Justification for Other than Full and Open Competition
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A01_PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 1, APR 2015 PREVIOUS VERSION IS OBSOLETE
COMPLETION INSTRUCTIONS for:
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION for
SIMPLIFIED ACQUISITIONS VALUED BELOW $150K
I. General Information
a. The purpose of the justification document is to ensure the requiring activity and contracting office have thoroughly evaluated the requirement and have considered all possible alternatives prior to deciding to restrict competition.
b. This is a legal document and will be made part of the official contract file. Ensure it is completed accurately and professionally.
c. The requiring activity is responsible for completing the first part of the document through Section 6. The contracting office verifies and completes the rest of the information.
d. Before submitting to the contracting office, the requiring activity should remove the instructions in “red” within the document. The below information is guidance supplemental to those instructions and is meant to aid the preparers in adequately completing the document.
e. References to the Federal Acquisition Regulations (FAR) can be accessed at: http://farsite.hill.af.mil
II. Authorities to Limit Competition- For purchases not exceeding the simplified acquisition threshold (SAT), contracting officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available* (e.g. urgency, exclusive licensing agreements, brand name, or industrial mobilization).
*The FAR states that contracting without providing for full and open competition shall not be justified on the basis of a lack of advance planning by the requiring activity.
a. Sole Source: FAR 13.106-1(b)(1)(i) Soliciting from a single source- Select this authority when procuring requirements on the basis of urgency, exclusive licensing agreements, brand name or industrial mobilization.
b. Brand Name: FAR 13.106-1(b)(1)(ii) Brand name specification- Select this authority when a single source is identified to provide a portion of a purchase because that portion specifies a particular brand-name item. The documentation should state it is veering only the portion of the acquisition which is brand-name.
c. Brand Name or Equal*: If the commodity or service required meets the criterion for a Brand Name or Equal competitive action- STOP. This justification is not required.
*See supplemental information at the end of this instructions document.
III. Estimated Value (inclusive of options):
a. This justification template is only appropriate for use below the Simplified Acquisition Threshold, $150,000.
b. Estimated value needs to be the total of the basic requirement plus any option years or option quantities.
IV. Form Completion
Section 1- Name of proposed sole source contractor or brand name manufacturer
Section 2- Brief description of supplies or services required and the intended use:
a. In layman’s terms, briefly describe the services or supplies to be provided, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing purchase order, distinguish clearly between the work covered by the basic order and the work to be obtained by the proposed modification.
b. General description of requirement- do not go into justification rationale here.
Version 1, APR 2015 PREVIOUS VERSION IS OBSOLETE
Section 3- Unique salient characteristics that limit availability to only one source, with the reason no other supplies or services can be used:
a. Explain factors/unique qualifications such as proprietary data or exclusive licensing rights, if applicable.
b. If brand name, explain why an adequate purchase description or other information suitable to solicit by full and open competition has not been developed or are not available.
Section 4- Reason why contractor is the only source capable of meeting mission requirements; specifically, the reason no other source can meet the unique capabilities in section 3:
a. Has the vendor provided a statement verifying the unique/specialized/proprietary nature of the requirement?
b. Follow-On Contracts: Defined as a separate, new contract action for which the price and terms are non-competitively negotiated with the incumbent contractor to continue or augment a specific program which is necessitated by prior procurement decisions. Discuss how the sole source action will avoid duplication of costs that is not expected to be recovered through competition, or discuss the unacceptable delays to the government. Provide an estimate of the costs that will be duplicated and explain how such estimate was derived.
c. If urgency is the basis for the justification, explain the chronological events leading up to the requirement and explain why time constraints cannot permit even a limited competition. Describe impact of required delivery/performance date. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source contractor.
Section 5- Market Research:
a. Reference FAR Part 10
b. Describe the extent of the market research conducted to identify all qualified sources and the results thereof. "Market Research" is defined as those attempts you made to ascertain whether other qualified sources exist, and can include contact with knowledgeable experts regarding similar or duplicate requirements, contact with industry, results of a sources sought synopsis, or draft solicitations. Research of the marketplace may consist of written, telephonic, or world wide web inquiries.
c. Procurement History: Identify contract numbers and whether those actions were competed or not.
Section 7- Actions to Increase Competition (for completion by ACC-APG Acquisition Personnel):
a. What supplemental market research has been done?
b. Has a sources sought, RFI, or notice of intent been posted?
c. Have any contractors identified their interest in this requirement?
d. Has the proposed contractor been contacted for verification of the information presented?
e. Have resellers/distributors been researched and identified?
f. Have the mandatory sources of FAR Part 8 been screened? (FPI/UNICOR, AbilityOne, GSA, FSS)
Brand Name or Equal (FAR 11.104)-
- Brand name or equal purchase descriptions must include, in addition to the brand name, a general description of those salient physical, functional, or performance characteristics of the brand name item that an “equal” item must meet to be acceptable for award.
- Use brand name or equal descriptions when the salient characteristics are firm requirements.
- The below chart details the difference between “Brand Name or Equal” and “Brand Name” actions under $150k:
Brand Name or Equal Brand Name Does NOT require a “Justification” Does require a “Justification” Does not limit competition/Provides for greater competition
Does limit competition
Informally describe salient characteristics (via email, memo, etc.) in written form.
Formally describe salient characteristics via a “Justification”
No specific format Use Justification for Other Than Full and Open Competition for Simplified Acquisitions <$150k
Allows for “or equal” similar/comparable items Must supply specific item (part number, model number, serial number etc.)
Version 1, APR 2015 PREVIOUS VERSION IS OBSOLETE
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION for
SIMPLIFIED ACQUISITIONS VALUED BELOW $150K
FAR 13.106-1(b)(1)(i) Soliciting from a single source FAR 13.106-1(b)(1)(ii) Brand name specification
PURCHASE REQUEST NUMBER:
DESCRIPTION OF ACTION:
New Requirement Modification
ESTIMATED VALUE (inclusive of options):
FUND TYPE: YEAR:
1. NAME OF PROPOSED SOLE SOURCE CONTRACTOR / BRAND NAME MANUFACTURER:
2. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES REQUIRED AND THE INTENDED USE:
3. UNIQUE SALIENT CHARACTERISTICS THAT LIMIT AVAILABILITY TO ONLY ONE SOURCE, WITH THE
REASON NO OTHER SUPPLIES OR SERVICES CAN BE USED:
4. REASON WHY CONTRACTOR IS THE ONLY SOURCE CAPABLE OF MEETING MISSION REQUIREMENTS;
SPECIFICALLY, THE REASON NO OTHER SOURCE CAN MEET THE UNIQUE CAPABILITIES IN SECTION 3:
Is this a follow-on contract? yes no If yes, provide contract number: _____________________________
5. MARKET RESEARCH:
6. TECHNICAL CERTIFICATION:
I certify that the supporting data under my cognizance, which is included in the sections above, is accurate and complete to the best of my knowledge and belief.
NAME AND TITLE OF CUSTOMER DIGITAL SIGNATURE EMAIL ADDRESS DATE
✔ 21493.00
Southwestern Industries, 2615 Homestead Pl,Rancho Dominguez CA 90220 CAGE Code: 06238
The Contractor shall provide maintenance, calibration and labor for government owned equipment.
This shall include semi-annual maintenance visits. This service includes maintenance and calibration for 64 axis and tool room lathe to include: material, freight, travel, and emergency visits.
Southwestern Industries is the sole manufacturer and distributor of the equipment. They also have the only personnel and spare parts available to service the equipment on “as needed” and “on call” basis.
✔ W91ZLK-15-P-0377
What market research has been conducted and how recently? Describe procurement history. What market research is your agency conducting to identify alternative sources/products/service providers for similar actions in the future?
ADM has been using Southwestern Industries for several years for the rapid repair of various pieces of equipment. Any company that came in would be faced with a learning curve that would waste precious time while the new contractor learned what Southwest Industries already knows. This could result in significant downtime and scheduled delays of customer funded programs.
RDT&E (2040) FY 2018
Version 1, APR 2015 PREVIOUS VERSION IS OBSOLETE
7. ACTIONS TO INCREASE COMPETITION (For Contracting Personnel Use):
8. CONTRACT SPECIALIST/PURCHASING AGENT REVIEW:
I have done my due diligence in verifying the information presented above by the requiring activity and have attempted to obtain competition to the maximum extent practicable.
NAME OF REVIEWER
DIGITAL SIGNATURE EMAIL ADDRESS DATE
9. ENDORSEMENT OF THE ACC-APG TENANT DIVISION CONTRACTING OFFICER
I hereby approve / disapprove this justification in accordance with the authority cited on this document.
Approval is based on the availability of funds and provided that the services and property herein described have been otherwise authorized for procurement.
NAME OF CONTRACTING OFFICER
DIGITAL SIGNATURE EMAIL ADDRESS DATE
7. ACTIONS TO INCREASE COMPETITION (For Contracting Personnel Use):
Describe efforts made to compete the action, including whether a notice was or will be publicized as required by FAR Subpart 5.2 or which exception under FAR 5.202 applies.
Notice of Intent will be published.
Southwest Industries provided a proprietary letter stating they were the sole manufacturer of TRAK machines and no other company was able to provide them.
Sherry L. Compton sherry.l.compton.civ@mail.mil 12 September 2018
Sherry L. Compton sherry.l.compton.civ@mail.mil 12 September 2018
COMPTON.SHER
RY.L.1229314137
Digitally signed by
COMPTON.SHERRY.L.122931413
Date: 2018.09.12 10:06:25 -04'00'
COMPTON.SHER
RY.L.1229314137
Digitally signed by
COMPTON.SHERRY.L.122931413
Date: 2018.09.12 10:10:17 -04'00'
SOLE SOURCE
Version 1, APR 2015 PREVIOUS VERSION IS OBSOLETE
CONTINUATION PAGE
Version 1, APR 2015 PREVIOUS VERSION IS OBSOLETE
CONTINUATION PAGE
File details come from the government source that posted it.