A02_bid_schedule_0183.pdf
PDF 78 KB Posted
- Attached to
- HVACR M&R Support for Army Test Command
- Solicitation number
- W91ZLK-17-T-0183
About this file
Bid Schedule
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
Item No. Description Estimated Quantity Amount
BASE YEAR BID
0001 Scheduled Maintenance PMCS/Routine M&R Site Visit. 800 hours journeyman level HVACR technician. 1 technician, 16 hours/week, 50 weeks/year.
LARC Seasonal Changeover 400 hours journeyman level HVACR technician. Average of 5 techs, 40 hours/week, 2 weeks/year.
Per Hour 1200hrs
0002 Unscheduled Maintenance Rates for unscheduled work as described in Part IIB of the Performance Work Statement
1 JOB
Journeymen Level HVACR Technician 350 estimated hours. $_________ $___________
Rate Per Hour Sub-Total
OT/Weekend Rate. 40 Estimated Hours.
Automation Software Technician
Regularly Hourly Rate. 80 Estimated Hours
Contractor Automation Software Technician OT/Weekend Rate. 80
Estimated Hours.
Contractor Engineer Regular Hourly Rate. 40 Estimated Hours.
0002 Unscheduled Maintenance
Subtotal
0003 Replacement Parts
Trane Roof Top Unit
Per Unit 1 Total
R‐22 Refrigerant (30‐lb) $_________ $___________ Per Unit 60 Total
R‐410A Refrigerant (30‐lb) $_________ $___________ Per Unit 10 Total
R‐134A Refrigerant (30‐lb) $_________ $___________
1/4‐HP Blower Motor $_________ $___________ Per Unit 5 Total
3‐HP Blower Motor $_________ $___________
Condenser Fan Motor $_________ $___________ Per Unit 100 Total
1/100 HP Reversible Motor $________ $___________ Per Unit 50 Total
1/20‐HP Split Capacitor Motor $________ $___________ Per Unit 30 Total
1/12‐HP Split Capacitor Motor $________ $___________
R‐12 Reciprocating Compressor $________ $___________ Per Unit 25 Total
R‐22 Scroll Compressor $________ $___________
R‐134A 1/3‐HP Reciprocating Compressor $________ $___________
R‐134A 1/4‐HP Reciprocating Compressor $________ $___________
R‐410A Scroll Compressor $________ $___________
Trane Scroll Compressor $________ $___________
Fan Control Board $________ $___________
OEM Flow Switch $________ $___________
Low Pressure R‐22 Controller $________ $___________
Electronic Temperature Controller $________ $___________
Remote Bulb Temperature Controller $________ $___________
Temperature Combo Sensor $________ $___________
Contactor $________ $___________
Galvanized Duct (linear ft) $________ $___________
BK85 x 1.00 Sheave $________ $___________
1VP44 x 0.875 Sheave $________ $___________
3/8 ODF Filter $________ $___________ Per Unit 75 Total
1/4" Refrigeration Tubing (50') $________ $___________
1/2" Refrigeration Tubing (50') $________ $___________
5/8" Refrigeration Tubing (50') $________ $___________
7/8" Refrigeration Tubing (50') $________ $___________
Consumables (Belts, Seals, Bearings, etc) $5000.00____
0003 Replacement Parts Subtotal
Accounting for Contract Services Cost for Providing Accounting for Contract Services - ACC-APG 5152.237- 4900, Accounting for Contract Services Requirement, has been added to the Performance Work Statement, and the contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. As part of its proposal, the offeror shall provide the estimated total cost (if any) incurred to comply with the Contractor Manpower Reporting Application (eCMRA) requirement. If no direct cost is associated with providing the data, the proposal submitted shall identify the CLIN and state, "No Cost". Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting Application) website at: https://cmra.army.mil. For further assistance, email the CMRA Help Desk at contractormanpower@hqda.army.mil.
Total Base Year Bid
OPTION YEAR 1
Item No. Description Estimated Quantity Amount
1001 Scheduled Maintenance hours journeyman level HVACR technician. 1 technician, 16 hours/week, 50 weeks/year.
LARC Seasonal Changeover 400 hours journeyman level HVACR technician. Average of 5
1002 Unscheduled Maintenance Rates for unscheduled work as
1002 Unscheduled Maintenance
1003 Replacement Parts
1003 Replacement Parts Subtotal
1004 Accounting for Contract Services
Cost for Providing Accounting for Contract Services - ACC-APG 5152.237- 4900, Accounting for Contract Services Requirement, has been added to the Performance Work Statement, and the contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. As part of its proposal, the offeror shall provide the estimated total cost (if any) incurred to comply with the Contractor Manpower Reporting Application (eCMRA) requirement. If no direct cost is associated with providing the data, the proposal submitted shall identify the CLIN and state, "No Cost". Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting
Total Option Year 1 Bid $____________
OPTION YEAR 2
Item No. Description Estimated Quantity Amount
2001 Scheduled Maintenance hours journeyman level HVACR technician. 1 technician, 16 hours/week, 50 weeks/year.
LARC Seasonal Changeover 400 hours journeyman level HVACR technician. Average of 5
2002 Unscheduled Maintenance Rates for unscheduled work as
0003 Unscheduled Maintenance
2003 Replacement Parts
2003 Replacement Parts Subtotal
2004 Accounting for Contract Services
Cost for Providing Accounting for Contract Services - ACC-APG 5152.237- 4900, Accounting for Contract Services Requirement, has been added to the Performance Work Statement, and the contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. As part of its proposal, the offeror shall provide the estimated total cost (if any) incurred to comply with the Contractor Manpower Reporting Application (eCMRA) requirement. If no direct cost is associated with providing the data, the proposal submitted shall identify the CLIN and state, "No Cost". Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting
Total Option Year 2 Bid
File details come from the government source that posted it. Updated .