08. 46990 DRAWING FI-MUE Carroll TCG (Bldg.S652) Generator LCR FY24_Ver.06.pdf
PDF 1 MB Posted
- Attached to
- W91QVN24R0094, Replace 2 Generators
- Solicitation number
- W91QVN24R0094
About this file
This document contains drawing files and a scope of work for a federal contract opportunity to replace the generator, automatic transfer switch (ATS), and fuel tank for a building at Camp Carroll. The key details are:
The scope of work requires removing the existing generator, ATS, and fuel systems and replacing them with new equipment. This includes installing a 300kW generator, 1000A ATS, 600-gallon day tank, and 2000-gallon main fuel tank. The work also includes installing new underground fuel piping, electrical raceways, HVAC, and other related site work. The contractor must follow various federal safety and technical standards in performing the work. The contract opportunity has a solicitation number of W91QVN24R0094 and is being issued by the Department of the Army Materiel Command Army Contracting Command. No proposal due date or award information is provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN24R0094 Replace 2 Generators.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSFIED OFFICIAL USE ONLY
CP CARROLL - TCG BLDG S‐652
Emergency Power Supply System LCR DRAWING
OCTOBER 2023
SCHEDULE OF DRAWING
REVISION STATUSDESCRIPTION OF DRAWINGSHT. NO.REF. NO.RING NO.
GENERAL
TITLE SHEET1 OF 2G-1①
PROJECT LOCATION PLAN2 OF 2G-2②
MECHNICAL/ELECTRICAL
SCOPE OF WORK 1 OF 13ME-1③
SCOPE OF WORK 2 OF 13ME-2④
SCOPE OF WORK 3 OF 13ME-3⑤
SCOPE OF WORK 4 OF 13ME-4⑥
SCOPE OF WORK 5 OF 13ME-5⑦
EQUIPMENT SCHEDULE6 OF 13ME-6⑧
DRAWING – CARROLL TCG (BLDG.652) Generator shelter layout (AS-IS)7 OF 13ME-7⑨
DRAWING – CARROLL TCG (BLDG.652) Generator shelter layout (TO-BE)8 OF 13ME-8⑩
DRAWING – CARROLL TCG (BLDG.652) outdoor layout (TO-BE)9 OF 13ME-9⑪
DRAWING – CARROLL TCG (BLDG.652) SINGLE LINE DIAGRAM10 OF 13ME-10⑫
DRAWING – CARROLL TCG (BLDG.652) DETAILS – MAIN TANK11 OF 13ME-11⑬
DRAWING – CARROLL TCG (BLDG.652) DETAILS – UNDERGROUND (PIPE)12 OF 13ME-12⑭
DRAWING – CARROLL TCG (BLDG.652) DETAILS – UNDERGROUND (PIPE)13 OF 13ME-13⑮
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL
TITLE SHEET
REF.
NO.
DRAWING NO.
S4 23-G901
PROJECT NO. :
G-1SHEET 1 OF 2SCALE: N/A
LIFE CYCLE REPLACEMENT – Emergency Power Supply System CP CARROLL (BLDG S‐652) Generator shelter
PROJECT LOCATION PLAN (BLDG S-652)
CAMP CARROLL
GENERAL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING ALL EXISTING CONDITION AND DIMENSIONS
PRIOR TO COMMENCING ANY CONTSRUCTION OR
RENOVATION
2. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS
FOR NEW WORK SUCH AS EQUIPMENT & SERVICE
CLEARANCE, EQUIP, PAD SIZE, INSTALLATION
LOCATIONS, AND ADDITIONAL ITEMS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO
CONSTRUCT OR REPAIR ALL DAMAGES TO EXISTING
AREAS CAUSED BY THIS PROJECT AND TO MATCH
CONDITION TO ADJACENT AREAS AT HIS OWN COST.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REMOVAL AND REINSTALLATI0N OF ALL OBSTRUCTIONS
AS NECESSARY TO ALLOW FOR INSTALLATION AND
REPLACEMENT OF MECHANICAL AND ELECTRICAL
SYSTEM AT NO ADDITIONAL COST TO THE
GOVERNMENT, INCLUDING, BUT NOT LIMITED TO ITEMS
SUCH AS WALLS, CEILING, ROOF, PIPE, DUCT,
EQUIPMENT AND ELECTRICAL ITEMS.
5. CONNECTION TO EXISTING SYSTEM SHALL BE DONE IN
SUCH A MANNER AS NOT DAMAGE ANY EXISTING
EQUIPMENT, DUCTWORK, PIPING, CABLES AND ETC. ANY
DAMAGED DUE TO THE WORK PERFORMED UNDER THIS
CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS
CONTRACTOR AT THEIR OWN COST.
6. ALL MECHNICAL/ELECTRICAL SYSTEMS SHALL BE TESTED,
ADJUSTED AND BALANCED BY THE CONTRACTOR IN
STRICT ACCORDANCE WITH APPLICABLE SECTIONS OF
DIVISION 22, 23 & 26 - O & MA STANDARD TECHNICAL
SPECIFICATIONS FOR MISCELLANEOUS PROJECTS, KOREA,
THE TEST REPORT SHALL BE SUBMITTED TO THE COR FOR
REVIEW AND APPROVAL.
7. DISPOSAL OF CONSTRUCTION DEBRIS, WASTE
MATERIALS, MATERIALS RESULTING FROM DEMOLITION
ACTIVITIES, AND THE LIKE SHALL BE DONE BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE
GOVERNMENT.
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL
PROJECT LOCATION PLAN
REF.
NO.
DRAWING NO.
S4 23-G902
PROJECT NO. :
G-2SHEET 2 OF 2SCALE: N/A
TCG (S-2320)
Carroll TCG (Bldg.S652)
SCOPE OF WORK
A. Generator/ ATS/ Fuel tank Life Cycle Replacement (LCR) Project
1. Remove existing Generator/ ATS/ Fuel systems with associated architectural/mechanical/electrical parts according to government directions and perform area clean-up. The contractor shall submit the certification of disposal of demolished equipment.
2. If needed, The fire resistance barrier shall be installed by regulations described in the attached regulations.
3. The existing power lines between ATS and commercial incoming service point, building main power panel shall be reused.
4. The day tank volume shall be sized with 600[Gal] to ensure generator can operate continuously for 24 hours at full rated capacity.
5. The main tank (that have UL 752) volume shall be sized with 2000[Gal] to ensure generator can operate continuously for 24 hours at building loads.
6. The embedded power race way shall be installed between equipment; the depth & conduit type shall follow described regulations.
7. The pipes for fuel system shall have anti-corrosion that conforms to the described regulations.
8. The splicing between cables is not permitted.
9. The concrete installation shall be installed by government standards.
10. The concrete pad installation shall be installed by manufacture’s standards.
11. The contractor shall verify and make modifications about power configurations for the project.
12. The generator shall be installed with vibration isolating parts.
13.1 The contractor shall provide temporary power back-up plan during absence of gen set.
13.2 The portable generator shall have power capacity to supply minimum 200kW.
13.3 The portable ATS shall have power capacity to supply minimum 600A.
13.4 The portable generator and ATS shall have NEMA 3/3R rating.
14. The fuel tank shall be designed by standard described in table.20 and incorporate industrial recommendations.
15. The minimum distance for future maintenance can be determined by manufacturer’s recommendations. Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL
SCOPE OF WORK
REF.
NO.
DRAWING NO.
S4 23-G903
PROJECT NO. :
ME-1SHEET 1 OF 13SCALE: N/A
SCOPE OF WORK
SCOPE OF WORK
A. Generator/ ATS/ Fuel tank Life Cycle Replacement (LCR) Project
16. Electrical connections or cable terminations shall be installed only when connecting equipment is de-energized and grounded.
17. All the equipment & materials which are used for this project shall be purchased with approval from government.
18. All supports, covers, bolts and straps etc. shall be of corrosion resistant materials or protected against corrosion.
19. If the installation of Rigid Metal Conduit (RMC) is not possible, Contractor shall notify government of the situation for alternative.
20. The power raceway including junction/pulling box shall not have sharp points that can cause damage to the cables.
21. If new grounding lines to meet the regulations is needed for fuel system, The contractor shall install new grounding not sharing from existing lines.
22. The contractor shall have plans and apply it to the fuel systems to make sure there will be no leakage.
23. The contractor shall submit the work plans and have approval from government for the spill control, leakage, explosion, materials spec., grounding, pipe tightness, valves (service, relief, vent, sump, gauge), control devices, other things needed for fuel systems.
24. The minimum warranty periods - CTTS is 3 years/ Generators and ATS are 10 years.
25. Damper systems for air intake and exhaust system shall be weather proof type.
26. All equipment shall not be affected from inclement weather.
27. All equipment shall be installed by manufacturer standard and manufacturer’s certified
28. Fuel tanks shall have means for dewater, sediment cleaning.
29. Fuel trans pumps shall cover consumption of both generators.
30.1 Generator options.
30.2 Coolant heater for ambient.
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL
SCOPE OF WORK
REF.
NO.
DRAWING NO.
S4 23-G904
PROJECT NO. :
ME-2SHEET 2 OF 13SCALE: N/A
SCOPE OF WORK
A. Generator/ ATS/ Fuel tank Life Cycle Replacement (LCR) Project
30.3 PowerCommand 3.3 with Masterless Load Demand (MLD)
30.4 Exhaust gas temperature sensor
30.5 Temperature sensors – RTDs, 2-phase/ Alternator bearing RTD/ 105 Celsius Rise grade.
30.6 AC Entrance Box/ Circuit breaker (Set mounted)/ Remote annunciator panel
30.7 Spring isolators
31. Restore exist wall. When needed to restore wall, The contractor shall use the same materials for the works not ruining the aesthetics.
32. Technical standard. The contractor shall perform the project in accordance with technical provisions described in SOW.
33. Contractor shall verify existing power system and submit shop drawing including power and control wiring plan for approval by government
34. The generator shall be installed using vibration isolator springs, and the Height, Length, Width, and Density of the Foundation Pad shall adhere to the manufacturer's construction standards.
Additionally, Sand or gravel shall be under of foundation pad.
35. HVAC
36. The HVAC input powers shall not be shared. Exceptions may be made in cases due to the power specifications of the set itself.
37. The Contractor shall verify & modify current power system for HVAC installation.
38. The contractor shall install RMC unless otherwise specified. But where terminated for HVAC, Metal Flexible Conduit (MFC) shall be installed and not over 5 feet from equipment.
39. Safety Switch and power panel shall be NEMA 3/3R type unless otherwise specified.
40. Conduit terminations shall be with water-tight type in outdoor.
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL
SCOPE OF WORK
REF.
NO.
DRAWING NO.
S4 23-G905
PROJECT NO. :
ME-3SHEET 3 OF 13SCALE: N/A
SCOPE OF WORK
A. Generator/ ATS/ Fuel tank Life Cycle Replacement (LCR) Project
40. Power raceway shall be fastened to the structure surface at intervals not exceeding 4 feet.
41. All the equipment & materials which are used for this project shall be purchased with approval from government.
42. All supports, covers, bolts and straps etc. shall be of corrosion resistant materials or protected against corrosion.
43. If the installation of Rigid Metal Conduit (RMC) is not possible, Contractor shall notify government of the situation for alternative.
44. HVAC
44.1 The cable specification and wiring method shall conform to the specification described in manufacturer’s document.
44.2 The splicing between cables shall not be permitted.
44.3 The power raceway including junction/pulling box shall not have sharp points that can cause damage to the cables.
44.4 All pipe systems and cables shall be protected with stainless steel cover and tray in outdoor.
44.5 Any products or works that deviate from the specifications stated in this SOW shall be pre-approved by the COR with notification.
44.6 Considering the capacities required in the room and the ventilation factors presented by industrial standards, the contractor must select Wall-type Air Conditioners. The N+1 Requirement must be applied.
47. The contractor must verify and replace the necessary emergency lights in the Generator room, in accordance with the publications specified in Table 20.
48. Additional grounding for the generator installation shall be connected to the existing buried grounding ring.
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL
SCOPE OF WORK
REF.
NO.
DRAWING NO.
S4 23-G905
PROJECT NO. :
ME-4SHEET 4 OF 13SCALE: N/A
SCOPE OF WORK
A. Generator/ ATS/ Fuel tank Life Cycle Replacement (LCR) Project
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL
SCOPE OF WORK
REF.
NO.
DRAWING NO.
S4 23-G906
PROJECT NO. :
ME-5SHEET 5 OF 13SCALE: N/A
SCOPE OF WORK
Safety and Health RequirementsEngineering Manual 385-l-1
The Army Safety ProgramAR 385-10
Environmental Protection and EnhancementAR 200-1
Accident Reporting and RecordsAR 385-40
U.S. Department of Labor, Occupational Safety and Health Administration(OSHA)StandardsTitle 29 Code of Federal Regulations
Standard Technical Specifications for OMA Projects KoreaOMA 214
Generic Telecommunications Bonding and Grounding (Earthing) For Customer PremisesTIA-607-C (Revision of TIA-607-B)
Maintenance of Mechanical and Electrical Equipment at C4ISR FacilitiesTM 5-692
Site Power Coordinator ProgramNETCOM Regulation 420-1
Engine-Driven Generator Systems for Prime and Standby power applicationsUFC 3-540-01
Safety/ Operations/ ManagementUFC 3-560-01
Fire protection criteriaUFC 3-600-01
Electrical General RequirementsUFC 3-501-01
Telecommunications interior infrastructure planning & designUFC 3-580-01
Petroleum Fuel facilitiesUFC 3-460-01
Fire CodeNFPA 1
Flammable and Combustible Liquids CodeNFPA 30
Installation and Use of Stationary Combustion engines and Gas turbinesNFPA 37
National Electrical CodeNFPA 70
Electrical Safety in the WorkplaceNFPA 70E
Emergency and Standby Power systemsNFPA 110
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL
EQUIPMENT SCHEDULE
REF.
NO.
DRAWING NO.
S4 23-G907
PROJECT NO. :
ME-6SHEET 6 OF 13SCALE: N/A
EQUIPMENT SCHEDULE
Note.WarrantyQ’tyModelMFRRatingCategoryNo.
MFR. Cummins model “QSL9-G7” or approved equal10 Years2QSL9-G7Cummins300kW (375kVA)Generator1
MFR. Cummins model “BTPC 1000A” or approved equal10 Years1BTPC Bypass IsolationCummins1000AATS2
MFR. ATS model “H7 ACTB B3 1000 C5XC 7000” or approved equal3 Years1H7 ACTB B3 1000 C5XC 7000 Bypass IsolationASCO1000ACTTS3
As UL certified product, Pumps and a controller, provided according to the manufacturer’s recommendations, should be included.1 Years1UL Listed, Double shellsSimplex600 [Gal]Day Tank4
Limited to UL 752 (MFR. CONVAULT) products that meet the requirements.1 Years1UL Listed, Double shellsConvault2000 [Gal]Main Tank5
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL TCG – Generator shelter
LAYOUT (AS-IS) – SHELTER (BLDG.654)
REF.
NO.
DRAWING NO.
S4 23-G908
PROJECT NO. :
ME-7SHEET 7 OF 13SCALE: N/A
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL TCG – Generator shelter
LAYOUT (TO-BE) – SHELTER (BLDG.654)
REF.
NO.
DRAWING NO.
S4 23-G909
PROJECT NO. :
ME-8SHEET 8 OF 13SCALE: N/A
CTTS (ASCO) ATS
(CUMMINS)
Gen#1
3[ft]3[ft]5[ft]
3[ft]
Gen#2
3[ft]
Fire resistance rating finish
Air intake
Air intake
Embedded raceway (minimum depth 2”)
4-350 KCMIL
1-#2AWG (G)
Reuse – KEPCO incoming lines
Reuse – Building power
Entrance
Supply & Return 1” Steel type
Flexible pipes
Water separator Supply & Return 1” Steel type
Day tank
Flexible pipes
Water separator
Day tank
Control wiring – 2 Lines (Dry contact)
Control wiring – 4 Lines (Dry contact/ DC Input)
Equipment Grounding
System bonding
Equipment Grounding
Grounding Rod Grounding Rod
Power panel (both power sources are available)
To. Leaking monitoring system + G To. Pump controller + G
System bonding
Equipment Grounding
Equipment GroundingReuse
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL TCG – Generator shelter
LAYOUT (TO-BE) – OUTDOOR
REF.
NO.
DRAWING NO.
S4 23-G910
PROJECT NO. :
ME-9SHEET 9 OF 13SCALE: N/A
Antenna Main tank
Concrete encasement
Pump controller
Generator
“B” “C”
“D” “A”
“A” “B”
“C”
“D”
Maintenance valve
Strainer
Maintenance valve
Anti-siphoning valve Hopper
Maintenance valve
Monitoring system (TMS2000)
Generator shelter (Bldg.S654)
Return pump supply pump
To. Leaking monitoring system (input power) + G To. Pump controller + G
Grounding Rod
Equipment grounding
For pump control – 2 Lines
For sensing fuel level – 2 Lines
For sensing fuel level – 2 Lines
For sensing leaking – 2 Lines
Emergency shutdown (From. Generator)
Day tank location shall be determined by field engineers with government approval
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL TCG – Generator shelter
SIGNLE LINE DIAGRAM
REF.
NO.
DRAWING NO.
S4 23-G910
PROJECT NO. :
ME-10SHEET 10 OF 13SCALE: N/A
G
G
To. SW PNL
(IN BUILDING)1000AT/AF
1000AT/AF
CUMMINS
300kW/375kVA
120/ 208V – 3PH 4W
CUMMINS
300kW/375kVA
120/ 208V – 3PH 4W
Gen-to-Gen ATS
CUMMINS 1000A
Main ATS
ASCO CTTS 1000A
MCCB
1200AT/ 1200AF
TR
5.7kV – PRI.
208Y/120V – SEC.
3PH 4W 60Hz
Commercial power (From KEPCO)
4 SETS
4 - 350 KCMIL,
1 - #2 Grounding
CONTROL CONDUIT
CONTROL CONDUIT
(TO. PUMP CONTROLLER)
PNL. SW
Circuit No.14 100AT/AF
1 SET OF 35mm C/ 4 – 2 AWG & 1 – 8 AWG (G)
LIGHTS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
20AT
100AF
RECEP. RECEP. RECEP.GEN#1
COOLANT
HEATER
GEN#1
ENGINE
HEATER
GEN#1
BATT.
CHARGER
GEN#1
ANTI-COND.
HEATER
GEN#1
CABINET
HEATER
GEN#2
COOLANT
HEATER
GEN#2
ENGINE
HEATER
GEN#2
BATT.
CHARGER
GEN#2
ANTI-COND.
HEATER
GEN#2
CABINET
HEATER
FUEL
SUPPLY
PUMP
FUEL
RETURN
PUMP
SPARE SPARE SPARE SPARE
GENERATOR ROOM – EXISTING PANEL “A”
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
20AT
100AF
12 SET of 16mm C/ 2 - #12 & 1 - #12 (G)
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL TCG – Generator shelter
PANELBOARD “A” LOAD SCHEDULE
REF.
NO.
DRAWING NO.
S4 23-G910
PROJECT NO. :
ME-11SHEET 11 OF 13SCALE: N/A
PANELBOARD “A” LOAD SCHEDULE
CONNECTION
DIAGRAMREMARK
CIRCUIT BREAKER SIZEPHASE LOADTOTAL
LOADLOAD DESCRIPTIONCKT
NO. AICATAFPCBA
#12 (3/4” C)10kA201001600600LIGHTS1
#12 (3/4” C)10kA201001970970RECEPTACLE2
#12 (3/4” C)10kA201001150150GEN#1 COOLANT HEATER3
#12 (3/4” C)10kA201001450450GEN#1 ENGINE HEATER4
#12 (3/4” C)10kA20100112001200GEN#1 BATTERY CHARGER5
#12 (3/4” C)10kA201001300300GEN#1 ANTI-CONDENSATION HEATER6
#12 (3/4” C)10kA201001100100GEN#1 CABINET HEATER7
#12 (3/4” C)10kA201001150150GEN#2 COOLANT HEATER8
#12 (3/4” C)10kA201001450450GEN#2 ENGINE HEATER9
#12 (3/4” C)10kA20100112001200GEN#2 BATTERY CHARGER10
#12 (3/4” C)10kA201001300300GEN#2 ANTI-CONDENSATION HEATER11
#12 (3/4” C)10kA201001970970RECEPTACLE12
#12 (3/4” C)10kA201001100100GEN#2 CABINET HEATER13
#12 (3/4” C)10kA201001970970RECEPTACLE14
#12 (3/4” C)10kA201001250250FUEL SUPPLY PUMP15
#12 (3/4” C)10kA201001250250FUEL RETURN PUMP16
SPARE17 – 20
4 - #2 & #8 (G) 35mm2770275028908410 [W]TOTAL LOAD
100A LUG INTERIOR.
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL TCG – Generator shelter
DETAILS – MAIN TANK
REF.
NO.
DRAWING NO.
S4 23-G911
PROJECT NO. :
ME-12SHEET 12 OF 13SCALE: N/A
Generator, ATS & Fuel system LCR, TCG
CAMP CARROLL TCG – Generator shelter
DETAILS – UNDERGROUND (PIPE)
REF.
NO.
DRAWING NO.
S4 23-G911
PROJECT NO. :
ME-13SHEET 13 OF 13SCALE: N/A
Concrete encasement sump
Fuel supply Fuel return
Double-wall primary pipe (PVDF)
To. Main fuel tank
Dual Layer access pipe
Transition slab
To. Day tank