This is a Questions and Answers document for the AS27 Catering Services solicitation (W91QVP-26-AS27-CATERING), clarifying requirements and operational details for catering services to be provided at the PKO Training Center in Cambodia during Angkor Sentinel 27 exercise from February 13-26, 2027.
The contractor must serve approximately 90 U.S. and 250 Cambodian personnel with breakfast (0600-0730) and dinner (1700-1830) daily in the same 90-minute windows, plus separate Cambodian lunch (1130-1300). The first meal is breakfast on February 13, 2027, and the last meal is dinner on February 26, 2027, with exceptions on cultural event days (approximately February 20-21) when no lunch/dinner and no breakfast/lunch will be required respectively. All meals must accommodate halal and vegetarian options available to both populations, with American/Western menus for U.S. personnel and Cambodian menus for Cambodian personnel. The contractor must provide all equipment, cooking facilities, power generation, potable water from FWRA-approved sources (no guaranteed on-site potable water), waste and grey-water disposal, sanitation procedures compliant with Army TB MED 530, and food-safety certifications for the Person in Charge and key personnel. A Food and Water Risk Assessment (FWRA) is mandatory during November 9-11, 2026, with facility details required by November 2, 2026; FWRA findings will be communicated prior to award, and eligibility for award depends on FWRA results and corrective-action status. Meals will be invoiced based on actual quantity served (unit price × actual daily count), with meal CLINs 0003-0007 pricing on estimated quantities; CLIN 0010AA (ice cream machine option) will be evaluated as part of total price for award; the contractor must include applicable taxes in pricing with no separate tax reimbursable CLINs permitted. The submission deadline is November 20, 2026, at 1300 HST in PDF and Excel format.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Continued AS27 Catering Services
1. Which documents must be ready on the FWRA inspection day (licenses, PIC certificates, supplier list, SOPs, pest-control records)? At minimum (per the RFQ Addendum to 52.212-1 and PWS): Current food-service licenses and permits, Food-safety certifications for the proposed Person in Charge (PIC) and key personnel, Proposed sanitation and cleaning procedures / SOPs, Temperature-control procedures, Potable-water source information, Waste, grey-water, and grease-water disposal plan, Food transportation and food-protection procedures (if applicable), Supplier list / approved sources, Pest-control records (if already available, Additional documentation may be requested by the assessment team. Please review the Army TB MED 530. Typically any certificates and records required for a catering company.
1. How and when will the FWRA findings be communicated, and what is the deadline to close corrective actions before award? Will there be a follow-up visit after correcting a critical finding? We will provide a company once FWRA has been completed and reviewed prior to award.
1. Is the "dining facility" in PWS 1.1 the DFAC being rehabilitated under RFQ W91QVP-26-AS27-BLS? Please give its location within the PKO Training Center and its seating capacity. The phrase in PWS 1.1 refers to the Government-designated serving location at the PKO Training Center. It is not the DFAC being rehabilitated under the separate BLS RFQ (W91QVP-26-AS27-BLS). Exact location within the PKO and seating capacity will be identified by the COR after award / during site coordination. Seating capacity is sufficient to fit all personnel. No permanent Government cooking area is available at the serving location.
1. The Government provides no equipment, water or labor (PWS Part 3). Will it provide any of the following: a dining area with structure, tables and chairs, power or generator hookups, a water point, or a waste and grey water disposal location? Dinning Hall is available to serve personnels. Contractor is required to provide everything it needs to function. Although there could be power and waterpoints are the PKO center, contractor shall not rely fully on it in the event it fails or becomes unavailable.
1. Will an existing PKO location be made available to set up the kitchen? If yes, will it be an open outdoor facility or a covered place? Will there be a possibility for a site visit prior to quoting? An existing PKO location is available for emplacement of a mobile or temporary kitchen; approach would be decided by the vendor. Pre-quote site visits are not currently scheduled. Vendors may request one through the contracting office; approval is at Government discretion and subject to PKO base access.
1. Is it in the contractor’s scope to provide a separate dining facility at the serving area and if yes, what are the requirements? Not required.
1. Please confirm no U.S. lunch is required. If one may be added, will the Government add a CLIN or apply the CLIN 0006 rate? Not required.
1. Confirm the first meal (breakfast 13 Feb 2027) and the last meal (dinner 26 Feb 2027). Confirmed: First meal: Breakfast on 13 February 2027, Last meal: Dinner on 26 February 2027 (Subject to the flexibility language in the PWS regarding changes in period of performance.)
1. Will breakfast and dinner for both populations be served in the same 90-minute window at one location, or at separate locations? Breakfast and dinner for both populations are planned within the same 90-minute windows (Breakfast 0600–0730; Dinner 1700–1830) at the Government-designated serving location(s). Exact whether one or multiple serving points will be used will be confirmed by the COR. Cambodian lunch is a separate window (1130–1300).
1. Is there a potable water point on the PKO approved for food use, or must all water be trucked in from an FWRA-approved source? All water used for food preparation, beverage service, handwashing, cleaning, and sanitizing must come from an FWRA-approved potable source. There is no pre-approved on-PKO potable water point guaranteed for food use. The Contractor is responsible for providing approved water (trucked or otherwise).
1. Are reusable serving utensils and pans required, or is a fully disposable service acceptable? Fully disposable service is acceptable provided it meets food-safety, sanitation, and waste-management requirements. Reusable items are also acceptable if they are cleaned and sanitized in accordance with TB MED 530. The choice is the Contractor’s, as long as standards are met.
1. Where may kitchen grey water be discharged? Will a PKO septic or drain connection be available, or must all be pumped and hauled? The Contractor is responsible for all grey-water collection, containment, and disposal in accordance with Cambodian law and the approved FWRA plan. No guaranteed PKO septic or drain connection is provided. Pump-and-haul is the default assumption unless the COR later identifies an approved connection.
1. Are there restrictions on staff hours on the PKO (earliest arrival, latest departure)? No specific earliest-arrival or latest-departure restrictions are stated in the PWS beyond the need to support the published meal windows and maintain an adequate workforce. Exact access times will be coordinated with the COR and host-nation security procedures after award.
1. Is a specific uniform or identification required for contractor staff? No specific uniform is mandated. Contractor personnel must be clearly identifiable as contractor employees (PWS 1.11) and must comply with all PKO access and security requirements. The COR may issue additional identification guidance after award.
1. May LPG cylinders be used and stored on the PKO? Any limit on quantity or storage location? LPG may be used if permitted by Cambodian law, PKO safety rules, and the Contractor’s approved safety plan. Quantity limits and exact storage locations will be subject to COR and host-nation approval. The Contractor is fully responsible for safe storage, handling, and compliance.
1. May diesel for a kitchen generator be stored on site, and what containment is required? Diesel may be stored on site if required for a Contractor-furnished generator, subject to proper secondary containment, spill kits, fire extinguishers, grounding, and all applicable environmental and safety rules (see related BLS PWS standards for guidance). Exact quantity and location require COR approval.
1. Where must food waste be taken after each meal: BLS dumpsters at the DFAC, or off the PKO to a licensed site? Food waste and trash must be removed from the serving location after each meal period (PWS 5.1.8). Contractor can dispose at the BLS Dumpster by the DFAC.
1. What standard of site restoration is required (e.g., cleaning, ground repair under the kitchen)? Kitchen Rehab not required. Contractor is required to clean dinning hall after prior and after each meal period is complete.
1. CLIN 0009 reads "if separately priced by direction of the KO," but the DBA addendum says DBA is not separately priced. Should we enter a price in CLIN 0009 or include it in other CLINs? Submit the required DBA insurance estimate with your quote.
1. Will CLIN 0010AA be evaluated as part of the total price? Yes. Option CLIN 0010AA will be evaluated as part of the total evaluated price for award purposes (price and other factors).
1. Is Ice cream machine mandatory, or is scooped ice cream acceptable? Is there a minimum number of flavors required? The ice-cream support is an Option only (CLIN 0010AA). It is not mandatory. If the Option is exercised, a commercial ice-cream machine with product, toppings, cups/cones, etc., is required. Scooped ice cream from an approved source may be proposed as an alternative technical approach for evaluation. No minimum number of flavors is specified.
1. Will meal CLINs be invoiced on actual meals served (per daily count) or on the awarded quantity? Meal CLINs (0003–0007) will be invoiced on the basis of actual meals ordered and served (unit price × actual quantity), as verified by daily counts / COR records. The quantities shown in the RFQ are estimates only.
1. The instructions say to price without taxes, but clause 52.229-6 says the price includes applicable taxes. Should VAT be included or excluded? Will the government provide a tax-exemption certificate? No tax exemptions provided, contractor need to factor any taxes if they are applicable. No additional tax reimbursable clins shall be added.
1. Where will the BLS latrines be placed relative to the serving line and onsite kitchen. Placement of the chemical latrines and handwash units (under the separate BLS contract) will be coordinated by the respective CORs. Exact distances relative to the catering serving line and any onsite kitchen will be determined on-site to maintain sanitation separation. The Catering Contractor remains responsible for its own handwashing capability for food-service personnel.
Questions and Answers 20 February (estimated): Breakfast only. Personnel will depart for the cultural site after breakfast. No lunch or dinner will be required that day for the participating contingent.21 February (estimated): Dinner only. upon return to the PKO / designated location. No breakfast or lunch will be required that day for the participating contingent
QUESTIONS:
CLIN 0002, 0003, 0004, 0005, 0006, 0007,
- Please Clarify: Will breakfast, lunch and dinner meals be required to be served to the Cultural Day Non-Participating troops? As of now we don’t anticipate any non-participants for cultural event day. Contractor shall be notified in advance if there are non-participants. As of now contractors shall quote for zero (0) non-participants.
-Any idea how many Non-Participating troops there will be? As of now we don’t anticipate any non-participants for cultural event day. Contractor shall be notified in advance if there are non-participants. As of now contractors shall quote for zero (0) non-participants.
Questions and Answers
1. Meal mix. For the 90 U.S. and 250 Cambodian personnel, what share of meals should we plan as Halal and as vegetarian? Should U.S. personnel be served American/Western menus and Cambodian personnel Cambodian menus, or should every meal offer both? There should be options to accommodate halal and vegetarian. All options shall be available for both US and Cambodia side.
2. Serving location. Will all meals, including U.S. breakfast and dinner, be served at the PKO Training Center rather than at the hotel? Will a covered dining area with electricity and water (the dining hall being rehabilitated under the base life support contract) be available to the caterer for holding and serving? Serving location shall be at the PKO Dinning Facility. Electricity and Water shall be provided but Contractor should plan for contingent in the event it is not. Cooking Facility at PKO is not available, electricity shall be provided by PKO, Water can be provided but not guaranteed, contractor is required to provide everything it needs to complete catering services without relying solely on PKO.
3. Headcount and billing. Will the per-person, per-meal CLINs be paid on the actual sign-in headcount or on the planned numbers? Is there a minimum number of meals? Meal shall be capable to feeding the total person count
4. Cultural day (about 20–21 February). For personnel travelling to Siem Reap, should we provide packed meals, no meals, or meals at the destination? For those staying, should meals continue at the PKO Center? Contractor is required to factor no lunch and dinner on cultural event date departure and no breakfast and lunch for cultural event day arrival. All personal shall travel for cultural event day.
5. Drinking water. Is sealed bottled water from an FWRA-approved source acceptable for the 0.5 litre per person per meal? Yes