A07_QUESTION_AND_ANSWERS_(ATC_Railroad_Maintenance_Final).pdf
PDF 103 KB Posted
- Solicitation number
- W91ZLK-17-T-0451
About this file
Questions & Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A07_QUESTION_AND_ANSWERS_(ATC_Railroad_Maintenance_Final_Revision).pdf | ||
| A01_QASP.pdf | ||
| A02_Solicitation_(Instructions_to_Offerors).pdf | ||
| A01_Performance_Work_Statement_(PWS)_Final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWERS: ATC Railroad Maintenance (12 month Contract) RFQ W91ZLK-17-T-0451
1.) Please confirm if a detailed proposal offering both scope of work and unit pricing will suffice as both technical and price proposals.
ANSWER: A detailed proposal is required for both technical and Price, however we will need them separated.
2.) Item C.1.7.3. Does not allow use of hand held spiker driver – will this particular contract allow for use of pneumatic hand held spiking gun?
ANSWER: A pneumatic spiking gun can be used.
3.) Please confirm the specific lengths of each 15 grade 5 switch timbers and 2 each head block timbers to be replaced.
ANSWER: the head blocks are 14’ the switch timbers will be varied from 9’ – 12’
4.) Does ATC have a preferred supplier of the #4 ballast? If so, could that information be provided?
ANSWER: No preferred supplier.
5.) Will contractor’s employees be required to attend ATC specific training? If so, approximately how long does training last? Is there a cost to contractor?
ANSWER: As long as the company has a safety program in place and does morning meetings we do not have any other requirements
6.) Please confirm that all replaced ties and timbers are to be disposed of off-site.
ANSWER: the contractor will remove and dispose of the old ties and timbers.