W91QVN19R0242_DRAWING_Pg10-11.pdf
PDF 423 KB Posted
- Attached to
- Repair Concrete Pavement, Suwon AB
- Solicitation number
- W91QVN19R0242
About this file
Drawing Page10-11
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EN
TIR
ELY EPO
XY C
O
ATED
D O
W
EL BAR
C om pact the top 150 m m of base course to 100% and the bottom 100 m m to 95% of ASTM D
1557 m axim um density.
C om pact the top 150 m m of base course to 100% and the bottom 100 m m to 95% of ASTM D
1557 m axim um density.
| Page 1 |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| Page 8 |
| Page 9 |
| Page 10 |
| Page 11 |
| Page 12 |
| Page 13 |
| Page 14 (C-13, M201)-1 |
| Page 15 |
| Page 16 |
| Page 17 |
| Page 18 |
File details come from the government source that posted it.