal Brand Name Does NOT require a “Justification” Does require a “Justification”
Does not limit competition/Provides for greater competition
Does limit competition
Informally describe salient characteristics (via email, memo, etc.) in written form.
Formally describe salient characteristics via a “Justification”
No specific format Use Justification for Other Than Full and Open Competition for Simplified Acquisitions <$250K
Allows for “or equal” similar/comparable items Must supply specific item (part number, model number, serial number etc.)
Version 4, DEC 2020 PREVIOUS VERSION IS OBSOLETE
CONTINUATION PAGE
File details come from the government source that posted it. Updated .