This document contains a request for quotation for HVACR maintenance and repair services at Aberdeen Proving Ground in Maryland. The services include scheduled maintenance, unscheduled maintenance, and replacement parts for HVACR and ancillary equipment at the Light Armor Range Complex and Mobile Environment Unit test chambers. Interested contractors may request a site visit by 21 April 2021 and must submit fixed price quotes by 26 April 2021 to the identified contracting officers. The award will be made to the lowest price technically acceptable offeror considering technical capability and past performance. The contract will have a one-year base period and four one-year options and utilize firm-fixed price contract line items for the various services required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLIN Structure April 21.docx | DOCX document | |
| FAR Clause 52_204_24 Representation.docx | DOCX document | |
| A02 Instructions for Offerors.docx | DOCX document | |
| ATC HVACR PWS.pdf | ||
| Wage Determination 15-4265 Dec 20.txt | TXT text file | |
| FAR Clause 52_204_25 Prohibition.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LARC HVACR Support Contract
W91ZLK-21-R-0016
Q&A 20 April 2021
• Does this contract account for PM?
o Yes. The COR will delegate PMCS IAW tasks outlined in the SOW. Time to complete these tasks will be billed against the CLIN 0001 hour total.
• What is the required response time for unscheduled service?
o Two hours to be on-site, as required by the SOW
• What specialty and/or non-OEM equipment is currently in service at each site?
o Included in PWS Appendix
• Is there a list of models and serial numbers?
o Included in PWS Appendix
• Is all equipment to be maintained stationed at a single location?
o No. Thirteen firing ranges at one central location. Portable environmental chambers throughout Aberdeen and Edgewood areas of APG.
• What hazards are present at the various job sites?
o Other than the standard industrial/electrical and HVAC-related hazards, lead exposure and slip, trip, and fall hazards are commonly encountered.
• Will vendor personnel need to be escorted full-time each time they come onsite?
o Primary POCs will have non-escort access to restricted areas, and have permission to escort additional support personnel as needed.
• What type of engineer is required for CLIN 0002?
o At least two Professional Engineers with at least five years of HVACR, automation, controls, and design experience each
• Does CLIN 0003 account for inflation and part price increases?
o Fair market pricing determined as of March 2021. All vendors should bid based on active market prices to ensure fair and consistent bidding.
• How often is servicing of the LARC ranges required?
o Bi-annual seasonal changeovers is generally two to three weekends each in April and September. Routine servicing throughout the year varies depending on test schedules.
• When was LARC last overhauled?
o Late 2000s
• Are there only 4 makeup air units in B690?
o Included in PWS Appendix
• Do the air handlers contain desiccant wheels?
o No. None of the LARC air systems contain desiccant wheels.
• What make and model are the lead-catching filters?
o All filters are made by Air Handler. Model numbers used include 2GHR3, 11Z806, 6B924, 6B930, 6B937, 6B950, 6B956, and 6B657. Filter dimensions and approximate annual quantities used are listed below:
Filter Size QTY. Used Per Year 24 x 24 x 2 560
24 x 24 x 12 380 24 x 24 x 11.5 50
22.5 x 22.5 x 2 10
20 x 25 x 2 240 20 x 22 x 1 10 20 x 20 x 2 360 16 x 25 x 2 500 16 x 25 x 1 10 16 x 20 x 2 80 16 x 20 x 1 20
8.75 x 42.125 x 1 25
8.875 x 61.125 x 1 10
21-5/8 x 43-7/8 x 2-7/8 3
• Where are the LARC lead catcher filters located?
o Lead-catching filters are installed in the exhaust plenums of each range.
• How often are the LARC air filters changed?
o The schedule is dependent on the specific range and usage; replacement intervals can vary from twice daily to every 60 days depending on load experienced.
• Are air filters procured through the government, or is the vendor responsible for procurement?
o Government generally procures via GPCC, but may procure via CLIN 0003 depending on urgency
• Are air filters recycled onsite?
o Contractor will support physical removal of filters; Government will handle recycling of filters.
• Does the government typically obtain advance knowledge of when heavy testing (lead output) will occur?
o Schedule is generally generated on a weekly basis due to evolving needs of customers
• Is automation for the LARC ranges web- or computer-based?
o Web based
• What software is used to control the LARC air handlers?
o Honeywell Niagara N4 is the primary central control software used, except one building that uses Niagara AX.
• Is there an existing service contract with Honeywell?
o The vendor for this contract is responsible for providing Honeywell support. A separate contract with Honeywell does NOT exist directly with the Government.
• Do mobile temperature boxes use standard refrigeration, cascade, CO2?
o Mechanical (single stage and cascade) and CO2 for rapid and supplemental cooling
• How is centralized control of the chambers set up for LARC and the mobile chambers?
o LARC system operates via Honeywell Niagara as stated above. MEU has centralized control of its chambers via SuperView software, which interfaces with chamber process controllers (i.e. Micristar).