About this file
VTC Systems for USFK OHR Conference Room
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN19R0253-0003.pdf | ||
| W91QVN19R0253-0002.pdf | ||
| W91QVN19R0253-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN19R0253 20-Aug-2019
b. TELEPHONE NUMBER
315-755-0656
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 04 Sep 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. PAK, HYON CHON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011328853-0002
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CSB, KOREA - IMB
UNIT#15289
APO AP 96205
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 724-6977 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$27,500,000
NAICS:
541512
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN19R0253
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Confidence Camera, Full HD Resolution 12
FFP
Sony Confidence Camera, Full HD Resolution 12x Optical, 71 Degree field of view, Part No. SRG-120DH FOB: Destination
PURCHASE REQUEST NUMBER: 0011328853-0002
PSC CD: 7010
NET AMT
0002 1 Each 36U A/V Rack
FFP
36U A/V Rack FOB: Destination
0003 7 Each Floor box for HDMI/MIC and NIPR/SIPR/CEN
FFP
Floor box for HDMI/MIC and NIPR/SIPR/CEN FOB: Destination
0004 4 Each 85in Commercial Grade LCD, Full HD with
FFP
Samsung 85in Commercial Grade LCD, Full HD with 4 mounting brackets Part No. LH85QMNEBGC/KR
FOB: Destination
0005 2 Each 43in Commercial Grade LCD, Full HD, wi
FFP
Samsung 43in Commercial Grade LCD, Full HD, with 2 mounting brackets Part No. LH43DCJPLGA/KR FOB: Destination
0006 5 Each 29" Ultra Wide Signage Monitor, bracket
FFP
LG 29" Ultra Wide Signage Monitor, bracket included Part No. 29UM58
FOB: Destination
0007 1 Each Modular Matrix Switcher with RPU, comes
FFP
Extron Modular Matrix Switcher with RPU, comes with 1 XTP input board, with 3 HDMI Input Boards and 4 HDMI Output boards Part No. XTP CrossPoint 1600 FOB: Destination
0008 2 Each Three Input Switcher with Remote Power C
FFP
Extron, Three Input Switcher with Remote Power Capable Part No. XTP T USW 1034K FOB: Destination
0009 3 Each Four Output HDMI DA
FFP
Extron, Four Output HDMI DA Part No. DA4HD4K FOB: Destination
0010 2 Each XTP 4K Transmitter for HDMI
FFP
Extron, XTP 4K Transmitter for HDMI Part No. XTP T HWP 1014K FOB: Destination
0011 2 Each ICSLan IR/S Interface, 4 IR/S and 4 Inpu
FFP
AMX, ICSLan IR/S Interface, 4 IR/S and 4 Inputs Part No. FG2100-23 FOB: Destination
0012 2 Each Signage Player
FFP
BrightSign, Signage Player Part No. HD223 FOB: Destination
0013 26 Each Flush-Mount Microphone with LED Ring
FFP
Audio Technica, Flush-Mount Microphone with LED Ring Part No. AT8656/LED FOB: Destination
0014 26 Each Condenser Gooseneck Microphone, 7.77" lo
FFP
Audio Technica, Condenser Gooseneck Microphone, 7.77" long Part No. ES-935H6 FOB: Destination
0015 3 Each Stand Mics, include Mic stand
FFP
Shure Stand Mics, include Mic stand Part No. SM-58SK FOB: Destination
0016 8 Each Microflex Low Profile Boundary Microphon
FFP
Shure Microflex Low Profile Boundary Microphone for Ceiling Part No. MX-395W/C-LED FOB: Destination
0017 1 Each Digital Matrix Audio Processor, 16 in, 1
FFP
Lectrosonics, Digital Matrix Audio Processor, 16 in, 12 out Part No. SPN1612 FOB: Destination
0018 1 Each 32 Channel ASPEN input only expansion
FFP
Lectrosonics 32 Channel ASPEN input only expansion Part No. SPN32i FOB: Destination
0019 1 Each 8-Channel 70V Power Amplifier
FFP
QSC Audio Products, 8-Channel 70V Power Amplifier Part No. CX108V FOB: Destination
0020 1 Each Sound masking generato consisting of con
FFP
SoundWorks, Sound masking generator consisting of controller and emitters Part No. ST1000 FOB: Destination
0021 2 Each Ceiling Speakers
FFP
Harman, Ceiling Speakers Part No. Control 14C/T FOB: Destination
0022 1 Each HDTV tuner
FFP
Contemporary Research, HDTV tuner Part No. 232-ATSC-4 FOB: Destination
0023 1 Each New Partition for 98" and 65" monitors
FFP
New Partition for 98" and 65" monitors FOB: Destination
0024 1 Job Installation and Labor
FFP
Installation and Labor, Cables/Connectors, Programing, Mouting Hardware FOB: Destination
SOW
OHR CONFERENCE ROOM
STATEMENT OF WORK
CUSTOMER ORGANIZATION: USFK SJS
INTRODUCTION/BACKGROUND
Installation of multi-classification VTC suites in three USFK conference rooms in the Vessey Bldg USAG-Humphreys. The VTC System must be able to switch all three network classifications NIPR, CENTRIXS-K and SIPR via AMX touch panel or similar system. The system must be able to display standalone PowerPoint briefs on all three network classifications.
All newly installed equipment must be interoperable with existing system and equipment. Either
Ohr or Kim conference room must remain fully operational during entire installation period for ongoing activities.
Note: 1. The vendor must conduct site survey and provide plan of work, schematic drawings and any necessary documents for customers review.
2. The vendor can modify the equipment list to meet the customer’s requirements.
3. All of the VTC software programs, login information and passwords will be property of the USFK and must be turned over to the USFK SJS. The installed programs must be able to be open, modify, and reload by the customer.
4. The vendor is responsible for capability and operability of the newly installed and existing system
5. The vendor must provide minimum of one year warranty of work and equipment with the ability to provide on-site support within 24 hours with no additional cost.
6. The service contract requires customer’s technical review before it can be awarded
1. OHR CONF. ROOM (CR)
The VTC system will be installed in a 60+ person conference room. Install three classification VTC systems with the ability to display on two 98”, four 85”, two 65”, two 43”, and two 32” displays. The System must be able to display PowerPoint briefs on all three classifications.
Installation of the system consist of mounting new and existing display units to a partition wall, VTUs, control and signage. The vendor is required to install the partition wall that can support the display units. Newly installed system must be interoperable with existing system that is currently installed in the conference room. All cabling and configuration will be provided by the vendor and covered under installation cost.
● All cabling in the conference room will be concealed.
● All equipment MUST be UL tested
● All equipment must run on 120VAC
○ No up converted power transformers are allowed.
HARDWARE:
• 2ea Cisco SX80: 1ea-existing device, 1ea-new device with encryption and multisite software. Device must be TAA compliance.
• Cisco Touch 10: Existing device
• 3ea VoIP phone: 1ea-existing phone. 2ea- new phones. Requesting spider type of phones for conference room support. Device must be TAA compliance
• 2ea Media converter: New. Device must be TAA compliance.
• Secure switch: Existing device. It will use for CENTRIXS-K and NIPR VTC switching
• 2ea 98” display: Existing display. Move from Kim room
• 4ea 85” display: New
• 2ea 65” display: Existing display. Move from SJS conference room
• 2ea 43” display: New
• 2ea 32” display: Existing display. Move from Kim room to A/V room
• Confidence camera for A/V room: New
• HDMI matrix: New. Equivalent to Extron matrix.
• AMX controller: Reuse existing AMX controller with new expansion card
• 2ea AMX touch panel: Existing device, 1ea-new device
• Audio Mixer – New. No less than 40 inputs
• Amplifier: New
• Microphone: New and existing microphones
• Sound masking generator with emitters: New
• 2ea Camera: Existing cameras
• 2ea playback speakers: Existing speakers
• Ceiling speakers: 2pr New and existing speakers
• PDU (Power distribution unit): Existing PDU
• 16ea executive conference table for 26 seats: Will be provided by furniture vendor. Need to coordinate with furniture vendor to meet customer’s requirement (microphone hole size, cable tray, etc)
• 36u rack: New. Size can be determined on site survey
• CATV: New
• 5ea 29” Wide signage monitor: New
• 2ea Signage player: New
• Time zone clock: New. Model can be decided at the site survey
• Credenza: New. Will be provided by furniture vendor. Need to mount two 43” display for
Commander’s table.
• 8 Floor box: New. Quantity can be determined on site survey
• Requires new façade/mounting structure to mount two 98” and two 65” displays in the front of the conference room with one camera mounted
Note:
1) All racked systems will have their Serial Numbers printed and attached to the front visible edge.
2) Final equipment list will be provide to customer with serial numbers. All of the equipment must meet or exceed the specifications that the customer provided.
WORK REQUIREMENTS
VTC System Two VTC systems will be deployed with the briefing system. One will be existing and other system will be newly purchase with encryption and multisite license. System should also be capable of sharing slides through VTC connection without any audio issue on all 3 network classifications. System requires only one camera connection to conduct all three classification.
VTC system should be able to host a conference with 5 participant sites. Only one Codec will have power on at a time. A PDU will control power on and off of the Codec. These VTU system will comply with DISA APL, and be JITC approved.
Displays Display consists of two 98”, four 85”, two 65”, two 43”, two 32” display. New displays will have a minimum resolution of 1920x1080. The system will have enough computer/video HDMI inputs available for display. System will not have or disable wifi/Bluetooth network capabilities.
All displays should able to display separate input from Matrix (no daisy chain).
• 2ea 98” display will be relocate from Kim room to Ohr room. Displays will be mounted in the front of the conference room
• 4ea 85” display will be purchased by vendor. Displays will be mounted on the side wall of the conference room.
• 2ea 65” display will be relocate from SJS room to Ohr room. Displays will be mounted underneath the 98” display in front of the conference room
• 2ea 43” display will be purchased by vendor. Display will be mounted on the credenza by Commander’s desk.
• 2ea 32” display will relocate from Kim room. Display will be installed in the A/V room
Note: All newly purchased monitors should be acquired from the local economy for future maintenance service
Signage
• New 5ea 29” ultra-wide signage monitors
• New 2ea signage player. Device should able to display messages (scheduling, classification, etc). Requires to change message using by laptop connection
Audio Two sets of playback and ceiling speakers will be available.
● Requires sound reinforcement.
● New 2pr of ceiling speakers need to be added to the existing speaker system
● Audio system requires zoning configuration in order to manage echo and noise cancellation.
● Audio will follow video for main display. Audio sources would include
○ VTC
○ Computers in the conference room and A/V room
○ CATV
○ In room microphones
Microphones 26ea Condenser Gooseneck, 7ea ceiling, 2ea podium, 3ea stand and 1ea A/V room microphones will be used in this installation. These microphones will have a lighted push to talk function. All microphones and ceiling speakers must be configured for zoning in order to manage echo and noise cancellation. The ceiling microphones must be able to manage by the controller from the AV control room and podium. All microphones will connect to separate input on the audio mixer (no daisy chain)
● New 26ea 7.77” Condenser gooseneck microphone will be mounted to the table. One additional microphone will be purchase for maintenance purpose.
● New 8ea Ceiling microphone for conference room audience with status indicator
● Reuse 2ea 12” Gooseneck MX412 for podium: Custom made floor panel required for connection
● New 3ea stand microphone: Location can be determined at site survey. Custom made floor panel required for connection
● Reuse 1ea 12” Gooseneck MX412 for A/V room
Cameras
● 2ea existing cameras will be available, in the front and rear of the room with speaker tracking
● Both cameras will be routed separately
● New camera will be installed to monitor the entire conference room and will be displayed in the A/V room. With the option to be disabled.
AMX control system An existing AMX Enova controller with new expansion card will be designed to support this system. It will have at a minimum the following capabilities. It is expected that the majority of programing will be done off site and only modifications will be done onsite.
● System power On/Off
● Source select
● Volume up/down
● CODEC control
● Two 10” AMX touch panels will be installed. Both touch panels must have mirror image
(if changes are made on one touch panel, the other must reflect the same changes)
○ One at the head table: Existing touch panel
○ One at the A/V room: Existing touch panel
All programing will be the property of the USFK and must be turned over to the USFK SJS. Any login information and passwords must also be turned over to USFK SJS.
Programming must be able to be opened, modified, and reloaded by customer.
Rack
● Rack for equipment will be located in the A/V room
● Require fan installation for cooling equipment in rack
● Noise from equipment and fans must be silent
● All cables will be installed neatly and properly labeled
● Size of rack can be determined based on equipment list
Networks
● SIPR and CENTRIXS-K networks have switches in the side of room.
○ Fiber extensions to the rack will be needed.
○ All network connections coming into the rack must be fiber.
POWER REQUIREMENTS:
• Display
○ Single Screen 120w typical
○ Integrated Matrix control system: 100 Watts typical
○ VTU w/Camera: 40 watts typical
Note: If power or air conditioning upgrades are needed, it is incumbent on the vendor to request support from the local Department of Power and Water (DPW)
PERIOD OF PERFORMANCE
Vendor will be prepared to deploy system within 30 work days from date of award. Actual installation date will be arranged based off of facility availability.
PLACE OF PERFORMANCE
Korea, Gyeonggi Do, Camp Humphrey, USFK HQ building 12410, Rm 426.08
Contractor’s Responsibilities.
The vendor will be responsible for performing tasks throughout various stages of this project.
The following is a list of these tasks which will result in the successful completion of this project:
Kickoff:
● Vendor will create and present project plan including schedule, testing plan, implementation plan.
● Vendor will present project plan to USFK SJS for review and approval
Design Phase:
● Work with USFK SJS on any modifications to requirements.
● Modify design based on collected requirements.
Implementation Phase:
● Vendor will implement system in accordance with implementation plan provided to
USFK SJS
Testing Phase:
● Vendor will provide familiarization training and standard operating procedures.
Project Handoff/Closure:
● Vendor will provide USFK SJS with all documentation in accordance with the approved project plan
● Vendor will provide all system programming/coding and any system login and password information.
● Vendor and USFK SJS project lead will develop a punch list of any deficiencies.
● Vendor will fix any deficiencies and inspect with USFK SJS project lead.
SCHEDULE/MILESTONES
The below list consists of the initial milestones identified for the USFK Cuddy room:
Implementation Start Date NLT 30 days from award* Estimated Installation Complete Date 15 working days from installation start date Testing Complete Last day of installation Project Completion Review Last day of installation
*Actual installation dates will be agreed upon between vendor and customer. Equipment must be available for installation no later than 30 workdays from award.
MANPOWER ESTIMATE
All manpower will be provided by the vendor.
Oversight manpower will be provided by USFK SJS.
The vendor must provide the number of personnel, and vehicles that will require access to the site on each day of the installation.
Vendor is required to provide:
● Vehicle registration
● Insurance
● Driver license for the driver of each vehicle that requires access to site.
● Korean ID or Driver's license for each employee requires access to site.
ACCEPTANCE CRITERIA
Testing will be conducted at a minimum of the following capabilities.
● Power On/Off
● Control of display
○ Main display
○ Side display
● Control of audio selection
○ Local computer
○ VTC
○ CATV
○ Sound reinforcement
● Control of audio volume
○ Local computer
○ VTC
○ CATV
● Source selection
○ Local computers
● AMX touch panels
● Control of VTC
REQUIRED CONTRACTOR PROVIDED ARTIFACTS
● As built drawings
● Any logins and or passwords
● Any programing information
● All component operation manuals
● Standard operating procedures
● List of installed equipment with serial number
● Warranty information
OTHER REQUIREMENTS
● Serial number will be posted on front of equipment
● Work schedule must be flexible due to daily events
CONFIGURATION DATA AND DRAWINGS
As built drawings will be provided by vendor. Any drawings provided in this document are for general design guidance.
CLAUSES INCORPORATED BY REFERENCE
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-99 System for Award Management Registration (August 2012)
(DEVIATION)
AUG 2012
52.211-6 Brand Name or Equal AUG 1999 52.212-1 Instructions to Offerors--Commercial Items OCT 2018 52.212-3 Alt I Offeror Representations and Certifications--Commercial
Items (OCT 2018) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.212-5 (Dev) Contract Terms and Conditions Required to Implement
Statutes or Executive Orders--Commercial Items (Deviation 2018-O0021)
MAY 2019
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.237-2 Protection Of Government Buildings, Equipment, And Vegetation
APR 1984
52.247-34 F.O.B. Destination NOV 1991 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.211-7003 Item Unique Identification and Valuation MAR 2016 252.225-7041 Correspondence in English JUN 1997 252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.233-7001 Choice of Law (Overseas) JUN 1997 252.243-7001 Pricing Of Contract Modifications DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019) ALTERNATE I (MAR 2015)
As prescribed in 22.1705(a)(2), substitute the following paragraph in place of paragraph (c)(1)(i) of the basic clause:
(i)
(A) The United States Government's policy prohibiting trafficking in persons described in paragraph (b) of this clause; and
(B) The following directive(s) or notice(s) applicable to employees performing work at the contract place(s) of performance as indicated below:
Document Title: USFK Regulation 190-2 Document may be obtained from:
http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/UploadedFile/USFK/USFK_Reg_190-2_Off- Limits_Areas_and_Establishments.pdf
Document Title: USFK Command Policy Letter #12 Document may be obtained from:
http://www.usfk.mil/usfk/Uploads/140/USFK%20CPL12.pdf
Applies to Performance in/at: Republic of Korea
(End of clause)
52.237-1 SITE VISIT (APR 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/UploadedFile/USFK/USFK_Reg_190-2_Off-Limits_Areas_and_Establishments.pdf http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/UploadedFile/USFK/USFK_Reg_190-2_Off-Limits_Areas_and_Establishments.pdf http://www.usfk.mil/usfk/Uploads/140/USFK%20CPL12.pdf that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vmfara.htm http://farsite.hill.af.mil/vmdfara.htm
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vmfara.htm
252.209-7999 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law
REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILTIY
OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-00004) (JAN 2012)
(a) In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012, (Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that-
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or http://farsite.hill.af.mil/vmfara.htm http://farsite.hill.af.mil/vmdfara.htm http://farsite.hill.af.mil/vmfara.htm debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that –
(1) It is ( ) is not ( ) a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with authority responsible for collecting the tax liability,
(2) It is ( ) is not ( ) a corporation that was convicted of a felony criminal violation under a federal law within the preceding 24 months.
252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS
OUTSIDE THE UNITED STATES (JUN 2015)
(a) Definition. United States, as used in this clause, means, the 50 States, the District of Columbia, and outlying areas.
(b) Except as provided in paragraph (c) of this clause, the Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall--
(1) Affiliate with the Overseas Security Advisory Council, if the Contractor or subcontractor is a U.S. entity;
(2) Ensure that Contractor and subcontractor personnel who are U.S. nationals and are in-country on a non-transitory basis, register with the U.S. Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality;
(3) Provide, to Contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States; and
(4) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel.
(c) The requirements of this clause do not apply to any subcontractor that is--
(1) A foreign government;
(2) A representative of a foreign government; or
(3) A foreign corporation wholly owned by a foreign government.
(d) Information and guidance pertaining to DoD antiterrorism/force protection can be obtained from HQDA-AT; telephone, DSN 222-9832 or commercial (703) 692-9832.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
https://www.sam.gov/ https://wawf.eb.mil/
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC W56GBU Issue By DoDAAC W91QVN Admin DoDAAC** W91QVN Inspect By DoDAAC W56P0F Ship To Code W56P0F Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) W56P0F Service Acceptor (DoDAAC) W56P0F Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS
(a) SUBCONTRACTING:
If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.
(b) AFFILIATED OFFERORS:
(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.
(2) Each offeror shall furnish, below, the following information:
(i) Whether the offeror has any affiliates;
(ii) The names and addresses of all affiliates of the offeror; and
(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.
AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)
(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):
Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.
(d) STANDARDS OF CONDUCT CERTIFICATION:
This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.
(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________
(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________
(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________
Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________
Title _____________________________________________________ Date of Execution ____________________________________________
(e) TAXES:
(1) References:
(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."
(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.
(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.
(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.
(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
This item will be imported specifically for this contract? Yes _____ No _____
(ii) Special Excise Tax:
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
Name of item manufacturer
(iii) Value Added Tax (VAT):
Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____
(iv) Special Excise (Petroleum) Tax:
No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________
(v) Education Tax.
(3) Name of the oil company from which POL products will be purchased:
Oil Company: _________________________________________ (Name only)
(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.
Signed (Chop)
(f) CERTIFICATIONS AND REPRESENTATIONS
By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.
The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.
5152.229-4012 TAX EXEMPTION, CUSTOMS, REPUBLIC OF KOREA
(a) EXEMPTION: This clause is in implementation of Article IX of the Status of Forces Agreement between the Republic of Korea and the United States of America granting contractors exemption from Republic of Korea customs duties and other such charges. At the time this contract is awarded, the Contractor shall certify to the Contracting Officer that all materials, supplies, and equipment to be imported for the contract have been proposed to the Government exclusive of customs duties and other such charges and; further, that the contract price includes no customs duty whatsoever. It shall indicate to the Contracting Officer the total amount of customs duties excluded from the contract price. The USFK Contracting Officer will verify the amount of customs duty that would otherwise be applicable to the contract and will issue USFK Form(s) 75 to the Contractor. The contractor will submit the original USFK Form 75 to the governing ROK Customs Office at the time of import declaration. The Chief of the Customs Office will review the USFK Form 75 and will exempt the Contractor from customs duties and other such charges. During the review process the customs office will post on the Contractor's Import Permit the anticipated submission date for a completed USFK Form 76, which will be prepared by the Contracting Officer and given to the contractor immediately after contract performance. The Contractor will submit the original USFK Form 76 to the governing ROK Customs Office no later than the date posted on the Import Permit. If the USFK Form 76 is not submitted by the anticipated date, the ROK Customs Office will immediately collect the customs duties and other such charges previously exempted.
(b) If for any reason the Contractor has paid customs duties on materials, supplies, or equipment prior to award of this contract and desires to use such materials, supplies, or equipment for performance of this contract, the Contractor must exclude such duties from the contract price and may obtain refund of such previously paid duties by submitting a completed USFK Form 76 to the governing ROK Customs Office.
(c) Refund: Any Contractor that requires refund of customs duties and other such charges on items used for USFK contracts, can claim refund of such charges by submitting a copy of a completed USFK Form 76 to the governing ROK Customs Office
(d) This entire clause is inapplicable to contracts, or any portions of contracts, funded by the Republic of Korea.
5152.229-4013 TAX EXEMPTION, SPECIAL EXCISE TAX, REPUBLIC OF KOREA
This clause is in implementation of Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States, granting Contractors exemption from Republic of Korea Special Excise Taxes. At the time this contract is awarded the Contractor shall indicate to the Contracting Officer which items will be purchased for the contract that are subject to Special Excise Tax. It shall indicate the name of the item, the number of units to be purchased, the cost per unit without tax, the percentage of tax, the tax amount per unit, the total tax, and the manufacturer of the item. The Contracting Officer will verify the reasonableness of the quantities claimed and ensure that the Contractor has certified that the contract price excludes Special Excise Tax on those items subject to the tax. The contractor shall purchase the special-excise-taxed items from the manufacturer, tax-inclusive. For construction and single-delivery type supply and service contracts, the contractor shall employ the following procedure: At the time it purchases the items it shall present the manufacturer with a notification letter requesting refund of the Special Excise Tax. (Copies of this letter can be obtained from the 411th CSB, Korea Contracting Officer.) The manufacturer will endorse the letter to the manufacturer's District Tax Office which will make refund to the manufacturer. The manufacturer will make subsequent refund to the Contractor. Requests for refund under requirements-type contracts will be submitted monthly and will be accompanied by copies of the USFK delivery orders issue
5152.229-4014 TAX EXEMPTION, VALUE ADDED TAX, REPUBLIC OF KOREA
This clause implements Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States of America, which exempts contractors from paying the Republic of Korea Value-Added Taxes.
When the contractor submits an offer, it shall certify to the Contracting Officer that all the costs in the offer will be exclusive of any Value-Added Tax; and further, that the proposed contract price includes no Value-Added Tax. The contractor shall also indicate the amount and type of Value-Added Taxes excluded from the contract price. If supplies and/or services which the contractor purchases for this contract include Value-Added Taxes, it can obtain a full refund for the amount of the Value-Added Tax by submitting to the ROK District Tax Office tax invoices which the contractor receives when it purchases materials and/or services for this contract. The contractor must submit a copy of the USFK contract with its first tax invoice submission. Subsequent tax invoice submissions must be accompanied by a letter which references the USFK contract submitted with the first tax invoice submission.
5152.229-4015 TAX EXEMPTION, POL PRODUCTS, REPUBLIC OF KOREA
(a) This clause is in implementation of Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States of America, granting Contractors exemption from Republic of Korea taxes for petroleum products (POL) utilized on USFK acquisitions in the Republic of Korea. At the time this contract is awarded, the Contractor shall make a final nomination in writing of its point of purchase for POL products to be used on this contract. If the Contractor intends to purchase directly from an oil company refinery, it may nominate any of the three ROK oil companies below which have agreed to sell to Contractor FOB refinery at the SET-exempt price.
List of Oil Companies and their Respective Tax Offices
(1) Hyundai Oil Refinery Co., Ltd.: Dong-Inchon District Tax Office ATTN: POL Tax Administrator Inchon City, Korea
(2) SK Corporation: Ulsan District Tax Office ATTN: POL Tax Administrator Ulsan City, Kyongsan Nam Do, Korea
(3) LG Caltex Company: Yosu District Tax Office ATTN: POL Tax Administrator Yosu City, Chonla Nam Do, Korea
(b) If the contractor instead intends to purchase its POL products from an individual gasoline station, the Contracting Officer will advise the contractor as to which individual gasoline stations will sell to it at the SET-exempt price. The contractor shall specify from which of those stations it will purchase. In addition to specifying the oil company/gas station, the Contractor shall state the estimated quantity and the amount of POL to be purchased from each refinery/gas station. The USFK Contracting Officer will verify the reasonableness of the amounts of POL products claimed for use on the contract and, based on this verification, the USFK Responsible Officer will issue USFK POL Tax Exemption Coupons. If the Contractor wishes to purchase from an individual gas station, it will be required to make advance payment for the amount of POL covered by the coupons. Advance payment will be at the SET-exempt price and will be made to the gas station(s) previously nominated. Representatives from the nominated gas station(s) shall be present at the issuing session. They will collect the advance payments, mark “paid” on the back of the original copy of the coupons issued, and provide the purchasing Contractor with tax invoices to be used by the Contractor to obtain SET refund from its governing ROK District Tax Office. All coupons for construction contracts will be issued at the time of award. Coupons for requirements-type contracts will be issued on a delivery order increment basis or on a monthly basis. Pre-selected oil company refineries will sell their POL products at the SET-exempted prices upon presentation of the coupons. Individual gas stations, which have previously collected POL payment in advance will accept the pre-paid USFK POL Tax Exemption Coupons from contractors and will provide the POL amounts reflected on tendered coupons without any further charge.
5152.233-4703 AMC-LEVEL PROTEST PROGRAM
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. If you want to file a protest under the AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below. All other agency-level protests should be sent to the contracting officer for resolution.
Headquarters U.S. Army Materiel Command Office of Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Facsimile number (256)450-8840
The AMC-Ievel protest procedures are found at:
http://www.amc.army.mil/pa/COMMANDCOUNSEL.asp
If Internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.
(End of Provision)
INSTRUCTION TO OFFERORS
ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S)
1. Quotations shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to hyonchon.pak1.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to ONLY FBO server problem not individual failure/problem.
2. All questions shall be emailed to hyonchon.pak1.ln@mail.mil within five (5) days after the solicitation is issued.
The electronic bid shall be submitted by the closing date and time of the solicitation. Partial quotation will not be http://www.amc.army.mil/pa/COMMANDCOUNSEL.asp http://www.fbo.gov/) mailto:%20hyonchon.pak1.ln@mail.mil mailto:%20hyonchon.pak1.ln@mail.mil acceptable.
3. The offeror’s quotation shall be a complete proposal with detailed specification for the proposed each items, even if the offeror proposed the same item. Offeror(s) who fail to submit all of the specified information will not be considered for award.
The offeror(s) shall submit the following requirements IAW Para 1 above.
a. Factor A. Technical Proposal (Brand Name or Equal): The offeror shall provide the specified salient characteristics of each item. "Brand name or equal " products must meet, or exceed, the salient physical, functional, or performance characteristics of the part numbers specified in the solicitation.
b. Factor B. Price: The offeror shall submit complete price
4. Site Visit is scheduled to be held on 27 August 2019, 1430 hours
Note: Participants who don’t have base access will meet at Dongchang-ri Gate by 1400.
For escort, please contract Mr. Pak, Sok W (Jay) at 0503-355-4315 (DSN: 755-4315) in advance.
5. DELIVERY AND INSTALLATION LEAD TIME: Delivery shall be made within 30 calendar days after receipt of order to the designated place. The estimated installation shall be made within 15 calendar days after completion of system delivery.
6. FOB Destination.
7. Award shall be made based on all or none basis.
8. In accordance with FAR 25.1002, solicitations for contracts to be entered into and performed in Korea, to ensure a fair evaluation of offers,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.