This document is a Memorandum for Record documenting the minutes of a pre-quote conference and site visit held on 11 August 2026 for two federal construction solicitations: W91SMC26QA016 and W91SMC26QA017. The solicitations cover a CES UPS Expansion Upgrade and Base Signage Upgrade at the 183d Wing in Springfield, Illinois. The contracting officers are Mr. Gawain Piper and Mr. Lawrence Romang from the P&C Office, with Capt Nicholas Hotze serving as the Base Civil Engineer. The contract period is 120 calendar days for the UPS Expansion Upgrade and 59 calendar days for the Base Signage Upgrade, with all work including cleanup and punch list items to be completed within these timeframes. Following receipt and approval of required documents, the government will issue a pre-construction conference notice and Notice to Proceed.
Key procedural requirements include that all interested offerors must be registered in the System for Award Management (SAM) using their Unique Entity ID number. Contractors should anticipate security delays when accessing the base, as all vehicles will be searched by Security Forces at the Main Gate; those who submitted SF 1705 forms for the site visit need not resubmit them at the request for quote closing date. All contractor questions must be submitted in writing via email to contacts listed in the respective solicitations and routed through the Contracting Office rather than directed to government engineers. All answered questions, amendments, and correspondence will be posted to SAM.gov, and contractors are advised to check the website frequently for updates.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15 July 2026
MEMORANDUM FOR RECORD
FROM: USPFO IL
SUBJECT: Minutes of Pre-Quote Conference and Site Visit, Solicitation W91SMC26QA016 and A017, CES UPS Expansion Upgrade and Base Signage Upgrade, 183d Wing, Springfield, Illinois.
Date: 11 August 2026 – Time 13:00-14:00 hours.
1. The list of contractors attending the meeting is shown on the attached sign-in sheet.
The following Government representatives attended the meeting:
Name Title
Mr. Gawain Piper Contracting Officer – P&C Office Mr. Lawrence Romang Contracting Officer – P&C Office Capt Nicholas Hotze Base Civil Engineer
2. The following items were discussed during the Pre-Quote Conference:
a. The Contract period is 120 calendar days for UPS Expansion Upgrade and 59 days for Base Signage Upgrade. This includes all work to include cleanup and punch list items. Following receipt and approval of any required documents we will hold a pre-construction conference and issue the Notice to Proceed (NTP).
b. Contractors should expect delays in gaining access to the base for security reasons. Every contractor that needs to gain entry to the installation will have their vehicles searched by Security Forces at the Main Gate. Persons who have submitted an SF 1705 for this site visit should not have to resubmit the SF 1705 for the Request for Quote closing date.
c. Interested offerors/bidders must be registered in System for Award Management (SAM). To register, go to: https://sam.gov/. You will need your Unique Entity ID number to register.
3. A Power Point slide presentation on the project specifics and basis for award was presented to all attendees (Attached).
4. The Power Point presentation was followed by a tour of the subject job sites.
5. Questions must be submitted in writing via email, especially technical questions to: To the contacts listed in the respective solicitation. DO NOT CONTACT Government Engineers. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to SAM.gov as an additional attachment. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued. All correspondence, questions and answers, amendments, etc. will be issued/posted at https://sam.gov/.
6. Any amendments that are issued will be posted to the website. Contractors were advised to check the website frequently.
7. The pre-quote conference and site visit concluded at 14:00 hours (2:00PM CDT).
Contracting Officer
2 Attachments
1. Sign-In Sheet, 11 Aug 26
2. Power Point Slides, 11 Aug 26