X-Ray_Vault_Concrete_Pad.pdf

PDF 553 KB Posted

Attached to
X-Ray Unit for Nondestructive Inspection (NDI)
Solicitation number
W91SMC19-Q-7005
Issued by

About this file

XRay Vault Concrete Pad information

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The pad is 14’-0” x 15’-0”

There is one sprinkler pipe down to the vault for hook up after the vault is installed. Vault should have an integral sprinkler system that the existing pipe will hook in to.

There is 120/208V 1 PH power near the vault location for install.

File details come from the government source that posted it.