Attachement 1_Drawings_2ID_Monument_Installation_v4_Revision_19Jul24.pdf

PDF 4 MB Posted

Attached to
Install 2ID Indianhead Statue, USAG Humphreys
Solicitation number
W91QVN24R0086
Issued by

About this file

This document is a set of drawings for the installation of a 2nd Infantry Division (2ID) monument at Camp Humphreys in the Republic of Korea. The drawings include the proposed location centered on a traffic circle, a plan view showing the layout of the monument and surrounding concrete slab, front elevation details, and construction details for the concrete slab. The monument will feature a 2ID patch made of tiles, with the bottom of the patch aligned southeast towards Indian Head Avenue. The statue will face southeast, centered on the 2ID star. The concrete slab foundation will be 0.15m thick with wire mesh reinforcement. This is in support of the federal contract opportunity W91QVN24R0086 to "Install 2ID Indianhead Statue, USAG Humphreys", issued by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION ENGINEERS

2ND INFANTRY DIVISION

2ND INFANTRY DIVISION

INDIAN MONUMENT

CAMP HUMPHREYS, ROK

SUBMISSION DATE: 03/29/24

REVISION NUMBER: 04

SIGN: DATE:

SIGN: DATE:

DIV ENG TECH: CW3 VELIZ, RENE

D

IV

IS

IO

N E

N G

IN

EE

R S

2N D

IN

FA

N

TR

Y D

IV

IS

IO

N

C

AM

P

H U

M

PH

R

EY

S R

EP

U

BL

IC

O F

KO

R

EA

A B C D E F G H I

J K

D

ES

IG

N

ED

B

Y:

C

W

VE

LI

Z

D R

AW

N

B Y:

C W

VE

LI

Z

C H

EC

KE

D B

Y:

LT

C A

U

ST

IN

PL

O

T

SC

AL

E:

NT

S

FI

LE

N

AM

E:

PL

O

T D

AT

E:

/M

AR

/2

C :\U se rs

\R en e\ D es kt op \A rm y\

Pr oj ec ts

\In di an H ea d

SHEET

IDENTIFICATION

G-01

2I D

-R U

C D

IN

D

IA

N

M O

N U

M

EN

T C

AM

P

H U

M

PH

R

EY

S, R

O K

PA

PE

R S

IZ

E:

AN

SI

C

AP

PR

DA

TE

D

ES

C

R

IP

TI

O

N

14 13 12 11 10 9 8

M

AR

K

AP

PR

DA

TE

D

ES

C R

IP

TI

O N

7 6 5 4 3 2 1

M

AR

K

DIVISION ENGINEERS

2ND INFANTRY DIVISION

ROK/US COMBINED DIVISION

INDEX OF SHEETS

PAGE SHEET DESCRIPTION

1 G-01 TITLE PAGE

2 C-01 PROPOSED LOCATION

3 A-01 PLAN VIEW

4 C-02 FRONT ELEVATION

5 C-03 CONSTRUCTION DETAILS

6 E-01 LIGHTING PLAN

SIGN: DATE: 29MAR24

SIGN: DATE: 29MAR24

DIV ENG: LTC AUSTIN, DEREK C.

VELIZSALCE.RENE.129012213

SHEET 1 OF 6

Digitally signed by

VELIZSALCE.RENE.1290122135

Date: 2024.03.29 10:24:58 +09'00'

A B C D E F G H I

J K

C :\U se rs

\R en e\ D es kt op \A rm y\

Pr oj ec ts

\In di an H ea d

PA

PE

R S

IZ

E:

AN

SI

C

AP

PR

DA

TE

D

ES

C

R

IP

TI

O

N

14 13 12 11 10 9 8

M

AR

K

AP

PR

DA

TE

D

ES

C R

IP

TI

O N

7 6 5 4 3 2 1

M

AR

K

DIVISION ENGINEERS

2ND INFANTRY DIVISION

ROK/US COMBINED DIVISION

PR

O

PO

SE

D L

O C

AT

IO

N

SHEET

IDENTIFICATION

C-01

PROPOSED LOCATION1 SCALE: 1/32" : 1'

D

IV

IS

IO

N E

N G

IN

EE

R S

2N D

IN

FA

N

TR

Y D

IV

IS

P

H U

M

PH

R

EY

S R

EP

U

BL

IC

O F

KO

R

EA

D

ES

IG

N

ED

B

Y:

C

W

VE

LI

Z

D R

AW

N

B Y:

C W

VE

LI

Z

C H

EC

KE

D B

Y:

LT

C A

U

ST

IN

PL

O

T

SC

AL

E:

1/

: 1

FI

LE

N

AM

E:

PL

O

T D

AT

E:

/M

AR

/2

2I D

-R U

C D

IN

D

IA

N

M O

N U

M

EN

T C

AM

P

H U

M

PH

R

EY

S, R

O K

PROPOSED LOCATION CENTERED

ON TRAFFIC CIRCLE, FRONT OF

MONUMENT FACING SOUTHEAST

SHEET 2 OF 6

• Bottom of the 2ID Patch is SE aligned with Indian head Ave

• The face of the statue faces SE toward Indian head ave.

• The Statue centered on 2ID Star

• 2ID Patch is made of tiles

• Green = Grass

A B C D E F

G H I J K

SHEET

IDENTIFICATION

C :\U se rs

\R en e\ D es kt op \A rm y\

Pr oj ec ts

\In di an H ea d

PA

PE

R S

IZ

E:

AN

SI

C

AP

PR

DA

TE

D

ES

C

R

IP

TI

O

N

14 13 12 11 10 9 8

M

AR

K

AP

PR

DA

TE

D

ES

C R

IP

TI

O N

7 6 5 4 3 2 1

M

AR

K

DIVISION ENGINEERS

2ND INFANTRY DIVISION

ROK/US COMBINED DIVISION

PLAN VIEW1 SCALE: 1/8" : 1'

D

IV

IS

IO

N E

N G

IN

EE

R S

2N D

IN

FA

N

TR

Y D

IV

IS

P

H U

M

PH

R

EY

S R

EP

U

BL

IC

O F

KO

R

EA

D

ES

IG

N

ED

B

Y:

C

W

VE

LI

Z

D R

AW

N

B Y:

C W

VE

LI

Z

C H

EC

KE

D B

Y:

LT

C A

U

ST

IN

PL

O

T

SC

AL

E:

1/ 8"

1'

FI

LE

N

AM

E:

PL

O

T D

AT

E:

/M

AR

/2

2I D

-R U

C D

IN

D

IA

N

M O

N U

M

EN

T C

AM

P

H U

M

PH

R

EY

S, R

O K

NOTES:

1. INSTALLATION OVER CONCRETE SLAB

WILL BE TILES SHOWCASING 2ID

COMBINED DIVISION SHIELD,

SURROUNDED BY GRASS.

2. 2ID SHIELD ALIGNED WITH INDIANHEAD

AVE ALIGNMENT.

3. MONUMENT CENTERED ON STAR,

FACING SOUTHEAST. PL

AN

V

IE

W

C O

LO

R

ED

C

O N

C R

ET

E

IN

ST

AL

LA

TI

O

N

A-02

SHEET 3 OF 6

IDENTIFICATION

C-02

SHEET 4 OF 6

A B C D E F G H I

J K

SHEET

C :\U se rs

\R en e\ D es kt op \A rm y\

Pr oj ec ts

\In di an H ea d

7 6 5 4 3 2 1

M

AR

K

PA

PE

R S

IZ

E:

AN

SI

C

D

ES

C R

IP

TI

O N

14 13 12 11 10 9 8

D

AT

E

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DIVISION ENGINEERS

2ND INFANTRY DIVISION

ROK/US COMBINED DIVISION

FR

O

N T

EL

EV

AT

IO

N

1 FRONT ELEVATION

SCALE: 1/4" : 1'

D

IV

IS

IO

N E

N G

IN

EE

R S

2N D

IN

FA

N

TR

Y D

IV

IS

P

H U

M

PH

R

EY

S R

EP

U

BL

IC

O F

KO

R

EA

D

ES

IG

N

ED

B

Y:

C

W

VE

LI

Z

D R

AW

N

B Y:

C W

VE

LI

Z

C H

EC

KE

D B

Y:

LT

C A

U

ST

IN

PL

O

T

SC

AL

E:

1/ 4"

1'

FI

LE

N

AM

E:

PL

O

T D

AT

E:

/M

AR

/2

2I D

-R U

C D

IN

D

IA

N

M O

N U

M

EN

T

0.15m CONCRETE SLAB ON GRADE

FOUNDATION (2ID SHIELD SHAPE)

FOR VISUALIZATION ONLY

A B C D E F G H I

J K

SHEET

C :\U se rs

\R en e\ D es kt op \A rm y\

Pr oj ec ts

\In di an H ea d

PA

PE

R S

IZ

E:

AN

SI

C

AP

PR

DA

TE

D

ES

C

R

IP

TI

O

N

14 13 12 11 10 9 8

M

AR

K

AP

PR

DA

TE

D

ES

C R

IP

TI

O N

7 6 5 4 3 2 1

M

AR

K

DIVISION ENGINEERS

2ND INFANTRY DIVISION

ROK/US COMBINED DIVISION

C O

N C

R

ET

E

SL

AB

D

ET

AI

LS

D

IV

IS

IO

N E

N G

IN

EE

R S

2N D

IN

FA

N

TR

Y D

IV

IS

P

H U

M

PH

R

EY

S R

EP

U

BL

IC

O F

KO

R

EA

D

ES

IG

N

ED

B

Y:

C

W

VE

LI

Z

D R

AW

N

B Y:

C W

VE

LI

Z

C H

EC

KE

D B

Y:

LT

C A

U

ST

IN

PL

O

T

SC

AL

E:

1- 1/

2"

1'

FI

LE

N

AM

E:

PL

O

T D

AT

E:

/M

AR

/2

2I D

-R U

C D

IN

D

IA

N

M O

N U

M

EN

T

SIDEWALK DETAIL1 SCALE: 1-1/2" : 1'

FINISHED GRADE

BELOW SLAB

SURFACE

6X6-W1.4XW1.4

WELDED WIRE

FABRIC @ MID DEPTH

NOTES:

1. CONCRETE USED SHALL HAVE A SPECIFIED MINIMUM

COMPRESSIVE STRENGTH OF 3,500 PSI AT 28 DAYS.

2. CONCRETE REINFORCING STEEL SHALL CONFORM TO THE

REQUIREMENTS OF ASTM A615, GRADE 60. REINFORCING

TO BE WELDED SHALL CONFORM TO THE REQUIREMENTS

OF ASTM A706, GRADE 60.

3. CONCRETE COVER OVER STEEL REINFORCING SHALL

CONFORM TO THE MINIMUMS REQUIRED BY ACI 318.

4. WHERE IT COMES NECESSARY, EXPANSION JOINTS ARE TO

BE PLACED 25-35 FEET APART DEPENDING ON TRANSVERSE

JOINT MARKINGS AND WHERE SIDEWALK IS BUILT DIRECTLY

AGAINST EXISTING CONCRETE.

5. WHERE IT COMES NECESSARY, CONCRETE JOINT MATERIAL

TO BE FLUSH WITH THE SLAB SURFACE, HALF INCH

PREMOLDED FIBER.

6. LONGITUDINAL JOINT MARKINGS NOT REQUIRED.

7. WHERE IT COMES NECESSARY, TRANSVERSE HAND

TOOLED JOINT MARKINGS ARE TO BE MADE TO FORM

BLOCKS AS NEARLY TO SQUARE AS PRACTICAL.

8. DESIRABLE SLAB CROSS SLOPE IS 1.5%, ABSOLUTE

0.15m AGGREGATE BASE

@ 95% MODIFIED PROCTOR

COMPACTED SUBGRADE

0.15m

VAPOR BARRIER

9. WHERE IT COMES NECESSARY TO REMOVE PARTS OF

EXISTING CONCRETE, IF ANY, THE RESULTING EDGES

SHALL BE CUT TO A NEAT LINE, AND ANY OFFSETS IN SUCH

LINES SHALL BE MADE AT RIGHT ANGLES.

IDENTIFICATION

C-03

SHEET 5 OF 6

MAXIMUM IS 2.0%.

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5

File details come from the government source that posted it. Updated .