O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
DEPUTY DESIGN BR.
USING AGENCY
PROJECT NO.
SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
IMCOM
REVIEWED BY
PM
SHEET OF
USAG HUMPHREYS
HGFEDCBA
AS SHOWN T-1
LOCATION MAP
NOT TO SCALE
- T1
USAG HUMPHREYS
FEWR NO. V9-210018
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
11.
12.
13.
ORIGINAL OR BETTER CONDITION, UNLESS OTHERWISE NOTED.
DAMAGED OR REMOVED AS A RESULT OF THIS PROJECT TO ITS
THE CONTRACTOR SHALL RESTORE EXISTING GOVERNMENT PROPERTY
PROPERLY WITHOUT ANY ADDITIONAL COST TO THE GOVERNMENT.
FALSEWORK SUCH AS FORMWORK, SAFETY FENCE AND SHORING ETC
CONTRACTOR SHALL PROVIDE ANY NECESSARY RESOURCES INCLUDING
AND ELEVATIONS AND STATIONS ARE IN METERS.
UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN MILLIMETERS
REPRESENTATIVE.
DRAWINGS FOR APPROVAL TO THE CONTRACTING OFFICER
CONTRACTOR SHALL SUBMIT MANUFACTURERS INSTALLATION SHOP
SPECIFICATIONS.
THESE GENERAL NOTES ARE NOT INTENDED TO REPLACE
THE PROJECT.
SHALL BE APPROVED BY THE COR PRIOR TO COMMENCING WORK ON
THE CONTRACTOR REQUIRED TO COMPLETE THE JOB. THE DRAWINGS
DETAILED PORTION OF THE PROJECT AS IDENTIFIED BY THE COR OR
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING(S) FOR ANY UN-
COMMENCING ANY PHASE OF THE WORK.
REPRESENTATIVE (COR) PRIOR TO ORDERING MATERIALS OR
DISCREPANCIES THROUGH THE CONTRACTING OFFICERS
AND CONDITIONS (BOTH NEW AND EXISTING) AND SHALL REPORT
THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS, GRADES
9.
14.
STANDARDS FOR KOREA, USFK PAM 200-1.
KOREAN ENVIRONMENTAL LAWS AND THE ENVIRONMENTAL GOVERNING
ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE
PROCEDURES, TECHNIQUES, AND SEQUENCE.
RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,
SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY
THE METHOD OR MEANS OF CONSTRUCTION. THE PRIME CONTRACTOR
PROJECT, AND EXCEPT WHERE SPECIFICALLY SHOWN, DO NOT INDICATE
THESE DRAWING AND SPECIFICATIONS REPRESENT THE FINISHED
SUBMISSION OF CONTRACT PROPOSAL.
CLARIFICATION THROUGH THE CONTRACTING OFFICE PRIOR TO
DIMENSIONS AT THE PROJECT SITE ORIENTATION AND SHALL REQUEST
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND
PLACEMENT OF ANY FACILITIES.
THE COR AND THE SITE PLAN WILL BE APPROVED BY COR BEFORE
CONTRACTOR SHALL PREPARE A SITE PLAN WITH DIRECTION FROM
ACCORDANCE WITH O&MA SPECIFICATIONS SECTION 01500. THE
CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY FACILITIES IN
FOR APPROVAL.
SUBMITTED THROUGH THE CONTRACTING OFFICER REPRESENTATIVE
THE CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND
EXACT FIELD CONDITIONS, SUCH DETAILS SHALL BE PREPARED BY
SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH
ACCORDANCE WITH O&MA STANDARD SPECIFICATION SECTION 01780.
COR FOR APPROVAL AFTER COMPLETION OF THE CONSTRUCTION, IN
CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS THROUGH THE
10.
THROUGH COR.
SHALL NOTIFY ENVIRONMENTAL DIVISION, DPW, USAG HUMPHREYS
RESOURCES SHALL BE CEASED IMMEDIATELY AND THE CONTRACTOR
PERFORMANCE, ANY PART OF THE ACTIVITIES THAT MAY THREATEN THE
CULTURAL OR HISTORIC RESOURCE DURING THE CONTRACT
IF CONTRACTOR'S PERSONNEL INADVERTENTLY ENCOUNTER ANY
(NOVEMBER 30, 2015)
b. STANDARD DETAIL DRAWINGS FOR O&MA PROJECTS, KOREA
KOREA, REVISION 1 (OCTOBER 30, 2015)
a. STANDARD TECHNICAL SPECIFICATIONS FOR O&MA PROJECTS, ALL WORK SHALL CONFORM TO THE FOLLOWING:
16.
DRAWING.
IN TO DPW, UNLESS OTHERWISE SPECIFIED IN THIS CONTRACT
RECYCLED OR RECLAIMED MATERIALS AND METAL NOT TURNED
THE CONTRACTOR RETAINS THE RIGHTS TO SALVAGE VALUE OF
15.
PEDESTRIAN GATE
DONGCHANG-RI GATE
MAIN GATE
DODU-RI GATE
THIS PROJECT
VB VAPOR BARRIER
GL GROUND LEVEL
EXISTING
CWB
EXST
CAPILLARY WATER BARRIER
ABBREVIATIONS
FF
AL /ALUM
BLDG BUILDING
CMT
CMU
CONC
CONT
DIA DIAMETER
EXT
EA EACH
EIFS
FL
GWB
GA GAGE
HGT
HORI HORIZON
HEIGHT
MIN MINIMUM
NO NUMBER
NRP NON REMOVAL PIN
OC ON CENTER
STL
GWT
DWG DRAWING
EXTERIOR
TYP TYPICAL
EWH ELECTRIC WATER HEATER
MFTR
VCB
VCT
ACST
COL COLUMN
EXPOSEDEXP
MANUFACTURE
MET
VINYL COMPOSITION TILE
VINYL COVE BASE
MISC MISCELLANEOUS
SCP SKIM COAT PLASTER
CONTINUOUS
ACOUSTICAL TILE
ALUMINUM
CERAMIC MOSAIC TILE
CONCRETE MASONRY UNIT
CONCRETE
FACTORY FINISH
FLOOR
FRP FIBERGLASS REINFORCED PLASTIC
EXTERIOR INSULATION
AND FINISH SYSTEM
GLAZED WALL TILE
GYPSUM WALL BOARD
METAL
STEEL
CBB CEMENTITIOUS BACKING BOARD
RO ROUGH OPENING
LAVS LAVATORYS
LM LINEAR METER
VERT VERTICAL
VENT VENTILATOR
SCHEDULE OF DRAWINGS
REMARKSRING NO. REF. NO. DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS RING NO. REF. NO. DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS
TITLE SHEET, GENERAL NOTES, LOCATION MAP AND ABBREVIATIONT - 1
ARCHITECTURAL
LOCATION MAP AND ABBREVIATION
TITLE SHEET, GENERAL NOTES,
HAMJEONG-RI GATE
A - 2
A - 1
A - 3
BUILDING P-1284
CHIEF DESIGN BR.
CM BR.
1OF 1
1OF 6
2OF
3OF
A - 4 4OF
A - 5 5OF
A - 6 6OF
1st FLOOR PLAN, ELEVATION, SCOPE OF WORK AND NOTE
2nd FLOOR PLAN, 3rd FLOOR PLAN AND ELEVATION
4th FLOOR PLAN, 5th FLOOR PLAN AND ELEVATION
6th FLOOR PLAN, 7th FLOOR PLAN AND ELEVATION
INTERIOR FINISH SCHEDULE AND ACOUSTICAL WALL CARPET DESCRIPTION
V9-210018
8th FLOOR PLAN, RM 801 ELEVATION, RM 802 ELEVATION AND FLOOR TRANSITION DETAIL
AIR FIELD CONTROL TOWER, P-1284
REPLACE CARPET AND REPAINT ALL INTERIOR SURFACE FOR
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
1289988820.LN
Typewritten Text 23-013
1289988820.LN
Typewritten Text 1 1
HGFEDCBA
AS SHOWN
A-1
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
N
8,200
3,6002,800
A1- SCALE: 1 / 50
1st FLOOR PLAN
400400 1,000
,0
,0
,8
,5
,2
ELEVATOR
LATRINE
STAIRWAY
HALLWAY
MECH RM
ELEV.
MECH RM
CH:3,600
A1--
A
B
C
D
A B DC
HALLWAY @ RM102
A1- SCALE: 1 / 50
ELEVATION
A1--
A
B
1.
2.
6.
7.
5.
PAINT AREA
REPLACE VCB REPLACE VCB REPLACE VCB REPLACE VCB
A B DC
,4
CLG
FFL
EXST.ELEVATOR
,4
CLG
FFL
LATRINE @ RM103
NOTE
1.
SCOPE OF WORK
,6
CLG
FFL
,6
CLG
FFL
2,520 9501,200 2,520950 1,200
1st FLOOR TO 7th FLOOR STAIR
REPAIR/MAINTENANCE WORK
COVERS
2EA RADIATOR's
REPAINT
ON THE FLOOR
REPAINT EPOXY
REPAINT WALL
DOOR W/ DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL REPAINT WALL
GUARDRAIL
REPAINT HANDRAIL AND
REPAINT WALL
3.
ANY CONSTRUCTION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION AND DIMENSION PRIOR TO COMMENCING
BEFORE PAINTING, ALL SURFACES SHALL BE SCRAPED TO REMOVE PEELING PAINT, CLEANED, LEVELED AND SMOOTHED BY THE CONTRACTOR.
DAMAGED PORTION SHALL BE REPAIRED PROPERLY TO APPLY PAINT.
ALL ELECTRICAL AND MECHANICAL DEVICES AND EQUIPMENT SHALL BE PROTECTED FROM PAINT STAINS UNDER THE PAINTING WORK.
4.
5.
6.
7.
W/ DOOR FRAME
2EA METAL DOORS
REPAINT
COVER
RADIATOR's
REPAINT
SCOPE OF WORK AND NOTE
1st FLOOR PLAN, ELEVATION, MATERIAL BY MANUFACTURER.
THE CONTRACTOR SHALL FOLLOW UP WITH MANUFACTURE INSTALLATION SPECIFICATION AND COMPLY WITH RECOMMENDED ADHESIVE
GUARDRAIL
REPAINT HANDRAIL AND
USE LEAD FREE PAINT MATERIALS.
ALL PAINTING WORK SHALL BE DONE IN ACCORDANCE WITH O&MA STANDARD SPECIFICATION SECTION 09900 AND
3.
4.
REMOVE AND RE-INSTALL FURNITURE AND OTHER OBSTRUCTIONS, EXCEPT FOR UNIT OPERATION EQUIPMENT DURING THE WORK.
REPLACE EXISTING ACOUSTICAL WALL CARPET WITH NEW AT ROOM 801 AND 802 AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)
ON THE FLOOR
REPAINT EPOXY
ON THE FLOOR
REPAINT EPOXY
8.
8.
2.
DUE TO THEIR OPERATION EQUIPMENT DURING THE PERFORMANCE OF THE WORK.
THE CONTRACTOR SHALL COORDINATES WITH USER TO MOVE THEIR OPERATING EQUIPMENT THRU COR WHEN INTERFERENCE OCCURS
TREAD AND LANDING
REPAINT EPOXY ON RISER,
REPAINT WALL
TREAD AND LANDING
REPAINT EPOXY ON RISER,
AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)
REPLACE EXISTING ACOUSTICAL CEILING TILE(ACT) WITH NEW DARK COLORED(BLACK) ACOUSTICAL CEILING TILE AT ROOM 801
ROOM 801 AND 802 AS PER DRAWING AND SCHEDULE(SEE NOTE #1).
402, 404, 601, 701, 702(INCLUDED FLOOR) AND ALL OF WALL, TREAD, RISER, LANDING, HANDRAILS AND GUARDRAILS IN THE STAIRWAY INCLUDING
SURFACE PREPARATION AND REPAINT INTERIOR SURFACE OF WALL AT ROOM 102, 103(INCLUDED FLOOR), 202(INCLUDED FLOOR), 301, 303, 401, 2(TWO)EA OF METAL RADIATOR COVERS AT ROOM 102 AND 201 AS PER DRAWING.
SURFACE PREPARATION AND REPAINT ALL METAL DOOR FRAMES, 2(TWO)EA OF METAL DOORS AT 1st FLOOR STAIRWAY AND
ON THE STAIRWAY AT ROOM 802 AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)
REPLACE EXISTING RUBBER FLOOR TREAD, RISER AND VINYL COMPOSITION TILE(VCT) WITH NEW RUBBER FLOOR TILE(RT), TREAD AND RISER
VCB LANDING
REPLACE RUBBER STRINGER AND
VCB LANDING
REPLACE RUBBER STRINGER AND
STRINGER AT ALL IN STAIRWAY AS PER DRAWING AND SCHEDULE.
REPLACE EXISTING VINYL COVE BASE(VCB) WITH NEW AT ROOM 102, 301, 303, 401, 402, 404, 601, 701 AND RUBBER
TO FLIGHT OPERATIONS( MARKED AREA) SEE DRAWING A5 AND A6.
THE WORK RELATED TO ROOM 801 AND 802 MAY ONLY BE CARRIED OUT ON WEEKEND OR U.S. HOLIDAYS OR USER SPECIFIED DAYS DUE
INCLUDING FOUR(4)EA THRESHOLDS AND ONE(1)EA ALUMIMUM CARPET TRANSITION AS PER DRAWING AND SCHEDULE(SEE NOTE #1).
REPLACE EXISTING CARPET WITH CARPET TILE ON THE FLOOR AT ROOM 301, 701 AND PROVIDE CARPET TILE ON THE FLOOR AT ROOM 401, 402, 801
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
(AWC)
ACOUSTICAL WALL CARPET
CARPET TILE(CT)
1289988820.LN
Typewritten Text 23-013
1289988820.LN
1 6
UP
DN
N
8,000
2,540
A2- SCALE: 1 / 50
2nd FLOOR PLAN
300300
,0
,0
,8
,1
,7
1,360 3,500
A2- SCALE: 1 / 50
3rd FLOOR PLAN
A B C D
ELEVATOR
STAIRWAY
TRAINING RM
LATRINE
HGFEDCBA
AS SHOWN
A-2
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
SHOWER
TO
OPENED
A2--
A
B
C
D
A B DC
REPLACE VCB REPLACE VCB REPLACE VCB
EXST.ELEVATOR
REPLACE VCB REPLACE VCB
ATC CHIEF's OFFICE @ RM301
HALLWAY @ RM303
A B DC
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
N
OFFICE
ATC CHIEF's
STAIRWAY
UP
DN
CLOSET
STORAGE
W/ CARPET TILE
REPLACE CARPET
A2--
A
B
C
D
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
HALLWAY
ELEVATOR
LATRINE @ RM202
A2 SCALE: 1 / 50
ELEVATION
A2
CH:3,600
CH:3,600
ON THE FLOOR
REPAINT EPOXY
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
AND ELEVATION
2nd FLOOR PLAN, 3rd FLOOR PLAN
ON THE FLOOR
REPAINT EPOXY
ON THE FLOOR
REPAINT EPOXY
REPLACE THRESHOLD
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
1289988820.LN
Typewritten Text 23-013
1289988820.LN
2 6
HGFEDCBA
AS SHOWN
A-3
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
A3 SCALE: 1 / 50
ELEVATION
A3
A3- SCALE: 1 / 50
5th FLOOR PLAN
N
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
ELEVATOR
EQPT RM
STAIRWAY
UP
DN
N
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
A3- SCALE: 1 / 50
4th FLOOR PLAN
CLOSET
STORAGE
OFFICE
GCA CHIEF's
OFFICE
TOWER CHIEF's
HALLWAY
ELEVATOR
STAIRWAY
EXST.ELEVATOR
A B C D
A B C D
A B
REPLACE VCB REPLACE VCB REPLACE VCB REPLACE VCB
TOWER CHIEF's OFFICE @ RM401
GCA CHIEF's OFFICE @ RM402
REPLACE VCB
REPLACE VCB REPLACE VCB
DC
HALLWAY @ RM404
A3--
A
B
C
D
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
CH:3,600
CH:3,600
REPLACE VCB REPLACE VCB
REPAINT WALL REPAINT WALL REPAINT WALL REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
AND ELEVATION
4th FLOOR PLAN, 5th FLOOR PLAN
REPLACE THRESHOLD
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
1289988820.LN
Typewritten Text 23-013
1289988820.LN
3 6
MW
REF
HGFEDCBA
AS SHOWN
A-4
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
N
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
A4- SCALE: 1 / 50
6th FLOOR PLAN
A4- SCALE: 1 / 50
7th FLOOR PLAN
ELEVATOR
STAIRWAY
BREAK RM
HVAC RM
A B
DC
BREAK ROOM @ RM601
A4--
A
B
C
D
REPLACE VCB REPLACE VCB
EXST.ELEVATOR
REPLACE VCB
A B
DC
ADMIN OFFICE @ RM701
REPLACE VCB REPLACE VCB
REPLACE VCB REPLACE VCB
A B C D
LATRINE @ RM702
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
,4
CLG
FFL
A4 SCALE: 1 / 50
ELEVATION
A4
UP
DN
CHASE
N
8,000
2,540 300300
1,360 3,500
,2
,8
,1
,7
LATRINE
ADMIN OFFICE
A4--
A
B
C
D
REPLACE CARPET W/ CARPET TILE
CH:3,600
CH:3,600
REPLACE VCB
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
AND ELEVATION
6th FLOOR PLAN, 7th FLOOR PLAN
REPAINT WALL REPAINT WALL REPAINT WALL
DOOR FRAME
REPAINT METAL
REPAINT WALL
ON THE FLOOR
REPAINT EPOXY
ON THE FLOOR
REPAINT EPOXY
ON THE FLOOR
REPAINT EPOXY
THRESHOLD
REPLACE
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
1289988820.LN
Typewritten Text 23-013
1289988820.LN
4 6
HGFEDCBA
AS SHOWN
A-5
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
TOWER CAB
DN
STAIRWAY
8,200
6,3801,820
,3
,8
,5
,1
A5--
A
C
B
A5--
A
BC
N
CARPET W/ NEW
REPLACE ACOUSTICAL WALL
,0
FFL
CLG
,0
A
B
C
A5- SCALE: 1 / 50
8th FLOOR PLAN
8F
,4
FFL
,4
,0
6,600 6,600 1,100
A B C
REPLACE ACOUSTICAL WALL CARPET
CARPET W/ NEW
REPLACE ACOUSTICAL WALL
,0
FFL
CLG
,0
REPLACE ACOUSTICAL WALL CARPET W/ NEW
,0
FFL
CLG
,0
A5- SCALE: 1 / 50
RM801 ELEVATION
A5- SCALE: 1 / 50
RM802 ELEVATION
A5 NOT TO SCALEA5
REPAINT HANDRAILREPAINT HANDRAIL
WALL CARPET W/ NEW
REPLACE ACOUSTICAL
PROVIDE CARPET TILE ON THE VCT FLOOR
REPAINT HANDRAIL
REPLACE ACOUSTICAL CEILINING TILE W/ NEW DARK COLORED(BLACK) ONE.
REPLACE ACOUSTICAL WALL CARPET W/ NEW
REPLACE ACOUSTICAL WALL CARPET W/ NEW
DOOR FRAME
REPAINT METAL
DOOR FRAME
REPAINT METAL
EXST.STRUCTURE
CARPET TILE
(RT)
RUBBER TILE
A5
A5
FLOOR TRANSITION DETAIL
FLOOR TRANSITION DETAIL
RM 802 ELEVATION AND
8th FLOOR PLAN, RM 801 ELEVATION, AND RUBBER TREAD AND RISER
REPLACE RUBBER FLOOR TILE
AND RUBBER TREAD AND RISER
REPLACE RUBBER FLOOR TILE
AND RUBBER TREAD AND RISER
REPLACE RUBBER FLOOR TILE
ALUMIMUM CARPET EDGE STRIP
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
1289988820.LN
Typewritten Text 23-013
1289988820.LN
5 6
HGFEDCBA
AS SHOWN
A-6
YI, K SSIM, C H
V9-210018
ARCHITECTURAL
O&M DIV.
SECURITY DIV.
FIRE SERV. DIV.
SAFETY OFC.
MASTER PLAN DIV.
SUBMITTED BY
USING AGENCY SCALE :
DRAWING NO. REF NO.
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS
UNIT # 15228, APO AP 96271-5228
SYMBOL ZONE DESCRIPTION
R E V I S I O N S
DATE BY CHK. APVD.
USAG HUMPHREYS
IMCOM
REVIEWED BY
SHEET OF
DESIGNED BY REVIEWED BY
PROJECT NO.
DEPUTY DESIGN BR.
CHIEF DESIGN BR.
CM BR.
INTERIOR FINISH SCHEDULE
RM NO ROOM NAME
HALLWAY
LATRINE
LATRINE
ATC CHIEF 's OFFICE
HALLWAY
404 HALLWAY
TOWER CHIEF 's OFFICE
GCA CHIEF 's OFFICE
601 BREAK ROOM
701 ADMIN OFFICE
702 LATRINE
801 TOWER CAB
802 STAIRWAY
1F TO 7F STAIRWAY
FLOOR
EXST NEW FINISH COLOR
CONC - EPOXY GRAY
CONC - EPOXY GRAY
CARPET CARPET TILE F.F
CARPET CARPET TILE F.F
CONC - EPOXY GRAY
CONC/METAL - EPOXY GRAY
BASE
EXST NEW FINISH COLOR
F.F
VCB VCB F.F
MOUSE GRAY
VCB VCB MOUSE GRAY ZEBRAWOOD
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
VCB VCB F.F MOUSE GRAY
INTERIOR WALL
EXST NEW FINISH COLOR
GWB PAINT
PEBBLE
- (MUNSELL 2.5Y 7.8/2.1)
WGWB PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
-WGWB PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
GWB PAINT
ANTIQUE WHITE -
(MUNSELL 5.6Y 9.3/1.1)
GWB PAINT
PEBBLE - (MUNSELL 2.5Y 7.8/2.1)
GWB PAINT
ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)
GWB PAINT
ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)
GWB PAINT
PEBBLE - (MUNSELL 2.5Y 7.8/2.1)
GWB PAINT
ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)
GWB PAINT
ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)
-WGWB PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
CMU/GWB PAINT
PEBBLE
(MUNSELL 2.5Y 7.8/2.1)
REMARKS
ACOUSTICAL WALL CARPET DESCRIPTION
ACOUSTICS FIRST (www.acousticfirst.com) OR APPROVED EQUAL.
ACOUSTICAL WALL CARPET SHALL BE SIMILAR TO "SOUND CHANNELS" AS MANUFACTURED BY
THE FEATURES ARE AS FOLLOWS:
IS NONALLERGENIC MATERIAL AND NO VOC's, ODS's AND HEAVY METALS OR FORMALDEHYDE.
ACOUSTICAL WALL CARPET SHALL BE RESISTANT TO MOISTURE, MILDEW, ROT, BACTERIA AND
ACOUSTICAL
TENSILE STRENGTH
TEAR STRENGTH
FLAMMABILITY
NRC 0.60
100lbs.
23lbs.
PASSES
CLASS "A"
PER ASTM C 423
PER ASTM D 1682
PER ASTM D 2261
PER NFPA 265, UBC 8-2
PER ASTM E 84
ACOUSTICAL WALL CARPET DESCRIPTION
AND
INTERIOR FINISH SCHEDULE
*GUNMETAL GREY
*GUNMETAL GREY
ZEBRAWOOD
VCT CARPET TILE F.F DARK COLOR
RT F.F
VCB F.F MOUSE GRAY
SHADOW GRAY
EXST NEW FINISH COLOR
ACT
WALL CARPET
WALL CARPET
WALL CARPET
WALL CARPET
F.F
F.F
ACT F.F BLACK
HANDRAIL AND GUARDRAIL IS MATCHED WITH EXISTING.
THE COLOR OF RADIATOR, DOOR, DOOR FRAME,
(A DARK COLOR WITH NO REFLECTION OF LIGHT)
AT ROOM 801 IS SELECTED BY USER.
THE COLOR OF WALL CARPET AND CARPET TILE
COEFFICIENT: LR-1, 0.75 OR GREATER)
REFLECTION OF LIGHT, MIN. LIGHT REFLECTANCE
STANDARD FINISH BLACK COLOR WITH NO
THE CEILING TILE IS ALLOWED FACTORY-APPLIED
STRINGER
RUBBER
VCT
VCT
CARPET TILE
CARPET TILE
F.F
F.F
ZEBRAWOOD
ZEBRAWOOD
RT/VCT
*THRESHOLD J32100 --- 4EA
AIR FIELD CONTROL TOWER, P-1284
INTERIOR SURFACE FOR
REPLACE CARPET AND REPAINT ALL
CEILING
1289988820.LN
Typewritten Text 23-013
1289988820.LN
6 6
| V9-210018, P-1284-a1-Model-000 |
| V9-210018, P-1284-a2-Model-000 |
| V9-210018, P-1284-a3-Model-000 |
| V9-210018, P-1284-a4-Model-000 |
| V9-210018, P-1284-a5-Model-000 |
| V9-210018, P-1284-a6-Model-000 |
| V9-210018-t01 |
| 2022-11-22T09:31:16+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2022-11-22T09:31:34+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2022-11-22T09:31:46+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2022-11-22T09:31:59+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2022-11-22T09:32:12+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2022-11-22T09:32:24+0900 | |
| SIM.CHAE HWA.1289586624 |
| 2022-11-22T09:32:36+0900 | |
| SIM.CHAE HWA.1289586624 |
File details come from the government source that posted it. Updated .