This document is a Contractor Inquiries file for a Vessel Towage (LSV-4) solicitation, containing 11 detailed questions and official responses from the government. The solicitation strictly requires a U.S. Flag Vessel, with key specifications including a tow draft of 11.5 feet (3.5052 meters) at the stern and 10.5 feet (3.2004 meters) at the bow. Critical operational details include that post-award meetings will be virtual, contracted personnel must adhere to U.S. Safety standards, and the preference is for an unmanned tow. Additional requirements mandate that vessel tail shafts be secured/locked during towage, and the vessel must have certified primary and emergency tow connection points in suitable condition for Marine Warranty Surveyor approval. Foreign-flagged vessels, including those from the Cook Islands, will not be accepted, and pre-award vessel or crew inspections are not permitted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR INQUIRIES – VESSAL TOWAGE (LSV-4)
1. Solicitation Page 5, Factor 1 c. states “Only U.S. Flag Vessels will be considered”. Will the Government consider Foreign Flag offers if no viable US Flag offers are received? This of course assumes that key personnel are fluent in English (spoken, listening, and written form) -and- Contractor Operators are proficient in conversational Basic English.
No; PWS states U.S. Flag Vessel only.
2. PWS page 3, paragraph 1.8: Will these potential post award conferences and progress meetings be virtual or in-person? If in person, who is responsible for arranging the meeting space?
Virtual.
3. PWS page 5, paragraph 1.21: Please advise why contracted personnel shall be equipped and adhere to U.S. and Philippine Safety standards? There is no Philippine component of this Solicitation.
Please disregard statement regrading Philippine Safety Standards. However, contracted personnel shall be equipped and adhere to U.S. Safety and applicable host nation Standards.
4. PWS Page 6, paragraph 1.26.3: Please advise if this iWATCH Training requirement is applicable. Is this training to be completed before commencement of tow? With the quick turn-around time of this solicitation, there is not sufficient time to complete this requirement.
If unable to meet the requirements prior to commencement (EG., start sail day one), simply report suspicious activity to the COR.
5. Can you confirm whether a Cook Islands-flagged vessel would be accepted by the United States for this towage operation?
No.
6. Would it be possible to inspect the vessel and speak with the crew while it is berthed at Kuru Wharf tomorrow, Thursday 25th September (Australian time)?
No; Crew can be spoken to, post-award.
7. Could you please advise the proposed tow draft for the vessel?
11.5 feet (3.5052 meters) stern / 10.5 ft (3.2004 meters) bow.
8. Does the vessel have certified primary tow bridal & emergency tow connection points in suitable condition for the approval of the Marine Warranty Surveyor
(MWS)?
Yes, both are in suitable condition.
9. Will the tow vessel be manned by U.S. military personnel who will maintain an appropriate watch and condition monitoring schedule, with reporting capabilities to the towing vessel?
The preference is unmanned tow.
10. Will the U.S. military permit the vessel’s tail shafts to rotate during towage, or is it required that they be secured/locked?
They should be secured / locked during towage.
11. Are there any outstanding international export requirements or customs agent processes that need to be completed prior to the vessel’s departure?
No requirement.