Attachment 02 OVERHAUL CHILLER COOLING TOWER TE02 MATERIAL LIST.pdf

PDF 117 KB Posted

Attached to
Overhaul Chiller and Cooling Tower
Solicitation number
W91QVN21R0027
Issued by

View the file

Other files

File Type Posted
Attachment 01 CHILLER COOLING TOWER TE01 OM MANUAL.pdf PDF
W91QVN21R0027.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Attachment Technical Exhibit 2 (TE) – Material List

1. Chillers

# Description Specification Est Qty Unit Remark 1 Sensor – Motor Gap Temperature WME 050 2 EA 2 Filter Drier WME 050 2 EA 3 COND Water Box Gasket 30” ~ 48” 2 EA 4 Refrigerant R-134a 500 kg includes container 5 Nitrogen Gas 99.90% 30 B/T 6 Combination Paint similar with current 8 L 7 Soft Brush 19 40 SET 8 Enamel Thinner KSM5319 2nd grade 6 L 9 Anti-Corrosive Coat KSM5312 2nd grade 4 L

2. Cooling Towers

# Description Specification Est Qty Unit Remarks 1 Fan Belt ATWB 20-5K36 8 EA

2 Fan Bearing ATWB 20-5K36 8 EA The grease lubrication shall be replaced.

3 Motor Bearing ATWB 20-5K36 8 EA The grease lubrication shall be replaced.

4 Louver PVC 72 EA Approx. 30”x70”x3” (36 EA per 1 Cooling Tower)

5 Drift Eliminator PVC 2 EA Approx. 36’ 2-1/2”x20’ 5/8” (per 1 Cooling Tower)

6 Circulation Pump ATWB 20-5K36 1 EA

File details come from the government source that posted it. Updated .