Appendix_A_thru_E.DOCX
DOCX document 25 KB Posted
- Attached to
- Septic Services
- Solicitation number
- W91QVN-19-R-0090
About this file
DRAFT Appendices
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft_W91QVN-19-R-0090.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Remove, Clean and Dispose of Portable Latrines, Grease Traps, Septic Tanks and Lift Stations for Osan Air Base
APPENDIX A
ESTIMATED CONTRACT WORKLOAD DATA
ITEM
NAME
ESTIMATED QUANTITY
| 1 |
| Clean and maintain septic tanks |
| 13 |
| Each |
| 2 |
| Clean and maintain grease traps |
| 16 |
| Each |
| 3 |
| Clean and maintain portable toilets |
| 33 |
| Each |
| 4 |
| Dispose of human waste |
| 2,422,300 |
| Liters |
| 5 |
| Dispose of waste grease |
| 423,600 |
| Liters |
| 6 |
| Clean and Dispose of sludge and sand from lift station |
| 134 |
| Cubic Meter |
APPENDIX B
PORTABLE TOILET ESTIMATED WORKLOAD DATA
Facility Number Capacity in Liters Max. Capacity Allowed
Base Wide 250,000 70%
APPENDIX C
GREASE TRAP ESTIMATED WORKLOAD DATA
| Facility Number | Capacity in Liters | Max. Capacity Allowed | ||||||
| 461 | 10,000 | 90% | ||||||
| 473 | 2,000 | 90% | ||||||
| 507 | 2,500 | 90% | ||||||
| 733 | 6,000 | 90% | ||||||
| 767 | 4,000 | 90% | ||||||
| 775 | 1,000 | 90% | ||||||
| 828 | 300 | 90% | ||||||
| 917 | 2,000 | 90% | ||||||
| 924 | 1,000 | 90% | ||||||
| 965 | 6,000 | 90% | ||||||
| 975 | 1,200 | 90% | ||||||
| 1313 (inside) | 500 | 90% | ||||||
| 1313 (outside) | 4,500 | 90% | ||||||
| 1470 | 6,500 | 90% | ||||||
| 1741 | 2,000 | 90% | ||||||
| 1774 | 500 | 90% | ||||||
| See note below | 5,000 | 90% | ||||||
| Total | 55,000 |
APPENDIX D
SEPTIC TANK ESTIMATED WORKLOAD DATA
Facility Number Capacity in Liters Max. Capacity Allowed 123 3,000 90%
| 133 | 13,000 | 90% | ||
| 163 | 9,000 | 90% | ||
| 173 | 23,000 | 90% | ||
| 351 | 9,000 | 90% | ||
| 358 | 4,000 | 90% |
504 5,000 90% 910 2,000 90% 1501 7,500 90% 1696 10,000 90% 1789 10,000 90% 2118 7,000 90%
| 2678 (35th ADA) | 5,000 | 90% | ||
| See note below: 5,000 | 90% | |||
| Total | 112,500 |
Note: Contractor shall be required to service those septic tanks not yet identified as requiring service. Contractor shall notify the COR in the event a septic tank not yet identified requires servicing more than 3 times during any month. The COR will initiate a modification to include this requirement on the normal schedule. This may be because of construction, disconnection, etc. Capacity is estimated from historical data.
APPENDIX E
LIFT STATION ESTIMATED WORKLOAD DATA
Facility Number Cubic Meters Max. Capacity Allowed 420 8 As need
| 432 | 3 | As need | ||
| 436 | 3 | As need | ||
| 659 | 1 | As need | ||
| 814 | 1 | As need | ||
| 824 | 12 | As need | ||
| 839 | 1 | As need | ||
| 842 | 1 | As need | ||
| 876 | 4 | As need | ||
| 1130 | 1 | As need | ||
| 1160 | 1 | As need | ||
| 1180 | 1 | As need | ||
| 1215 | 7 | As need |
1232 5 As need
| 1356 | 2 | As need | |
| 1706 | 22 | As need | |
| 1715 | 1 As need |
1715 Sludge Tank 39 As need 1819 9 As need 2427 4 As need 2435 7 As need
| 2437 | 1 | As need |
| Total | 134 |
APPENDIX
Page 1 of 4+
File details come from the government source that posted it.