W91QVN20R0007_Amend0003.pdf
PDF 581 KB Posted
- Solicitation number
- W91QVN20R0007_Amend0003
About this file
This is an amendment to a solicitation for an MA IDIQ contract for general building repair and construction at USAG Humphreys in Area III. The amendment provides answers to vendor questions, changes the statement of work in Section C, updates Attachment 1 for pricing and Attachment 3 for specifications. It also modifies Section L instructions. The closing date for proposals is extended from August 30 to September 21, 2020 at 0700 hours in Korea Standard Time. Eligible vendors may bid on individual task orders for general construction work such as ceilings, walls, floors, mechanical systems, civil work and electrical work. Pricing will be on a job basis according to the schedule in Attachment 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN20R0007 Attachment 3-DPW Guide Specifications 2020.PDF | ||
| W91QVN20R0007 Attachment 1 REV1-Pricing Schedule.XLS | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
411TH CSB, KOREA - CONST & SUPPLY TEAM
POC: MS. KANG, SU-CHONG
TEL: 0503-355-3394/315-755-3394
SUCHONG.KANG.LN@MAIL.MIL
APO AP 96271
UNITED STATES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide changed Pricing Schedule, Technical Specifications, and updated local clauses and FAR clauses. See next page for detail. As a result of changes, the solicitation closing date and time is extended from 30 Aug 20, 0700 hours to 21 Sep 20, 0700 hours in Korea Standard Time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 60
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN20R0007
X 9B. DATED (SEE ITEM 11)
24-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2020
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
CONSTRUCTION & SUPPLY DIV, UNIT #15289
APO AP 96271
UNITED STATES
W91QVN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W91QVN
FACILITY CODECODE
EMAIL:TEL:
W91QVN20R0007
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 31-Aug-2020 07:00 AM to 21-Sep-2020 07:00 AM.
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND0003_BLOCK 14 CONTINUATION
a. The purpose of this amendment is to provide government's answer to vendor question, and to provide changed statement of work in Section C-Description and Specifications, changed Attachment 1 REV 1-Pricing Schedule and Attachment 3-DPW Guide Specifications 2020 in Section J-List of Documents, Exhibits and Other Attachments, and updated Section L-Instructions, Conditions, and Notices to Bidder.
b. Local clauses, 5152.204-4032, Representations and Certifications, 5152.222-4034 – Korean Labor Law, 5152.228-4033 – Defense Base Act, 5152.229-4012 – Tax Exemption Customs, Republic of Korea, 5152.229-4013
– Tax Exemption Special Excise Tax, Republic of Korea, 5152.229-4014 – Tax Exemption Value Added Tax (VAT), Republic of Korea, 5152.229-4015 – Tax Exemption POL Products, Republic of Korea, 5152.233-4703 – AMC-Level Protest Program are updated.
c. Offeror shall provide two representations under FAR clauses 52.204-24(d)(1)&(2) and one representation under FAR 52.204-26 (c).
52.204-24(d)(1): To certify whether they will or will not PROVIDE covered telecommunications equipment or service to the Government
52.204-24(d)(2): To certify whether it does or does not USE covered telecommunications equipment or services, or use any equipment, system, or services that uses covered telecommunications equipment or services
52.204-26(c): To certify whether it does or does not PROVIDE covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.
AMEND0003_VENDOR QUESTION & GOVERNMENT ANSWER
Question 1) After the presolicitation for MA IDIQ Contract General Building Repair and Construction, USAG Humphreys, Area III (W91QVN20R0007) issued, we sent response with a brief description of experience with the required work, company infos and etc by March 2nd. However, "Standard Form 1442" of original solicitation stated that "MA IDIQ Contract, Repair and Upgrade of USFK facilities for Area III (Contract No. W91QVN-18-D-0053, 0054, 0056, 0057, 0058, 0059, 0060, 0062, 0064, 0065, 0066, 0069, 0070, 0071, 0072, 0073, 0074, 0076, 0077, 0163) will be used for the high dollar amount that requires design" Is that statement meant by only those awardees are allowed to submit the proposal for this contract?
Answer 1) This is full and open competition. Any offerors can participate in this solicitation. In accordance with Solicitation Section H, paragraph 2.3 2.3. The dollar limit for each individual task order under this contract shall not exceed $250,000.
Question 2) Regarding the Safety license or Certificate, it says,"SSHO shall have a safety engineer license issued
(안전기사) by Human Resources Development Services of Korea (한국산업인력공단) with at least three (3) years relevant experience within the last seven (7) years as of the closing date of this solicitation.............SSHO shall obtain training certificate from FED safety training." on page 38 & 39 of the solicitation. However, it only says that
"SSHO shall have a safety engineer license issued (안전기사) by Human Resources Development Services of
Korea (한국산업인력공단)" on page 96 & 97 of Section L. Which one should we follow? Please clarify.
Answer 2) Section C is the contract terms and conditions that will be affected after contract award, and Section L is offeror’s proposal submission requirement.
Question 3) On page 39 of the solicitation, it says, "The prime contractor shall provide evidence document for key personnel. The evidence documents shall be one of national pension payment record (국민연금 납부기록) or medical insurance payment record (의료보험납부기록) to validate employment under prime contractor." Would it be acceptable to submit the agreements with key personnel who are going to join our company when awarded as part of the proposal documents?
Answer 3) Yes.
Question 4) Solicitation, Section B, (1) What is the meaning of “Max Quantity 500 Job”?
Answer 4) The issuance of orders for the performance of tasks does not exceed 500 each order.
Question 5) How the unit price per ”Job” can be calculated?
Answer 5) The price for task order will be specified based upon “job” basis. The price of task order will be calculated total amount of Sub contract line items specified under Attachment 1-Pricing Schedule.
Question 6) As mentioned Page 32 of 37 in RFP that key personnel’s national pension payment record shall be submitted in the proposal, we’d like to suggest to be replaced to the “Insured Status certificate of National Pension
Service(국민연금가입증명서) due to the personal information regarding the monthly exact paid amount.
Answer 6) This is required for verification process that proposed key personnel are belong to prime vendor.
Question 7) Guide Spec Section 23 00 00, Item No. 0023BN thru 0023BV, Question 7-1) Smoke Damper, Fire Damper, Volume Damper are not related to Grille items, and should be separated each other.
Answer 7-1) Smoke Damper and Fire Damper are deleted from the description in Sub-CLINs 0023BN through 0023BV, including option periods, under Attachment 1-Pricing Schedule.
Question 7-2) Smoke Damper, Fire Damper should be marked with asterisks (Off-shore Material)
Answer 7-2) Smoke Damper and Fire Damper are deleted from the description in Sub-CLINs 0023BN through 0023BV, including option periods, under Attachment 1-Pricing Schedule.
Question 8) Guide Spec Section 23 64 10, Item No. 0023FK thru 0023KA should be categorized by Guide Spec Section 23 64 25.
Answer 8) 0023FK through 0023KA are categorized in the DPW Guide Specifications, Section 23 64 26 not in Section 23 64 10. There is no Section 23 64 25 in the DPW Guide Specifications.
Question 9) Spec Section 23 65 00 is omitted in DPW Guide Specifications, and required to be added.
Answer 9) Section 23 65 10 is added in the DPW Guide Specifications.
Question 10)
Question 10-1) Regarding the Part 1.3 Contract Administration, Section 01 45 00.15 10 of DPW GUIDE SPECIFICATIONS AREA Ⅲ, KOREA, the Government uses RMS GM (Resident Management System Government Mode) to assist in its monitoring and administration of the contract. Also, Contractor accesses the system using the Contractor Mode (RMS CM) to record, maintain, input, track, and electronically share information with the Government throughout the contract period. We would like to ask you whether the above speciation is applied in this project.
Answer 10-1) RMS is not a part of this contract, MA IDIQ for General Building Repair and Construction, Area III.
It is not required by this contract for the contractors to use RMS system.
Question 10-2) Regarding the Part 1.5.1 Transmittal Form, Section 01 33 00 of DPW GUIDE SPECIFICATIONS AREA Ⅲ, KOREA, we are understood ENG. Form 4025 is used and these forms are included in the QCS Software.
However, as far as I know, QCS is not a system which is currently used but RMS is. We would like to know whether the QCS Software is used or not.
Answer 10-2) QCS is a part of RMS. As answered to Question 10-1, QCS is also automatically not a part of this contract, MA IDIQ for General Building Repair and Construction, Area III. It’s not required by this contract for the contractors to use QCS software.
Question 11)
ITME No. DESCRIPTION QUESTIONS
0007CC Plant Tree Types of tree, Size(Height or Diameter)
0026AD
Remove Recessed 2' x 4' LED light, replacement for 3 or 4/F32T8
Please verify Replacement or Removal.
0026AE
Remove Surface 1' x 4' or 2' x4' LED light, replacement for 1 or 2/F32T8
Please verify Replacement or Removal.
Answer 11)
‐ 0007CC: This line item doesn’t include the tree price. This line item 0007CC reflects just pure tree planting work without tree price. Trees shall be selected IAW Installation Planning Standards (IPS) and be priced separately.
Tree size is approx. 5m or less in height and 200mm diameter or less.
‐ 0007CD Plant Tree is added.
‐ 0026AD through 002AE: “Replacement” is deleted. 0026AA through 0026AE, including option periods, are updated.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
TECHNICAL PROVISION I
STATEMENT OF WORK
1. DESCRIPTION: The Contractor shall provide all labor, tools, equipment, transportation, materials and other necessary resources to accomplish the scope of work contained in the schedule and in accordance with the drawings, statement of work, specifications and terms and conditions of the individual task order. The type of work anticipated hereunder shall consist of but is not limited to the following: ceilings, walls, floors, doors, windows, latrines, roofing, mechanical work, civil work, and electrical work.
2. PRINCIPAL FEATURES: This project includes the following principal features; General Construction contract in accordance with the detailed specifications and drawings as provided under individual task orders. In performing work under individual task orders, contractors must comply with the following:
Schedule – Repair/Maintenance (K): All work shall be in accordance with the attached drawings and specifications.
a. General Work
1) Boiler worker
2) Carpenter (Concrete form)
3) Carpenter (Construction)
4) Carpenter (Door & window)
5) Common labor
6) Concrete worker
7) Communication worker
8) Duct worker
9) Exterior electrician
10) Glazer
11) Insulation worker
12) Interior electrician
13) Interior finish worker
14) Mason
15) Mechanical equipment installer
16) Painter
17) Plumber
18) Paving worker
19) Roof worker
20) Steel worker
21) Tile worker
22) Water proofing worker
23) Welder
24) Project manager
25) Safety manager
26) Quality controller
27) Backhoe 0.6
28) Backhoe 0.4
29) Backhoe 0.2
30) Concrete pump truck 43m
31) Crane wheel type 250t
32) Crane wheel type 200t
33) Crane wheel type 160t
34) Crane wheel type 130t
35) Crane wheel type 100t
36) Crane wheel type 80t
37) Crane wheel type 50t
38) Dump 15t
39) Fork lift 5t
40) Fork lift 7.5t
41) Trailer 20T
42) Truck, cargo 4.5T
43) Backhoe 0.6 w/ breaker
44) Backhoe 0.2 w/ breaker
45) PE (Poly Ethylene) safety fence
46) EGI (Electrolytic Galvanized Iron) Safety fence 2.4m for 3 months
47) EGI Safety fence 2.4m for 6 months
48) Double cord scaffolding with temporary stair or slope for 3 month rental, base on H30.0m
49) Double cord scaffolding with temporary stair or slope for 6 month rental, base on H30.0m
50) Rolling trestle scaffolding, 6'x4', for 3month rental, base on H2.0m
51) Rolling trestle scaffolding, 6'x4', for 6month rental, base on H2.0m
52) Rolling trestle scaffolding, 6'x4', for 3month rental, base on H4.0m
53) Rolling trestle scaffolding, 6'x4', for 6month rental, base on H4.0m
54) Shoring (h4.0m,B1.5m)
55) "General construction Site clean up"
56) Treatment of Construction waste
57) Treatment of designated landfill waste
b. CIVIL WORK
1) Fabricate standard concrete forms for pad, slab, retaining wall, cantilever wall, foundation, pedestal wall, culvert, column, beam, girder and all R.C structure, form height: below 3,048mm, included form tie, wedge fin, spacer, chamfer strip, hook, clamp and all other supporting form accessories
2) Fabricate standard concrete forms for pad, slab, retaining wall, cantilever wall, foundation, pedestal wall, culvert, column, beam, girder and all R.C structure, form height: 3,048 thru 6,096mm, included form tie, wedge fin, spacer, chamfer strip, hook, clamp and all other supporting form accessories
3) Install Metallic or Non-Metallic water stop with adhesive and sealant
4) Install dowel bar with cap on expansion joint, Below 30D, Length: 600mm
5) Install expansion/Contraction joint filler, 130mm thick
6) Fabricate deformed reinforce steel bars, D10 thru D29, for pad, slab, retaining wall, cantilever wall, foundation, pedestal wall, culvert, column, beam, girder and all R.C structure, Per 100kg of standard KS D 3629 reinforcing steel fabrication
7) Place welded wire fabric in concrete slab or pad, #4, 150 x 150mm
8) Install reinforced Conc. 4'W Step included base course and step nosing
9) Place 27MPa ready mixed concrete by backhoe, included surface finish, vibrator and operators with equipment, Below 6CM per 1 placing
10) Place 27MPa ready mixed concrete by backhoe, included surface finish, vibrator and operators with equipment, Above or equal 6CM per 1 placing
11) Place 27MPa ready mixed concrete, included surface finish and vibrator under below 100CM (Add below pump truck)
12) Place 27MPa ready mixed concrete, included surface finish and vibrator, 100CM thru 200CM (Add below pump truck)
13) Concrete pump truck rental cost less than 4 hours
14) Concrete pump truck rental cost, full days, 8 hours
15) Removal of concrete
16) Removal of reinforced concrete
17) Removal of Asphalt concrete
18) Excavation
19) Disposal of Soil
20) Engineering Fill
21) Install Gabion
22) Install 280mm thk Sub-Base Course
23) Base course levelling and compaction density 95%
24) Install 125mm thk Base Course
25) Install 150mm thk Base Course
26) AC. Surface Milling - 50mm thk.
27) AC. Surface Milling - 75mm thk.
28) AC. Surface Milling - 100mm thk.
29) Temporary Road (Gravel), 300mm thk
30) Install or Overlay 50mm thk. A/C (#78)
31) Install or Overlay 75mm thk. A/C (#78)
32) Install or Overlay 100mm thk. A/C (#78)
33) Install 100mm thk. Reinforced Conc. Slab
34) Install 100mm thk. Conc. Slab
35) Install 150mm thk. Reinforced Conc. Slab
36) Install 150mm thk. Conc. Slab
37) Install 200mm thk. Reinforced Conc. Slab
38) Install 200mm thk. Conc. Slab
39) Install 250mm thk. Reinforced Conc. Slab
40) Install 250mm thk. Conc. Slab
41) Install 300mm thk. Reinforced Conc. Slab
42) Install 300mm thk. Conc. Slab
43) Install Sidewalk with Base Course, expansion and contraction joint, bloom finish and chamfered edge
44) Install Conc. Curb
45) Install Granite Stone Curb
46) Install Conc. Gutter
47) Construct conc. Drainage/Surface Inlet including Cast Iron Grating and drain manhole
48) Install handrail
49) Install 190mm x 90mm x 57mm red brick wall
50) Paint reflective, 100mm wide pavement marking include bead
51) Paint reflective, 150mm wide pavement marking include bead
52) Paint reflective, 150mm, 300mm or/and 600mm Marking letter include bead
53) Paint reflective marking Handicap symbol
54) Paint 100mm wide stripe, reflective parking stall painting (Per EA)
55) Paint 150mm wide stripe, reflective parking stall painting (Per EA)
56) Install Traffic/Parking sign Board with 2"Dia Stl. Post & brackets
57) Install information sign Board with 2"Dia Stl. Post & brackets
58) Install Handicap parking sign 2"Dia Stl. Post & brackets
59) Install vehicle Wheel Stop
60) Install chain link fence with barbed wire on single arm, Type FE-6, Fabric width: 2,100 thru 2,400 included concrete footing
61) Install chain link fence with barbed wire on double arm, Type FE-7, Fabric width: 2,100 thru 2,400 included concrete footing
62) Install chain link fence with barbed wire and concertina wire on double arm, Type FE8, Fabric width:
2,100 thru 2,400 included concrete footing
63) Install double swing gate with gate posts, Type FE-6/7 included hinge, drop rod, latch assembly, grounding rod, wire and clamp
64) Install personnel gate with gate posts, Type FE-6/7 included hinge, drop rod, latch assembly, grounding rod, wire and clamp
65) Install Seeding
66) Replace existing Top Soil with 100mm thk. Top Soil
67) Install 100mm thk. Top Soil
68) Install Spot Sodding
69) Install Strip Sodding
70) Install Solid Sodding
71) Install Landscape Conc. Block
72) Removal of Tree
73) Plant Tree (Excuding the price of the tree. Approx 5 meters or less in height and 200mm diameter or less, Tree type is based on planting trees suggested in IPS)
74) Removal of Water Line & Plug, (up to 300mm Dia.) (Per LM)
75) Install 50mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)
76) Install 75mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)
77) Install 100mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)
78) Install 150mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)
79) Install 200mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)
80) Install 250mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)
81) Install 300mm dia AWWA C-900 150 PSI Water Pipe Line (Per LM)
82) Install 50mm dia. Gate valve & thrust block(Per EA)
83) Install 75mm dia. Gate valve & thrust block(Per EA)
84) Install 100mm dia. Gate valve & thrust block(Per EA)
85) Install 150mm dia. Gate valve & thrust block(Per EA)
86) Install 200mm dia. Gate valve & thrust block(Per EA)
87) Install 250mm dia. Gate valve & thrust block(Per EA)
88) Install 300mm dia. Gate valve & thrust block(Per EA)
89) Install Gate Valve Box (Per EA)
90) Install Indicator Post (Per EA)
91) Install Fire Hydrant and Guard Post (Per EA)
92) Install 100mm bend & thrust block.(Per EA)
93) Install 150mm bend & thrust block.(Per EA)
94) Install 200mm bend & thrust block.(Per EA)
95) Install 250mm bend & thrust block.(Per EA)
96) Install 300mm bend & thrust block.(Per EA)
97) Install 100 mm dia. Tee & thrust block (Per EA)
98) Install 150 mm dia. Tee & thrust block (Per EA)
99) Install 200 mm dia. Tee & thrust block (Per EA)
100) Install 250 mm dia. Tee & thrust block (Per EA)
101) Install 300 mm dia. Tee & thrust block (Per EA)
102) Install Valve Box (1.5m x 2m x 2m Depth) w/Lockable Cover for Security (Per EA)
103) Install Valve Box (3m x 5m x 2m Depth) w/Lockable Cover for Security (Per EA)
104) Install 50mm dia Check Valve (Per EA)
105) Install 100mm dia Check Valve (Per EA)
106) Install 150mm dia Check Valve (Per EA)
107) Install Flow Meter 50mm dia & Pressure Gage (Per EA)
108) Install Flow Meter 100mm dia & Pressure Gage (Per EA)
109) Install Flow Meter 150mm dia & Pressure Gage (Per EA)
110) Install 50mm dia with Valve Box (Per EA)
111) Removal of Sewer line & plug, various size ( Per LM )
112) Install Sewer Man Hole (Less than 1.8m Deep) (Per EA)
113) Install S.M.H. ( 1.8m - 2.4m Deep) (Per EA)
114) Install S.M.H. ( 2.4m - 3.0m Deep) (Per EA)
115) Install S.M.H. ( 3.0m - 3.6m Deep) (Per EA)
116) Install 100mm dia Surface Cleanout (Per EA)
117) Install 150mm dia Surface Cleanout (Per EA)
118) Install 200mm dia Surface Cleanout (Per EA)
119) Install 150mm dia VG-1 P.V.C Sewer Line & Fitting (PER LM)
120) Install 200mm dia VG-1 P.V.C Sewer Line & Fitting (PER LM)
121) Install 300mm dia VG-1 P.V.C Sewer Line & Fitting (PER LM)
122) Install Reinforced Concrete Encasement (PER LM)(100mm dia)
123) Install Reinforced Conc. Encasement (PER LM)(150mm dia)
124) Install Reinforced Conc. Encasement (PER LM)(200mm dia)
125) Install Reinforced Conc. Encasement (PER LM)(250mm dia)
126) Install Reinforced Conc. Encasement (PER LM)(300mm dia)
127) Install Reinforced Conc. Encasement (PER LM)(350mm dia)
128) Removal of Reinforced Concrete Pipe, Various Size (PER LM)
129) Install Surface inlet or Catch Basin (up to 1.5m) (Per EA)
130) Install 300mm dia Reinforced Concrete Pipe (PER LM)
131) Install 450mm dia R.C.P (PER LM)
132) Install 600mm dia R.C.P (PER LM)
133) Install 1.2m W x 1.2m L x 1.6m D Conc. Manhole include Cast Iron Frame and Cover (Per EA)
134) Install Conc. Ditch (300mm W, Various Height) (PER LM)
135) Install Conc. Ditch (450mm W, Various Height) (PER LM)
136) Install Conc. Ditch (600mm W, Various Height) (PER LM)
137) Install Conc. Ditch Cover (300mm W) (Per EA) (PER LM)
138) Install Conc. Ditch Cover (450mm W) (Per EA) (PER LM)
139) Install STL Grating Cover, 20 ton Load (300mm W) (PER LM)
140) Install STL Grating Cover, 20 ton Load (450mm W) (PER LM)
141) Install STL Grating Cover, 20 ton Load (600mm W) (PER LM)
142) Install Conc. Head Wall for 450mm dia Pipe (Per EA)
143) Install Conc. Head Wall for 600mm dia Pipe (Per EA)
144) Install Turf Swale (Per SM)
145) Install Riprap Apron (Per SM)
146) Install metal post guardrail & spacer block
147) Install Metal post guardrail w/o spacer block
148) Install conc. post guard rail & spacer block
149) Install conc. post guard rail w/o spacer block
150) General Area Survey (100m x 100m, 1Day)
151) Slope and Restricted Area Survey (100m x 100m, 1Day)
152) Digitizing and topographic design - TYP. Contour span (20mm)
c. Architectural Work
1) Remove CMU wall, 100mm-190mm thick w/re-bars & W.W.F
2) Remove lintel or sills for windows, doors and all openings
3) Remove precast coping on top of wall
4) Remove Stainless Steel Pipe Column, 25.4mm dia. Through 76.3mm dia
5) Remove Stainless Steel Pipe Column, 100mm dia. Through 125mm dia
6) Remove Stainless Steel Non-Slip on Stairway
7) Remove Guardrail and handrail with post, metal pipe
8) Remove 2Ply- Plywood Sheathing
9) Remove wood fascia board or soffit board with nailed
10) Remove Wood Molding
11) Remove mineral fiber blanket insulation or rigid insulation in wall, ceiling and roof deck
12) Remove Exterior Insulation and Finish System including metal lath EPS board etc. On Existing Wall
13) Remove Shingle Roof With 2-Ply Asphalt Felt
14) Remove Korean Cement Roof Tile With 2-Ply Asphalt Felt, Wood Strip
15) Remove Corrugated Iron Sheet Siding
16) Remove EPDM roofing with insulation, included seam tape, bonding adhesive and membrane flashings, lap sealant, edge treatment & EPDM sheet
17) Remove rubber walk board on EPDM roofing sheet
18) Remove Metal Gutter or downspout with strap and hanger
19) Remove All type of Single Steel Door without door frame
20) Remove All type of Double Steel Door without door frame
21) Remove All type of Single Steel Door With Frame, lockset, hinges, threshold, exit device and trim etc.
22) Remove All type of Double Steel Door With Frame, lockset, hinges, threshold, exit device and trim etc.
23) Remove all type of Alum. Door including Manual operated Entrance door without Door Frame
24) Remove All type of Alum. Door including Manual operated Entrance door With Door Frame, hinges, threshold, lockset, exit device and trim including fixed glasses etc.
25) Remove All type of wooden Single Door W/O Door Frame
26) Remove All type of wooden Double Door W/O Door Frame
27) Remove All type of Wooden Single Door With Frame, hinges, threshold, exit device and trim etc.
28) Remove All type of Wooden Double Door With Frame, hinges, threshold, exit device and trim etc.
29) Remove Ceiling Access Door with Frame
30) Remove All type of Alum. Auto Swing or Sliding Door With Door Frame, hinges, threshold, exit device, trim and fixed glasses, including Elec. Power and Fire alarm system disconnection etc.
31) Remove electrical powered metal rolling counter door or overhead coiling door with guide rail, insulated slot, motor operator, hand chain hoist, locking device, weather seal and wall mounted button control station etc.
32) Remove Aluminum Window with Frame, trim and insect screen
33) Remove Door hardware's(Exit device, Door check, Door stop, Threshold, weather-strip, Door Coordinator, Astragal, Kick plate, push plate, floor hinge and all type of lockset etc.)
34) Remove gypsum wall board
35) Remove gypsum ceiling board
36) Remove Metal or wood member Stud & runner 50mm-203mm W. 300mm~450mm O.C
37) Remove M-Bar type metal or wood ceiling suspension system
38) Remove Cement Plaster wall including Asphalt felt, metal lath etc.
39) Remove Ceramic wall & floor Tile
40) Remove Ceramic wall & floor Tile including setting bed
41) Remove Silicon sealants and caulking
42) Remove acoustic ceiling tile without frame
43) Remove and re-install acoustic ceiling tile
44) Remove T-bar type metal suspended ceiling system
45) Remove vinyl cove base
46) Remove vinyl composition tile
47) Remove rubber tile
48) Remove carpet or carpet tile with glue and felt
49) Remove Wallpaper
50) Remove existing paint for metal surface (By using hand & power tool machine)
51) Remove existing paint for CMU or concrete surface (By using hand & power tool machine)
52) Remove existing paint for wooden surface (By using hand & power tool machine)
53) Remove & re-install Toilet accessories (Lavatory faucet, Shower faucet, Towel bar, Mirror, Soap dish, Clotheshorse and Toilet tissue dispenser etc.)
54) Remove and re-install Toilet Fixtures (Urinal, Water Closet, Lavatory with Cabinet including drainage system)
55) Remove Blind, Vertical or venetian
56) Remove Kitchen Wall or Base Cabinet W/ Door and countertops sized wall cabinet Depth 300-400mm X
Height 640 - 770mm or base cabinet Depth 600-650mm X Height 900-1100mm
57) Remove and Reinstall Various Furniture Including Steel or Wooden Cabinets, Shelves, Book Cases, Office
Furniture, Chairs Refrigerators & Other Office Equipment's.
58) Block-up window & other opening w/CMU wall, 100mm to 190mm thk.
59) Block-up window & other opening w/#24 gage corrugated iron sheet 100mm thk insulation wood frame and interior lining
60) Install CMU wall, 100mm-190mm thick w/re-bars
61) Install stainless steel non-slip on stair
62) Install wood member with stud, furring, blocking & trim etc, at wall
63) Install 18mm thick plywood sheathing
64) Install wood fascia board & nailed incl. painting, 25mm x 250mm
65) Install soffit board, trim & paint 12mm thick plywood
66) Install 25mm x 100mm wood base board
67) Install chair rail, 100mm or 150mm oak molding
68) Install hardwood closet shelf, 600mm wide x 25mm thick Incl. stain & vanish finish
69) Install existing waterproofing materials and pressure wash roof surface, seal exposed cracks and crevices, apply concrete sealer, flash transition point, roof penetrations & install acrylic fluid applied waterproofing on existing concrete flat roof.
70) Install insulation w/aluminum foil jacket, in wall 75mm thick
71) Install exterior insulation and finish systems on concrete or CMU or metal wall including metal lath
72) Install asphalt shingle and 1-ply rubberized waterproofing membrane sheet
73) Install Korean cement roof tile, factory color finish size: 12 mm x 400 mm x 350mm with 1-ply rubberized waterproofing membrane sheet underlayment & treated battens
74) Install #24 gauge galvanized corrugated metal roof & painting
75) Install #24 gage corrugated sheet metal siding and painting
76) Install #26 gage sheet metal lining on the wall, ceiling
77) Install #24 gauge 150mm-200mm wide sheet metal rain gutter & hanger incl. painting
78) Install #24 gauge 100mm-150mm dia. sheet metal downspout & strap incl. Painting
79) Install basket strainer, 100mm dia. ~ 150mm dia.
80) Install #24 gauge galvanized sheet metal flashing incl. painting for valley flashing, drip edge, window, door, corner, smoke stack, duct and etc.
81) Install steel flush single door with steel door frame , 900 mm X 2,150 mm, 44.5 mm thick
82) Install steel flush 180mm X 670mm vision glass insulated single door with steel door frame , 900 mm X
2,150 mm, 44.5 mm thick
83) Install steel flush louvered insulated single door with steel door frame , 900 mm X 2,150 mm, 44.5 mm thick
84) Install steel flush insulated double door with steel door frame , 1,800 mm X 2,150 mm, 44.5 mm thick
85) Install steel flush insulated louvered double door with steel door frame , 1,800 mm X 2,150 mm, 44.5 mm thick
86) Install steel flush insulated 180mm X 670mm vision glasses double doors with steel door frame , 1,800 mm
X 2,150 mm, 44.5 mm thick
87) Install aluminum screen single door, 900mm x 2150mm
88) Install wood flush hollow core single door with steel door frame , 900 mm X 2,150 mm, 35 mm thick
89) Install wood flush solid core single door with steel door frame , 900 mm X 2,150 mm, 35 mm thick
90) Install wood flush 180mm X 670mm vision glass solid core single door with steel door frame , 900 mm X
2,150 mm, 35 mm thick
91) Install wood flush louvered solid core single door with steel door frame , 900 mm X 2,150 mm, 35 mm thick
92) Install wood flush hollow core dutch single door with steel door frame , 900 mm X 2,150 mm, 35 mm thick
93) Install ceiling access metal door w/metal frame swing up model, 450mm x 450mm
94) Install 90 minute fire rated steel flush insulated single door with steel door frame, 900 mm X 2,150 mm,
44.5 mm thick
95) Install 90 minute fire rated wood flush insulated single door with steel door frame, 900 mm X 2,150 mm,
44.5 mm thick
96) Install 45 minute fire rated wood flush insulated single door with steel door frame, 900 mm X 2,150 mm,
44.5 mm thick
97) Install aluminum sash sliding window & aluminum frame, insect screen & window latch 6mm glass +
12mm air space + 6mm laminated inner glass)
98) Install aluminum sash sliding window & aluminum frame6mm thick laminated glass
99) Install aluminum framed insect screen
100) Install only screen for door & window
101) Install fixed aluminum window & aluminum frame
102) Install single hung window & aluminum frame
103) Install awning with Fixed window & aluminum frame
104) Install project window & aluminum frame
105) Install 1,200x1,200 Dual action aluminum window(Turn and tilt) & aluminum frame
106) Install exit device, type 3 or 10, F-05/08 (ANSI/BHMA A156.3)
107) Install exit device, type 2, F-01 (ANSI/BHMA A156.3)
108) Install mortise lockset, F-02, F-04, F-05, F-07, F-08 or F-13 (ANSI/BHMA A156.13)
109) Install bored type lockset, F-82 or F-86 (ANSI/BHMA A156.2)
110) Install hinge butt, 4-1/2"" x 4-1/2"", A2111 or A5111 (ANSI/BHMA A156.1)
111) Install hinge butt, 4-1/2" x 4-1/2", A8111 (ANSI/BHMA A156.1)
112) Install aluminum weather strip for door
113) Install astragal for door
114) Install aluminum threshold, 100mm-150mm wide
115) Install door stopper and holder, L01361, L01371, L02141L01381, L02121, L01241 & etc.
(ANSI/BHMA A156.16)
116) Install foot bolt, 150mm long
117) Install door closer, C02021, C02011 (ANSI/BHMA A156.4)
118) Install push plate, J304 (ANSI/BHMA A156.16)
119) Install pull plate, J407 (ANSI/BHMA A156.16)
120) Install kick plate, J102 (ANSI/BHMA A156.16)
121) Install door viewer, 180 degree angle of view. L03171 (ANSI/BHMA A156.16)
122) Replace 4.5mm thick polycarbonate sheet with caulking
123) Install metal stud/runner for wall, 152mm wide 300mm - 450mm on center
124) Install M-Bar furring for wall 22mm D x 35mm W
125) Install suspended ceiling metal frame for gypsum board
126) Install suspended ceiling metal frame for acoustic tile
127) Install metal casing bead
128) Install plaster wall w/15# asphalt felt , metal lath (1.8kg per square meter) and 25mm thick cement plaster finish
129) Install wall board with 12.5mm thick gypsum board including joint taping & compound, regular type
130) Install wall board with 15mm thick gypsum board incl. joint taping & compound, type "X" (Special fire resistant )
131) Install wall board with 12.5mm thick gypsum board incl. joint taping & compound, water resistant type
132) Install ceiling board with 12.5mm thick gypsum board incl. joint taping & compound
133) Install ceiling board with 15mm thick gypsum board incl. joint taping & compound, type "X" (Special fire resistant)
134) Install ceiling board with 12.5mm thick gypsum board incl. joint taping & compound, water resistant type
135) Install ceramic mosaic floor tile or ceramic floor tile
136) Install ceramic wall tile incl. accessories (trim & corner)
137) Install 15mm thick acoustical ceiling tile
138) Install vinyl composition tile 300mm x 300mm x 3mm thick
139) Install vinyl composition tile, 450mm x 450mm x 3mm thick
140) Install rubber tile, 500mmx500mmx4mm thick
141) Install rubber stair tread with integrated riser, 480mm wide x 5mm thick
142) Install vinyl cove base, 100mm to 150mm high
143) Install Carpet, Nylon Pattern Cut/Loop Incl. Accessories
144) Install nylon carpet with level-loop, multilevel loop, cut and loop incl. accessories
145) Install carpet tile, loop, incl. accessories 500mm x 500mm x 9.5mm thick
146) Replace raised floor system, 600 mm X 600 mm including die cast panel, stringer, pedestals, non -conductive tile and accessories
147) Install wall paper (fire retardant type) Class A flame spread rating of 0-25 and smoke development rating of 0-50 when tested in accordance with ASTM E 84.
148) Install caulking for bathroom & kitchen
149) Paint, interior , 2-coats
150) Paint, interior oil modified clear urethane, stain, 3-coats
151) Paint, exterior alkyd enamel 2-coats
152) Paint on metal surface, aluminum paint, 2 coats
153) Paint, galvanized metal primer, 1 coat
154) Paint, interior primer sealer, 1 coat
155) Paint on concrete floor, epoxy paint, 2 coats
156) Paint, stain wood floor, natural finish, 3 coats
157) Repaint for exterior insulation and finish system
158) Install hardener for concrete floor slab
159) Install metal toilet partition & door
160) Install metal urinal baffle
161) Install shower bench, 300mm wide
162) Install stainless steel (SST) shower curtain rod, w/curtain 25mm dia x 900mm - 1200mm lg.
163) Install SST robe hook
164) Install soap dish (stainless or ceramic)
165) Install metal framed glass mirror, 450mm x 600mm high.
166) Install metal framed tilting glass mirror, 400mm x 750mm high.
167) Install toilet tissue dispenser
168) Install paper towel dispenser
169) Install liquid soap dispenser
170) Install #18 gauge heavy duty SST shelf incl. brackets & supports
171) Install #20 gauge light duty SST shelf incl. brackets & supports
172) Install SST towel bar 19mm dia. X 500mm lg., 1 or 2 hanger
173) Install vanity cabinet, 700 mm W x 490 mm D x 760 mm H w/marble top
174) Install medicine cabinet, 470 mm x 870 mm H
175) Install stainless steel fire extinguisher cabinet below 2 hour rated.
176) Install horizontal blind, 25mm aluminum slats incl. head channel, bracket and accessories
177) Install vertical blind, 89mm aluminum or cloth strips incl. bracket and accessories
178) Install kitchen wall cabinet with door 640mm~770mm H x 300 - 400mm D X 1,000mm W
179) Install Kitchen Hood wall cabinet with door 600mm W x 520 - 700mm H x 300 - 400mm D
180) Install Kitchen Hood wall cabinet with door 900mm -1,100mm W x 520 - 700mm H x 300 - 400mm D
181) Install kitchen base cabinet with door Incl. Artificial Marble Counter Top, Sink Faucet & Single bowl sink or double bowl sink 800mm~920mm H x 600mm - 650mm D x 1,000mm W
182) Install kitchen base cabinet with door Incl. Artificial Marble Counter Top, Sink Faucet & Single bowl sink or double bowl sink 900mm~1,200mm W x 800mm - 920 H x 600mm - 650mm D
183) Install kitchen counter top artificial marble counter top with back splash
d. Mechanical Work
1) Remove Packaged liquid chiller, air cooled or water cooled condenser type, all standard accessories, cooling capacity : any size
2) Remove air handling unit, all type, cooling/heating coil, capacity : any size
3) Remove air cooled condensing unit, any size
4) Remove cooling tower, any size
5) Remove package air conditioning unit, stand alone indoor unit, air cooled condensing outdoor unit with OA duct & piping system (cooling, heat pump type or elec. Coil include type) capacity : any size
6) Remove hot water heating boiler, or domestic hot water boiler, capacity : any size
7) Remove expansion tank, bladder or diaphragm type, capacity : any size
8) Remove unit heater, horizontal or vertical type, any capacity
9) Remove finned tube radiator, with non elec. Control valve, any capacity
10) Remove Smoke stack with barometric damper, any size
11) Remove pump, base mounted end suction, or in-lined, capacity : any size
12) Remove all type and any size valves, fittings (gate valve, glove valve or balancing cock, strainer, check valve, air separator, flexible connection, etc.
13) Remove steel pipe schedule#40 or copper tube & hanger, included all type valves, fittings, without insulation, any size"
14) Remove pipe insulation, flexible cellular(Armaflex) or glass wool including adhesive & tape cover, any size
15) Remove roof or wall ventilator, any type and any capacity
16) Remove bathroom exhaust fan, grille, backdraft damper
17) Remove duct accessories (grille, louver, smoke damper, smoke louver, fire damper, volume damper or turning vane, register diffuser)
18) Remove all Air duct,
19) Remove duct insulation, flexible cellular or glass wool
20) Remove sanitary ware (water closet, urinal, lavatory, service sink, kitchen sink) & accessories,
21) Remove shower, wall mounted, single lever, head,
22) Remove galvanized steel vent pipe w/ fittings, hanger
23) Remove cast iron soil pipe, any size
24) Remove sprinkler head, pendent or upright, chrome, fusible link type,
25) Remove Sprinkler pipe, including fittings, hangers, black steel schedule # 40, size : any size
26) Remove all type sensor (temperature. Thermostat, detectors)
27) Remove inside equipment concrete pad, 50mm THK.
28) Remove outside equipment concrete pad, 300mm THK.
29) Remove fan coil unit, floor mount or ceiling mounted type, any size
30) Install Sprinkler head, pendent or upright, quick response, chrome, fusible link type
31) Install Sprinkler pipe, including fittings, hangers, black steel schedule # 40, size 25mm
32) Ditto, 32 mm
33) Ditto, 40 mm
34) Ditto, 50 mm
35) Ditto, 100 mm
36) Install Water closet, tank type,1 piece, vitreous china, siphon jet flushing & accessories, (American std.
2403.128-1.28 gpf)
37) Install Water closet, FV type, vitreous china, siphon jet flushing & accessories, except F.valve(American std. 2403.128-1.28 gpf)
38) Install Urinal, flush valve type, wall hung, vitreous china, except F. valve(American std. 6590.001-0.5 gpf)
39) Install Lavatory, counter top, single lever, vitreous china, accessories, 0.5 gpm
40) Install Lavatory, 2 handle lever, vitreous china, accessories, wheelchair, (American std. 9141.011.020 &
6531.145)
41) Install Service sink, enameled cast iron with accessories(American std. 2696.102 & 7295.252)
42) Install Kitchen sink, double bowl, faucet, accessories, 33" x 21"
43) Install Kitchen sink, single bowl, accessories, 33" x 19" (American std. 14SB331900 & 6409.180)
44) Install Shower, wall mounted, single lever, head,(American std. T508.507)
45) Install toilet flush valve, manual type (American std. 6047.122.002)
46) Install toilet flush valve, sensor type (American std. 606B721)
47) Install Electric water cooler, incl. piping & accessories
48) Install Backflow preventer valve, w/ pressure reducing principle, bronze body, 20 mm DIA
49) Install domestic gas burner type hot water heater, 30, 000Kcal/hr. or under (ΔT 100 оF, 115 GPH)
50) Ditto, 50, 000Kcal/hr. (192GPH)
51) Ditto, 65, 000Kcal/hr. (250 GPH)
52) Ditto, 90, 000Kcal/hr. (360 GPH)
53) Install Electric domestic water heater, 100 L, 1.6 KW
54) Ditto, 450 L, 4.5 KW
55) Ditto, 1000 L, 10 KW
56) Install Galvanized steel pipe, schedule#40 w/ fitting & hanger, for sewer vent pipe, 32mm DIA
57) Ditto, 40mm DIA
58) Ditto, 50mm DIA
59) Ditto, 65mm DIA
60) Ditto, 80mm DIA
61) Ditto, 100mm DIA
62) Install Cast iron soil pipe, hub type, 50 mm DIA
63) Ditto, 75 mm DIA
64) Ditto, 100 mm DIA
65) Ditto, 125 mm DIA
66) Install Floor cleanout with 45 DEG. Bend, extension pipe, with Y-branch,100 mm DIA
67) Ditto, 75 mm DIA
68) Ditto, 50 mm DIA
69) Install Floor drain, with P-trap, 50 mm DIA
70) Ditto, 100 mm DIA
71) Install Faucet/ hose bibb, 15 mm DIA
72) Install Water hammer arrester , PDI unit "A" type
73) Ditto, "B" type
74) Ditto, "C" type
75) Install sump/submersible pump, cast iron, single stage, vertical W/control panel, water level switch and pump guide, below or equal 25GPM/1HP
76) Ditto, 75GPM, 1-1/2HP
77) Ditto, 100GPM, 2HP
78) Ditto, 150GPM, 3HP
79) Ditto, 200GPM, 5HP
80) Ditto, 300GPM, 10HP
81) Ditto, 500GPM, 15HP
82) Ditto, 800GPM, 20HP
83) Install sump/submersible pump, cast iron, single stage, explosion proof type vertical W/control panel, water level switch and pump guide, below or equal 25GPM
84) Ditto, 75GPM
85) Ditto, 100GPM
86) Ditto, 150GPM
87) Ditto, 200GPM
88) Ditto, 300GPM
89) Ditto, 500GPM
90) Ditto, 800GPM
91) Install Air handling unit, all type, cooling/heating coil, 3,400 CMH(2,000 CFM)
92) Ditto, 8,500 CMH(5,000 CFM)
93) Ditto, 17,000 CMH(10,000 CFM)
94) Ditto, 25,500CMH(15,000 CFM)
95) Ditto, 34,000 CMH(20,000 CFM)
96) Ditto, 51,000CMH(30,000 CFM)
97) VAV or CAV terminal w/ hot water reheat, damper, actuator, thermostat, control valve & controller, 1,000CFM or under
98) Ditto, 1,500CFM or under
99) Ditto, 3,000CFM or under
100) Install Fan coil unit, floor mounted, 3 row coil, manual air vent, 3 speed switch,UL motor, washable filter, fresh air intake grille, 400 CFM
101) Ditto, 600 CFM
102) Ditto, 800 CFM
103) Ditto, 1200 CFM
104) Install Fan coil unit, above ceiling mounted, UL motor, 400 CFM
105) Ditto, 600 CFM
106) Ditto, 800 CFM
107) Ditto, 1200 CFM
108) Install Liquid filter dryer for refrigeration line
109) Install Sight glass for refrigeration line
110) Install Roof ventilator, direct or belt driven, 815 CFM under, 1/4" SP
111) Ditto, direct driven, 2050 CFM under, 1/4" SP
112) Ditto, belt driven, 1650 CFM under, 1/4" SP
113) Ditto, belt driven, 2750 CFM under, 1/4" SP
114) Ditto, belt driven, 3500 CFM under, 1/4" SP
115) Install Wall ventilator, direct or belt driven, 1320 CFM, 1/4 HP
116) Ditto, direct driven, 1983 CFM, 1/4 HP
117) Ditto, direct driven, 2900 CFM, 1/2 HP
118) Install Utility fan, centrifugal, V belt driven, pedestal, 2,000 CFM, 1 HP, 1/4" SP or under
119) Ditto, 3,600 CFM, 3/4 HP or under
120) Ditto, 4,800 CFM, 1 HP or under
121) Ditto, 15,000 CFM, 5 HP or under
122) Ditto, 20,000 CFM, 7.5 HP or under
123) Install Ceiling fan, right angle, extra quiet, 0.1" SP, 385 CFM
124) Ditto, 855 CFM
125) Install Bathroom exhaust fan, grille, backdraft damper,260 CFM
126) Install Paddle blade ceiling fan, 52"blade,3-5ea bade, fan cap.: 25,500CFM,1/8 HP
127) Install Grille or louver or volume damper or turning vane, 300mm x 300mm or underDitto, 400 x 400 or under
128) Ditto, 500 x 500 or under
129) Ditto, 600 x 600 or under
130) Ditto, 700 x 700 or under
131) Ditto, 800 x 800 or under
132) Ditto, 900 x 900 or under
133) Ditto, 1000 x 1000 or under
134) Install Register or backdraft damper, 300mm x 300mm or under
135) Ditto, 400 x 400 or under
136) Ditto, 500 x 500 or under
137) Ditto, 600 x 600 or under
138) Ditto, 700 x 700 or under
139) Ditto, 800 x 800 or under
140) Ditto, 900 x 900 or under
141) Ditto, 1000 x 1000 or under
142) Install Ceiling diffuser, round or square type w/damper, 200 mm neck DIA or under, aluminum
143) Ditto, 250 mm DIA
144) Install Air duct, 0.5mm THK.(#26GA), without insulation
145) Install Air duct, 0.6mm THK.(#24GA), without insulation
146) Install Air duct, 0.8mm THK.(#22GA), without insulation
147) Install Air duct, 1mm THK.(#20GA), without insulation
148) Install Air duct, 1mm THK.(#16GA), without insulation
149) Install Residential type range hood, 30"W, 2-speed, 210 CFM
150) Install insulated flexible duct for diffuser conn. 150 mm DIA, 3m LG
151) Ditto, 300 mm DIA, 3m LG
152) Install Dryer vent kit, flexible hose / duct, weather cap
153) Install Pipe insulation, flexible elastomeric cellular (Armaflex) or glass wool, 40mm THK. including adhesive & tape cover, 15 mm DIA
154) Ditto, 20mm DIA
155) Ditto, 25mm DIA
156) Ditto, 32mm DIA
157) Ditto, 40mm DIA
158) Ditto, 50mm DIA
159) Ditto, 50 mm THK, 65mm DIA
160) Ditto, 50 mm THK, 80mm DIA
161) Ditto, 50 mm THK, 100mm DIA
162) Ditto, 50 mm THK, 125mm DIA
163) Ditto, 50 mm THK, 200mm DIA
164) Install Duct insulation, glass wool or flexible elastomeric cellular, 50 mm THK
165) Install aluminum jacket on insulation, 50 mm DIA pipe or under
166) Ditto, 150 mm DIA pipe or under
167) Install LONWORK Translator on existing equipment
168) Install new DDC program on existing CPU, multi-user, GUI, report output & historical data record function, included emergency back up/restoration disk or movable storage, MFR: Johnson Control, METASYS or approved equal
169) Register Control Point on new DDC program (300 CP or below), 1 EA per Control Point (PC).
170) Register Control Point on new DDC program (Above 300 CP), 1 EA per CP.
171) Test and Inspect DDC Communication, 1EA per DDC.
172) Test and Inspect Control point, 1 EA per CP.
173) Install hot water heating boiler, 30,000Kcal/hr. (119,000 btuh), gas burner, steel body
174) Ditto, 50,000 Kcal/hr(200,000BTUH)
175) Ditto, 70,000 Kcal/hr.(280,000BTUH)
176) Ditto, 100,000 Kcal/hr.(400,000BTUH)
177) Ditto, 131,000 Kcal/hr. (525,000 BTUH)
178) Ditto, 183,000 Kcal/hr.(735,000 BTUH)
179) Ditto, 262,000 Kcal/hr.(1,050,000 BTUH)
180) Ditto, 577,000 Kcal/hr.(2,310,000 BTUH)
181) Install Air separator, 32 mm
182) Ditto, 40 mm
183) Ditto, 50 mm, with strainer
184) Ditto, 65 mm, with strainer
185) Ditto, 80 mm, with strainer
186) Ditto, 100 mm, with strainer
187) Install Unit heater, horizontal or vertical type, hot water heating coil, 8,000 Kcal/hr.
188) Ditto, 12,000 Kcal/hr.
189) Install Unit heater, Electric, 5 KW
190) Install Finned tub radiator, with non elec. Control valve, 1 row-1m L
191) Ditto, 1 row-2 m L
192) Ditto, 2 row-1 m L
193) Ditto, 2 row-2 m L
194) Ditto, 3 row-1 m L
195) Install 15mm automatic air vent with stop valve
196) Install Packaged liquid chiller, air cooled condenser type, ARI 550/590, conform ASHRAE 15, Safety control with automatic reset, all standard accessories, cooling capacity : 20 R/T
197) Ditto, 30 R/T
198) Ditto, 40 R/T
199) Ditto, 60 R/T
200) Ditto, 80 R/T
201) Ditto, 100 R/T
202) Ditto, 130 R/T
203) Ditto, 175 R/T
204) Install Packaged liquid chiller, water cooled condenser type, w/o cooling tower ARI 550/590, conform
ASHREA 15, Safety control with automatic reset, all standard accessories, cooling capacity : 75 R/T
205) Ditto, 95 R/T
206) Ditto, 115 R/T
207) Ditto, 125 R/T
208) Ditto, 145 R/T
209) Ditto, 200 R/T
210) Install Air cooled refrig. Condensing unit, direct drive, compressor, 3 Ref.ton or under
211) Ditto, 5 TON or under
212) Ditto, 10 TON or under
213) Ditto, 15 TON or under
214) Ditto, 20 TON or under
215) Ditto, 25 TON or under
216) Replace water chiller part: Scroll type hermetic compressor, R410A, nominal 20RT, Brazed connection, included compressor contactor, electronic motor protection, terminal block, Comp. control board and protection cover, Carrier SH240 series or equal
217) Ditto, nominal 25RT,Carrier SH295 or SH300 series or equal
218) Ditto, Nominal 10 thru 15RT
219) Install Chemical feeder, 150mm dia X450 L with fittings
220) Install Pump, base mounted end suction, mechanical seal, cap. : 1-1/2HP, 40GPM, 60FT head, 1800
RPM
221) Ditto, 2 HP, 50 GPM or under
222) Ditto, 3 HP, 150 GPM or under
223) Ditto, 5 HP, 350 GPM or under
224) Ditto, 7.5 HP, 350 GPM or under
225) Ditto, 10 HP, 600 GPM or under
226) Ditto, 25 HP, 1,550 GPM or under
227) Install Pump, in-line, 1/12 HP, 20~40mm
228) Ditto, 1/8 HP, 20~40mm
229) Ditto, 1/3 HP, 20~40mm
230) Ditto, 1/2 HP, 80 mm
231) Install Gate valve, glove valve or balancing cock, threaded bronze body, 15 mm DIA
232) Ditto, 20 mm DIA
233) Ditto, 25 mm DIA
234) Ditto, 32 mm DIA
235) Ditto, 40 mm DIA
236) Ditto, 50 mm DIA
237) Ditto, 65 mm DIA
238) Install Gate valve, glove valve, flanged, cast iron body, OS & Y. 80 mm DIA.
239) Ditto, 100 mm
240) Ditto, 125 mm
241) Ditto, 150 mm
242) Ditto, 200 mm
243) Install Check valve, threaded bronze body,…
This is the start of the file's text. The full file is on GovTribe.