SEE ADDENDUM

(No Collect Calls)

W91QVN21R0027 16-Dec-2020

b. TELEPHONE NUMBER

315-755-3370

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 14 Jan 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QVN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MR. YI, SUNG-YONG

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011568019

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

SERVICES DIV, UNIT #15289

APO AP 96271

UNITED STATES

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE WT4KBR 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

W3BH USA GARRISON HUMPHREYS

W3BH USA GARRISON HUMPHREYS

348TH QM CO SP 52

CAMP HUMPHREYS BLDG 1603

PYEONGTAEK 17982

TEL: 011-82-53-470-65 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$16,500,000

NAICS:

238220

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91QVN21R0027

Section SF 30 - BLOCK 14 CONTINUATION PAGE

SPECIAL NOTICE

"All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA) does not permit the U.S. Government to grant Invited Contractor or Technical Representative Status to any offeror for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. source, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea must submit adequate verification in its initial proposal or quote that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If the initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award.

Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer."

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Overhaul Chillers

FFP

Overhaul Chillers in accordance with PWS Para 8.3. (1 Job = Chiller 2EA) FOB: Destination

PURCHASE REQUEST NUMBER: 0011568019

PSC CD: J041

NET AMT

0002 1 Job Overhaul Cooling Tower

FFP

Overhaul Cooling Towers in accordance with PWS Para 8.4. (1 Job = Cooling Tower 2EA) FOB: Destination

0003 1 Job Contractor Manpower Reporting (CMR)

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract in accordance with Para. 3.3 of the Performance Work Statement (PWS).

FOB: Destination

Estimated Cost for War Hazard Losses

FFP

Estimated Cost for War Hazard Losses is Zero(0).

Performance Work Statement (PWS)

Overhaul Chillers and Cooling Towers at Building 6110, USAG Humphreys

1.1. Introduction: This is non-personal services contract to provide overhaul for two (2) chillers and two (2) cooling towers at building 6110 in USAG Humphreys. The overhaul includes repair, replacement, cleaning, inspection, test, and calibration. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS.

1.2. Background: US Army Garrison Humphreys is located in Pyeongtaek City, Kyonggi Province, South Korea and the one-time service contract is required to provide overhaul for chillers and cooling towers at building 6110 in USAG Humphreys.

1.3. Objectives: The Contractor shall ensure all works accomplished in the performance of this PWS meets all applicable ROK regulation, Technical Code, O&M Manual and directives to include, but not limited to, the publications in Section 7, Related Documents.

The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all works in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.

The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost effective ways to provide overhaul for chillers and cooling towers of building 6110 at USAG Humphreys.

1.4. Climatic Conditions: The average annual rainfall is 53 inches; with the wettest months being July - August.

The average annual snowfall is 11 inches, with snowfall expected during the period of December - February. The average frost-free period (growing season) during the year is about 225 days. The first killing frost may be expected about November, and the last killing frost generally occurs in February. The average annual maximum and minimum temperatures are approximately 90 and 15 degrees Fahrenheit, respectively. Monthly normal temperatures ranged from a low of 26 degrees in the month of January to a high of 80 degrees in the month of August. Summer temperatures often reach 95 degrees Fahrenheit, while sub-freezing weather is common during the winter months.

1.5. Facility Access: The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the Fire Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection. The Fire Department will reset alarm systems to operational status.

1.6. Traffic Flow: N/A.

1.7. Drainage: Maintenance work performed under this contract shall not impede drainage.

1.8. Restoration of Landscape Damage: Trees or other landscape features damaged by the Contractor’s operations shall be restored at no additional cost to the Government. The COR/ACOR will decide the method of restoration for trees or whether damaged trees will be removed.

1.9. Dust Suppression: N/A.

2. Requirements

2.1. Description of Services: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide overhaul for chillers and cooling towers of building 6110 at US Army Garrison Humphreys as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.

2.1.1. Non-Personal Services: The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.

2.1.2. General Information

2.1.2.1. Period of Performance. : The Period of Performance will be (4) months after contract awarded.

2.1.3. Place of Performance and Hours of Operation

2.1.3.1. Place of Performance: The work will be performed at the building 6110, USAG Humphreys.

2.1.3.2. Hours of Operation: The Government's regular (normal) hours are from 0800 – 1700 hours, Monday through Friday except Korean holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours.

2.1.4. Holidays:

ROK legal holidays are as follows:

1 and 2 January (New Year’s Day) 31 December, 1 and 2 January on the Lunar Calendar (Lunar New Year’s Day) 1 March (Independence Movement Day) 1 May (Labor Day) 5 May (Children's Day) 8 April on the Lunar Calendar (Buddha's Birthday) 6 June (Memorial Day) 15 August (Liberation Day) 14, 15, and 16 August on the Lunar Calendar (Chu-Sok) 3 October (National Foundation Day) 9 October (Hangul Day) 25 December (Christmas Day)

2.1.4.1. Installation Closures: When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:

a. Reschedule the work to be performed the following day unless the following day is a legal Korean public holiday as listed above, and when routine work is not scheduled for that day; or

b. Reschedule the work on any day that is satisfactory between the COR or the appropriate DPW representative.

2.1.4.2. Inclement Weather Delay: If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the KO if inclement weather suspends operations within (2) hours. The Contractor shall resume operations with KO approval.

2.1.5. Travel/Temporary Duty: N/A

2.1.6. Emergency Services: Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.

2.1.6.1. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR/ACOR immediately, not later than (NLT) two (2) hours of the incident.

2.1.6.2. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.

2.1.7. Contract Administration and management

2.1.7.1. Post Award Conference/Performance Evaluation Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. COR will meet quarterly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by both the Contract Manager and the COR. The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.

2.1.7.2. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.

2.1.7.3. The following provides the roles and their respective authority during the performance of the contract:

2.1.7.3.1. Contracting Officer (KO): The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.

2.1.7.3.2. Contracting Officer’s Representative (COR): The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.

2.1.7.3.2.1. COR Authority: A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.

2.1.7.3.3. The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).

2.1.8. COR/ACOR Functions: The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government- Furnished Property, and coordinate site entry of Contractor personnel.

2.1.9. Reserved.

2.1.10. The Procurement Integrated Enterprise Environment (PIEE). The Procurement Integrated Enterprise

Environment (PIEE). PIEE(https://piee.eb.mil/xhtml/unauth/home/login.xhtml shall be used for nomination, tracking, documentation, and management of CORs IAW DoDI 5000.72, DFARS 201.602-2 and PGI 201.602-2. Additionally, CORs will use PIEE to ensure contract performance, document, upload, and store contract surveillance documentation as well as payment invoice processing/monitoring if required

2.1.11. Subcontract Management: The Contractor shall submit the subcontract management plan to the COR within five working day after contract award if sub-contractor is required to inspect chillers and cooling towers. The Subcontract management plan shall contain at a minimum but not limited.

- Sub-Contract Company Name

- Sub-Contract Company Experience

- Sub-Contract Company Business License or Permit

- Sub-Contract Company Responsibility in this contract.

- QC plan for sub-contractor’s performance.

2.1.12. Contractor Qualification

2.1.12.1. Key Personnel. The following personnel are considered key personnel by the Government. The resume and required license of Key personnel shall be submitted to the COR.

2.1.12.1.1. Contract Manager (CM): The Contractor shall provide a Contract Manager who is responsible for the performance of the work. The Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The name of the Contract Manager shall be provided by the Contractor to the KO and COR within 10 days from the contract award date. The CM shall respond within two (2) hours from the time notified by the Contracting Officer’s Representative (COR) to meet on the installation at the location specified by the COR regardless of operation hours.

2.1.12.1.2. HVAC Engineer. The HVAC Engineer shall have a license of Engineer General of Air-Conditioning Refrigerating (공조냉동기계기사) with at least three (3) years of experience in the field of repair and maintenance of HVAC system.

2.1.12.1.3. HVAC Mechanic. The HVAC Mechanic shall have a license of Craftsman Air-Conditioning and Refrigeration Machinery license (공조냉동 기능사 자격증) with at least two (2) years of experience in the field of repair and maintenance of HVAC systems.

2.1.12.2. Prime Contractor’s Prior Experience and Certificate: The prime contractor shall have at least (3) years of experience in the field of repair and maintenance of HVAC system. The prime contractor shall have certificate of Refrigerant Recovery Business(냉매회수업).

2.1.12.3. Qualification Standards: The Contractor shall inspect, repair, and maintain systems and components associated with facilities listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees.

2.1.12.4. CAC requirement: N/A

2.1.12.5. Contractor Identification: The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves by wearing uniform or high visibility vest with company name from Government employees.

The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.

2.1.12.6. Standards of Conduct: Contractor personnel’s conduct shall not reflect discredit upon the Government.

The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.

2.1.12.7. Contractor Hiring Restrictions: The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.

2.1.12.8. Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO, and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the

OCI.

2.1.13. Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute the requirements of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR/ACOR corrective action plans and timely identification of issues within two (2) days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

2.2. Work Management: N/A

2.2.1. Coordination: The Contractor shall schedule and coordinate with the COR/ACOR to minimize disruptions to the facility mission.

2.2.2. General Fund Enterprise Business System (GFEBS): N/A

2.2.2.1. GFEBS Certification: N/A

2.2.2.2. Preventive Maintenance Orders (PMO): N/A

2.2.2.3. Operations Work Orders (OWO): N/A

2.2.2.4. GFEBS Support: N/A

2.2.2.4.1. Database Tasks/Requirements: N/A

2.3. As-Builts and Geospatial Information System (GIS): N/A

2.3.1. Maintain As-Builts: N/A

2.3.2. Real Property Records Updates: N/A

2.3.3. GIS: N/A

2.3.4. GIS Support Services: N/A

2.3.5. GIS Files: N/A

2.3.6. Other Documents: N/A

2.4. Historic Property or Archaeological Site: N/A

2.4.1. Repair and Replacement: N/A

2.5. Special Requirements

2.5.1. Security

2.5.1.1. Access and General Protection/Security Policy and Procedures: The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. The COR/ACOR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.Motor Vehicle Operators: Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.

2.5.1.3. Contractor Vehicle Registration: The Contractor shall submit required documents to register Contractor-owned or operated vehicles and trailers operating on the installation within 5 working days from the beginning of Phase-In Period for COR review and sponsor’s approval. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.

The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office.

2.5.1.4. The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office.

2.5.1.5. Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. The Contractor shall maintain a physical security checklist or log (e.g., Standard Form (SF) 701, Activity Security Checklist), which will be forwarded to the COR/ACOR, NLT the tenth (10th) of each month, following the month of surveillance. The Contractor shall secure Government facilities, equipment, and materials at the close of each work period.

2.5.2. Antiterrorism (AT)iWATCH Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within ten (10) calendar days of contract award and within five (5) calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

2.5.2.2. AT Level I Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within ten (10) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within five (5) calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

2.5.2.3. Access and general Protection/Security Policy and Procedures: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204- 9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

2.5.2.3.1. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

2.5.2.4. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within ten (10) calendar days of their reporting for duty.

2.5.3. Safety: The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.

2.5.3.1. Safety Plan: The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.

2.5.3.2. Occupational Safety and Health: The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.

2.5.3.3. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 30 minutes of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum.

Contract number and contract name/description Name of contractor Date/Time of accident Date report was completed.

Detail description of events that lead to the accident Root cause of accident Corrective action(s) to prevent recurrence.

The following require immediate accident notification and written accident report A fatality A permanent total or permanent partial disability

The hospitalization of three or more people resulting from a single occurrence.

Property damage of $200 or more

The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the COR/Alternate Contracting Officer’s Representative (ACOR)/ Quality Assurance Representative (QAR), and shall notify the COR of the corrective action to be taken.

2.5.4. Training, Physical Requirements, or other Expertise Required

2.5.4.1. The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed, as appropriate in South Korea, in the specific areas required by the South Korean National, Provincial, Municipal, or local governmental organizations. The Contractor shall ensure employees are certified or licensed in the appropriate areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within twenty-four (24) hours prior to employees commencing performance.

2.5.5. Environmental Requirements

2.5.5.1. Green Procurement. N/A

2.5.5.2. Reserved

2.5.5.3. Environmental Compliance: The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations. All solutions, chemicals and other potentially dangerous products must be stored in their original or labeled container or in vessel/containers in English and Hangul if not in the original container. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR/ACOR. The Contractor shall provide upon request from the COR/ACOR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the

COR/ACOR.

2.5.5.4. Spill Plan: The Contractor shall notify the COR/ACOR within one (1) hour, if the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification. The Contractor shall submit a Spill Plan to the KO for approval within thirty (30) days of contract award IAW Spill Prevention Control and Countermeasure Plan.

2.5.6. Contingency Plans: N/A

2.5.6.1. Mobilization Contingency Plan: N/A

2.5.6.2. Disaster Contingency Plan: N/A

2.5.6.3. Dispute Contingency Plan: N/A

2.5.6.4. Plan Updates: N/A

2.6. Job Order Contract (JOC) Quality Assurance (QA)/Inspection Support: N/A

2.6.1. Project Support: N/A

3. Performance Requirements and Standards

3.1. High Level Objectives (HLO)

3.1.1. Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs).

3.1.1.1 Damage Caused by Contractor. Damages caused by Contractor employees shall be repaired at no cost to the Government. The Contractor shall notify the COR/ACOR and return the damaged area to its previous condition.

The Contractor shall furnish all labor, materials, and equipment to perform the repair work including cultivating and applying seed, sprigging, or placing sod. The Contractor shall maintain all turf repair work to ensure successful growth.

3.1.1.1.1. Damage Report: The Contractor shall submit a damage report to the COR/ACOR that annotates the damage, corrective action, and date corrected. The report shall be submitted as soon as possible but not more than 30 minutes of a damage occurrence.

3.2. Transition (Phase In/Phase Out): N/A

3.3. Contractor Manpower Reporting Application (CMRA).

Reporting Labor Hours: The Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report all Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address: https://sam.gov.

3.3.1. The required information includes the following:

a. Names of the KO and COR;

b. Contract number, including task and delivery order number;

c. Beginning and ending dates covered by reporting period;

d. Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data;

e. Estimated direct labor hours (including subcontractors);

f. Estimated direct labor dollars paid this reporting period (including subcontractors);

g. Total payments (including subcontractors);

h. Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each subcontractor if different);

i. Estimated data collection cost;

j. Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity

(RA) (the Army RA is responsible for providing the Contractor with its UIC for the purposes of reporting this information);

k. Locations where Contractor and subcontractors perform the work (specified by zip code in the U.S. and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

l. Presence of deployment or contingency contract language; and

m. Number of Contractor and subcontractor employees deployed in theater this reporting period (by country).

As part of its submission, the Contractor shall provide the estimated total cost incurred to comply with this reporting requirement.

Reporting period shall be the PoP not to exceed twelve (12) months ending thirty (30) September of each Government FY and must be reported by 31 October of each calendar year. The Contractor shall use a direct data transfer to the database server or fill in the fields on the website. The direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The Contractor shall report the required information to the CMR system’s secure database.

The COR/ACOR is responsible for verifying that the Contractor has reported the required data.

4. Performance Requirement Summary (PRS) Matrix

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success

Required Services Performance Standard

Method of Surveillance

Incentive (Positive and/or Negative)

# 1. Contractor shall ensure all work accomplished meets all applicable Federal, and local laws, regulations and directives to include, but not limited to applicable publications in Section 7, Related Documents.

The Contractor shall provide services IAW PWS, para. 1.2.

100% Inspection and complaint validations performed by the

COR.

Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System; Contractor shall re-perform the service.

# 2.The contractor shall submit an overhaul schedule (repair, replacement, cleaning and inspection) to the COR for approval NOT later than two (2) weeks prior to implementation.

The Contractor shall perform IAW PWS, para.

8.2

100% Inspection. Re-submit within one (1) working day after notification from the COR.

# 3.The contractor shall replace following parts; Motor gap sensors, Filter Driers, Water Box Gaskets etc. The specific quantity and description are listed in Technical Exhibit 2 (TE).

The Contractor shall perform IAW PWS, para.

8.3.1.

100% Inspection. Re-Perform within one (1) working day after notification from the COR.

# 4.The contractor shall provide cleaning for the whole closed circuit coils of two

(2) chillers. The both physical and chemical cleaning shall be conducted.

The strainers shall be cleaned. All chemical shall be removed through enough rinsing with clean water.

The Contractor shall perform

8.3.2.

100% Inspection. Re-Perform within one (1) working day after notification from the COR.

# 5.The Contractor shall perform operation test of two (2) chillers and two

(2) cooling towers during (8) hours in accordance with O&M Manual, Technical Exhibit 1 (TE). The deficiencies identified during tests shall be reported and corrected during contract period. The test report shall be re-submitted to the COR.

The Contractor shall perform

8.3.3. and 8.4.3.

100% Inspection. Re-Perform within one (1) day after notification from the COR.

Re-submit the test report within three

(3) working days to the COR.

# 6.The contractor shall replace fan belts, bearing assembly, louvers, eliminators, circulation pump. The specific quantity and description are listed in Technical Exhibit 2 (TE).

The Contractor shall perform

8.4.1.

# 7.The contractor shall provide cleaning for the inside and outside of the water basin and the outside of the closed circuit coils. The both physical and chemical cleaning shall be conducted. The strainers and spray nozzles shall be cleaned.

The Contractor shall perform

8.4.2.

4.1. Quality Assurance: The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). QASPs are considered to be "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. The QASP is not part of the PWS and will not be issued with the solicitation. The QASP focuses on the procedures and processes the Government will implement to assure the Contractor is performing IAW the performance standards within the PWS. The Government plan defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the Performance Requirements Summary (PRS). The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not conform to contract requirements, the Contractor shall perform the services again at no additional cost to the Government.

4.2. Quality Control Plan (QCP): Quality control is the responsibility of the Contractor. The Contractor shall develop, implement, and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify and prevent the recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The QCP shall be constructed in such a manner that each CLS service can be extracted and used for that function only and not contain extraneous information. The Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work. The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the KO and COR for acceptance within seven (7) calendar days after contract award. The Contractor shall submit any proposed changes in the QCP to the KO and COR for written approval within five (5) working days prior to implementation. The Quality Control Plan shall include the following:

4.2.1. Inspection System: Written procedures for the inspection system includes the title/name of the individual responsible for the Quality Control Plan and who shall perform the inspections. The location of inspection records and key control logs shall be made available to the Government at all times during the term of the contract.

4.2.2. Deficiency Prevention: An inspection form describing the method for identifying and preventing defects in the quality of service performed.

4.2.3. Inspection Record: The inspection record shall provide the following information:

Date, time, and location (building number) of the inspection.

Title and signature block for the person who performed the inspection.

Ratings of acceptable or unacceptable for all work performance inspected.

5. Common Levels of Service (CLS).

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions of the Base Operations specified below. This shall be done IAW all the terms, conditions, general and special provisions, specifications, drawings, attachments, and exhibits contained herein or incorporated by reference.

CLS Service Title 411 Facility Maintenance - Vertical

6. Deliverables.

DELIVERABLE FREQUENCY # OF COPIES MEDIUM/FORMAT DISTRIBUTION

A001 (PWS, para. 2.1.6.1) Accident Requiring Emergency Medical Treatment

Immediate. Not later than two

(2) hours after the incident. N/A Email or Telephone KO or COR/ACOR

A003 (PWS, para. 2.5.1.3) Contractor Vehicles Registration

Within five (5) working days of contract start date, insurance presented upon application of vehicle registration.

1 Electronic Copy

By making application

Vehicle Registration Section of the Provost Marshal’s Office and

COR/ACOR

A004 (PWS, 2.5.1.4)

Information required for background checks to meet installation access requirements

Within five (5) working days of contract start date, insurance presented upon application of vehicle registration.

Hard Copy

By making application

Installation Provost Marshall Office, Director of Emergency Services, or Security Office

A005 (PWS, para. 2.5.2.1) I Watch Training Report

Training: within ten (10) days of the contract award Five (5) Calendar days of new employees commencing performance.

1 Electronic Copy

Portable Document Format (Pdf) with CM’s Signature

COR/ACOR

A006 (PWS, para.2.5.2.2) AT Level I Training

Within ten (10) calendar days after contract start date

1 Electronic Copy

Portable Document Format (Pdf) COR/ACOR

A007 (PWS, para 2.5.2.4)

OPSEC

New employees: Within ten

(10) calendar days of their reporting for duty.

Electronic Copy

Portable Document Format (Pdf) COR/ACOR

A008 (PWS, para. 2.5.3.1) Safety Plan

Within ten (10) days of commencement of work.

1 Electronic Copy

Portable Document Format (Pdf) with

A009 (PWS, para. 2.5.3.3) Accident Report Logs

Report all accidents as soon as possible but not more than thirty (30) minutes of accident occurrence.

Appropriate corrective actions to the KO/COR as soon as possible but no later than five

(5) working days following the accident.

Portable Document

A011 (PWS, para. 2.5.4.1) Valid certifications and licenses

Within twenty-four (24) hours prior to employees commencing performance

Format (Pdf)

A012 (PWS, para. 2.5.5.3) Environmental Compliance, All environmental and hazardous material records

Beginning of the next duty day after the Government’s request to view the records

Make records available

Coordinate with

COR/ACOR COR/ACOR

A013 (PWS, para 2.5.5.4) Spill Plan

Within 30 days of contract award and written notification within one (1) hour of spill

1 Electronic Copy

Coordinate with

COR KO

A014 (PWS, para. 3.1.1.1.1), Damage Report

Report all accidents as soon as possible but not more than thirty (30) minutes of a damage occurrence.

1 Electronic Copy

Portable Document Format (Pdf) with CM’s Signature

COR/ACOR

A015 (PWS, Para 4.2) Quality Control Plan

Within seven (7) Calendar days after contract award.

Changed: Five (5) Working days prior to implementation.

A016 (PWS, para. 8.2.)

Inspection Schedule

NOT later than two (2) weeks prior to implementation.

1 Electronic Copy

Portable Document Format (Pdf) or MS Excel with CM’s Signature

A017 (PWS, para. 8.5.)

Inspection Report

NOT later than five (5) working days after work completion.

1 Electronic Copy

Portable Document Format (Pdf) with

7. Related Documents.

7.1. Definitions and Acronyms.

7.1.1. Definitions.

7.1.1.1. Acceptable Quality Level (AQL): The AQL is the maximum percent defective (or the number of defects per hundred units) for the purposes of sampling inspection can be considered satisfactory.

7.1.1.2. Alternate Contracting Officer’s Representative (ACOR). An employee of the U.S. Government provided by the RA and appointed by the KO to provide support to CORs in monitoring and documenting the Contractor’s performance. These alternate surveillance support personnel will serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR.

7.1.1.3. Addition: A change to a real property facility that adds to its overall external dimension or footprint.

7.1.1.4. Alteration: A change to interior or exterior facility arrangements or components to improve current use.

This includes installed equipment made a part of an existing facility. Additions, expansions or extensions are not alterations.

7.1.1.5. Breakdown: The stoppage or collapse of equipment, of a facility, or a component thereof, which requires immediate corrective action to restore it to an operating condition.

7.1.1.6. Cannibalize: Remove parts from Government property for use or for installation on other Government property

7.1.1.7. Cleaning: Removing stains, soil, and dirt; accomplished by chemical or mechanical means.

7.1.1.8. Completion Time: The interval between the time the contractor receives the request for the service and the time all work requested is completed and the work order is closed out.

7.1.1.9. Contract Administrator…