A02_bid_schedule_0183.pdf

PDF 78 KB Posted

Attached to
HVACR M&R Support for Army Test Command
Solicitation number
W91ZLK-17-T-0183
Issued by

About this file

Bid Schedule

View the file

Other files

File Type Posted
A01_ATC_HVACR_MR_PWS_-_28JUN2017.pdf PDF
A07_Site_Visit_Information_0183.docx DOCX document
LARC Range 6 Upgrades - Part 2.pdf PDF
LARC Range 6.pdf PDF
LARC D-Range Filter Housings.pdf PDF
LARC Firing Ranges - Part 1.pdf PDF
LARC Range 6 Loading Room.pdf PDF
LARC D-Ranges 1-4.pdf PDF
LARC D-Range Loading Room B690A-B.pdf PDF
LARC D-Range Dampers.pdf PDF
LARC Firing Ranges - Part 2.pdf PDF
LARC Range 6 Upgrades - Part 1.pdf PDF
LARC Range 6A.pdf PDF
SPECS.pdf PDF
LARC Range 6 Upgrades - Part 3.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

Item No. Description Estimated Quantity Amount

BASE YEAR BID

0001 Scheduled Maintenance PMCS/Routine M&R Site Visit. 800 hours journeyman level HVACR technician. 1 technician, 16 hours/week, 50 weeks/year.

LARC Seasonal Changeover 400 hours journeyman level HVACR technician. Average of 5 techs, 40 hours/week, 2 weeks/year.

Per Hour 1200hrs

0002 Unscheduled Maintenance Rates for unscheduled work as described in Part IIB of the Performance Work Statement

1 JOB

Journeymen Level HVACR Technician 350 estimated hours. $_________ $___________

Rate Per Hour Sub-Total

OT/Weekend Rate. 40 Estimated Hours.

Automation Software Technician

Regularly Hourly Rate. 80 Estimated Hours

Contractor Automation Software Technician OT/Weekend Rate. 80

Estimated Hours.

Contractor Engineer Regular Hourly Rate. 40 Estimated Hours.

0002 Unscheduled Maintenance

Subtotal

0003 Replacement Parts

Trane Roof Top Unit

Per Unit 1 Total

R‐22 Refrigerant (30‐lb) $_________ $___________ Per Unit 60 Total

R‐410A Refrigerant (30‐lb) $_________ $___________ Per Unit 10 Total

R‐134A Refrigerant (30‐lb) $_________ $___________

1/4‐HP Blower Motor $_________ $___________ Per Unit 5 Total

3‐HP Blower Motor $_________ $___________

Condenser Fan Motor $_________ $___________ Per Unit 100 Total

1/100 HP Reversible Motor $________ $___________ Per Unit 50 Total

1/20‐HP Split Capacitor Motor $________ $___________ Per Unit 30 Total

1/12‐HP Split Capacitor Motor $________ $___________

R‐12 Reciprocating Compressor $________ $___________ Per Unit 25 Total

R‐22 Scroll Compressor $________ $___________

R‐134A 1/3‐HP Reciprocating Compressor $________ $___________

R‐134A 1/4‐HP Reciprocating Compressor $________ $___________

R‐410A Scroll Compressor $________ $___________

Trane Scroll Compressor $________ $___________

Fan Control Board $________ $___________

OEM Flow Switch $________ $___________

Low Pressure R‐22 Controller $________ $___________

Electronic Temperature Controller $________ $___________

Remote Bulb Temperature Controller $________ $___________

Temperature Combo Sensor $________ $___________

Contactor $________ $___________

Galvanized Duct (linear ft) $________ $___________

BK85 x 1.00 Sheave $________ $___________

1VP44 x 0.875 Sheave $________ $___________

3/8 ODF Filter $________ $___________ Per Unit 75 Total

1/4" Refrigeration Tubing (50') $________ $___________

1/2" Refrigeration Tubing (50') $________ $___________

5/8" Refrigeration Tubing (50') $________ $___________

7/8" Refrigeration Tubing (50') $________ $___________

Consumables (Belts, Seals, Bearings, etc) $5000.00____

0003 Replacement Parts Subtotal

Accounting for Contract Services Cost for Providing Accounting for Contract Services - ACC-APG 5152.237- 4900, Accounting for Contract Services Requirement, has been added to the Performance Work Statement, and the contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. As part of its proposal, the offeror shall provide the estimated total cost (if any) incurred to comply with the Contractor Manpower Reporting Application (eCMRA) requirement. If no direct cost is associated with providing the data, the proposal submitted shall identify the CLIN and state, "No Cost". Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting Application) website at: https://cmra.army.mil. For further assistance, email the CMRA Help Desk at contractormanpower@hqda.army.mil.

Total Base Year Bid

OPTION YEAR 1

Item No. Description Estimated Quantity Amount

1001 Scheduled Maintenance hours journeyman level HVACR technician. 1 technician, 16 hours/week, 50 weeks/year.

LARC Seasonal Changeover 400 hours journeyman level HVACR technician. Average of 5

1002 Unscheduled Maintenance Rates for unscheduled work as

1002 Unscheduled Maintenance

1003 Replacement Parts

1003 Replacement Parts Subtotal

1004 Accounting for Contract Services

Cost for Providing Accounting for Contract Services - ACC-APG 5152.237- 4900, Accounting for Contract Services Requirement, has been added to the Performance Work Statement, and the contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. As part of its proposal, the offeror shall provide the estimated total cost (if any) incurred to comply with the Contractor Manpower Reporting Application (eCMRA) requirement. If no direct cost is associated with providing the data, the proposal submitted shall identify the CLIN and state, "No Cost". Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting

Total Option Year 1 Bid $____________

OPTION YEAR 2

Item No. Description Estimated Quantity Amount

2001 Scheduled Maintenance hours journeyman level HVACR technician. 1 technician, 16 hours/week, 50 weeks/year.

LARC Seasonal Changeover 400 hours journeyman level HVACR technician. Average of 5

2002 Unscheduled Maintenance Rates for unscheduled work as

0003 Unscheduled Maintenance

2003 Replacement Parts

2003 Replacement Parts Subtotal

2004 Accounting for Contract Services

Cost for Providing Accounting for Contract Services - ACC-APG 5152.237- 4900, Accounting for Contract Services Requirement, has been added to the Performance Work Statement, and the contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. As part of its proposal, the offeror shall provide the estimated total cost (if any) incurred to comply with the Contractor Manpower Reporting Application (eCMRA) requirement. If no direct cost is associated with providing the data, the proposal submitted shall identify the CLIN and state, "No Cost". Instructions, including the Contractor and Subcontractor User Guides, are available at the CMRA (Contractor Manpower Reporting

Total Option Year 2 Bid

File details come from the government source that posted it. Updated .