Drawings (Rev).pdf
PDF 5 MB Posted
- Attached to
- Replace Carpet and Repaint
- Solicitation number
- W91QVN-23-R-0076
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_W91QVN23R00760001.pdf | ||
| RFP_W91QVN23R0076.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIM.CHAE
HWA.1289586624
Digitally signed by SIM.CHAE
HWA.1289586624
Date: 2022.11.22 09:31:16 +09'00'
YI.YONGSOP.1288268530
Digitally signed by
YI.YONGSOP.1288268530
Date: 2022.11.23 12:05:41 +09'00'
FLOOR TRANSITION DETAIL AND WALL CARPET DETAIL
1289988820.LN
Typewritten Text 23-013
1289988820.LN
Typewritten Text 1 1
HGFEDCBA
AS SHOWN
A-1
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
N
8,200
3,6002,800
A1- SCALE: 1 / 50
1st FLOOR PLAN
400400 1,000
,0
,0
,8
,5
,2
ELEVATOR
LATRINE
STAIRWAY
HALLWAY
MECH RM
ELEV.
MECH RM
CH:3,600
A1--
A
B
C
D
A B DC
HALLWAY @ RM102
A1- SCALE: 1 / 50
ELEVATION
A1--
A
B
1.
2.
6.
7.
5.
PAINT AREA
REPLACE VCB REPLACE VCB REPLACE VCB REPLACE VCB
A B DC
,4
CLG
FFL
EXST.ELEVATOR
,4
CLG
FFL
LATRINE @ RM103
NOTE
1.
SCOPE OF WORK
,6
CLG
FFL
,6
CLG
FFL
2,520 9501,200 2,520950 1,200
1st FLOOR TO 7th FLOOR STAIR
REPAIR/MAINTENANCE WORK
COVERS
2EA RADIATOR's
REPAINT
ON THE FLOOR
REPAINT EPOXY
REPAINT WALL
DOOR W/ DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL REPAINT WALL
GUARDRAIL
REPAINT HANDRAIL AND
REPAINT WALL
3.
ANY CONSTRUCTION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION AND DIMENSION PRIOR TO COMMENCING
BEFORE PAINTING, ALL SURFACES SHALL BE SCRAPED TO REMOVE PEELING PAINT, CLEANED, LEVELED AND SMOOTHED BY THE CONTRACTOR.
DAMAGED PORTION SHALL BE REPAIRED PROPERLY TO APPLY PAINT.
ALL ELECTRICAL AND MECHANICAL DEVICES AND EQUIPMENT SHALL BE PROTECTED FROM PAINT STAINS UNDER THE PAINTING WORK.
4.
5.
6.
7.
W/ DOOR FRAME
2EA METAL DOORS
REPAINT
COVER
RADIATOR's
REPAINT
SCOPE OF WORK AND NOTE
1st FLOOR PLAN, ELEVATION, MATERIAL BY MANUFACTURER.
THE CONTRACTOR SHALL FOLLOW UP WITH MANUFACTURE INSTALLATION SPECIFICATION AND COMPLY WITH RECOMMENDED ADHESIVE
GUARDRAIL
REPAINT HANDRAIL AND
USE LEAD FREE PAINT MATERIALS.
ALL PAINTING WORK SHALL BE DONE IN ACCORDANCE WITH O&MA STANDARD SPECIFICATION SECTION 09900 AND
3.
4.
REMOVE AND RE-INSTALL FURNITURE AND OTHER OBSTRUCTIONS, EXCEPT FOR UNIT OPERATION EQUIPMENT DURING THE WORK.
REPLACE EXISTING ACOUSTICAL WALL CARPET WITH NEW AT ROOM 801 AND 802 AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)
ON THE FLOOR
REPAINT EPOXY
ON THE FLOOR
REPAINT EPOXY
9.
8.
2.
DUE TO THEIR OPERATION EQUIPMENT DURING THE PERFORMANCE OF THE WORK.
THE CONTRACTOR SHALL COORDINATES WITH USER TO MOVE THEIR OPERATING EQUIPMENT THRU COR WHEN INTERFERENCE OCCURS
TREAD AND LANDING
REPAINT EPOXY ON RISER,
REPAINT WALL
TREAD AND LANDING
REPAINT EPOXY ON RISER,
AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)
REPLACE EXISTING ACOUSTICAL CEILING TILE(ACT) WITH NEW DARK COLORED(BLACK) ACOUSTICAL CEILING TILE AT ROOM 801
2(TWO)EA OF METAL RADIATOR COVERS AT ROOM 102 AND 201 AS PER DRAWING.
SURFACE PREPARATION AND REPAINT ALL METAL DOOR FRAMES, 2(TWO)EA OF METAL DOORS AT 1st FLOOR STAIRWAY AND
ON THE STAIRWAY AT ROOM 802 AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)
REPLACE EXISTING RUBBER FLOOR TREAD, RISER AND VINYL COMPOSITION TILE(VCT) WITH NEW RUBBER FLOOR TILE(RT), TREAD AND RISER
INCLUDING FOUR(4)EA THRESHOLDS AND ONE(1)EA ALUMIMUM CARPET TRANSITION AS PER DRAWING AND SCHEDULE(SEE NOTE #1).
REPLACE EXISTING CARPET WITH CARPET TILE ON THE FLOOR AT ROOM 301, 701 AND PROVIDE CARPET TILE ON THE FLOOR AT ROOM 401, 402, 801
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
(AWC)
ACOUSTICAL WALL CARPET
CARPET TILE(CT)
THE CEILING
REPAINT ON
REPAINT CEILING
REPLACE VCB REPLACE VCB
8.
THE STAIRWAY INCLUDING ROOM 802 AS PER DRAWING AND SCHEDULE(SEE NOTE #1).
FLOOR), 301, 303, 401, 402, 404, 601, 702(INCLUDED CEILING AND FLOOR) AND ALL OF WALL, TREAD, RISER, LANDING, HANDRAILS AND GUARDRAILS IN
SURFACE PREPARATION AND REPAINT INTERIOR SURFACE OF WALL AT ROOM 102, 103(INCLUDED CEILING AND FLOOR), 202(INCLUDED CEILING AND
AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)
REPLACE EXISTING ACOUSTICAL CEILING TILE(ACT) WITH NEW DARK COLORED(BLACK) ACOUSTICAL CEILING TILE AT ROOM 801
SCHEDULE.(SEE NOTE #1)
REPLACE EXISTING VINYL COVE BASE(VCB) WITH NEW AT ROOM 102, 301, 303, 401, 402, 404, 601, 701 AND ALL IN STAIRWAY AS PER DRAWING AND
USER SPECIFIED DAYS DUE TO FLIGHT OPERATIONS( MARKED AREA) SEE DRAWING A4, A5, AND A6.
THE WORK RELATED TO ROOM 801,802 AND 6F TO 8F STAIRWAY WORK SHALL ONLY BE CARRIED OUT ON WEEKEND OR U.S. HOLIDAYS OR
(GYPSUM WALL BOARD GET REPLACED JUST RIGHT BELOW THE EXISTING CEILING LINE)
REPLACE EXISTING ALL GYPSUM WALL BOARD WITH 12.7mm GYPSUM WALL BOARD INCLUDING PAINTING FINISH AT ROOM 701 AS PER DRAWING.
1289988820.LN
Typewritten Text 23-013
1289988820.LN
1 6
UP
DN
N
8,000
2,540
A2- SCALE: 1 / 50
2nd FLOOR PLAN
300300
,0
,0
,8
,1
,7
1,360 3,500
A2- SCALE: 1 / 50
3rd FLOOR PLAN
A B C D
ELEVATOR
STAIRWAY
TRAINING RM
LATRINE
HGFEDCBA
AS SHOWN
A-2
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
SHOWER
TO
OPENED
A2--
A
B
C
D
A B DC
REPLACE VCB REPLACE VCB REPLACE VCB
EXST.ELEVATOR
REPLACE VCB REPLACE VCB
ATC CHIEF's OFFICE @ RM301
HALLWAY @ RM303
A B DC
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
N
OFFICE
ATC CHIEF's
STAIRWAY
UP
DN
CLOSET
STORAGE
W/ CARPET TILE
REPLACE CARPET
A2--
A
B
C
D
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
HALLWAY
ELEVATOR
LATRINE @ RM202
A2 SCALE: 1 / 50
ELEVATION
A2
CH:3,600
CH:3,600
ON THE FLOOR
REPAINT EPOXY
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
AND ELEVATION
2nd FLOOR PLAN, 3rd FLOOR PLAN
ON THE FLOOR
REPAINT EPOXY
ON THE FLOOR
REPAINT EPOXY
REPLACE THRESHOLD
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
CEILING
REPAINT ON
REPAINT CEILING
1289988820.LN
Typewritten Text 23-013
1289988820.LN
2 6
HGFEDCBA
AS SHOWN
A-3
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
A3 SCALE: 1 / 50
ELEVATION
A3
A3- SCALE: 1 / 50
5th FLOOR PLAN
N
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
ELEVATOR
EQPT RM
STAIRWAY
UP
DN
N
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
A3- SCALE: 1 / 50
4th FLOOR PLAN
CLOSET
STORAGE
OFFICE
GCA CHIEF's
OFFICE
TOWER CHIEF's
HALLWAY
ELEVATOR
STAIRWAY
EXST.ELEVATOR
A B C D
A B C D
A B
REPLACE VCB REPLACE VCB REPLACE VCB REPLACE VCB
TOWER CHIEF's OFFICE @ RM401
GCA CHIEF's OFFICE @ RM402
REPLACE VCB
REPLACE VCB REPLACE VCB
DC
HALLWAY @ RM404
A3--
A
B
C
D
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
CH:3,600
CH:3,600
REPLACE VCB REPLACE VCB
REPAINT WALL REPAINT WALL REPAINT WALL REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
AND ELEVATION
4th FLOOR PLAN, 5th FLOOR PLAN
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
THRESHOLD
REPLACE
PROVIDE CARPET TILE
1289988820.LN
Typewritten Text 23-013
1289988820.LN
3 6
MW
REF
HGFEDCBA
AS SHOWN
A-4
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
N
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
A4- SCALE: 1 / 50
6th FLOOR PLAN
A4- SCALE: 1 / 50
7th FLOOR PLAN
ELEVATOR
STAIRWAY
BREAK RM
HVAC RM
A B
DC
BREAK ROOM @ RM601
A4--
A
B
C
D
REPLACE VCB REPLACE VCB
EXST.ELEVATOR
REPLACE VCB
A B
DC
ADMIN OFFICE @ RM701
REPLACE VCB REPLACE VCB
REPLACE VCB REPLACE VCB
A B C D
LATRINE @ RM702
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
A4 SCALE: 1 / 50
ELEVATION
A4
UP
DN
CHASE
N
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
LATRINE
ADMIN OFFICE
A4--
A
B
C
D
CH:3,600
CH:3,600
REPLACE VCB
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
DOOR FRAME
REPAINT METAL
DOOR FRAME
REPAINT METAL
AND ELEVATION
6th FLOOR PLAN, 7th FLOOR PLAN
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
ON THE FLOOR
REPAINT EPOXY
ON THE FLOOR
REPAINT EPOXY
ON THE FLOOR
REPAINT EPOXY
THRESHOLD
REPLACE
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
CARPET TILE
REPLACE CARPET W/
THE CEILING
REPAINT ON
WALL
REPAINT
REPAINT WALL
THE CEILING
REPAINT ON
RIGHT BELOW THE EXST.CEILING LINE)
(GYPSUM WALL BOARD GET REPLACED JUST
PAINTING FINISH AT ALL AROUND WALL.
12.7mm GYPSUM WALL BOARD AND
REPLACE EXST.ALL GYPSUM WALL BOARD W/
RIGHT BELOW THE EXST.CEILING LINE)
(GYPSUM WALL BOARD GET REPLACED JUST
PAINTING FINISH.
12.7mm GYPSUM WALL BOARD AND
REPLACE EXST.ALL GYPSUM WALL BOARD W/
RIGHT BELOW THE EXST.CEILING LINE)
(GYPSUM WALL BOARD GET REPLACED JUST
PAINTING FINISH.
12.7mm GYPSUM WALL BOARD AND
REPLACE EXST.ALL GYPSUM WALL BOARD W/
1289988820.LN
Typewritten Text 23-013
1289988820.LN
4 6
HGFEDCBA
AS SHOWN
A-5
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
TOWER CAB
DN
STAIRWAY
8,200
6,3801,820
,3
,8
,5
,1
A5--
A
C
B
A5--
A
BC
N
CARPET W/ NEW
REPLACE ACOUSTICAL WALL
,0
FFL
CLG
,0
A
B
C
A5- SCALE: 1 / 50
8th FLOOR PLAN
8F
,4
FFL
,4
,0
6,600 6,600 1,100
A B C
REPLACE ACOUSTICAL WALL CARPET
CARPET W/ NEW
REPLACE ACOUSTICAL WALL
,0
FFL
CLG
,0
REPLACE ACOUSTICAL WALL CARPET W/ NEW
,0
FFL
CLG
,0
A5- SCALE: 1 / 50
RM801 ELEVATION
A5- SCALE: 1 / 50
RM802 ELEVATION
REPAINT HANDRAILREPAINT HANDRAIL
WALL CARPET W/ NEW
REPLACE ACOUSTICAL
REPAINT HANDRAIL
DOOR FRAME
REPAINT METAL
DOOR FRAME
REPAINT METAL
A6
A5
AND RM 802 ELEVATION
8th FLOOR PLAN, RM 801 ELEVATION
AND RUBBER TREAD AND RISER
REPLACE RUBBER FLOOR TILE
AND RUBBER TREAD AND RISER
REPLACE RUBBER FLOOR TILE
AND RUBBER TREAD AND RISER
REPLACE RUBBER FLOOR TILE
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
EXST.WALL CARPET
REMAIN
EXST.WALL CARPET
REMAIN
CARPET W/NEW
REPLACE EXST.WALL
CARPET W/NEW
REPLACE EXST.WALL
REPLACE WALL CARPET
REPLACE WALL CARPET
A6
A6
NEW DARK COLORED(BLACK) ONE.
REPLACE ACOUSTICAL CEILINING TILE W/
(CARPET TILES DON'T GET PROVIDED UNDER ATC CONSOLE)
PROVIDE CARPET TILE ON THE VCT FLOOR
1289988820.LN
Typewritten Text 23-013
1289988820.LN
5 6 m m
@WAINSCOT
ACOUSTICAL WALL CARPET
REMAIN EXST.
SURFACE
EXST.STRUCTURE
A6 NOT TO SCALEA5
HGFEDCBA
AS SHOWN
A-6
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
INTERIOR FINISH SCHEDULE
RM NO ROOM NAME
HALLWAY
LATRINE
LATRINE
ATC CHIEF 's OFFICE
HALLWAY
404 HALLWAY
TOWER CHIEF 's OFFICE
GCA CHIEF 's OFFICE
601 BREAK ROOM
701 ADMIN OFFICE
702 LATRINE
801 TOWER CAB
802 STAIRWAY
1F TO 6F STAIRWAY
FLOOR
EXST NEW FINISH COLOR
CONC - EPOXY GRAY
CONC - EPOXY GRAY
CARPET CARPET TILE F.F
CARPET CARPET TILE F.F
CONC - EPOXY GRAY
CONC/METAL - EPOXY GRAY
BASE
EXST NEW FINISH COLOR
F.F
VCB VCB F.F
MOUSE GRAY
VCB VCB MOUSE GRAY ZEBRAWOOD
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
INTERIOR WALL
EXST NEW FINISH COLOR
GWB PAINT
PEBBLE
- (MUNSELL 2.5Y 7.8/2.1)
WGWB PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
-WGWB PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
GWB PAINT
ANTIQUE WHITE -
(MUNSELL 5.6Y 9.3/1.1)
GWB PAINT
PEBBLE -
(MUNSELL 2.5Y 7.8/2.1)
GWB PAINT
ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)
GWB PAINT
ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)
GWB PAINT
PEBBLE - (MUNSELL 2.5Y 7.8/2.1)
GWB PAINT
ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)
GWB PAINT
ANTIQUE WHITE
(MUNSELL 5.6Y 9.3/1.1)
-WGWB PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
CONC/GWB PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
REMARKS
ACOUSTICAL WALL CARPET DESCRIPTION
ACOUSTICS FIRST (www.acousticfirst.com) OR APPROVED EQUAL.
ACOUSTICAL WALL CARPET SHALL BE SIMILAR TO "SOUND CHANNELS" AS MANUFACTURED BY
THE FEATURES ARE AS FOLLOWS:
IS NONALLERGENIC MATERIAL AND NO VOC's, ODS's AND HEAVY METALS OR FORMALDEHYDE.
ACOUSTICAL WALL CARPET SHALL BE RESISTANT TO MOISTURE, MILDEW, ROT, BACTERIA AND
ACOUSTICAL
TENSILE STRENGTH
TEAR STRENGTH
FLAMMABILITY
NRC 0.60
100lbs.
23lbs.
PASSES
CLASS "A"
PER ASTM C 423
PER ASTM D 1682
PER ASTM D 2261
PER NFPA 265, UBC 8-2
PER ASTM E 84
*GUNMETAL GREY
*GUNMETAL GREY
ZEBRAWOOD
VCT *CARPET TILE F.F
RT F.F
VCB F.F MOUSE GRAY
SHADOW GRAY
EXST NEW FINISH COLOR
ACT
WALL CARPET
WALL CARPET
WALL CARPET
WALL CARPET
F.F
F.F
ACT F.F BLACK
EXST.STRUCTURE
CARPET TILE
(RT)
RUBBER TILE
HANDRAIL AND GUARDRAIL IS MATCHED WITH EXISTING.
THE COLOR OF RADIATOR, DOOR, DOOR FRAME,
(A DARK COLOR WITH NO REFLECTION OF LIGHT)
AT ROOM 801 IS SELECTED BY USER.
THE COLOR OF WALL CARPET AND CARPET TILE
COEFFICIENT: LR-1, 0.75 OR GREATER)
REFLECTION OF LIGHT, MIN. LIGHT REFLECTANCE
STANDARD FINISH BLACK COLOR WITH NO
THE CEILING TILE IS ALLOWED FACTORY-APPLIED
FLOOR TRANSITION DETAIL
ALUMIMUM CARPET EDGE STRIP
VCT
VCT
CARPET TILE
CARPET TILE
F.F
F.F
ZEBRAWOOD
ZEBRAWOOD
RT/VCT
*THRESHOLD J32100 --- 4EA
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
CEILING
WALL CARPET
REPLACE ACOUSTICAL
WALL CARPET FROM SILL TO 200mm
CONSOLE AREA ONLY REPLACED
THE WAINSCOT OF THE ATC
A6 NOT TO SCALEA5
WALL CARPET DETAIL
GWB
WGWB
WGWB
WGWB
PAINT
PAINT
PAINT
VCB
STRIP
RUBBER
WHITE
(MUNSELL N9.5)
WHITE
(MUNSELL N9.5)
WHITE
(MUNSELL N9.5)
*DARK COLOR
6F TO 8F STAIRWAY CONC/METAL - EPOXY GRAY VCB VCB F.F MOUSE GRAY PAINT- PEBBLE
(MUNSELL 2.5Y 7.8/2.1) *
CONC
CONC -
PAINT
PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
F.F.L
CONC/GWB
WALL CARPET DETAIL
FLOOR TRASITION DETAIL AND
ACOUSTICAL WALL CARPET DESCRIPTION,
INTERIOR FINISH SCHEDULE,
1289988820.LN
Typewritten Text 23-013
1289988820.LN
6 6
| 2023-03-09T19:06:05+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2023-03-09T19:06:47+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2023-03-09T19:07:17+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2023-03-09T19:07:53+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2023-03-09T19:08:21+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2023-03-09T19:09:12+0900 | |
| SIM.CHAE HWA.1289586624 |
File details come from the government source that posted it. Updated .