Attachment_4_Master_Consolidated_Response_to_Questions.xlsx
XLSX spreadsheet 81 KB Posted
- Solicitation number
- W91RUS19Q0012
About this file
Attached is Attachment 4, the response to questions asked by industry. In addition, there will be a subsequent modification removing the "secret" security requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_PWS_Revision_1.docx | DOCX document | |
| W91RUS19Q0012_JBLM_LMR.pdf | ||
| W91RUS19Q0012_JBLM_LMR.pdf | ||
| Attachment_1_PWS.docx | DOCX document | |
| Attachment_3_JBLM_LMR_Spares__06122019.xlsx | XLSX spreadsheet | |
| Attachment_2_Equipment-Listing_(004).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Reference | Page # | Question | Response | ||||
| Request a seven business day extension from receipt of answers to questions, this is required to provide the adequate response. | At this time - an extension is not granted. | ||||||
| Section 1.3 | Is a 2 hour on-site response time required? Listed as 4 hour in 2.3.10.1.1 | 2 hour response time required for Severity 1 cases. 4 hour response time is for lower Severity cases. Note: Response times are defined as having an on-site technician, or a remote system support specialist having taken assignment of the service call/work order and working on the system. | |||||
| Section 2.3.10.1 | Is 24X7 Network Monitoring required or a link to connect when issues arise? | 24x7 Network Monitoring is not required, and not allowed per 7TH SIG CMD. There is a port on the equipment that can be connected by Government Reps for remote troubleshooting by vendors. | |||||
| Section 2.3.13 | Can the government supply a listing of the subscriber equipment to be included? Please include serial numbers, make and model. | Subscriber equipment Portable and Mobile equipment are not part of current contract. | |||||
| Section 2.3.15 | Please define the software enhancements expected? Is this a system upgrade? | Software enhancements only pertain to the current system version, and not a whole system upgraded. The current system is a Motorola v7.7. | |||||
| Attachment 2 Equipment Listing | 6 | Can the government provide UPS maintenance history data and assure that the the UPS is currently in working order with no batteries needing replacement? | Control Board Replaced by Eaton, 2014. The Master Site UPS is in working order but requires battery replacement at this time. | ||||
| Attachment 2 Equipment Listing | 16, 18 | Can the government provice the last structural analysis detail on the tower and the type of lighting system installed? | Last structural analysis performed in April 2017. | MARS Tower: REPAIRS: 20’ mast pipe be bolted to top of tower with a 6’ Lighting Rod placed at summit of mast. Install minimal of 3/Ot THHN stranded copper be installed from Lightning Rod to a new 3point ground ring. Labelling of the Coaxial Cables on this structure should also be labeled for future mapping. Install stiff arms on the microwave dish for stability of path and install the torque arm system. The top marker lights (Only Lights 141’ elev.) need to be replaced. Install Missing Ice clips. Replace corroded Top Marker Lights. | Roy Tower: REPAIRS: Leg A needs flat plate (Cover) Installed | YTC BLDG 159: REPAIRS: Furnish and Installation of needs a 20’ Lightning Rod Extension kit. Furnish and Installation @ 15’ Rad Center Line needs an Ice Shield installed a minimal of 3’ above antenna. Fill completely Hex Nut Inner Cavity with Tig Weld and finish smooth to allieviate the short threading of Tower foundation anchor bolts. | YTC OP13: REPAIRS: Proper marking of all lines under designated color code needs to be executed. Furnish and Install Ice Shields for Both Microwave Antennas need to be sheltered under Ice Shields |
Ft Lewis JBLM Maintenance 19 RFP Solicitation #W91RUS19Q0012