QUESTION AND ANSWERS: ATC Railroad Maintenance (12 month Contract) RFQ W91ZLK-17-T-0451

1.) Please confirm if a detailed proposal offering both scope of work and unit pricing will suffice as both technical and price proposals.

ANSWER: A detailed proposal is required for both technical and Price, however we will need them separated.

2.) Item C.1.7.3. Does not allow use of hand held spiker driver – will this particular contract allow for use of pneumatic hand held spiking gun?

ANSWER: A pneumatic spiking gun can be used.

3.) Please confirm the specific lengths of each 15 grade 5 switch timbers and 2 each head block timbers to be replaced.

ANSWER: the head blocks are 14’ the switch timbers will be varied from 9’ – 12’

4.) Does ATC have a preferred supplier of the #4 ballast? If so, could that information be provided?

ANSWER: No preferred supplier.

5.) Will contractor’s employees be required to attend ATC specific training? If so, approximately how long does training last? Is there a cost to contractor?

ANSWER: As long as the company has a safety program in place and does morning meetings we do not have any other requirements

6.) Please confirm that all replaced ties and timbers are to be disposed of off-site.

ANSWER: the contractor will remove and dispose of the old ties and timbers.