Drawings.pdf

PDF 4 MB Posted

Attached to
Replace Carpet and Repaint
Solicitation number
W91QVN-23-R-0076
Issued by

View the file

Other files

File Type Posted
Drawings (Rev).pdf PDF
RFP_W91QVN23R00760001.pdf PDF
RFP_W91QVN23R0076.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV.

SUBMITTED BY

DEPUTY DESIGN BR.

USING AGENCY

PROJECT NO.

SCALE :

DRAWING NO. REF NO.

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DESCRIPTION

R E V I S I O N S

DATE BY CHK. APVD.

IMCOM

REVIEWED BY

PM

SHEET OF

USAG HUMPHREYS

HGFEDCBA

AS SHOWN T-1

LOCATION MAP

NOT TO SCALE

- T1

USAG HUMPHREYS

FEWR NO. V9-210018

GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

11.

12.

13.

ORIGINAL OR BETTER CONDITION, UNLESS OTHERWISE NOTED.

DAMAGED OR REMOVED AS A RESULT OF THIS PROJECT TO ITS

THE CONTRACTOR SHALL RESTORE EXISTING GOVERNMENT PROPERTY

PROPERLY WITHOUT ANY ADDITIONAL COST TO THE GOVERNMENT.

FALSEWORK SUCH AS FORMWORK, SAFETY FENCE AND SHORING ETC

CONTRACTOR SHALL PROVIDE ANY NECESSARY RESOURCES INCLUDING

AND ELEVATIONS AND STATIONS ARE IN METERS.

UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN MILLIMETERS

REPRESENTATIVE.

DRAWINGS FOR APPROVAL TO THE CONTRACTING OFFICER

CONTRACTOR SHALL SUBMIT MANUFACTURERS INSTALLATION SHOP

SPECIFICATIONS.

THESE GENERAL NOTES ARE NOT INTENDED TO REPLACE

THE PROJECT.

SHALL BE APPROVED BY THE COR PRIOR TO COMMENCING WORK ON

THE CONTRACTOR REQUIRED TO COMPLETE THE JOB. THE DRAWINGS

DETAILED PORTION OF THE PROJECT AS IDENTIFIED BY THE COR OR

THE CONTRACTOR SHALL SUBMIT SHOP DRAWING(S) FOR ANY UN-

COMMENCING ANY PHASE OF THE WORK.

REPRESENTATIVE (COR) PRIOR TO ORDERING MATERIALS OR

DISCREPANCIES THROUGH THE CONTRACTING OFFICERS

AND CONDITIONS (BOTH NEW AND EXISTING) AND SHALL REPORT

THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS, GRADES

9.

14.

STANDARDS FOR KOREA, USFK PAM 200-1.

KOREAN ENVIRONMENTAL LAWS AND THE ENVIRONMENTAL GOVERNING

ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE

PROCEDURES, TECHNIQUES, AND SEQUENCE.

RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,

SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY

THE METHOD OR MEANS OF CONSTRUCTION. THE PRIME CONTRACTOR

PROJECT, AND EXCEPT WHERE SPECIFICALLY SHOWN, DO NOT INDICATE

THESE DRAWING AND SPECIFICATIONS REPRESENT THE FINISHED

SUBMISSION OF CONTRACT PROPOSAL.

CLARIFICATION THROUGH THE CONTRACTING OFFICE PRIOR TO

DIMENSIONS AT THE PROJECT SITE ORIENTATION AND SHALL REQUEST

THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND

PLACEMENT OF ANY FACILITIES.

THE COR AND THE SITE PLAN WILL BE APPROVED BY COR BEFORE

CONTRACTOR SHALL PREPARE A SITE PLAN WITH DIRECTION FROM

ACCORDANCE WITH O&MA SPECIFICATIONS SECTION 01500. THE

CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY FACILITIES IN

FOR APPROVAL.

SUBMITTED THROUGH THE CONTRACTING OFFICER REPRESENTATIVE

THE CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND

EXACT FIELD CONDITIONS, SUCH DETAILS SHALL BE PREPARED BY

SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH

ACCORDANCE WITH O&MA STANDARD SPECIFICATION SECTION 01780.

COR FOR APPROVAL AFTER COMPLETION OF THE CONSTRUCTION, IN

CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS THROUGH THE

10.

THROUGH COR.

SHALL NOTIFY ENVIRONMENTAL DIVISION, DPW, USAG HUMPHREYS

RESOURCES SHALL BE CEASED IMMEDIATELY AND THE CONTRACTOR

PERFORMANCE, ANY PART OF THE ACTIVITIES THAT MAY THREATEN THE

CULTURAL OR HISTORIC RESOURCE DURING THE CONTRACT

IF CONTRACTOR'S PERSONNEL INADVERTENTLY ENCOUNTER ANY

(NOVEMBER 30, 2015)

b. STANDARD DETAIL DRAWINGS FOR O&MA PROJECTS, KOREA

KOREA, REVISION 1 (OCTOBER 30, 2015)

a. STANDARD TECHNICAL SPECIFICATIONS FOR O&MA PROJECTS, ALL WORK SHALL CONFORM TO THE FOLLOWING:

16.

DRAWING.

IN TO DPW, UNLESS OTHERWISE SPECIFIED IN THIS CONTRACT

RECYCLED OR RECLAIMED MATERIALS AND METAL NOT TURNED

THE CONTRACTOR RETAINS THE RIGHTS TO SALVAGE VALUE OF

15.

PEDESTRIAN GATE

DONGCHANG-RI GATE

MAIN GATE

DODU-RI GATE

THIS PROJECT

VB VAPOR BARRIER

GL GROUND LEVEL

EXISTING

CWB

EXST

CAPILLARY WATER BARRIER

ABBREVIATIONS

FF

AL /ALUM

BLDG BUILDING

CMT

CMU

CONC

CONT

DIA DIAMETER

EXT

EA EACH

EIFS

FL

GWB

GA GAGE

HGT

HORI HORIZON

HEIGHT

MIN MINIMUM

NO NUMBER

NRP NON REMOVAL PIN

OC ON CENTER

STL

GWT

DWG DRAWING

EXTERIOR

TYP TYPICAL

EWH ELECTRIC WATER HEATER

MFTR

VCB

VCT

ACST

COL COLUMN

EXPOSEDEXP

MANUFACTURE

MET

VINYL COMPOSITION TILE

VINYL COVE BASE

MISC MISCELLANEOUS

SCP SKIM COAT PLASTER

CONTINUOUS

ACOUSTICAL TILE

ALUMINUM

CERAMIC MOSAIC TILE

CONCRETE MASONRY UNIT

CONCRETE

FACTORY FINISH

FLOOR

FRP FIBERGLASS REINFORCED PLASTIC

EXTERIOR INSULATION

AND FINISH SYSTEM

GLAZED WALL TILE

GYPSUM WALL BOARD

METAL

STEEL

CBB CEMENTITIOUS BACKING BOARD

RO ROUGH OPENING

LAVS LAVATORYS

LM LINEAR METER

VERT VERTICAL

VENT VENTILATOR

SCHEDULE OF DRAWINGS

REMARKSRING NO. REF. NO. DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS RING NO. REF. NO. DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS

TITLE SHEET, GENERAL NOTES, LOCATION MAP AND ABBREVIATIONT - 1

ARCHITECTURAL

LOCATION MAP AND ABBREVIATION

TITLE SHEET, GENERAL NOTES,

HAMJEONG-RI GATE

A - 2

A - 1

A - 3

BUILDING P-1284

CHIEF DESIGN BR.

CM BR.

1OF 1

1OF 6

2OF

3OF

A - 4 4OF

A - 5 5OF

A - 6 6OF

1st FLOOR PLAN, ELEVATION, SCOPE OF WORK AND NOTE

2nd FLOOR PLAN, 3rd FLOOR PLAN AND ELEVATION

4th FLOOR PLAN, 5th FLOOR PLAN AND ELEVATION

6th FLOOR PLAN, 7th FLOOR PLAN AND ELEVATION

INTERIOR FINISH SCHEDULE AND ACOUSTICAL WALL CARPET DESCRIPTION

V9-210018

8th FLOOR PLAN, RM 801 ELEVATION, RM 802 ELEVATION AND FLOOR TRANSITION DETAIL

AIR FIELD CONTROL TOWER, P-1284

REPLACE CARPET AND REPAINT ALL INTERIOR SURFACE FOR

AIR FIELD CONTROL TOWER, P-1284

INTERIOR SURFACE FOR

REPLACE CARPET AND REPAINT ALL

1289988820.LN

Typewritten Text 23-013

1289988820.LN

Typewritten Text 1 1

HGFEDCBA

AS SHOWN

A-1

YI, K SSIM, C H

V9-210018

ARCHITECTURAL

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV.

SUBMITTED BY

USING AGENCY SCALE :

DRAWING NO. REF NO.

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DESCRIPTION

R E V I S I O N S

DATE BY CHK. APVD.

USAG HUMPHREYS

IMCOM

REVIEWED BY

SHEET OF

DESIGNED BY REVIEWED BY

PROJECT NO.

DEPUTY DESIGN BR.

CHIEF DESIGN BR.

CM BR.

N

8,200

3,6002,800

A1- SCALE: 1 / 50

1st FLOOR PLAN

400400 1,000

,0

,0

,8

,5

,2

ELEVATOR

LATRINE

STAIRWAY

HALLWAY

MECH RM

ELEV.

MECH RM

CH:3,600

A1--

A

B

C

D

A B DC

HALLWAY @ RM102

A1- SCALE: 1 / 50

ELEVATION

A1--

A

B

1.

2.

6.

7.

5.

PAINT AREA

REPLACE VCB REPLACE VCB REPLACE VCB REPLACE VCB

A B DC

,4

CLG

FFL

EXST.ELEVATOR

,4

CLG

FFL

LATRINE @ RM103

NOTE

1.

SCOPE OF WORK

,6

CLG

FFL

,6

CLG

FFL

2,520 9501,200 2,520950 1,200

1st FLOOR TO 7th FLOOR STAIR

REPAIR/MAINTENANCE WORK

COVERS

2EA RADIATOR's

REPAINT

ON THE FLOOR

REPAINT EPOXY

REPAINT WALL

DOOR W/ DOOR FRAME

REPAINT METAL

REPAINT WALL REPAINT WALL REPAINT WALL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL REPAINT WALL REPAINT WALL

GUARDRAIL

REPAINT HANDRAIL AND

REPAINT WALL

3.

ANY CONSTRUCTION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION AND DIMENSION PRIOR TO COMMENCING

BEFORE PAINTING, ALL SURFACES SHALL BE SCRAPED TO REMOVE PEELING PAINT, CLEANED, LEVELED AND SMOOTHED BY THE CONTRACTOR.

DAMAGED PORTION SHALL BE REPAIRED PROPERLY TO APPLY PAINT.

ALL ELECTRICAL AND MECHANICAL DEVICES AND EQUIPMENT SHALL BE PROTECTED FROM PAINT STAINS UNDER THE PAINTING WORK.

4.

5.

6.

7.

W/ DOOR FRAME

2EA METAL DOORS

REPAINT

COVER

RADIATOR's

REPAINT

SCOPE OF WORK AND NOTE

1st FLOOR PLAN, ELEVATION, MATERIAL BY MANUFACTURER.

THE CONTRACTOR SHALL FOLLOW UP WITH MANUFACTURE INSTALLATION SPECIFICATION AND COMPLY WITH RECOMMENDED ADHESIVE

GUARDRAIL

REPAINT HANDRAIL AND

USE LEAD FREE PAINT MATERIALS.

ALL PAINTING WORK SHALL BE DONE IN ACCORDANCE WITH O&MA STANDARD SPECIFICATION SECTION 09900 AND

3.

4.

REMOVE AND RE-INSTALL FURNITURE AND OTHER OBSTRUCTIONS, EXCEPT FOR UNIT OPERATION EQUIPMENT DURING THE WORK.

REPLACE EXISTING ACOUSTICAL WALL CARPET WITH NEW AT ROOM 801 AND 802 AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)

ON THE FLOOR

REPAINT EPOXY

ON THE FLOOR

REPAINT EPOXY

8.

8.

2.

DUE TO THEIR OPERATION EQUIPMENT DURING THE PERFORMANCE OF THE WORK.

THE CONTRACTOR SHALL COORDINATES WITH USER TO MOVE THEIR OPERATING EQUIPMENT THRU COR WHEN INTERFERENCE OCCURS

TREAD AND LANDING

REPAINT EPOXY ON RISER,

REPAINT WALL

TREAD AND LANDING

REPAINT EPOXY ON RISER,

AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)

REPLACE EXISTING ACOUSTICAL CEILING TILE(ACT) WITH NEW DARK COLORED(BLACK) ACOUSTICAL CEILING TILE AT ROOM 801

ROOM 801 AND 802 AS PER DRAWING AND SCHEDULE(SEE NOTE #1).

402, 404, 601, 701, 702(INCLUDED FLOOR) AND ALL OF WALL, TREAD, RISER, LANDING, HANDRAILS AND GUARDRAILS IN THE STAIRWAY INCLUDING

SURFACE PREPARATION AND REPAINT INTERIOR SURFACE OF WALL AT ROOM 102, 103(INCLUDED FLOOR), 202(INCLUDED FLOOR), 301, 303, 401, 2(TWO)EA OF METAL RADIATOR COVERS AT ROOM 102 AND 201 AS PER DRAWING.

SURFACE PREPARATION AND REPAINT ALL METAL DOOR FRAMES, 2(TWO)EA OF METAL DOORS AT 1st FLOOR STAIRWAY AND

ON THE STAIRWAY AT ROOM 802 AS PER DRAWING AND SCHEDULE.(SEE NOTE #1)

REPLACE EXISTING RUBBER FLOOR TREAD, RISER AND VINYL COMPOSITION TILE(VCT) WITH NEW RUBBER FLOOR TILE(RT), TREAD AND RISER

VCB LANDING

REPLACE RUBBER STRINGER AND

VCB LANDING

REPLACE RUBBER STRINGER AND

STRINGER AT ALL IN STAIRWAY AS PER DRAWING AND SCHEDULE.

REPLACE EXISTING VINYL COVE BASE(VCB) WITH NEW AT ROOM 102, 301, 303, 401, 402, 404, 601, 701 AND RUBBER

TO FLIGHT OPERATIONS( MARKED AREA) SEE DRAWING A5 AND A6.

THE WORK RELATED TO ROOM 801 AND 802 MAY ONLY BE CARRIED OUT ON WEEKEND OR U.S. HOLIDAYS OR USER SPECIFIED DAYS DUE

INCLUDING FOUR(4)EA THRESHOLDS AND ONE(1)EA ALUMIMUM CARPET TRANSITION AS PER DRAWING AND SCHEDULE(SEE NOTE #1).

REPLACE EXISTING CARPET WITH CARPET TILE ON THE FLOOR AT ROOM 301, 701 AND PROVIDE CARPET TILE ON THE FLOOR AT ROOM 401, 402, 801

AIR FIELD CONTROL TOWER, P-1284

INTERIOR SURFACE FOR

REPLACE CARPET AND REPAINT ALL

(AWC)

ACOUSTICAL WALL CARPET

CARPET TILE(CT)

1289988820.LN

Typewritten Text 23-013

1289988820.LN

1 6

UP

DN

N

8,000

2,540

A2- SCALE: 1 / 50

2nd FLOOR PLAN

300300

,0

,0

,8

,1

,7

1,360 3,500

A2- SCALE: 1 / 50

3rd FLOOR PLAN

A B C D

ELEVATOR

STAIRWAY

TRAINING RM

LATRINE

HGFEDCBA

AS SHOWN

A-2

YI, K SSIM, C H

V9-210018

ARCHITECTURAL

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV.

SUBMITTED BY

USING AGENCY SCALE :

DRAWING NO. REF NO.

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DESCRIPTION

R E V I S I O N S

DATE BY CHK. APVD.

USAG HUMPHREYS

IMCOM

REVIEWED BY

SHEET OF

DESIGNED BY REVIEWED BY

PROJECT NO.

DEPUTY DESIGN BR.

CHIEF DESIGN BR.

CM BR.

SHOWER

TO

OPENED

A2--

A

B

C

D

A B DC

REPLACE VCB REPLACE VCB REPLACE VCB

EXST.ELEVATOR

REPLACE VCB REPLACE VCB

ATC CHIEF's OFFICE @ RM301

HALLWAY @ RM303

A B DC

,4

CLG

FFL

,4

CLG

FFL

,4

CLG

FFL

N

OFFICE

ATC CHIEF's

STAIRWAY

UP

DN

CLOSET

STORAGE

W/ CARPET TILE

REPLACE CARPET

A2--

A

B

C

D

8,000

2,540 300300

1,360 3,500

,2

,8

,1

,7

HALLWAY

ELEVATOR

LATRINE @ RM202

A2 SCALE: 1 / 50

ELEVATION

A2

CH:3,600

CH:3,600

ON THE FLOOR

REPAINT EPOXY

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL REPAINT WALL REPAINT WALL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL REPAINT WALL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

AND ELEVATION

2nd FLOOR PLAN, 3rd FLOOR PLAN

ON THE FLOOR

REPAINT EPOXY

ON THE FLOOR

REPAINT EPOXY

REPLACE THRESHOLD

AIR FIELD CONTROL TOWER, P-1284

INTERIOR SURFACE FOR

REPLACE CARPET AND REPAINT ALL

1289988820.LN

Typewritten Text 23-013

1289988820.LN

2 6

HGFEDCBA

AS SHOWN

A-3

YI, K SSIM, C H

V9-210018

ARCHITECTURAL

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV.

SUBMITTED BY

USING AGENCY SCALE :

DRAWING NO. REF NO.

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DESCRIPTION

R E V I S I O N S

DATE BY CHK. APVD.

USAG HUMPHREYS

IMCOM

REVIEWED BY

SHEET OF

DESIGNED BY REVIEWED BY

PROJECT NO.

DEPUTY DESIGN BR.

CHIEF DESIGN BR.

CM BR.

A3 SCALE: 1 / 50

ELEVATION

A3

A3- SCALE: 1 / 50

5th FLOOR PLAN

N

8,000

2,540 300300

1,360 3,500

,2

,8

,1

,7

ELEVATOR

EQPT RM

STAIRWAY

UP

DN

N

8,000

2,540 300300

1,360 3,500

,2

,8

,1

,7

A3- SCALE: 1 / 50

4th FLOOR PLAN

CLOSET

STORAGE

OFFICE

GCA CHIEF's

OFFICE

TOWER CHIEF's

HALLWAY

ELEVATOR

STAIRWAY

EXST.ELEVATOR

A B C D

A B C D

A B

REPLACE VCB REPLACE VCB REPLACE VCB REPLACE VCB

TOWER CHIEF's OFFICE @ RM401

GCA CHIEF's OFFICE @ RM402

REPLACE VCB

REPLACE VCB REPLACE VCB

DC

HALLWAY @ RM404

A3--

A

B

C

D

,4

CLG

FFL

,4

CLG

FFL

,4

CLG

FFL

CH:3,600

CH:3,600

REPLACE VCB REPLACE VCB

REPAINT WALL REPAINT WALL REPAINT WALL REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL REPAINT WALL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

AND ELEVATION

4th FLOOR PLAN, 5th FLOOR PLAN

REPLACE THRESHOLD

AIR FIELD CONTROL TOWER, P-1284

INTERIOR SURFACE FOR

REPLACE CARPET AND REPAINT ALL

1289988820.LN

Typewritten Text 23-013

1289988820.LN

3 6

MW

REF

HGFEDCBA

AS SHOWN

A-4

YI, K SSIM, C H

V9-210018

ARCHITECTURAL

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV.

SUBMITTED BY

USING AGENCY SCALE :

DRAWING NO. REF NO.

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DESCRIPTION

R E V I S I O N S

DATE BY CHK. APVD.

USAG HUMPHREYS

IMCOM

REVIEWED BY

SHEET OF

DESIGNED BY REVIEWED BY

PROJECT NO.

DEPUTY DESIGN BR.

CHIEF DESIGN BR.

CM BR.

N

8,000

2,540 300300

1,360 3,500

,2

,8

,1

,7

A4- SCALE: 1 / 50

6th FLOOR PLAN

A4- SCALE: 1 / 50

7th FLOOR PLAN

ELEVATOR

STAIRWAY

BREAK RM

HVAC RM

A B

DC

BREAK ROOM @ RM601

A4--

A

B

C

D

REPLACE VCB REPLACE VCB

EXST.ELEVATOR

REPLACE VCB

A B

DC

ADMIN OFFICE @ RM701

REPLACE VCB REPLACE VCB

REPLACE VCB REPLACE VCB

A B C D

LATRINE @ RM702

,4

CLG

FFL

,4

CLG

FFL

,4

CLG

FFL

,4

CLG

FFL

,4

CLG

FFL

A4 SCALE: 1 / 50

ELEVATION

A4

UP

DN

CHASE

N

8,000

2,540 300300

1,360 3,500

,2

,8

,1

,7

LATRINE

ADMIN OFFICE

A4--

A

B

C

D

REPLACE CARPET W/ CARPET TILE

CH:3,600

CH:3,600

REPLACE VCB

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

AND ELEVATION

6th FLOOR PLAN, 7th FLOOR PLAN

REPAINT WALL REPAINT WALL REPAINT WALL

DOOR FRAME

REPAINT METAL

REPAINT WALL

ON THE FLOOR

REPAINT EPOXY

ON THE FLOOR

REPAINT EPOXY

ON THE FLOOR

REPAINT EPOXY

THRESHOLD

REPLACE

AIR FIELD CONTROL TOWER, P-1284

INTERIOR SURFACE FOR

REPLACE CARPET AND REPAINT ALL

1289988820.LN

Typewritten Text 23-013

1289988820.LN

4 6

HGFEDCBA

AS SHOWN

A-5

YI, K SSIM, C H

V9-210018

ARCHITECTURAL

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV.

SUBMITTED BY

USING AGENCY SCALE :

DRAWING NO. REF NO.

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DESCRIPTION

R E V I S I O N S

DATE BY CHK. APVD.

USAG HUMPHREYS

IMCOM

REVIEWED BY

SHEET OF

DESIGNED BY REVIEWED BY

PROJECT NO.

DEPUTY DESIGN BR.

CHIEF DESIGN BR.

CM BR.

TOWER CAB

DN

STAIRWAY

8,200

6,3801,820

,3

,8

,5

,1

A5--

A

C

B

A5--

A

BC

N

CARPET W/ NEW

REPLACE ACOUSTICAL WALL

,0

FFL

CLG

,0

A

B

C

A5- SCALE: 1 / 50

8th FLOOR PLAN

8F

,4

FFL

,4

,0

6,600 6,600 1,100

A B C

REPLACE ACOUSTICAL WALL CARPET

CARPET W/ NEW

REPLACE ACOUSTICAL WALL

,0

FFL

CLG

,0

REPLACE ACOUSTICAL WALL CARPET W/ NEW

,0

FFL

CLG

,0

A5- SCALE: 1 / 50

RM801 ELEVATION

A5- SCALE: 1 / 50

RM802 ELEVATION

A5 NOT TO SCALEA5

REPAINT HANDRAILREPAINT HANDRAIL

WALL CARPET W/ NEW

REPLACE ACOUSTICAL

PROVIDE CARPET TILE ON THE VCT FLOOR

REPAINT HANDRAIL

REPLACE ACOUSTICAL CEILINING TILE W/ NEW DARK COLORED(BLACK) ONE.

REPLACE ACOUSTICAL WALL CARPET W/ NEW

REPLACE ACOUSTICAL WALL CARPET W/ NEW

DOOR FRAME

REPAINT METAL

DOOR FRAME

REPAINT METAL

EXST.STRUCTURE

CARPET TILE

(RT)

RUBBER TILE

A5

A5

FLOOR TRANSITION DETAIL

FLOOR TRANSITION DETAIL

RM 802 ELEVATION AND

8th FLOOR PLAN, RM 801 ELEVATION, AND RUBBER TREAD AND RISER

REPLACE RUBBER FLOOR TILE

AND RUBBER TREAD AND RISER

REPLACE RUBBER FLOOR TILE

AND RUBBER TREAD AND RISER

REPLACE RUBBER FLOOR TILE

ALUMIMUM CARPET EDGE STRIP

AIR FIELD CONTROL TOWER, P-1284

INTERIOR SURFACE FOR

REPLACE CARPET AND REPAINT ALL

1289988820.LN

Typewritten Text 23-013

1289988820.LN

5 6

HGFEDCBA

AS SHOWN

A-6

YI, K SSIM, C H

V9-210018

ARCHITECTURAL

O&M DIV.

SECURITY DIV.

FIRE SERV. DIV.

SAFETY OFC.

MASTER PLAN DIV.

SUBMITTED BY

USING AGENCY SCALE :

DRAWING NO. REF NO.

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON HUMPHREYS

UNIT # 15228, APO AP 96271-5228

SYMBOL ZONE DESCRIPTION

R E V I S I O N S

DATE BY CHK. APVD.

USAG HUMPHREYS

IMCOM

REVIEWED BY

SHEET OF

DESIGNED BY REVIEWED BY

PROJECT NO.

DEPUTY DESIGN BR.

CHIEF DESIGN BR.

CM BR.

INTERIOR FINISH SCHEDULE

RM NO ROOM NAME

HALLWAY

LATRINE

LATRINE

ATC CHIEF 's OFFICE

HALLWAY

404 HALLWAY

TOWER CHIEF 's OFFICE

GCA CHIEF 's OFFICE

601 BREAK ROOM

701 ADMIN OFFICE

702 LATRINE

801 TOWER CAB

802 STAIRWAY

1F TO 7F STAIRWAY

FLOOR

EXST NEW FINISH COLOR

CONC - EPOXY GRAY

CONC - EPOXY GRAY

CARPET CARPET TILE F.F

CARPET CARPET TILE F.F

CONC - EPOXY GRAY

CONC/METAL - EPOXY GRAY

BASE

EXST NEW FINISH COLOR

F.F

VCB VCB F.F

MOUSE GRAY

VCB VCB MOUSE GRAY ZEBRAWOOD

VCB VCB F.F MOUSE GRAY

VCB VCB F.F MOUSE GRAY

VCB VCB F.F MOUSE GRAY

VCB VCB F.F MOUSE GRAY

VCB VCB F.F MOUSE GRAY

VCB VCB F.F MOUSE GRAY

INTERIOR WALL

EXST NEW FINISH COLOR

GWB PAINT

PEBBLE

- (MUNSELL 2.5Y 7.8/2.1)

WGWB PAINT

PEBBLE

(MUNSELL 2.5Y 7.8/2.1)

-WGWB PAINT

PEBBLE

(MUNSELL 2.5Y 7.8/2.1)

GWB PAINT

ANTIQUE WHITE -

(MUNSELL 5.6Y 9.3/1.1)

GWB PAINT

PEBBLE - (MUNSELL 2.5Y 7.8/2.1)

GWB PAINT

ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)

GWB PAINT

ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)

GWB PAINT

PEBBLE - (MUNSELL 2.5Y 7.8/2.1)

GWB PAINT

ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)

GWB PAINT

ANTIQUE WHITE - (MUNSELL 5.6Y 9.3/1.1)

-WGWB PAINT

PEBBLE

(MUNSELL 2.5Y 7.8/2.1)

CMU/GWB PAINT

PEBBLE

(MUNSELL 2.5Y 7.8/2.1)

REMARKS

ACOUSTICAL WALL CARPET DESCRIPTION

ACOUSTICS FIRST (www.acousticfirst.com) OR APPROVED EQUAL.

ACOUSTICAL WALL CARPET SHALL BE SIMILAR TO "SOUND CHANNELS" AS MANUFACTURED BY

THE FEATURES ARE AS FOLLOWS:

IS NONALLERGENIC MATERIAL AND NO VOC's, ODS's AND HEAVY METALS OR FORMALDEHYDE.

ACOUSTICAL WALL CARPET SHALL BE RESISTANT TO MOISTURE, MILDEW, ROT, BACTERIA AND

ACOUSTICAL

TENSILE STRENGTH

TEAR STRENGTH

FLAMMABILITY

NRC 0.60

100lbs.

23lbs.

PASSES

CLASS "A"

PER ASTM C 423

PER ASTM D 1682

PER ASTM D 2261

PER NFPA 265, UBC 8-2

PER ASTM E 84

ACOUSTICAL WALL CARPET DESCRIPTION

AND

INTERIOR FINISH SCHEDULE

*GUNMETAL GREY

*GUNMETAL GREY

ZEBRAWOOD

VCT CARPET TILE F.F DARK COLOR

RT F.F

VCB F.F MOUSE GRAY

SHADOW GRAY

EXST NEW FINISH COLOR

ACT

WALL CARPET

WALL CARPET

WALL CARPET

WALL CARPET

F.F

F.F

ACT F.F BLACK

HANDRAIL AND GUARDRAIL IS MATCHED WITH EXISTING.

THE COLOR OF RADIATOR, DOOR, DOOR FRAME,

(A DARK COLOR WITH NO REFLECTION OF LIGHT)

AT ROOM 801 IS SELECTED BY USER.

THE COLOR OF WALL CARPET AND CARPET TILE

COEFFICIENT: LR-1, 0.75 OR GREATER)

REFLECTION OF LIGHT, MIN. LIGHT REFLECTANCE

STANDARD FINISH BLACK COLOR WITH NO

THE CEILING TILE IS ALLOWED FACTORY-APPLIED

STRINGER

RUBBER

VCT

VCT

CARPET TILE

CARPET TILE

F.F

F.F

ZEBRAWOOD

ZEBRAWOOD

RT/VCT

*THRESHOLD J32100 --- 4EA

AIR FIELD CONTROL TOWER, P-1284

INTERIOR SURFACE FOR

REPLACE CARPET AND REPAINT ALL

CEILING

1289988820.LN

Typewritten Text 23-013

1289988820.LN

6 6

V9-210018, P-1284-a1-Model-000
V9-210018, P-1284-a2-Model-000
V9-210018, P-1284-a3-Model-000
V9-210018, P-1284-a4-Model-000
V9-210018, P-1284-a5-Model-000
V9-210018, P-1284-a6-Model-000
V9-210018-t01
2022-11-22T09:31:16+0900
SIM.CHAE HWA.1289586624
2022-11-22T09:31:34+0900
SIM.CHAE HWA.1289586624
2022-11-22T09:31:46+0900
SIM.CHAE HWA.1289586624
2022-11-22T09:31:59+0900
SIM.CHAE HWA.1289586624
2022-11-22T09:32:12+0900
SIM.CHAE HWA.1289586624
2022-11-22T09:32:24+0900
SIM.CHAE HWA.1289586624
2022-11-22T09:32:36+0900
SIM.CHAE HWA.1289586624

File details come from the government source that posted it. Updated .