A21_W91QVN18R0260_Amendment_01.pdf
PDF 183 KB Posted
- Attached to
- Repair Gym & Swiming Pool, Bldg# 151 & 158, K-16
- Solicitation number
- W91QVN18R0260
About this file
Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H1-Revised_Drawing_for_AMENDMENT.PDF | ||
| H1_188985_REPR-GYM-FAC-INDR-POOL-K16-158-151_DWG.PDF | ||
| A21_W91QVN18R0260_RFP.pdf | ||
| A22_Submittal_Register.XLSX | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QVN18R0260
411TH CSB, KOREA - CONST & SUPPLY TEAM
POC: SON, U KAP
TEL: 0503-355-3387/315-755-3387
UKAP.SON1.LN@MAIL.MIL
APO AP 96271
UNITED STATES
0011226289 188985
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise SOW & Draw ing and extend closing date to 17 Sep 18, 1500 hrs (KST).
See revised SOW and Draw ing.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN18R0260
X 9B. DATED (SEE ITEM 11)
01-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2018
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
CONSTRUCTION & SUPPLY DIV, UNIT #15289
APO AP 96271
UNITED STATES
W91QVN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W91QVN
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Sep-2018 03:00 PM to 17-Sep-2018 03:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
PWO TITLE LOCATION
188985 Repair Deteriorated Gymnasium Facility and Indoor Swimming Pool, BLDG S-158 & 151.
K-16
1. DESCRIPTION: Contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.
2. PERFORMANCE PERIOD: The contractor shall complete this project within 150 days after NTP is issued.
3. PRINCIPAL FEATURES: This project includes, but will not be limited to, the following principal features:
A. Repair and Maintenance ("K" work)
1) Architecture (Bldg 158):
a) Replace existing deteriorated ceiling systems with new GWB. ceiling and ACST. ceiling including ceiling suspension system as shown on drawing, A-2 ~ A-4.
b) Replace existing CMU. Wall and GWB. wall linings with new as shown on drawing, A-1 ~ A-3.
c) Replace existing deteriorated floor surfaces with new as shown drawing, A-3 ~ A-4.
d) Replace existing issue counter and windows with new including stainless steel roll-up counter door as shown on drawing, A-9.
e) Replace existing doors and frames with new including hardware as shown on drawing, A-7.
f) Replace existing deteriorated gymnasium main window operating system with new.
g) Repair existing deteriorated toilet, locker and shower areas in accordance with new plan as shown on drawing, A-1 ~ A-7.
h) Replace existing deteriorated sauna systems with new at locker room areas as shown on drawing, A-4 ~ A-6.
i) Replace existing wall and floor surfaces with new at existing racquet ball court for building to functional training room as shown on drawing, A-3, A-4 & A-9.
j) Replace existing deteriorated concrete floor slab with new at room 114, 134 and 135.
k) Replace existing deteriorated kitchenette system with new at room 114 and 134 as shown on drawing, A-2, A-4 & A-5.
l) Replace existing deteriorated lockers with new at locker rooms, room 108 and 135 as shown on drawing, A-2 ~ A-6.
m) Replace existing shelves with new at supply room as shown on drawing, A-8.
n) Replace existing deteriorated diaper changing station with new at women latrine area.
o) Replace existing deteriorated divider curtain with new at gymnasium area as shown on drawing, A-2 & A-4.
p) Repair by installing metal canopy for gymnasium entrance as shown on drawing, A-2.
q) Replace existing deteriorated wooden window shade with new aluminum shade at roof top area as shown on drawing, A-8.
r) Repair by installing vending machine shed as shown on drawing, A-9.
s) Replace existing interior signages with new at every room entrance as shown on drawing, A-2 &
STD. DWG.
t) Replace existing chain-link fence & guard rails with new fixed tempered glass window including stainless steel frames at watching area, 2nd floor.
u) Replace existing fire extinguishers and cabinets with new as shown on drawing, A-2 & A-9.
v) Paint all interior surfaces.
w) Replace existing rain gutters and downspouts with new between main gymnasium roof and swimming pool roof.
x) Replace existing inside swimming pool surfaces with new tile as shown on drawing, A-10.
NOTE:
Remove all existing deteriorated/pear-off paints completely, using sand blast or other approved method.
Install swimming pool tile expansion joint to be located with the existing expansion joint.
Install signage as per existing location, submit shop drawing showing tile patterns, signage, red circle around bottom drainage inlet, and other marks for government approval before purchasing.
Raise up hand holes, drainage inlets and pipe holes to new title surface.
Replace metal accessories with new stainless steel products as shown on drawing.
Repair cracks in floor & wall surfaces before tile installation.
All existing inlets, drains and pipes within the grading limits shown shall be kept cleaned and free flowing. The contractor is required to maintain drainage during construction, including pumping and dewatering, as necessary.
All penetrations into the pool walls or bottom such as fittings and wall anchors shall be installed with a waterproof seal.
Tile shall be the product manufactured by compression press method for swimming pool only.
Tile installation company shall be certified by Korea Swimming Federation and shall have the construction record of first grade swimming pool.
Tile products and accessories shall be approved product by Korea Swimming Federation.
Tile Properties shall be as follows :
- Water absorption rate : 1.3 % or below
- Bending strength (KS L 1001) : Pool tile, 145 N/cm2 or above.
- Crack resistant as per KS l 1001.
- Abrasion resistance : 0.1 gram or below as per KS L 1001.
- Winter frozen resistant as per KS L 1001.
- Chemical resistant as per KS L 1001.
Tile products and accessories shall be approved product by Korea Swimming Federation.
Tile and material samples shall submit for government approval before installation.
2) Mechanical:
a) Remove deteriorated existing air handling unit, air cooled condensing unit, heating & ventilating unit, A/C outdoor & indoor units, finned tube radiators, roof exhaust fans, dampers, louvers, valves, ducts, pipes, insulations, diffusers, controllers, thermostats, control work, concrete pad and all associated accessories, for HVAC system (heating, ventilating and air conditioning system) as shown on drawings.
b) Repair deteriorated existing HVAC system by installing new air handling unit, air cooled condensing unit, electric wall heater, roof exhaust fans, dampers, valves, ducts, pipes, insulations, diffusers, controllers, thermostats, control work, concrete pad and all associated accessories, for HVAC system (heating, ventilating and air conditioning system) as shown on drawings.
c) Repair deteriorated existing HVAC system by installing new duct-free split heat pump units, energy recovery ventilators, controllers, CO2 sensor, diffusers, dampers, ducts, insulations, pipe lines, control work, concrete pad, and all associated accessories as shown on drawings, remote controller indicators and labels shall be in English.
d) Repair deteriorated ventilation system by installing roof exhaust fan, damper, duct, control work and all associated accessories as shown on drawings.
e) Perform DALT (Duct Air Leakage Test) and T.A.B (Testing, Adjusting, and Balancing) after construction to verify if the HVAC system works properly.
f) Remove deteriorated existing domestic hot water heater, domestic cold and hot water piping system, sewer and vent piping system including plumbing fixtures, electric water coolers, and all associated accessories, for plumbing system as shown on drawings.
g) Repair deteriorated existing plumbing system by installing domestic hot water heater, domestic cold and hot water piping system, sewer and vent piping system including plumbing fixtures, electric water coolers, and all associated accessories as shown on drawings.
h) Replace existing sprinkler heads, and all associated accessories where the ceiling is replaced.
i) Replace deteriorated existing swimming pool heater and sand filters, control work related to equipment replacement, and all associated accessories as shown on drawings. (Pump room)
NOTE:
Control work must be performed by the Johnson Controls Inc. (JCI), and all control work should be connected with the existing system, prior to replacing existing H.V.A.C system as shown on the drawing. MATOC contractor shall verify existing condition, and coordinate with JCI and K- 16 DPW. DDC Control system were installed and operated by JCI under Energy Savings Performance Contract (ESPC) and are JCI’s properties. Contractor shall perform the contractual work with JCI’s service team for replace and re-recommissioning of control work. Contact information of JCI is 02-2027-4006 / www. Johnsoncontrols.kr
All ductwork sizes are shown as inside clear. Add appropriate dimensions for insulation or duct liner to obtain “total duct size”.
Provide concealed damper regulators for all volume dampers over inaccessible ceilings and soffits.
Refer to architectural drawings for ceiling types.
Contractor to allow and provide for metal duct work transitions between all equipment and duct connections.
All equipment connections to ductwork shall have a min. of 100mm of reinforced canvas flexible ductwork for vibration isolation.
Provide diffusers and grille frames compatible with architectural ceiling types. Refer to architectural drawings for ceiling types.
Coordinate exact locations of all room thermostats and/or room temperature sensors with the design architect before final installation, mounting height shall be at 1.5m above finish floor.
All outside air intakes to HVAC systems that are designed to move air throughout the building shall be located at least 3 meters (10 feet) above the ground.
All wiring and conduit systems for HVAC controls shall be by mechanical/controls contractor.
The mechanical/controls contractor shall provide all the wirings, relays, controllers, conduits and all necessary accessories for HVAC controls.
Installation of the HVAC system shall be in compliance with manufacturer’s specification by a licensed or certified installer.
The contractor shall verify existing conditions for new work such as equipment & service clearance, equipment pad size, installation locations, and additional items
a) If the contractor is going to construction during the cooling/heating season. The contractor shall provide the temporary cooling or heating system to the entire building.
3) Electrical:
a) Replace deteriorated existing lighting fixtures (LED), toggle switches, wires and conduits with new. (E-2)
b) Replace existing panelboard, receptacles with cover plates, associated wiring & conduit with new.
(E-4, E-7)
c) Relocate existing fire alarm system including mass notification system shown on drawings. (E-5)
d) Replace deteriorated existing safety switches, motor starters, manual motor starters, manual motor starters, junction boxes, control system, wires and conduits for mechanical system with new. (E-6, E-7)
e) Replace deteriorated existing lighting fixtures (LED vapor proof fixtures and underwater incandescent pool lights) with new. (E-8)
* LED types
NS-3: wall or ceiling surface mounted light emitting diode(LED) EXIT light fixture, 1PH, 120V, 4.99W(max input), battery back-up with battery charger, single face as required.
NS-4a & 4b: ceiling recessed mounted light emitting diode (LED) fixture, 1PH, 120V, 45W, with converter & accessories (NS-4a) & with EM unit (NS-4b) as required.
NS-5a & 5b: ceiling recessed mounted light emitting diode (LED) fixture, 1PH, 120V, 50W, with converter & accessories (NS-5a) & with EM unit (NS-5a) as required.
NS-6a & 6b: ceiling recessed mounted light emitting diode (LED) fixture, 1PH, 120V, 50W, with converter (dimming control) & accessories (NS-6a) & with EM unit (NS-6b) as required.
NS-3: wall surface mounted light emitting diode (LED) fixture, 1PH, 120v, 18W, with converter & accessories as required.
NS-8: wall mounted LED light fixtrure, 1PH, 120V, 22W, wet location type, with converter & accessories as required.
NS-9: ceiling surface mounted light emitting diode (LED) fixture, 1PH, 120V, 18W, with converter & accessories, wet location shower light trim, UL listed power unit as required.
NS-10a & 10b: ceiling recessed mounted light emitting diode (LED) fixture, 1PH, 120V, 25W, with converter & accessories (NS-10a) & with EM unit (NS-10b) as required.
NS-11: ceiling surface mounted LED light fixture outdoor type, 1PH, 120V, 22W w/converter & accessories as required.
NS-12a & NS-12b: ceiling surface/pendant mounted light emitting diode (LED) fixture, 1PH, 120V, 45W, UL listed, with converter and accessories (NS-12a) and EM unit (NS- 12b) as required.
NS-13: under cabinet LED light fixture 1PH, 120V, 18W, converter and accessories as required.
B. Construction/Alteration (“L” work)
1) Architectural
a) Construct 8,800 (W) x 12,000 (L) x 3,000 (H) storage facility with reinforced concrete foundations, concrete slab floor, CMU. walls, CMU. partition and steel truss roof including wooden sheathing and asphalt shingle roofing finish.
b) Install THK. 12.5mm waterproof type gypsum wall board ceiling including ceiling suspension system.
c) Install insulations under the bottom of the roof with fluted metal suspension system.
d) Install exterior insulation finish system on the exterior CMU. wall surfaces.
e) Install 2 (two) ea. double doors and frames including hardware.
f) Install stainless steel frame chemical storage shelf stands including plastic laminated wooden shelf at chemical storage area as shown on drawing, A-1 & 3.
g) Install metal rain gutters and downspouts including concrete splash blocks as shown on drawing, A-1.
h) Install warning sign and 2(two) building signs as shown on drawing, A-3 and standard detail drawings.
i) Install 1(one) EA. fire extinguishers and cabinets as shown on drawing, A-1.
j) Paint all required interior and exterior surfaces.
2) Mechanical:
a) Install heat pump system and associated piping including all necessary accessories.
b) Install wall ventilation system and associated ducts including all necessary accessories.
c) Install floor drain with the drain pipes including all necessary accessories.
d) Install chlorine gas detector & alert as indicated on the drawings.
e) Special Note: Duct system shall be made by stainless steel (STS-304) for chemical storage as indicated on the drawings.
3) Electrical:
a) Install lighting fixtures (LED), toggle switches, receptacles, wires and conduits with new.
b) Install power wires and conduits for mechanical equipment.
TECHNICAL PROVISIONS – II
TECHNICAL DETAIL SPECIFICATIONS
GENERAL: The specification sections listed below, but not limited to, are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, and Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the 411th CSB Web Page, http://www.usfk.mil/Resources/ContractingwithUSFK.aspx. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
STANDARD TECHNICAL SPECIFICATIONS FOR O&MA
PROJECT TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 03 – CONCRETE
03 20 00.00 10 CONCRETE REINFORCING
DIVISION 04 – MASONRY
04 20 00 MASONRY
DIVISION 05 – METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 14 STRUCTURAL METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 31 13 ASPHALT SHINGLES
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRRAMES
08 14 00 WOOD DOORS
08 33 13 METAL ROLLING COUNTER DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 87 16 FRAGMENT RETENTION FILM FOR GLASS
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 LATH
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALITIES
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
1. GENERAL: In addition to the requirements specified under "GENERAL PROVISIONS" for the Fixed Price Construction Contract for this project, the Contractor shall comply with the following "SPECIAL CONDITIONS" which form a part of the contract.
2. WORK HOURS: The work will be accomplished from 0730 hours through 1730 hours, from 1 October through 30 April and from 0730 hours through 1930 hours from 1 May through 30 September, Mondays through Saturdays, except for Korean Legal Holidays: Any proposed change in working hours should be approved by the Contracting Officer (KO) and Contracting Officer's Representative (COR).
The contractor will not be permitted any construction work during scheduled (15 days in March and 15 days in August) and unscheduled training/exercises. The contractor shall remove heavy equipment and field offices from CP Tango and K-16 training sites during the training/exercises periods.
3. WINTERIZATION: The contractor may be required to perform weather sensitive work during the winter season, which may cause additional costs to be incurred for the contractor. These additional costs are the contractor’s responsibility in the event you are required to work during the winter. Your responsibility regarding the preparation of the proposal is to reflect these additional costs in your proposal.
4. ESCORT PRIVILEGE: The contractor shall be responsible for requesting escorting privileges on base passes for Project Manager, Quality Control Manager, Safety Specialist and Foremen. The maximum number of escorted employee will be three persons and the number of escorted vehicle will be one. The contractor shall ensure that the escorting employee has full control of all escorted individuals at all times. Any individual found on the installation unescorted will be removed from the installation and the escort employee’s escorting privileges will be withdrawn. Any individual removed from this installation will not be authorized further access to this installation.
5. DISPOSAL OF CONSTRUCTION DEBRIS/WASTE MATERIALS: The Contractor shall be required to dispose all construction debris and waste materials in strict accordance with disposal requirements of Section 024100, Demolition and Deconstruction, and local laws and regulations at the Contractor’s responsibility and his own expense. The waste/unsalvageable materials shall be disposed at the location(s) approved and designated by the local authorities.
6. AT/FP TRAINING REQUIREMENTS OF CONTRACTOR:
a. AT Level 1 Training: All contractor employees, to include subcontractor employees, requiring access
Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 14 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 14 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
http://jko.jten.mil.
b. Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
d. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 14 calendar days after contract award.
e. OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
7. SUBMITTALS: The Contractor shall process submittals in accordance with Section 013300 – SUBMITTAL PROCEDURES. Specific submittal requirements are shown on attached document entitled, “SUBMITTAL REGISTER”, Enclosure 1.
8. CONSTRUCTION PHASING: Facility will be occupied while work is being performed and that work will be need to be conducted in two phases. As shown on the drawing (A-2), the first phase is the fitness center (Room #116, #116 A& #117) and this area shall be completed within 30 days. All other area shall be completed as second phase including swimming pool area. Contractor shall submit shop drawings indicating working zones and dates for review by Government. Contractor shall not start work until phasing plan is approved.
(End of Summary of Changes)