H1_191633_REP_BLDG-YSN-1380-1382-1396-1398_DWG_20180823.pdf
PDF 6 MB Posted
- Attached to
- Repair Building, Yongsan
- Solicitation number
- W91QVN-18-R-0251
About this file
Drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_for_W91QVN18R0251.pdf | ||
| H1_191633_REP_BLDG-YSN-1380-1382-1396-1398_SBMTL-RGTR-DRAFT.XLSX | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION STATUS
1 OF 1T - 1
DESCRIPTION OF DRAWINGS
TITLE SHEET
DESCRIPTION OF DRAWINGS REVISION STATUS
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
1:100 01 01
1 OF
2 OF
3 OF
4 OF
TITLE SHEET
A - 1
A - 2
A - 3
A - 4
YI, HS
191633
M - 1
M - 2
M - 3
M - 4
T-1
SCHEDULE OF DRAWINGS
NO.
RING
NO.
SHTEET
NO.
RING
NO.
REF.
NO.
DWG.
NO.
SHEET
NO.
REF.
NO.
DWG.
6 5 OF
E - 1
E - 2
E - 3
E - 4
MECHANICAL
M - 5
6 OF7
A - 5
A - 6
7 OF8 A - 7
8 OF9 A - 8
EXST./REMOVAL FLOOR PLAN(B#1380&1382)
NEW PROPOSED FLOOR PLAN(B#1380&1382)
11 OF
PWO. NO. 191633, YONGSAN
ENLARGED LATRINE LIGHTING PLAN(B#1380.1382)
LIGHTING PLAN(B#1380,1382)
BLDG. NO. S-1380,1382,1396 AND 1398
REPAIR BUILDING
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
GENERAL NOTES, SITE LOCATION PLAN AND SCOPE OF WORK
AND LAVATORY COUNTER DETAIL
LATRINE ENLARGED PLAN, TOILET ACCESSORIES SCHEDULE,
DOOR & WINDOW DESCRIPTIONS
SCOPE OF WORK AND GENERAL NOTE
LEGNED, GENERAL NOTES AND SCOPE OF WORK
LIGHTING PLAN (B#1398) AND LIGHTING FIXTURE DETAIL
1ST,2ND FLOOR LIGHTING PLAN (B#1396),
ARCHITECTURAL
ELECTRICAL
INTERIOR & EXTERIOR FINISH SCHEDULE
WALL SECTIONS AND SIGN DETAIL
A - 9
A - 10
9 OF
10 OF
FLOOR PLANS FOR B#1396
ENLARGED PLAN, TOILET ACCESSORIES SCHEDULE AND DETAIL
FLOOR PLAN FOR B#1398 AND ENLARGED FLOOR PLAN
E - 5
E - 6
B#1396 & B#1398 POWER PLAN
M - 6
M - 7
M - 8
M - 9
M - 10
12 OF
13 OF
14 OF
15 OF
16 OF
17 OF
18 OF
19 OF
20 OF
(B#1380 & 1382)
NEW ELECTRIC HEATER AND VENTILATION PLAN
21 OF
22 OF
23 OF
M - 11
M - 12
M - 13
24 OF
25 OF
26 OF
27 OF
28 OF
29 OF
29 B# 1396 (2ND FLOOR) POWER PLAN
(B#1380 & 1382)
NEW EQUIPMENT AND PLUMBING FIXTURE SCHEDULE
DOMESTIC HOT & COLD WATER PIPING PLAN (B#1380 & 1382)
NEW SEWER AND VENT PIPING PLAN (B#1380 & 1382)
VENTILATION AND ELECTRIC HEATER PLAN (B#1396, 1st.FL)
NEW DOMESTIC WATER PIPING, ELECTRIC HOT WATER HEATER,
(B#1396, 1st.FL))
NEW PLUMBING FIXTURES AND EQUIPMENT SCHEDULE
(B#1396, 2nd.FL)
NEW PLUMBING FIXTURES AND EQUIPMENT SCHEDULE
NEW SEWER AND VENT PIPING PLAN (B#1396, 2nd.FL)
VENTILATION AND ELECTRIC HEATER PLAN (B#1396, 2nd.FL)
NEW DOMESTIC WATER PIPING, ELECTRIC HOT WATER HEATER,
NEW EQUIPMENT AND PLUMBING FIXTURES SCHEDULES (B#1398)
VENTILATION AND NEW WALL HEATER PLAN (B#1398)
NEW DOMESTIC WATER PIPING, ELECTRIC HOT WATER HEATER,
NEW SEWER AND VENT PIPING PLAN (B#1396, 1st.FL)
191633
A-129
CONTRACTOR SHALL SUBMIT ALL MATERIAL & COLOR SAMPLES TO DPW FOR
APPROVAL.
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR IDENTIFICATION
A1
REPAIR/MAINTENANCE WORK
* B#1380 & 1382
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
NOT TO SCALE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
1:100
YI, HS
81338
01382
GATE #16(was #1)
JOB SITE
PURPOSES ONLY, AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE
MANUFACTURERS INDICATED. AN EXACT MATCH FOR MANUFACTURER COLOR IS NOT
REQUIRED. THE SELECTIONS SERVE ONLY TO INDICATE COLOR AND PATTERN WHICH
MANUFACTURERS STANDARD MUST APPROACH.
IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT, THE GENERAL
CONTRACTOR SHALL NOTIFY IT TO THE CONTRACTING OFFICER.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION
AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.
THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL
DAMAGES TO EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION
TO ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER.
SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH WITH EXACT
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE
CONTRACTING OFFICER FOR APPROVAL.
CUT, PATCH AND RESTORE OF WALLS, FLOORS AND CEILING TO MAKE WAY FOR THE
INSTALLING AND REPLACEMENT OF MECHANICAL, ELECTRICAL, TELEPHONE AND FIRE
ALARM SYSTEM COORDINATION OF THIS WORK MUST BE DONE TO INSURE ROUGH-IN
WORKS IS ACCOMPLISHED PRIOR TO FINISHING WORK.
ALL DOORS AND WINDOWS SHALL BE FABRICATED I.A.W. SPECIFICATIONS AND
MANUFACTURE R'S INSTRUCTIONS. THE CONTRACTOR SHALL PREPARE SHOP
DRAWINGS FOR ALL DOOR AND WINDOW DETAILS AND DRAWING SHALL BE
APPROVED BY THE COR BEFORE FABRICATION AND INSTALLATION.
THE ARCHITECTURAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
DRAWINGS FOR O & MA PROJECTS, KOREA, 24 JANUARY 2014, DEPARTMENT OF THE
ARMY, INSTALLATION MANAGEMENT AGENCY, KOREA REGION OFFICE." FORM AS A
PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE
ARCHITECTURAL SCOPE OF WORK AT NO ADDITIONAL COST TO THE PROJECT
CONTRAC T.
1.
2.
3.
4.
5.
6.
7.
SCOPE OF WORK
GENERAL NOTES
SITE LOCATION PLAN1
AND LOCATION PLAN
GENERAL NOTES, SCOPE OF WORK
8.
9.
COMPOUND IN ACCORDANCE WITH LOCAL LAWS AND REGULATIONS.
12. REMOVE AND DISPOSE ALL CONSTRUCTION DEBRIS TO OUTSIDE
UNATTENDED.
3)POWER EQUIPMENT AND HAZARDOUS MATERIAL SHOULD NOT BE
2)NO HEAT IN AND AROUND CONSTRUCTION AREA.
1)ALL MATERIAL MUST BE SEPARATED BY FLAMMABLES.
11. KEEP SAFETY CONDITION UNDER CONSTRUCTION.
EVERY DAY.
10. COVER UP ALL THE JOB SITE WITH CLEAN VINYL SHEET DURING WORKING HOURS
ELECTRICAL DEVICES, ETC.) DURING CONSTRUCTION PERIOD.
* B#1396
* B#1398
6. CONTRACTOR SHALL MOVE AND REARRANGE FURNITURE(DESKS, CHAIRS AND
APPLIED WATERPROOFING SYSTEM ON EXISTING ENTIRE ROOF SURFACES.
3. REPAIR BY PATCHING AND APPLYING NEW 100% ACRYLIC FLUID
5. PAINT ON WHOLE STEEL STAIR SURFACES. (LEFT SIDE STAIR ONLY)
ELECTRICAL DEVICES, ETC.) DURING CONSTRUCTION PERIOD.
5. CONTRACTOR SHALL MOVE AND REARRANGE FURNITURE(DESKS, CHAIRS AND
4. PATCH AND PAINT ALL INTERIOR SURFACES.
AS SHOWN ON DWG.
2. REPLACE EXISTING DOOR WITH NEW INCLUDING HARDWARE
SYSTEM AND INSULATIONS AS SHOWN ON DWG.
INCLUDING WATERPROOF TYPE GWB.CEILING, CEILING SUSPENSION
TOILET PATITIONS, VANITY CABINET AND TOILET ACCESSORIES
1. REPAIR EXISTING LATRINE WITH FULL HEIGHT GWCT.,CMT.,
(REPLACEMENT OF FASCIA BOARD AND METAL FLASHING : APPROX. 40%)
APPLIED WATERPROOFING SYSTEM ON EXISTING ENTIRE ROOF SURFACES.
3. REPAIR BY PATCHING AND APPLYING NEW 100% ACRYLIC FLUID
4. PATCH AND PAINT ALL INTERIOR SURFACES.
AND INSULATIONS AS SHOWN ON DWG.
INCLUDING WATERPROOF TYPE GWB.CEILING, CEILING SUSPENSION SYSTEM
CMT.,TOILET PATITIONS, VANITY CABINET AND TOILET ACCESSORIES
1. REPAIR EXISTING FIRST & SECOND FLOOR LATRINE WITH FULL HEIGHT GWCT.,
AS SHOWN ON DWG.
2. REPLACE EXISTING DOORS WITH NEW INCLUDING HARDWARE
AS SHOWN ON DWG.(TEMPORARY LATRINE LOCATION : DETERMINED BY GOVERNMENT)
9. TEMPORARY LATRINE SHALL BE PROVIDED FOR CONSTRUCTION DURATION TEMPORARY LATRINE
* SEE DETAIL DESCRIPTIONS "A-6"
OFFICE AS SHOWN ON DWG.
8. RELOCATE EXISTING WALL MOUNTED A/C UNIT AT CONSTRUCTION BRANCH CHIEF
ELECTRICAL DEVICES, ETC.) DURING CONSTRUCTION PERIOD.
7. CONTRACTOR SHALL MOVE AND REARRANGE FURNITURE(DESKS, CHAIRS AND
6. PATCH AND PAINT ALL INTERIOR SURFACES.
5. REPAIR LATRINES AS SHOWN ON DRAWINGS
AS SHOWN ON DRAWINGS.
4. REPLACE EXISTING DOORS AND WINDOWS WITH NEW INCLUDING HARDWARES
INCLUDING VINYL COVE BASE OR WOODEN BASE AS SHOWN ON DRAWING.
3. REPLACE EXISITING FLOOR SURFACES WITH NEW VINYL DECORATIVE TILES
ON THE DRAWINGS.
2. REPLACE EXISTING WALL LININGS WITH NEW GWB. WALL LININGS AS SHOWN
SYSTEM AND INSULATIONS AS SHOWN ON THE DRAWINGS.
1. REPLACE CEILING SYSTEMS WITH NEW INCLUDING CEILING SUSPENSION
N
6"
191633
A-229
REPLACE DOOR AS OPPOSITE DIRECTION
EXST./REMOVAL FLOOR PLAN
(B#1380 &1382)
EXST./REMOVAL FLOOR PLAN
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
AND BLOCK-UP THE WALL
REMOVE EXST.VENTILATOR
BLOCK-UP THE WALL
REMOVE EXST.DOOR AND
BLOCK-UP THE WALL
REMOVE EXST.DOOR AND
BLOCK-UP THE WALL
REMOVE EXST.WINDOW AND
REMOVE EXST.PARTITION
REMAIN EXST.COLUMN
* ALL HATCHED AREA
SURFACES
REPLACE EXST.FLOOR REMOVE EXST.PARTITION
AND BLOCK-UP THE WALL
REMOVE EXST.DOOR/WINDOW
SCALE : 1 / 100 (B# 1380 & 1382)
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
1:100
YI, HS
A2-
REMOVE EXST.PARTITION
A/C UNIT
WALL MOUNTED
RELOCATE EXST.
6"
DESIGN BR. OFFICE
OFFICE
CHIEF
DESIGN BR.
191633
A-329
ESTIMATION OFFICE
WORK RECEPTION
SERVER ROOM
D1 D1
D1
D2
D1
D1
D2
D1
D1
D3
STORAGE#1
#1
DAYROOM
OFFICE
ENERGY BR.
OFFICE
ESD CHIEF
OFFICE
CONS BR.
CHIEF OFFICE
CONS BR.
D1
OFFICE
BOI CHIEF
OFFICE
PC.
D3
D5
DAY ROOM #2
DAY ROOM #3
STORAGE #2
STORAGE #3
LATRINE
FEMALE
LOUNGE
LADY
CHIEF OFFICE
MESS
CORRIDOR #2
CORRIDOR #4
C O
R R I
D O
R
ROOM
MECH.
OFFICE
MESS
DAY ROOM #4
OFFICE
ADMIN CHIEF
OFFICE #1
ADMIN
OFFICE #2
ADMIN
OFFICE
DIRECTOR
OFFICE
O&M CHIEF
ROOM
CONFERENCE
O&M
ROOM #1
CONFERENCE
ROOM #2
CONFERENCE
ROOM
CONFERENCE
ESD
N
BUDGET OFFICE
OFFICE
CHIEF
ENERGY
ROOM
CONFERENCE
BOI
ROOM #1
ROOM #2
W1 D2
D4L
D2
D1
HALL
W2
W2
WB
WB
W3
W3
W3
WB WB WB WB WB
W1 W1
W1
W2
WB
WB
W4
W4
A3
A5
A3
A5
OFFICE
ADMIN
PM & CONS.
OFFICE
O&M
SECTION
O&M TECH
NEW PROPOSED FLOOR PLAN
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
1:100
YI, HS
A3 SCALE : 1/100 (B# 1380 & 1382)
OF GWB.WALL LINING
REPAIR BY INSTALLATION
NEW DOOR & FRAME
LATRINE
MALE
NEW PARTITION
FOR HALLWAY
INCL.SOUNDPROOF
INSULATION
1,200
CHIEF OFFICE
SHALL MOVE TO DESIGN BRANCH
EXST. HEATPUMP SYSTEM
LINING
OF GYMSUM BOARD WALL
REPAIR BY INSTALLATION
TO STORAGE #1
EXST.A/C SHALL MOVE
W/NEW
REPLACE DOORS & FRAMES
6,230 6,520 6,200
18,950 780
3,200 2,000
5,200
4,550 3,800 1,520
9,870
3,700 2,520
6,220
41,020
2,600 1,920
4,520
4,900 5,120
10,020
INSULATION
SOUNDPROOF
LINING W/
NEW GWB WALL
1,220 3,060 5,105 4,845 1,410 7,180 6,705 4,540 3,910 6,250 3,810 4,330 1,450 4,025
13,61580043,005
(B#1380 & 1382)
NEW PROPOSED FLOOR PLAN
D2
L
L
VEST.#2
VEST.#3
VEST.#1
D2 D4
D5
AND FRAMES
PAINT DOOR
AND FRAMES
PAINT DOOR
L
AND FRAMES
PAINT DOOR
AND FRAMES
PAINT DOOR
A3A6
1A 1A
A3A6
1B
A3 A6
A3A6
1A
1A
A3A6
A3A6
1C
A3A6
1C
A3 A6
1D
OF GWB.WALL LINING
REPAIR BY INSTALLATION
PATCH AND PAINT ON
EXST.METAL SIDING WALL
MATCH TO EXST.
NEW CONC.STOOP
A/C UNIT
WALL MOUNTED
RELOCATE EXST.
C O
R R I
D O
R
WB WB
AS SHOWN
A-404
STORAGE #1
DAYROOM #1
DESIGN BR. OFFICE
DAY ROOM #2
ESD. CHIEF OFFICE
CONS BR. OFFICE
ESD CONFERENCE ROOM
STORAGE #2
DAY ROOM #3
ENERGY BR. OFFICE
ESTIMATION OFFICE
BUDGET OFFICE
ENERGY CHIEF OFFICE
WORK RECEPTION
PC. OFFICE
BOI CONFERENCE ROOM
MESS CHIEF OFFICE
MESS OFFICE
SERVER ROOM
MALE LATRINE
LADY LOUNGE
FEMALE LATRINE
O&M CONFERENCE ROOM
O&M CHIEF OFFICE
DIRECTOR OFFICE
STORAGE #3
CONFERENCE ROOM #1
CONFERENCE ROOM #2
ADMIN CHIEF OFFICE
DAY ROOM #4
ADMIN OFFICE #1
CORRIDOR #1
CORRIDOR #2
CORRIDOR #4
MAIL ROOM #1
MAIL ROOM #2
SURFACE MATERIAL FINISH COLOR REMARKS
EXTERIOR FINISH SCHEDULE
ALUMINUM
DOOR
WINDOW
METAL
F.F. BY USER
DETERMINED
PAINT DESIGNATION
SEE COLOR
STOOPSTOOP CONC. BROOM -
HALL
VESTIBULE #1
VESTIBULE #3
#138B
#138A
#137
#134
#139A
#139B
#132
#136
#122
ADMIN OFFICE #2
#101
#100
#102
O&M TECH SECTION#103
#104
#106 O&M OFFICE
#106A
#106B
#120
#121
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
YI, HS
NO.
ROOM
ROOM NAME
INTERIOR FINISH SCHEDULE
FLOOR BASE WAINSCOT WALL CEILING
MAT. FIN. COLOR MAT. FIN. COLOR MAT. FIN. COLOR MAT. FIN. COLOR MAT. FIN. COLOR HGT.HGT.
REMARKS
INTERIOR & EXTERIOR FINISH SCHEDULE
BOI CHIEF OFFICE
DESIGN BR.CHIEF
PM.& CONS.ADMIN.
CONS BR.CHIEF
EXST. - -
VDT. F.F.
EXST.
VDT. F.F.
EXST. - -
VDT.
F.F.
EXST.
VDT.
EXST.
VDT.
CMT.
EXST.
CORRIDOR #3
VESTIBULE #2
F.F.
F.F.
WOOD PAINT
BY USER
DETERMINED
BY USER
DETERMINED
BY USER
DETERMINED
BY USER
DETERMINED
BY USER
DETERMINED
DESIGNATION
SEE COLOR
WOOD
EXST.
WOOD
WOOD
EXST.
GCWT.
WOOD
EXST.
EXST.
F.F.
BY USER
DETERMINED
PAINT
DESIGNATION
SEE COLOR
WOOD
EXST.
WOOD
GWB.
EXST.
GWB.
EXST.
EXST.
GWB.
GWB.
EXST./
GWB.
EXST./
EXST.
GWB.
EXST.
GCWT. F.F.
BY USER
DETERMINED
EXST. PAINT
DESIGNATION
SEE COLOR
PAINT
DESIGNATION
SEE COLOR
EXST. PAINT
DESIGNATION
SEE COLOR
ACST.
EXST.
F.F.
BY USER
DETERMINED
ACST. F.F.
BY USER
DETERMINED
PAINT
DESIGNATION
SEE COLOR
EXST. PAINT
DESIGNATION
SEE COLOR
GWB.
EXST.
ACST.
EXST.
*GWB.
F.F.
BY USER
DETERMINED
PAINT
DESIGNATION
SEE COLOR
ACST.
EXST.
ACST. F.F.
BY USER
DETERMINED
PAINT
DESIGNATION
SEE COLOR
EXST.
GWB.:12.5mm THK.GYPSUM WALL BOARD
ACST.:15mm THK.ACOUSTICAL TILE
*GWB.:12.5mm THK.WATERPROOF TYPE
ACST. F.F.
BY USER
DETERMINED
GWB. PAINT
DESIGNATION
SEE COLOR
ACST.
EXST.
INSULATION REPLACEMENT.
* REPLACEMENT CEILING WORKS INCLUDE
EXST.
VDT. F.F.
BY USER
DETERMINED
WOOD
EXST.
WOOD
EXST./
EXST.
GWB.
EXST./
EXST.
ACST.
PAINT
F.F.
*GWB. *GWB.:12.5mm THK.WATERPROOF TYPE
SSM-1:
OR APPROVED EQUAL.
CORIAN, COUNTER TOP : BLACK QUARTS
SOLID SURFACE MATERIAL
SSM-2:
CORIAN, ECRU OR APPROVED EQUAL.
& REMOVABLE PANEL
TOILET PARTITION, URINAL SCREEN
SOLID SURFACE MATERIAL
TOILET ACCESSORIES SCHEDULE
ITEM REMARK
SMLD
TTD
SD SOAP DISH
SHELF METAL LIGHT DUTY
TOILET TISSUE DISPENSER * 2-ROLLTYPE
* SEE STD.DETAIL DWG.
PTD PAPER TOWEL DISPENSER
TOILET PARTITION
Q'TY
MIRROR GLASSMG 1
2RH
* FIT TO WALL WIDTH
FLOOR MATERIAL/COLOR
BASE MATERIAL/COLOR
WALL MATERIAL/COLOR
CEILING MATERIAL/COLOR
CMT
OR APPROVED EQUAL
NON-SLIP, 300 x 300 x 8 THK
FG 7L67-1, MARON
DONGSEO, INUS
NON-SLIP CERAMIC FLOOR TILE
OR APPROVED EQUAL
DARK BROWN, 100 HGT, 3THK
LG HAUSYS
VINYL COVE BASE
GCWT.
* GROUT COLOR FOR GCWT
OR APPROVED EQUAL
: MOLD & MILDEW RESISTANT, STAIN PROOF
ANTIQUE WHITE
OR APPROVED EQUAL
300 x 600 x 10 THK
LQR 1N92-1, GLOSS
DONGSEO, INUS
GLAZED CERAMIC WALL TILE
OR APPROVED EQUAL
LATEX/SEMIGLOSS
NOROO NR7066
PAINT COLOR
OR APPROVED EQUAL
LATEX/EGGSHELL
NOROO NR7066
PAINT COLOR
* GROUT COLOR FOR CMT
OR APPROVED EQUAL
: MOLD & MILDEW RESISTANT, STAIN PROOF
ANTIQUE WHITE
VDT.
VCB
PAINT
PAINT
OR APPROVED EQUAL
450MMx450MM, 3MM THK
KCC EXCELLENT (NON-ACM)
VINYL DECORATIVE TILE
FEMALEMALE
* W/RECEPTACLE TYPE
* SSM-1 (CORIAN)
* SSM-2 (CORIAN)
* SSM-2 (CORIAN)
25THK.WOOD
TUBE FRAME(TYP.)
-50x50x6 ST'L
GALV.
200 275 150
CMT
@600 O.C.
TOGGLE BOLT
3EA.-18DIA.
(SEE MECH.DWG.)
LAVATORY
TYP.LAVATORY COUNTER DETAIL
NOT TO SCALE
MIRROR
A5 A5
MET.STUD
ANCHOR TO
ST'L PLATE
400x2,400x4THK.
US
ROBE HOOK
URINAL SCREEN -
OVER 18THK.PLYWOOD
COUNTER TOP & SPLASH BACK
(SSM-1)
SOLID SURFACING MATERIAL
POST-FORMED 13THK
ON12THK.PLY WD.
SSM-2(6THK.)
REMOVABLE PANEL
INSULATION
INCL.SOUND PROOF
@300 O.C.
ON 90/150mmTHK.METAL STUD
ON 12mmTHK.CEMENT BOARD
ON W.P.MEMBRANE
ON METAL LATH
GCWT.ON CEMENT MORTAR
LAVATORY COUNTER
TTD
TTD
TTD
TTD
A3
SMLD
SD
SMLD
SD
SMLD
SD
SMLD
SD
SMLD
SD
US
US
US
LATRINES ENLARGED PLAN1
A5
191633
AS SHOWN
A-505
MALE LATRINE
FEMALE LATRINE
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
YI, HS
LAVATORY COUNTER DETAIL
TOILET ACCESSORIES SCHEDULE AND
LATRINE ENLARGED PLAN,
ACST.
OR APPROVED EQUAL
WHITE
MC 3102
"KCC MITONE"
603MM x 603MM x 15MM THK
ACOUSTICAL CEILING TILE
3,050
PTD
RH
RH
RH
RH
SAPCE
WINDOW OPENING
EXISTING
BLOCK-UP
800X500
WITH NEW
REPLACE WINDOW
PTD
TTD TTD
1,900
RH RH
SCLAE : 1 / 50
FULL HEIGHT
GCWT.
FULL HEIGHT
GCWT.
NOT TO SCALE
TOILET SIGN DETAILS
* SEE O & MA STANDARD DETAIL DRAWINGS, KOREA : A-1501 & 1502
DOOR
FL
EE
DOOR
FL
EE150
TOILET SIGN LOCATION
POLISH EDGES
ALL AROUND (TYP)
BRAILLE
BLACK BROWN
WHITE BORDER LINE
WHITE LETTER
WHITE
PICTOGRAPH
(25 CAP LETTER HGT)
BACK GROUND
BASE BOARD
Men
C A
P
C A
P
Women
EXST.FLOOR SLAB
C L
G
H G
T
CORRIDOR
C L
G
H G
T
THK.12.5mm GWB
PAINT ON
WOOD BASE
PAINT ON
WALL SECTIONS
SCALE : 1 / 20A3 A6
HANGER (TYP.)
FRAME W/ WIRE
SUSPENDED METAL
STUD @400 O.C.
THK.90mm MET.
INSULATIONS
SOUND PROOF
OFFICE
THK.12.5mm GWB
PAINT ON
EXST.CEILING
EXST.FLOOR SLAB
C L
G
H G
T
THK.12.5mm GWB
PAINT ON
HANGER (TYP.)
FRAME W/ WIRE
SUSPENDED METAL
STUD @400 O.C.
THK.90mm MET.
OFFICE
1B
A3 A6
1A
A3 A6
INSULATIONS
191633
AS SHOWN
A-606
A3 A6
GWB.CEILINGACST.CEILING
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
YI, HS
WALL SECTIONS AND SIGN DETAIL
VDT.
WOOD BASE
PAINT ON
VDT. VDT.
WOOD BASE
PAINT ON
CMT W/MORTAR BED
HANGER (TYP.)
FRAME W/ WIRE
SUSPENDED METAL
EXST.FLOOR SLABASPHALT FELT
2-PLY,30#
C L
G
H G
T
INSULATIONS
SOUND PROOF
1C
A3A6
(WATERPROOF TYPE)
GWB.CEILING
12.5THK.
PAINT ON
@300 O.C.
ON 90THK.METAL STUD
ON 12THK.CEMENT BD.
ON W.P.MEMBRANE
ON METAL LATH
GCWT.ON CEMENT MORTAR
EXST.CONC.FL.SLAB
50THK.DEPRESSED
EXST.FLOOR SLAB
C L
G
H G
T
C L
G
H G
T
THK.12.5mm GWB
PAINT ON
WOOD BASE
PAINT ON
STUD @400 O.C.
THK.90mm MET.
INSULATIONS
SOUND PROOF
THK.12.5mm GWB
PAINT ON
1D
A3 A6
VDT.
WOOD BASE
PAINT ON
SERVER ROOMBOI CONF.ROOM
HANGER (TYP.)
FRAME W/ WIRE
SUSPENDED METAL
ACST.CEILING EXST.CEILING
EXST.FLOOR
PATCH THE EXST.WALL
OPENING.
EXST.DOOR/WINDOW
* BLOCK-UP
TO PROTECT SERVER FROM DUST.
AT SERVER ROOM SIDE
DURING CONSTRUCTION PERIOD
* 100% PLASTIC COVER SHALL BE NEEDED
LATRINE
NOT TO SCALE
A1 A6
TEMPORARY LATRINE DESCRIPTION
WATER CLOSET
HEATER
WALL MOUNTED
VENTILATION
PARTITIONS
TOILET
URINALS
MUSICBOX
SOUNDPRROF
LAVATORY
DRYER
HAND
* TEMPORARY LATRINE SHALL BE PROVIDED FOR CONSTRUCTION DURATION.
* SEWER TANK SHALL BE CLEANING FOR 0NCE PER A WEEK.
- OR APPROVED EQUAL
. H.V.A.C. SYSTEM EQUIPPED.
. SIZE : ABT. 7,000x2,500x3,000(H)
. TANK CAPACITY : ABT. SEWER-5,000L, WATER-2,000L
. LAVATORY : MALE 1EA., FEMALE 1EA.
. URINAL : MALE 4EA.
. WATER CLOSET : MALE 2EA., FEMALE 5EA.
- MODEL : T6
- RENTAL COMPANY : JAEIL MOBILE CO.LTD.(031-766-1660)
* TEMPORARY LATRINE
OFFICE
WITH STEEL DOOR FRAME
* WOOD FLUSH, SOLID CORE, SINGLE DOOR
MALE/ FEMALE LATRINE
1 - ALUMINUM THRESHOLD J32180
1 - DOOR HOLDER, L01381
1 - DOOR STOP, L02161
1 - KICK PLATE, J102
1 - DOOR CLOSER CO2021
1 - PULL PLATE, J401
1 - PUSH PLATE, J301
3 - BUTT, HINGES TYPE A5112
HDW - MALE/ FEMALE LATRINE
* 19 mm UNDER CUT
W1
TRIM
OAK WOOD
STOOL
OAK WOOD
INSECT SCREEN
WEATHERSTRIPPING AND WINDOW FASTENER
THERMAL BREAK TYPE INCLUDING INSECT SCREEN,
WITH ALUM. FRAME, ANODIZED DARK BRONZE,
* ALUMINUM SASH SLIDING BLAST WINDOW
NOTES
AND INSTALLATION
BY THE CONTRACTING OFFICER BEFORE FABRICATION
ALL DOORS AND WINDOWS. THESE SHALL BE APPROVED
2. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR
"BEST-LOCK" OR APPROVED EQUAL.
4. ALL LOCKS SHALL UTILIZED INTERCHANGEABLE CORE
FRAME DESIGNED IN ACCORDANCE WITH ASTM F2248.
PROVIDE WINDOW PRODUCT INCLUDING GLAZING AND
5. SPECIAL NOTE FOR WINDOW GLAZING AND FRAMES :
D1 D3
WITH STEEL DOOR FRAME
* WOOD FLUSH, SOLID CORE SINGLE DOOR
PASSAGE DOOR
* WOODEN LOUVER : 400 x 300
D2
191633
AS SHOWN
A-707
W2 W3 W4
- INSULATING OPAQUE GLASS UNIT (8.75+12+6)
* W4 - SIZE : 900 x 500 x THK.130mm
INSULATING GLASS UNIT
* 18mmTHK. (6+6+6)
EXIT DOOR (EXTERIOR)
SINGLE BLAST DOOR WITH STEEL DOOR FRAME
* STEEL FLUSH, INSULATED HALF GLASS
D4
DOOR & WINDOW DESCRIPTIONS
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
YI, HS
WITH STEEL DOOR FRAME
* WOOD FLUSH, SOLID CORE SINGLE DOOR
NOT TO SCALEA3 A7
1 DOOR & WINDOW DESCRIPTIONS
1 - ALUMINUM THRESHOLD, J32300
1 - DOOR STOP, L02161
1 - KICK PLATE J102
1 - DOOR CLOSER CO2021
1 - LOCKSET, F82
HDW - OFFICE
1 - THRESHOLD, J32300
1 - DOOR HOLDER, L01381
1 - DOOR STOP L02161
1 - KICK PLATE, J102
1 - DOOR CLOSER, C02021
1 - LOCK SET, F75 LEVER TYPE
HDW - PASSAGE DOOR
* 600x800x6mm WIRED OPAQUE GLASS
* WOODEN LOUVER : 400 x 300
EXIT DOOR (EXTERIOR)D5
* 600x800x6mm WIRED OPAQUE GLASS
BLAST DOOR WITH STEEL DOOR FRAME
* STEEL FLUSH, INSULATED SINGLE
L REPLACE LOCKSET ONLY
TO EXISTING.
* CODDIDOR SIDE WOOD FLUSH DOOR COLOR MATCH
COATED NATURAL COLOR FINISH.
3. WOOD FLUSH DOORS SHALL BE FINISHED FACTORY
PRIOR TO COMMENCING WORK.
REQUIRE APPROVAL BY THE CONTRACTING OFFICER
SCHEDULE AND MANUFACTURES' INSTRUCTIONS
IN ACCORDANCE WITH SPECIFICATIONS, HARDWARE
1. ALL DOORS AND WINDOWS SHALL BE FABRICATED
ANTITERRORISM STANDARDS FOR BUILDING.
ACCORDANCE WITH UFC 4-010-01, DoD MINIMUM
6. WINDOW PRODUCT INSTALLATION SHALL BE IN
+ THK.6mm TINTED LOW-E TEMPERED GLASS
+ THK.12mm AIR SPACE
THK.8.75mm LAMINATED GLASS
(THK.25mm)
* REPLACE WINDOW BLINDS WITH NEW AT ALL NEW WINDOWS.
1 - WEATHER STRIPPING
1 - ALUMINUM THRESHOLD, J36190
1 - DOOR STOP & HOLDER L01371
1 - KICK PLATE, J102
1 - DOOR CLOSER, C02021
* LEVER HANDLE TYPE
DOOR HANDLES, (KABA SIMPLEX 1000)
1 - PUSH-BUTTON COMBINATION
(TYPE"3" AND FUNCTION "5")
1 - EXIT DEVICE (PUSH PAD TYPE)
3 - BUTT, HINGES TYPE A5112 (NRP)
HDW - EXIT DOOR (EXTERIOR)
1 - WEATHER STRIPPING
1 - ALUMINUM THRESHOLD, J36190
1 - DOOR STOP & HOLDER L01371
1 - KICK PLATE, J102
1 - DOOR CLOSER, C02021
* LEVER HANDLE TYPE
DOOR HANDLES, (KABA SIMPLEX 1000)
1 - PUSH-BUTTON COMBINATION
3 - BUTT, HINGES TYPE A5112 (NRP)
* LEVER HANDLE TYPE
DOOR HANDLES, (KABA SIMPLEX 1000)
1 - PUSH-BUTTON COMBINATION
- INSULATING CLEAR GLASS UNIT (8.75+12+6)
* W1 - SIZE : 1150 x 1050 x THK.130mm
- INSULATING CLEAR GLASS UNIT (8.75+12+6)
* W2 - SIZE : 1050 x 750 x THK.130mm
- INSULATING CLEAR GLASS UNIT (8.75+12+6)
* W3 - SIZE : 900 x 750 x THK.130mm
WB
* FIT TO EXISTING WINDOW SIZE.
REPLACE WINDOW BLIND ONLY. (THK.25mm)
WITH STEEL DOOR FRAME
* WOOD FLUSH, SOLID CORE, SINGLE DOOR
MALE/ FEMALE LATRINE
* 19 mm UNDER CUT
D6
* WOODEN LOUVER : 400 x 300
1 - ALUMINUM THRESHOLD J32180
1 - DOOR HOLDER, L01381
1 - DOOR STOP, L02161
1 - KICK PLATE, J102
1 - DOOR CLOSER CO2021
1 - LOCKSET, F76
HDW - MALE/ FEMALE LATRINE
- INSULATING CLEAR GLASS UNIT (8.75+12+6)
* W5 - SIZE : 1,050 x 850 x THK.130mm
WITH STEEL DOOR FRAME
* WOOD FLUSH, SOLID CORE, SINGLE DOOR
WOODEN LOUVER
300 x 250
* 300 x 250 WOODEN LOUVER
JANITOR ROOMD7
1 - ALUMINUM THRESHOLD J32180
1 - DOOR HOLDER, L01381
1 - DOOR STOP, L02161
1 - KICK PLATE J102
1 - DOOR CLOSER CO2011
1 - LOCKSET, F86
HDW - STORAGE/ JANITOR
- A6
EXST.FIRST FLOOR PLAN
(B#1396)
- A6 (B#1396)
191633
A-808
1:100
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
YI, HS
EXST.SECOND FLOOR PLAN
SCALE : 1/100 SCALE : 1/100
CH: 2,500 CH: 2,500
13,630 1,900 3,300
18,830
8,360 2,165
3,780 4,135
18,830
18,830
14,580 2,150 2,100
18,830
8,840 5,920 4,070
A6 A6 (B#1396)SCALE : 1/100
CH: 2,500
13,630 1,900 3,300
18,830
8,360 2,165
3,780 4,135
18,830
NEW PROPOSED FIRST FLOOR PLAN 4
A6 A6 (B#1396)SCALE : 1/100
NEW PROPOSED SECOND FLOOR PLAN
D3
D3
ROOM
MECH.
ROOM
PRINTER
MALE
FEMALE
JAN.
OFFICE
BR.CHIEF
OFFICE
STAIR SURFACES
WHOLE STEEL
PAINT ON
*THIS SIDE ONLY
STAIR SURFACES
WHOLE STEEL
PAINT ON
*THIS SIDE ONLY
A8
A9
* SEE ENLARGED PLAN
FLOOR PLANS FOR B#1396
D7
CH: 2,500
18,830
14,580 2,150 2,100
18,830
8,840 5,920 4,070
OFFICE
OFFICE OFFICE
JAN.
FEMALE
MALE
D7 D3
D3
* SEE ENLARGED PLAN
A8
A9
A-909
1:100
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
YI, HS
TOILET ACCESSORIES SCHEDULE
ITEM REMARK
TTD
SD SOAP DISH
TOILET TISSUE DISPENSER * 2-ROLLTYPE
* SEE STD.DETAIL DWG.
PTD PAPER TOWEL DISPENSER
TOILET PARTITION
Q'TY
MIRROR GLASSMG
RH
* FIT TO WALL WIDTH
* W/RECEPTACLE TYPE
* SSM-2 (CORIAN)
ROBE HOOK
LAVATORY CABINET 2
A8
A9 SCLAE : 1 / 50 (B#1396)
D3
D3
1,080 1,870
2,950
450 1,580 1,870
3,900
NOT TO SCALEA9 A9
VARI.
150MM HIGH BACKFLASH
VANITY TOP, TRIM AND
13mmTHK. MARBLE,(SSM-1)
TTD
TTD
RH
RH
SD
SD
PTD
PTD
* SSM-1(CORIAN) COUNTER TOP
B#1398
EACH VANITY DOOR & HARDWARE
HINGE B 01361
2-PAIR SEMICONCEALED
2-CABINET KNOBS B 02181
CATCHES B 03171
2-HEAVY DUTY MAGNETIC
DOOR PULL W/SCREW
2-CHROME COATED ALUM.
W/LAMINATED FINISH
VANITY AND SHELVES
19mmTHK. PLYWOOD
(VOID)
DRAWER
LAV. CHINA BOWL
OVAL HORIZON
EQUAL
MG
MG
VANITY CABINET DETAIL
SCHEDULE AND DETAIL (B#1396)
ENLARGED PLAN, TOILET ACCESSORIES
D7
D3
D3
D7
TTD
SD
MG
PTD
SD
MG
TTD
MR
MR
PTD
450 1,580 1,870
3,900
1,060865
1,925
1,100 1,065 1,885
4,050
MR MOP RACK
JAN.
FEMALE
MALE
JAN.
FEMALE
MALE
2 * JANITOR ROOM
(1&2 FL.)
MALE
(1&2 FL.)
FEMALE
LATRINES ENLARGED PLAN (1st.FL.)
A8
A9 SCLAE : 1 / 50 (B#1396)
LATRINES ENLARGED PLAN (2nd.FL.)
FULL HEIGHT
GCWT.
FULL HEIGHT
GCWT.
FULL HEIGHT
GCWT.
FULL HEIGHT
GCWT.
FULL HEIGHT
GCWT.
FULL HEIGHT
- (B#1398)
191633
A-1010
1:100
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
YI, HS
EXST.FLOOR PLAN
SCALE : 1/100
CH: 2,500
CH: 2,500
8,080 4,500 9,5009,5009,500 4,720
26,800
26,800
3,850 2,180 2,185 9,735 5,500 3,350
* NO PAINT NEEDED
ACST.CEILING AREA
D6
A10
LATRINES ENLARGED PLAN2
SCLAE : 1 / 50A10 A11
SD
PTD
A9 A9
9001,080
1,980
MG
TTD
CABINET DETAIL
SEE VANITY
ENLARGED FLOOR PLAN
FLOOR PLAN FOR B#1398 AND
D6 FULL HEIGHT
GENERAL NOTE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
1:100
MECHANICAL
M-1
KIM TH
191633
GENERAL NOTE, SCOPE OF WORK
- MECHANICAL O&MA STANDARD TECHNICAL SPECIFICATIONS FOR MISCELLANEOUS.
CONTRACTOR IN STRICT ACCORDANCE WITH APPLICABLE SECTIONS OF DIVISION 23
16. ALL MECHANICAL SYSTEMS SHALL BE TESTED, ADJUSTED AND BALANCED BY THE
AS TAP WATER
REQUIREMENTS AND FLUSHED UNTIL ALL WATER BEING FLUSHED IS CLEAR
15. PIPING SYSTEMS SHALL BE FLUSHED, PURGED & CLEANED PER SPECS
14. RETURN AIR & EXHAUST AIR DUCT SHALL BE PRESSURE CLASS -50MM AQ.
13. ALL AIR DUCT DIMENSION SHOWN ARE INDICATED AS ACTUAL INSIDE DIMENSIONS.
DUCT CONNECTION TO FUNCTION AS ORIGINALLY INTENDED.
REMOVE THE EXIST DUCTWORK AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY
IF THE EXIST DUCT ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION,
WITH THE EXIST DUCTWORK AND PIPING ELEVATION/LOCATION.
12. PRIOR TO INSTALL NEW HVAC AND PLUMBING PIPING CONTRACTOR MUST COORDINATE
11. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY FIELD.
SUCH AS ANCHORS, HANGERS/SUPPORT, ETC.
10. ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL IT'S ACCESSORIES
SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREA.
9. ANY OPENING RESULT FROM THE REMOVAL WORK THAT'S NOT TO BE RE -USED
REQUIREMENTS OF SEAL CLASS C.
TO SMACNA STATIC PRESSURE CLASS 500PA AND DUCTWORK SHALL MEET THE
8. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREAS.
7. ALL WALL/FLOOR/ROOF OPENINGS RESULTED FROM THE REMOVAL OF PIPING AND
CONTRACT DRAWING.
DRAWINGS. SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE
6. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP
5. CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPEC.
SEALED PER SPEC.
4. ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/ NEW) SHALL BE
OR REPLACED BY THIS CONTRACTOR.
DAMAGED DUE TO THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED
THE EXISTING EQUIPMENT AND ANY EQUIPMENT SUCH AS DUCT WORK, PIPING ETC.
3. CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
APPROXIMATE AND SHALL BE VERIFIED AT THE JOB SITE.
2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC.
FOR PROPER CORRECTIONS FOR CONTRACTING OFFICER'S APPROVAL.
THE CONTRACTING OFFICER'S REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS
OF WORK. IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO
THE EXISTING CONDITIONS, EQUIPMENT, FINISHES, ETC., PRIOR TO START
1. CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH
YONGSAN, KOREA
BLDG. NO. 1380, 1382, 1396 AND 1398
REPAIR BUILDING
FY18
SCOPE OF WORK (REPAIR/MAINTENANCE WORK)
6. ALL DUCT SYSTEMS SHALL BE TESTED, ADJUSTED, BALANCED AND SUBMIT THE TEST REPORT AS REQUIREMENTS.
CLEANING WORK.
CLEANING SYSTEM AND SUBMIT THE REPORT WITH PHOTOS AND VIDEO ELECTRONIC FILES FOR BEFORE AND AFTER
5. DO CLEANING AND REMOVING THE DUST IN THE EXISTING DUCTS ON THE CEILING OF TOILET BY REMOTE ROBOT
TOILET ROOM WITH NEW AS INDICATED ON THE PLAN.
4. REPLACE EXISTING PLUMBING FIXTURES INCLUDING WATER CLOSETS, LAVATORIES AND ASSOCIATED PIPING AT THE
PLAN.
3. REPLACE EXISTING ELECTRIC HOT WATER HEATER WITH NEW AT TOILET ROOM AS INDICATED AS INDICATED ON THE
PLAN.
2. REPLACE EXISTING DOMESTIC HOT AND COLD WATER PIPING AT TOILET ROOM WITH NEW AS INDICATED ON THE
ON THE PLAN.
1. REPAIR BY INSTALLATION OF NEW WALL HEATER AND THE THERMOSTATS IN THE TOILET ROOM AS INDICATED
BLDG# 1398
7. ALL DUCT SYSTEMS SHALL BE TESTED, ADJUSTED, BALANCED AND SUBMIT THE TEST REPORT AS REQUIREMENTS.
ASSOCIATED PIPING AT THE MALE & FEMALE TOILET ROOMS WITH NEW AS INDICATED ON THE PLAN.
6. REPLACE EXISTING PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINAL, LAVATORIES, SERVICE SINK AND
5. REPLACE EXISTING ELECTRIC HOT WATER HEATERS WITH NEW AT MALE TOILET ROOMS AS INDICATED ON THE PLAN.
INDICATED ON THE PLAN.
4. REPLACE EXISTING DOMESTIC HOT AND COLD WATER PIPING AT MALE & FEMALE TOILET ROOMS WITH NEW AS
3. REPLACE EXISTING SEWER LINE WITH NEW AS INDICATED ON THE PLAN.
TOILET ROOMS WITH NEW AS INDICATED ON THE PLAN.
2. REPLACE EXISTING WALL EXHAUST FAN, CONTROL SWITCH AND ASSOCIATED GRILLE & DUCT AT MALE & FEMALE
FEMALE TOILET ROOMS AS INDICATED ON THE PLAN.
1. REPLACE EXISTING RADIATORS WITH NEW ELECTRIC WALL HEATERS AND THE THERMOSTATS IN THE MALE &
BLDG# 1396
ASSOCIATED PIPING AT THE MALE & FEMALE TOILET ROOMS WITH NEW AS INDICATED ON THE PLANS.
6. REPLACE EXISTING PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS, LAVATORIES AND
5. REPLACE EXISTING SEWER AND VENT PIPE WITH NEW AS INDICATED ON THE PLAN.
ON THE PLAN.
4. REMOVE AND RE -INSTALL EXISTING ELECTRIC HOT WATER HEATER AT FEMALE TOILET ROOM AS INDICATED
AS INDICATED ON THE PLAN.
3. REPLACE EXISTING DOMESTIC HOT AND COLD WATER PIPING AT MALE & FEMALE TOILET ROOMS WITH NEW
TOILET ROOMS WITH NEW AS INDICATED ON THE PLAN.
2. REPLACE EXISTING EXHAUST FANS, CONTROL SWITCH AND ASSOCIATED GRILLE & DUCT AT MALE & FEMALE
AS INDICATED ON THE PLAN.
1. REPLACE EXISTING ELECTRIC CEILING AND WALL HEATER WITH NEW IN THE MALE & FEMALE TOILET ROOMS
BLDG# 1380 & 1382
MECHANICAL
1:100
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
KIM, TH
191633
M-2
ITEM DESCRIPTION QTY REMARKS
NEW EQUIPMENT SCHEDULE
NEW EQUIPMENT SCHEDULE
M-2
M-2
NEW PLUMBING FIXTURES SCHEDULE
A
REMARKS
CONNECTION
PIPE
RATING
FU
QTY
SYMBOL
P.D.I
1-11
12-32
PLUMBING FIXTURES SCHEDULE
PLUMBING FIXTURES QTY
COLD HOT TRAP VENT
REMARKS
- INTEG.15
20 - 50 40
LOCAL PIPE CONNECTION
SYMBOL
6 LITERS/FLUSH
WATER HAMMER ARRESTER SCHEDULE
WATER CLOSET, FLUSH TANK
PDI-WH 201 AND MANUFACTURER'S INSTRUCTIONS.
2. SIZE AND LOCATE WATER HAMMER ARRESTORS PER
CHAMBER W/EXPANSION BELLOWS.
1. COPPER CONSTRUCTION PRESSURIZED COMPRESSION
B
P-2
P-1
NEW PLUMBING FIXTURE SCHEDULE
5 15 15 50 40 W/ 0.16 LPS FAUCETLAVATORYP-2
URINAL 3.8 LITERS/FLUSH
BLDG#1380 & 1382
BLDG#1380 & 1382
BLDG# 1380
FOR TOILET
BLDG# 1380
ROOF FAN
EXISTING
REPLACE
BLDG# 1382
ROOF FAN
EXISTING
REPLACE
NEW EQUIPMENT AND PLUMBING
FIXTURES SCHEDULE
2 FOR TOILET
BLDG#1380 &
WALL HEATER
BLDG# 1382
FOR TOILET
YONGSAN, KOREA
BLDG. NO. 1380, 1382, 1396 AND 1398
REPAIR BUILDING
FY18
6"
N
WORK LOCATION
M-2
BLDG#1380 & 1382
WORK LOCATION
AS REQUIRED
7680 BTU/HR
2250-WATT, 1PH 208V 10.8A
WALL HEATER
AS REQUIRED
2560 BTU/HR
750-WATT, 1PH 208V 3.6A
WALL HEATER
AS REQUIRED
FAN MOTOR: 1/4 HP 115 V 1PH 60HZ
AIR CAPACITY: 481 CFM, 1/4" WG SP
ROOF VENTILATION
AS REQUIRED
FAN MOTOR: 1/6 HP 115 V 1PH 60HZ
AIR CAPACITY: 133 CFM, 1/4" WG SP
ROOF VENTILATION
AS REQUIRED
BASEBOARD/LINE VOLT THERMOSTAT
THERMOSTAT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
1:100
MECHANICAL
KIM, TH
191633
M-3
WCO
65 VTR
FD
FD
WCO
WCO
EXISTING
SEWER LINE
TO
CONNECT
EXISTING
SEWER LINE
TOCONNECT
FD
SCALE = 1:50
NEW SEWER AND VENT PIPING PLAN
M-3
65 VTR
INCREASE
50x65
FCO
N
POC
INCREASE
50x65
NEW SEWER AND VENT PIPING PLAN
SEWER LINE WITH THE POC.
3.CONTRACTOR SHALL SUBMIT THE SHOP DRAWING OF
AND THE CONNECTION POINT AT THE SITE.
2.CONTRACTOR SHALL FIND OUT THE EXISTING LINE
FROM THE NEW PLAN.
1.EXISTING SEWER LINE CAN BE DIFFERENT
[POINT OF CONNECTION]
NOTE
6"
YONGSAN, KOREA
BLDG. NO. 1380, 1382, 1396 AND 1398
REPAIR BUILDING
FY18
BLDG#1382
BLDG#1380
(BLDG#1380&1382)
KIM, TH
191633
M-4
ELECTRIC WATER
HEATER 4 GAL
DRAIN PIPE
LAVATORY
VIEW OF A-A'
SCALE = 1:50M-4
LAVATORY CABINET
15.15
A
A'
25.40
40.20
(PDI:"B"TYPE)
P-2
P-1
WATER HAMMER
ARRESTOR
WATER HAMMER
ARRESTOR
(PDI:"B"TYPE)
WATER HAMMER
ARRESTOR
(PDI:"A"TYPE)
40.40
20.20
ELECTRICDOMESTIC
HOT WATER HEATER
15.15
N
B
P-1
P-3
P-3
B
A
POC
POC
NEW DOMESTIC HOT & COLD WATER PIPING PLAN
NEW DOMESTIC HOT & COLD
WATER PIPING PLAN
THE HOT & COLD LINE WITH THE POC.
3.CONTRACTOR SHALL SUBMIT THE SHOP DRAWING FOR
AND THE CONNECTION POINT AT THE SITE.
2.CONTRACTOR SHALL FIND OUT THE EXISTING LINE
FROM THE NEW PLAN.
1.EXISTING WATER LINE CAN BE DIFFERENT
[POC: POINT OF CONNECTION]
25.40
25.40
15.15
15.15
EXISTING
EXISTING
(RE-USE)
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
6"
YONGSAN, KOREA
BLDG. NO. 1380, 1382, 1396 AND 1398
REPAIR BUILDING
FY18
15.15
BLDG#1382 BLDG#1380
NOTE
(BLDG#1380&1382)
UNDER COUNTER TOP
(RE -USE)
ELECTRIC HOT WATER HEATER (RE -USE)
KIM, TH
191633
M-5
SCALE = 1:50
NEW ELECTRIC HEATER AND
VENTILATION PLAN
THERMOSTAT FOR WALL ELECTRIC HEATER
WALL ELECTRIC HEATER
WALL ELECTRIC HEATER
CEILING EXHAUST GRILLE
CONNECT TO ROOF FAN
THERMOSTAT FOR
WALL ELECTRIC HEATER
CEILING EXHAUST GRILLE
N
152MM X 152MM (133 CFM)
203MM X 203MM (240 CFM)
CONNECT TO ROOF FAN
ROOF EXHAUST DUCT
CONNECT TO ROOF FAN
203MM X 203MM (133 CFM)
ROOF EXHAUST DUCT
(481 CFM)
305MM X 305MM
VENTILATION PLAN
NEW ,ELECTRIC HEATER AND
M-5
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
6"
YONGSAN, KOREA
BLDG. NO. 1380, 1382, 1396 AND 1398
REPAIR BUILDING
FY18
BLDG#1382 BLDG#1380
(BLDG#1380&1382)
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
NEW EQUIPMENT SCHEDULE2
M-6
WORK LOCATION
M-6
M-6
NEW PLUMBING FIXTURES SCHEDULE
A
REMARKS
CONNECTION
PIPE
RATING
FU
QTY
SYMBOL
P.D.I
1-11 202
PLUMBING FIXTURES SCHEDULE
PLUMBING FIXTURES QTY
COLD HOT TRAP VENT
REMARKS
- INTEG.15
20 - 50 40
LOCAL PIPE CONNECTION
SYMBOL
6 LITERS/FLUSH
WATER HAMMER ARRESTER SCHEDULE
WATER CLOSET, FLUSH TANK
PDI-WH 201 AND MANUFACTURER'S INSTRUCTIONS.
2. SIZE AND LOCATE WATER HAMMER ARRESTORS PER
CHAMBER W/EXPANSION BELLOWS.
1. COPPER CONSTRUCTION PRESSURIZED COMPRESSION
P-2
P-1
NEW PLUMBING FIXTURE SCHEDULE
2 15 15 50 40 W/ 0.16 LPS FAUCETLAVATORYP-3
URINAL 3.8 LITERS/FLUSH
(1ST FLOOR)
(1ST FLOOR)
BLDG#1396
BLDG#1396
M-6
KIM, TH
MECHANICAL
16 29
1SERVICE SINK 15 80 40 8.3 LPM @ 60PSIP-4
(BLDG#1396, 1ST FLOOR)
EQUIPMENT SCHEDULES
NEW PLUMBING FIXTURES AND
CH: 2,500
MALE
FEMALE
JAN.
BLDG#1396
(1ST FLOOR)
WORK LOCATION
ITEM DESCRIPTION QTY REMARKS
NEW EQUIPMENT SCHEDULE
2 FOR TOILET
(1ST FLOOR)
FEMALE
FOR TOILET
MALE
FOR TOILET
TOILET
MALE/FEMALE
WALL HEATER
FOR TOILET
WALL FAN
EXISTING
REPLACE
FOR TOILET
(1ST FLOOR)
(1ST FLOOR)
(1ST FLOOR)
(1ST FLOOR)
AS REQUIRED
3413 BTU/HR
1000-WATT, 1PH 120V 8.4A
WALL HEATER
AS REQUIRED
2560 BTU/HR
750-WATT, 1PH 120V 6.25A
WALL HEATER
AS REQUIRED
BASEBOARD/LINE VOLT THERMOSTAT
THERMOSTAT
AS REQUIRED
FAN MOTOR: 1/6 HP 115 V 1PH 60HZ
AIR CAPACITY: 242 CFM, 1/5" WG SP
WALL VENTILATION
AS REQUIRED
120 VAC, 12 AMPS, 1440 WATT
CAPACITY: 4 GALLONS
ELECTRIC HOT WATER HEATER
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-7
KIM, TH
SCALE = 1:25
NEW SEWER AND VENT PIPING PLAN
M-7
IS REMAINED & RE -USE.
(POINT OF CONNECTION)
OUT OF WORK LOCATION
1. EXISTING SEWER LINE AT
2. NEW SEWER LINE SHALL BE
40.40
SCO
40.40
2"FD
2"FD
2"FD
4"
FCO4"
2"FD
FD
2"
0 1
POC
POC
LINE RISER
4" SEWER PIPE RISER
2" VENT
(BLDG#1396, 1ST FLOOR)
(BLDG#1396, 1ST FLOOR)
NEW SEWER AND VENT PIPING PLAN
CONNECTED AT THE POC
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
15.15
20.20
20.20
DRAIN
HOT WATER HEATER
WATER HAMMER
ARRESTOR
(PDI:"A"TYPE)
A
15.15
A A'
P-1
P-2
P-3
M-8
SCALE : 1/25
DRAIN PIPE
LAVATORY
LAVATORY CABINET
20.20.20
VIEW OF A-A' (SCALE: 1/25)
NEW VENTILATION AND ELECTRIC HEATER PLAN
ELECTRIC HOT WATER HEATER RE -LOCATION
SCALE = 1:25
M-8
HOT WATER HEATER
(1ST FLOOR)BLDG#1396
M-8
KIM, TH
NEW DOMESTIC HOT & COLD WATER PIPING AND
UNDER COUNTER TOP
POINT OF
CONNECTION
P-4
(1ST FLOOR)BLDG#1396
(BLDG#1396, 1ST FLOOR)
ELECTRIC HEATER PLAN
RE -LOCATION,VENTILATION AND
PIPING,ELECTRIC HOT WATER HEATER
NEW DOMESTIC HOT & COLD WATER
MECHANICAL
2" CW RISER
NEW
ELECTRIC HOT WATER HEATER PLAN
WALL ELECTRIC HEATER
THERMOSTAT FOR
WALL ELECTRIC HEATER
WALL ELECTRIC HEATER
THERMOSTAT FOR
WALL ELECTRIC HEATER
242 CFM
6"x6" GRILL
65CFM
6"x6" GRILL
WALL EXHAUST FAN
6"x6" GRILL
VD
VD
VD
(750W 120VAC)
(1000W 120VAC)
10" X 10" DUCT
(254 X 254)
10" x 6" DUCT
(254 x 152.4)
(152.5x152.4)
(65 CFM)
(65 CFM)
(152.5x152.4)
VD
6"x6" GRILL
(11 CFM)
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-7
M-9
KIM, TH
M-9
NEW PLUMBING FIXTURES SCHEDULE
(2ND FLOOR)BLDG#1396
ITEM DESCRIPTION QTY REMARKS
NEW EQUIPMENT SCHEDULE
NEW EQUIPMENT SCHEDULE2
M-9
2 FOR TOILET
(2ND FLOOR)
(2ND FLOOR)
(2ND FLOOR)
(2ND FLOOR)
(2ND FLOOR)
FEMALE
FOR TOILET
MALE
FOR TOILET
TOILET
MALE/FEMALE
WALL HEATER
FOR TOILET
WALL FAN
EXISTING
REPLACE
BLDG#1396
WORK LOCATION
SCALE = 1:100
A
REMARKS
CONNECTION
PIPE
RATING
FU
QTY
SYMBOL
P.D.I
1-11 202
PLUMBING FIXTURES SCHEDULE
PLUMBING FIXTURES QTY
COLD HOT TRAP VENT
REMARKS
- INTEG.15
20 - 50 40
LOCAL PIPE CONNECTION
SYMBOL
6 LITERS/FLUSH
WATER HAMMER ARRESTER SCHEDULE
WATER CLOSET, FLUSH TANK
PDI-WH 201 AND MANUFACTURER'S INSTRUCTIONS.
2. SIZE AND LOCATE WATER HAMMER ARRESTORS PER
CHAMBER W/EXPANSION BELLOWS.
1. COPPER CONSTRUCTION PRESSURIZED COMPRESSION
P-2
P-1
NEW PLUMBING FIXTURE SCHEDULE
2 15 15 50 40 W/ 0.16 LPS FAUCETLAVATORYP-3
URINAL 3.8 LITERS/FLUSH
1SERVICE SINK 15 80 40 8.3 LPM @ 60PSIP-4
(BLDG#1396, 2ND FLOOR)
EQUIPMENT SCHEDULES
NEW PLUMBING FIXTURES AND
MECHANICAL
CH: 2,500
JAN.
FEMALE
MALE
(2ND FLOOR)
BLDG#1396
WORK LOCATION
5 (2ND FLOOR)
FOR TOILET
AS REQUIRED
3413 BTU/HR
1000-WATT, 1PH 120V 8.4A
WALL HEATER
AS REQUIRED
2560 BTU/HR
750-WATT, 1PH 120V 6.25A
WALL HEATER
AS REQUIRED
BASEBOARD/LINE VOLT THERMOSTAT
THERMOSTAT
AS REQUIRED
FAN MOTOR: 1/6 HP 115 V 1PH 60HZ
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-10
KIM, TH
M-10 SCALE : 1/25
(2ND FLOOR)BLDG#1396
NEW SEWER AND VENT PIPING PLAN
(BLDG#1396, 2ND FLOOR)
NEW SEWER AND VENT PIPING PLAN
MECHANICAL
V T
R
4040.40
2"FD
2"FD
2"FD
4"WCO
FCO
4"
2"FD
4"
RISER
SEWER LINE
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
15.15
20.20
20.20
DRAIN
HOT WATER HEATER
WATER HAMMER
ARRESTOR
(PDI:"A"TYPE)
A
15.15
A A'
P-1
P-2
P-3
M-11
SCALE : 1/25
DRAIN PIPE
LAVATORY
LAVATORY CABINET
20.20.20
VIEW OF A-A' (SCALE: 1/25)
WALL ELECTRIC HEATER
THERMOSTAT FOR
WALL ELECTRIC HEATER
WALL ELECTRIC HEATER
THERMOSTAT FOR
WALL ELECTRIC HEATER
NEW VENTILATION AND ELECTRIC HEATER PLAN
242 CFM
6"x6" GRILLE
65CFM
6"x6" GRILLE
WALL EXHAUST FAN
6"x6" GRILLE
VD
VD
VD
SCALE = 1:25
M-11
HOT WATER HEATER
(750W 120VAC)
(1000W 120VAC)
(2ND FLOOR)BLDG#1396
(2ND FLOOR)BLDG#1396
M-11
KIM, TH
NEW DOMESTIC HOT & COLD WATER PIPING AND
10" X 10" DUCT
(254 X 254)
10" x 6" DUCT
(254 x 152.4)
(152.5x152.4)
(65 CFM)
(65 CFM)
(152.5x152.4)
UNDER COUNTER TOP
VD
6"x6" GRILLE
(11 CFM)
POINT OF
CONNECTION
P-4
(BLDG#1396, 2ND FLOOR)
ELECTRIC HEATER PLAN
RE -LOCATION,VENTILATION AND
PIPING,ELECTRIC HOT WATER HEATER
NEW DOMESTIC HOT & COLD WATER
MECHANICAL
2" CW RISER
ELECTRIC HOT WATER HEATER PLAN
NEW ELECTRIC HOT WATER HEATER
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SCALE : 1/100
WORK LOCATION
M-12
NEW PLUMBING FIXTURES SCHEDULE
A
REMARKS
CONNECTION
PIPE
RATING
FU
QTY
SYMBOL
P.D.I
1-11 202
PLUMBING FIXTURES SCHEDULE
PLUMBING FIXTURES QTY
COLD HOT TRAP VENT
REMARKS
- INTEG.15
LOCAL PIPE CONNECTION
SYMBOL
6 LITERS/FLUSH
WATER HAMMER ARRESTER SCHEDULE
WATER CLOSET, FLUSH TANK
PDI-WH 201 AND MANUFACTURER'S INSTRUCTIONS.
2. SIZE AND LOCATE WATER HAMMER ARRESTORS PER
CHAMBER W/EXPANSION BELLOWS.
1. COPPER CONSTRUCTION PRESSURIZED COMPRESSION
P-1
NEW PLUMBING FIXTURE SCHEDULE
1 15 15 50 40 W/ 0.16 LPS FAUCETLAVATORYP-2
BLDG#1389
NEW EQUIPMENT SCHEDULE1
M-12
M-12
KIM, TH
M-12
WORK LOCATION
BLDG#1398
(BLDG#1398)
FIXTURES SCHEDULES
NEW EQUIPMENT AND PLUMBING
MECHANICAL
ITEM DESCRIPTION QTY REMARKS
NEW EQUIPMENT SCHEDULE
BLDG# 1398
FOR TOILET
HEATER
FOR WALL
FOR TOILET
AS REQUIRED
2560 BTU/HR
750-WATT, 1PH 120V 6.25A
WALL HEATER
AS REQUIRED
BASEBOARD/LINE VOLT THERMOSTAT
THERMOSTAT
CAPACITY: 2.7 GALLONS
YONGSAN, KOREA
BLDG. NO. 1380,1382,1396 AND 1398,
REPAIR BUILDING
FY18
RISER
REPLACE
20.20
WATER HAMMER
ARRESTOR
(PDI:"A"TYPE)
A
15.15 PIPE POC
ELECTRIC
HOT WATER HEATER
M-13
P-1 P-2
SPECIAL NOTE
GRILLE WITH NEW
EXISTING
WALL ELECTRIC HEATER
SCALE = 1:25
THERMOSTAT FOR
WALL ELECTRIC HEATER
A A'
DRAIN PIPE
LAVATORY
20.20.20
VIEW OF A-A' (SCALE: 1/25)
ELECTRIC HOT WATER HEATER RE -LOCATION
HOT WATER HEATER
SCALE = 1:25
M-13
NEW DOMESTIC HOT & COLD WATER PIPING AND
(NEW)
(NEW)
CLEAN EXISTING DUCT
M-13
KIM, TH
1. CONTRACTOR SHALL CLEAN OUT EXISTING DUCT SYSTEM BEFORE GRILLE REPLACEMENT.
2. CONTRACTOR SHALL CLEAN OUT EXISTING EXHAUST FAN.
DUCT AND FAN CLEANING
VENTILATION AND NEW WALL HEATER PLAN
RE-LOCATION PLAN (BLDG#1398)
PLAN AND ELECTRIC HOT WATER HEATER
DOMESTIC HOT & COLD WATER PIPING
VENTILATION, NEW WALL HEATER, NEW
MECHANICAL
(RE -USE)
(RE -USE)
CLEAN EXISTING WALL EXHAUST FAN
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
NEW ELECTRIC
NEW
ELECTRIC HOT WATER HEATER PLAN
UNDER COUNTER TOP
LAVATORY CABINET
GENERAL NOTES
1.
2.MOUNTING HEIGHTS ABOVE FLOOR SHALL BE AS FOLLOW UNLESS OTHERWISE
NOTED ON THE DRAWING.
LIGHTING FIXTURE SEE LIGHTING FIXTURE SCHEDULE
PANELBOARD SEE SPECIFICATION
SAFETY SWITCH 1524mm TO CENTER OF THE ENCL
RECEPTACLE,TELEPHONE OUTLET 305mm TO CENTER OF THE ENCL
MOTOR CONTROLLER 1524mm TO CENTER OF THE ENCL
1676mm TO CENTER OF THE ENCL
2286mm TO CENTER OF BELL
ON CEILINGDETECTOR
1372mm TO CENTER OF STATIONMANUAL PULL STATION
INDICATEDS 2 #12AWG IN 16C
INDICATEDS 3 #12AWG IN 16C
INDICATEDS 4 #12AWG IN 16C
A GREATER NUMBER OF WIRES ARE INDICATED AS FOLLOWS;
1219mm TO CENTER OF THE ENCLWALL SWTICH
SCOPE OF WORK
F/A &MNS CONTROL
COMBO. SPEAKER & STROBE
ANY CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES 2-#12AWG
WIRES IN 16C CONDUIT UNLESS OTHERWISE INDICATED.
L E G E N D
INTERIOR
SYMBOL DESCRIPTION DESCRIPTIONSYMBOL
CONVERTER AND ACCESSORIES AS REQUIRED(NS-12a)
DIODE(LED) FIXTURE, 1PH,120V,50W, UL LISTED,WITH
CEILING RECESSED MOUNTED LIGHT EMITING
AND EM UNIT (NS-12b)
CONVERTER AND ACCESSORIES AS REQUIRED
DIODE(LED) FIXTURE, 1PH,120V,50W, UL LISTED,WITH
CEILING RECESSED MOUNTED LIGHT EMITING
AND EM UNIT (NS-12b)
CONVERTER AND ACCESSORIES AS REQUIRED
DIODE(LED) FIXTURE, 1PH,120V,50W, UL LISTED,WITH
CEILING SURFACE/PENDANT MOUNTED LIGHT EMITING
AND EM UNIT (NS-12b)
CONVERTER AND ACCESSORIES AS REQUIRED
DIODE(LED) FIXTURE, 1PH,120V,45W, UL LISTED,WITH
CEILING RECESSED MOUNTED LIGHT EMITING
L
CONVERTER AND ACCESSORIES AS REQUIRED(NS-12a)
DIODE(LED) FIXTURE, 1PH,120V,50W,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.