4-W91QVN-24-R-0034-A0001.pdf
PDF 331 KB Posted
- Solicitation number
- W91QVN-24-R-0034
About this file
This document is an amendment to Solicitation No. W91QVN-24-R-0034 for the Maintenance of Oil/Water Separator at USAG-Humphreys in South Korea. The purpose of the amendment is to change the requirements for the Prime Contractor's Business Registration under the Technical Factor.
The solicitation is for a Requirements-type contract with Firm-Fixed Price CLINs. Award will be made to the responsible offeror submitting the Lowest Price Technically Acceptable (LPTA) offer. The Technical Factor includes four subfactors: 1) Prime Contractor's Business Registration, 2) Prime Contractor's Prior Experience, 3) Key Personnel, and 4) Equipment Plan. The Past Performance Factor will be evaluated on an Acceptable/Unacceptable basis. A pre-award survey may be conducted. The site visit is scheduled for 25 April 2024. Offers are due by the closing date on the SF 1449.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
411TH CSB, KOREA - HUMP CONTRACTING DIV
POC: MS KIM, CHONG AE
TEL: 0503-355-0644
CHONGAE.KIM.LN@ARMY.MIL
APO AP 96271
UNITED STATES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE NEXT PAGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Apr-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN24R0034
X 9B. DATED (SEE ITEM 11)
11-Apr-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Apr-2024
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
HUMPHREYS CONTRACTING DIVISION
UNIT 15289
APO AP 96271-5584
UNITED STATES
W91QVN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W91QVN
FACILITY CODECODE
EMAIL:TEL:
W91QVN24R0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
a. The purpose of this modification is to change Paragraph 4, Factor I - Technical, Sub-Factor 1: Prime Contractor’s Business Registration in Addendum to FAR 52.212-1, Instructions to the Offeror(s) and Paragraph 2, Factor I - Technical, Sub-Factor 1: Prime Contractor’s Business Registration in Addendum to FAR 52.212-2, Evaluation-Commercial Items (Nov 2021), to read as follows:
Addendum FAR 52.212-1, Instructions to the Offeror(s)
FROM: The offeror shall provide a copy of Prime Contractor's valid and current permissions in Designated Waste Collection & Transportation Business Permission (지정폐기물 수집 운반업 허가증) and Designated Waste Intermediate Treatment/Disposal Permission (지정폐기물 중간 처분업 허가증) for collection and transportation of the designated waste and the treatment of the designated waste (Waste Oil/POL- laden sediment/sand/soil) issued by the Republic of Korea (ROK) Government. The Subcontractor’s business registration cannot be substituted for the prime Contractor's Registration.
TO: The offeror shall provide at least one copy for any one of the following Prime Contractor's valid and current permissions in 1) Interim Waste Disposal Business (폐기물중간처분업허가증); 2) Terminal Waste Disposal Business (폐기물최종 처분업허가증); 3) General Waste Disposal Business (폐기물종합처분업허가증); 4) Interim Waste Recycling Business (폐기물중간재활용업허가증); 5) Terminal Waste Recycling Business (폐기물최종재활용업허가증); or 6) General Waste Recycling Business (폐기물종합재활용업허가증) for collection and transportation of the designated waste and the treatment of the designated waste (Waste Oil/POL- laden sediment/sand/soil) issued by the Republic of Korea (ROK) Government. The Subcontractor’s business registration cannot be substituted for the prime Contractor's Registration
Addendum to FAR 52.212-2, Evaluation-Commercial Items (Nov 2021)
FROM: The offeror will be evaluated on providing a copy of valid and current permissions in Designated Waste Collection & Transportation Business Permission (지정폐기물 수집 운반업 허가증) and Designated Waste Intermediate Treatment/Disposal Permission (지정폐기물 중간 처분업 허가증) for collection and transportation of the designated waste and the treatment of the designated waste (Waste Oil/POL-laden sediment/sand/soil) issued by the Republic of Korea (ROK) Government. The Subcontractor’s business registration cannot be substituted for the prime Contractor's Registration.
TO: The offeror will be evaluated on providing at least one copy for any one of the following Prime Contractor's valid and current permissions in 1) Interim Waste Disposal Business (폐기물중간처분업허가증); 2) Terminal Waste Disposal Business (폐기물최종 처분업허가증); 3) General Waste Disposal Business (폐기물종합처분업허가증); 4) Interim Waste Recycling Business (폐기물중간재활용업허가증); 5) Terminal Waste Recycling Business (폐기물최종재활용업허가증); or 6)
General Waste Recycling Business (폐기물종합재활용업허가증) for collection and transportation of the designated waste and the treatment of the designated waste (Waste Oil/POL- laden sediment/sand/soil) issued by the Republic of Korea (ROK) Government. The Subcontractor’s business registration cannot be substituted for the prime Contractor's Registration.
b. All other terms and conditions of the solicitation remain the same.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
ADDENDUM
ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S)
1. In accordance with FAR 52.212-1 "Instructions to Offerors-Commercial Items (OCT 2015), the Government reserves the right, based on the Government's best interests, to make a determination to:
1) award without discussions; 2) make a single award for this requirement; 3) establish a competitive range in order to conduct discussions; and/or 4) make no award if, upon evaluation, none of the proposals are deemed likely to meet the requirements.
2. PROPOSAL SUBMISSION: Offerors’ proposals shall adhere to the following instructions:
2.1. These instructions are designed to ensure submission of essential information in order for the Government to understanding and evaluate proposals. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussions with Offerors.
2.2. Offerors are cautioned to submit adequate information to enable the Government team to fully ascertain each Offeror’s capability to perform all of the requirements identified in the solicitation. All commitments made in the proposal shall become a part of the resultant contract.
2.3. Contractor Team Arrangements: A contractor team arrangement (CTA) means an arrangement in which two or more companies form a partnership or joint venture to act as a potential prime contractor or a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. A CTA is not an arrangement in which two or more companies form a separate legal entity, such as a corporation or limited liability company, to act as a potential prime contractor.
2.3.1. The Government will, when applicable, recognize the integrity and validity of CTAs when identified and fully disclosed to the Contracting Officer. Offerors proposing a CTA must identify and fully disclose contractor team arrangements relationships in their offer/proposal. A CTA must be in writing.
2.3.2. After award, the Contractor must notify the Contracting Officer and CTA arrangement with subcontractor(s) within 10 days prior to any projected performance by the new subcontractor.
2.3.3. For offerors proposing a partnership/joint venture CTA: The CTA must do business under the CTA name, must register in SAM under the CTA name, must provide documents vesting an individual with the authority of the partners to bind the CTA, and must designate a single point of contact for the CTA.
2.3.4. The Government will perform a responsibility determination on a CTA just as it would on any prospective contract awardee.
2.4. Offerors are required to submit complete proposals (Technical Proposal, Past Performance Proposal, and Price Proposal) by e-mail to Contracting Officer, Mr. Emery S. Moser at emery.s.moser.civ@army.mil and Contract Specialist, Ms. Kim, Chong-Ae at chongae.kim.ln@army.mil by 13:00 hours on the closing date of the SF 1449 as follows:
- Write Solicitation Number (including amendment number, if applicable) in the Subject Line
- Identify Company Information including Company Name, POC, UEI # and CAGE Code in the
Proposal.
- Provide Name and Phone Number of the email sender at the bottom of the email.
- The only acceptable file formats are PDF, Microsoft Word, and Microsoft Excel.
- The maximum size of e-mail is limited 20MB to the Government email address.
- Emails sent from Commercial email services Gmail and Hotmail are acceptable. Other commercial email addresses may be blocked.
Once submitted proposals, offerors are required to confirm with Ms. Kim, Chong-Ae, Contract Specialist, Tel (0503) 355-0644 whether proposal received properly via e-mail before closing time and date.
Failure to submit proposal via e-mail as required in this solicitation shall be grounds for determining the offer to be ineligible for contract award.
The Offeror shall submit Technical Proposal, Price Proposal, and Past Performance in separate sheet.
The Offeror(s) shall round up/down all unit prices to the nearest whole Korean Won (KRW) thereby eliminating the use of any decimal points.
All questions shall be emailed to Mr. Emery S. Moser at emery.s.moser.civ@army.mil and/or Ms.
Kim, Chong Ae, at chongae.kim.ln@army.mil within two (2) calendar days after the site visit is conducted. Questions received after this date and time may not be answered.
2.5. FAR Clause 52.212-3, Alt I, OFFEROR REPRESENTATIONS AND CERTIFICATIONS COMMERCIAL ITEMS: The offeror shall provide a complete FAR 52.212-3, Alt 1, (h) & (k).
mailto:emery.s.moser.civ@army.mil mailto:chongae.kim.ln@army.mil mailto:emery.s.moser.civ@army.mil mailto:chongae.kim.ln@army.mil
2.6. FAR Clauses 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
2.7. FAR Clause 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-- REPRESENTATION (OCT 2020): The offeror shall check mark in checkbox on the representation whether the offeror WILL or WILL NOT provide the covered telecommunications equipment or services and DOES or DOES NOT use covered telecommunications equipment. The Offeror shall provide the additional disclosure information required at paragraph of this section if the Offeror responds “WILL” or "DOES" in paragraph of this section. (If both Clauses have been in SAM (https://www.sam.gov) already, you are not required to check mark.
2.8. Tax Exemptions- Republic of Korea, (5) TAXES - The offeror shall provide a complete the form and sign. The offeror shall indicate specific types and quantities of POL products upon which offeror’s based and for which tax exemption is allowed in this Solicitation.
2.9. Signed Solicitation and Amendment: Signed first page of the solicitation (SF1449) and each amendment (SF30) (if any amendment are issued)
2.10. Point of Contact (POC): Name(s) and telephone number, and e-mail address of person(s) authorized to conduct discussions/negotiations and to financially bind the company.
3.0. OFFICIAL MEANS OF DISSEMINATING INFORMATION:
3.1. Official Means of Disseminating Information after solicitation issued through sam.gov such as requests for clarification and/or information concerning this solicitation shall be submitted in writing or electronically as followed information: (for each question, comment or observation, identify the Paragraph number being referenced).
411th CSB Branch B ATTN: Ms. Kim, Chong-Ae Reference: W91QVN-24-R-0034, Maintenance of Oil/Water Separator, USAG-Humphreys E-mail: chongae.kim.ln@army.mil
3.2. No information concerning this solicitation or requests for clarification will be provided in response to Offeror initiated telephone calls. All such requests must be made in writing and submitted to the above email address. Written inquiries will be answered in writing and provided to all Offerors. The deadline for submission of questions regarding this solicitation is within two (2) dyas after the site visit is conducted.
4. SUBMITTAL REQUIREMENTS:
FACTOR I – TECHNICAL:
https://www.sam.gov/
Sub-Factor 1: Prime Contractor's Business Registration: The offeror shall provide at least one copy for any one of the following Prime Contractor's valid and current permissions in 1) Interim Waste Disposal Business (폐기물중간처분업허가증); 2) Terminal Waste Disposal Business (폐기물최종 처분업허가증); 3) General Waste Disposal Business (폐기물종합처분업허가증); 4) Interim Waste Recycling Business (폐기물중간재활용업허가증); 5) Terminal Waste Recycling Business (폐기물최종재활용업허가증); or 6) General Waste Recycling Business (폐기물종합재활용업허가증) for collection and transportation of the designated waste and the treatment of the designated waste (Waste Oil/POL- laden sediment/sand/soil) issued by the Republic of Korea (ROK) Government. The Subcontractor’s business registration cannot be substituted for the prime Contractor's Registration.
Sub-Factor 2: Prime Contractor’s Prior Experience: The Offeror will be evaluated on providing evidence of recent experience in calendar year 2020, 2021, and 2022 amounting to over W300,000,000 per year in waste collection and transportation business. The experience of a subcontractor cannot be substituted for the prime contractor’s experience. The offeror shall provide evidence of prior experience as required below:
- Title of the contract/Project
- A detail description of work completed
- Length of contract/Project (year/month/date – year/month/date)
- Value of contract/project in KW for total amount
- Complete name, phone number, and E-mail address of point of contact at Client
Organization (Company) or Requiring Activity (RA)
Sub-Factor 3: Key Personnel:
(1) Contract Manager (CM): The offeror shall provide CM’s resume with at least three (3) years of experience as a CM in designated waste collection and transportation within the last five (5) years from the issuance date of this solicitation. The resume for CM shall clearly identify below information as required:
- Name of CM
- A clear description of qualifying work experience
- Length of contract/project (year/month/date – year/month/date)
- Value of contract/project in KW for total amount
- Company Name/Employer, email/phone number of validating point of contact (POC)
Sub-Factor 4: Equipment Plan: The offeror shall provide equipment plan which clearly demonstrates how the offeror shall provide necessary equipment to perform services for removal, transportation, and disposal of oil/water mixture and contaminated sand/soil from various Oil/Water Separators and clearly identifies equipment list, equipment type, description, quantities, ability to secure required equipment and any other information to perform in accordance with the PWS.
FACTOR II - PAST PERFORMANCE: The past performance factor considers the offeror’s demonstrated recent and relevant record of performance in supplying services that meet the contract requirements.
Past performance will be evaluated on an acceptable/unacceptable basis. The offerors are required to identify contracts, both commercial and Government contracts for the same service. The Government may ascertain past performance information on the offeror from sources other than the contracts/ references provided. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have neutral past performance. In the context of acceptability/unacceptability, “a neutral rating” shall be considered “acceptable”
The offeror shall provide recent and relevant past performance in maintenance of oil/water separator.
Recent past performance is within the last five (5) years from the issuance date of this solicitation.
Relevant past performance are those that are the “same or similar” services based on size, scope, complexity, and contract type.
(a) Contract references. For each Past Performance submission as required in the below format:
-The title of the contract/project -A description of work completed -Name of the Client Organization or Requiring Activity -Length of contract/project (year/month/date – year/month/date) -Value of contract/project -Complete name, e-mail and phone number of point of contact (POC) at Client Organization
(b) The Government may send a Past Performance Questionnaire to the POC listed by the Offeror for each relevant contract, who will subsequently be requested to submit information to the Government no later than 14 days after Government issuance of the questionnaire.
Note: Offerors are reminded that while the Government may elect to consider data obtained from other sources, the Government does not assume the duty to search for data to cure problems it finds in the proposals. The burden of providing thorough and complete past performance information rests with the Offeror.
FACTOR III - PRICE PROPOSAL: The Offeror shall provide complete price proposal to include:
(a) Schedule of Services (CLINs/SubCLINs) of the RFP for all five (5) years;
(b) Prices shall be in local currency (Korean Won)
(c) Any escalation in additional option year pricing shall be identified and clearly explained
(d) Summary of Proposed Price: The offeror(s) shall provide a list of summary of proposed price with using below format as follows:
Price Proposal by: Identify Offeror's Name Base
Year 1st Option
Year 2nd Option
Year 3rd Option
Year 4th Option
Year
CLIN 0001
CLIN 0002
CLIN 0003
CLIN 0004
CLIN 0005
CLIN 0006
CLIN 0007
TOTAL AMOUNT
GRAND TOTAL AMOUNT FOR BASE + 4 OPTION YEARS
5. SITE VISIT:
a. Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the price of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. The scheduled site orientation schedule is as follows:
TIME AND DATE: 13:30 hours on 25 April 2024 ESCORT LOCATION: In front of the visitor center at ADAMS GATE (Doduri Gate-B #5502)
b. RSVP is required to request temporary escort approval. Offeror shall submit the following information to Ms. Kim, Chong-Ae at chongae.kim.ln@army.mil by 13:00 hours on 18 April 2024.
After sending e-mail, offerors shall confirm with Ms. Kim, Chong-Ae at 0503-355--644 (commercial) if the e-mail is delivered to her e-mail account.
- Name: maximum of 2 individuals per offeror
- Korean Identification Number
- Phone or Cell-phone number
- Name of Company
- If already have post pass which is available to get access Camp Humphreys: (YES/NO)
c. The attendee must bring a phone identification (주민등록증)
6. PRE-AWARD SURVEY: A pre-award survey may be conducted on firms, to include joint venture partners and subcontractors indicating firm commitments to this acquisition, submitting proposals. The pre-award survey is to determine the prospective contractor’s responsibility in accordance with FAR Part 9.104-1. Information may be requested as required by the Contracting Officer and the information shall be submitted within two (2) working days of the request.
--------- End of ADDENDUM to FAR 52.212-1 INSTRUCTION TO OFFERORS – COMMERCIAL ITEMS -----
(End of provision) mailto:chongae.kim.ln@army.mil
52.212-2 EVALUATION--COMMERCIAL ITEMS (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
------------------ ADDENDUM TO FAR 52.212-2 EVALUATION-COMMERCIAL ITEMS (Nov 2021) ---------------
1. The Government intends to execute a Requirements type with Firm-Fixed Price CLINs contract for Maintenance of Oil/Water Separator, USAG-Humphreys. Award will be made to the responsible Offeror submitting the Lowest Price Technically Acceptable (LPTA) offer in accordance with the Federal Acquisition Regulation (FAR) Parts 12 and 13.5 that satisfies all terms and conditions of the solicitation.
Offers will be evaluated for acceptability, but not ranked using the non-cost factors/subfactors. All non-cost factors and subfactors will be rated as either acceptable or unacceptable. In order to be considered for award, there must be an acceptable rating in every non-price factor/subfactor. In other words, a rating of unacceptable for any factor or subfactor will result in the entire offer being rated unacceptable.
2. Award will be made to the responsible Offeror submitting the Lowest Priced Technically Acceptable (LPTA) offer that satisfies all terms and conditions of the solicitation. Offers will be evaluated for acceptability, but not ranked using the non-price factors/subfactors. All non-price factors and subfactors will be rated as either “acceptable” or “unacceptable”. In order to be considered for award, there must be an “acceptable” rating in every non-price factor/subfactor. In other words, a rating of “unacceptable” for any factor or subfactor will result in the entire offer being rated “unacceptable”.
FACTOR I - TECHNICAL: Each factor and subfactor will be rated either acceptable or unacceptable. A rating of unacceptable for any factor or subfactor will result in an overall unacceptable rating. If an offeror fails to meet the minimum requirements outlined in one of the three (3) subfactors below, the subfactor, and overall proposal will be rated “unacceptable” and will not be eligible for award.
Technical Ratings Rating Description
Acceptable Proposal meets the requirements of the solicitation.
Un-acceptable Proposal does not meet the requirements of the solicitation.
Sub-Factor 1: Prime Contractor's Business Registration: The offeror will be evaluated on providing at least one copy for any of the following Prime Contractor's valid and current permissions in 1) Interim Waste Disposal Business (폐기물중간처분업허가증); 2) Terminal Waste Disposal Business (폐기물최종
처분업허가증); 3) General Waste Disposal Business (폐기물종합처분업허가증); 4) Interim Waste Recycling Business (폐기물중간재활용업허가증); 5) Terminal Waste Recycling Business (폐기물최종재활용업허가증); or 6) General Waste Recycling Business (폐기물종합재활용업허가증) for collection and transportation of the designated waste and the treatment of the designated waste (Waste Oil/POL- laden sediment/sand/soil) issued by the Republic of Korea (ROK) Government. The Subcontractor’s business registration cannot be substituted for the prime Contractor's Registration.
Sub-Factor 2: Prime Contractor’s Prior Experience: The offeror will be evaluated on providing evidence of recent experience in calendar year 2020, 2021, and 2022 amounting to over W300,000,000 per year in waste collection and transportation business. The experience of a subcontractor cannot be substituted for the prime contractor’s experience. Sub-Contractor’s experience can’t be substituted Prime Contractor’s Experience. The offeror shall provide evidence of prior experience as required below:
-Title of the contract/Project -A detail description of work completed -Length of contract/Project (year/month/date – year/month/date) -Value of contract/project in KW for total amount -Complete name, phone number, and E-mail address of point of contact at Client Organization
(Company) or Requiring Activity (RA)
Sub-Factor 3: Key Personnel:
(1) Contract Manager (CM): The offeror will be evaluated on providing CM’s resume with at three (3) years of experience as a CM in designated waste collection and transportation within the last five (5) years from the issuance date of this solicitation. The resume for CM shall clearly identify information as required below:
- Name of CM
- A clear description of qualifying work experience
- Length of contract/project (year/month/date – year/month/date)
- Value of contract/project in KW for total amount
- Company Name/Employer, email/phone number of validating point of contact (POC)
Sub-Factor 4: Equipment Plan: The offeror will be evaluated on providing equipment plan which clearly demonstrates how the offeror shall provide necessary equipment to perform services for removal, transportation, and disposal of oil/water mixture and contaminated sand/soil from various Oil/Water Separators and clearly identifies equipment list, equipment type, description, quantities, ability to secure required equipment and any other information to perform in accordance with the PWS.
FACTOR II - PAST PERFORMANCE: Past performance will be evaluated on an acceptable/unacceptable basis. Offerors are authorized to provide information on the problems encountered on the identified contracts and the Offeror’s corrective actions. The Government may ascertain past performance information on the Offeror from sources other than the references provided.
The offeror shall provide recent and relevant past performance in maintenance of oil/water separator.
Recent past performance is within the last five (5) years from the issuance date of this solicitation.
Relevant past performance are those that are the “same or similar” services based on size, scope, complexity, and contract type.
The past performance will be evaluated for all offeror’s proposals by the Contract Specialist/ Contracting Officer in the following manner:
(1) Review of the detailed explanation submitted by offerors demonstrating the relevance of the references to the requirements of the solicitation.
(2) References will be contacted by phone or email to verify contents in detail explanation and to determine record of compliance with contract requirements, accuracy of reports, technical and quality awards/certificates.
(3) The Government reserves the right to obtain past performance information from any reasonable source available, including Government database in order to evaluate past performance.
NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (See FAR 15.305(a)(2)(iv). Therefore, the offeror shall be determined to have unknown (or "neutral") past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered "acceptable".
PAST PERFORMANCE EVALUATION RATINGS
Adjectival
Rating Description
Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note above)
Un-acceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
FACTOR III - PRICE: Price analysis will be conducted for each proposal to ensure completeness, reasonableness, and identify unbalanced pricing IAW FAR 15.404-1(b). The following applies to that evaluation.
(1) Completeness. The offeror shall complete the pricing information for all CLINs identified for total five (5) years.
(2) Price Reasonableness. Price should also reflect fair market value and be reasonable when compared to the independent Government estimate, current market prices for same or similar services and/or when compared among other technically acceptable offers.
(3) Unbalanced Pricing: As part of the price evaluation, proposals will be reviewed to identify any unbalanced pricing. IAW FAR 15.404-1(g) (3), Unbalanced Pricing, a proposal may be rejected if the Contracting Officer determines the lack of balance poses an unacceptable risk to the Government.
Price is not scored: The lowest price for award purposes will be the combined total of the effective period of five (5) years from the date of award. Price shall include all CLINs as listed on the Price Schedule. The Government intends to evaluate proposals and award a contract without discussions.
Therefore, Offerors are instructed that submitted proposals should contain their best pricing.
FAR Clause 52.217-8 Option to Extend Services: As part of price evaluation, the Government will evaluate its option to extend services (FAR Clause 52.217-8 - Option to Extend Services) by adding one-half of the Offeror’s final option period prices to the Offeror’s total price. Thus, the Offeror’s total price for the purpose of evaluation will include the base period, 1st option, 2nd option, 3rd option, 4th option and one-half of the 4th option. Offerors are required only to price the base and four (4) options.
Offerors shall not submit a price for the potential one-half year extension of services period.
-------------------End of Addendum to FAR 52.212-2 Evaluation – Commercial Items (Nov 2021)-------------
(b)Options: The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the options.
(c) A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .