Attachment 02 OVERHAUL CHILLER COOLING TOWER TE02 MATERIAL LIST.pdf
PDF 117 KB Posted
- Attached to
- Overhaul Chiller and Cooling Tower
- Solicitation number
- W91QVN21R0027
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 01 CHILLER COOLING TOWER TE01 OM MANUAL.pdf | ||
| W91QVN21R0027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS Attachment Technical Exhibit 2 (TE) – Material List
1. Chillers
# Description Specification Est Qty Unit Remark 1 Sensor – Motor Gap Temperature WME 050 2 EA 2 Filter Drier WME 050 2 EA 3 COND Water Box Gasket 30” ~ 48” 2 EA 4 Refrigerant R-134a 500 kg includes container 5 Nitrogen Gas 99.90% 30 B/T 6 Combination Paint similar with current 8 L 7 Soft Brush 19 40 SET 8 Enamel Thinner KSM5319 2nd grade 6 L 9 Anti-Corrosive Coat KSM5312 2nd grade 4 L
2. Cooling Towers
# Description Specification Est Qty Unit Remarks 1 Fan Belt ATWB 20-5K36 8 EA
2 Fan Bearing ATWB 20-5K36 8 EA The grease lubrication shall be replaced.
3 Motor Bearing ATWB 20-5K36 8 EA The grease lubrication shall be replaced.
4 Louver PVC 72 EA Approx. 30”x70”x3” (36 EA per 1 Cooling Tower)
5 Drift Eliminator PVC 2 EA Approx. 36’ 2-1/2”x20’ 5/8” (per 1 Cooling Tower)
6 Circulation Pump ATWB 20-5K36 1 EA
File details come from the government source that posted it. Updated .