H1_191633_REP_BLDG-YSN-1380-1382-1396-1398_DWG_20180823.pdf

PDF 6 MB Posted

Attached to
Repair Building, Yongsan
Solicitation number
W91QVN-18-R-0251
Issued by

About this file

Drawing

View the file

Other files

File Type Posted
RFP_for_W91QVN18R0251.pdf PDF
H1_191633_REP_BLDG-YSN-1380-1382-1396-1398_SBMTL-RGTR-DRAFT.XLSX XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISION STATUS

1 OF 1T - 1

DESCRIPTION OF DRAWINGS

TITLE SHEET

DESCRIPTION OF DRAWINGS REVISION STATUS

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

1:100 01 01

1 OF

2 OF

3 OF

4 OF

TITLE SHEET

A - 1

A - 2

A - 3

A - 4

YI, HS

191633

M - 1

M - 2

M - 3

M - 4

T-1

SCHEDULE OF DRAWINGS

NO.

RING

NO.

SHTEET

NO.

RING

NO.

REF.

NO.

DWG.

NO.

SHEET

NO.

REF.

NO.

DWG.

6 5 OF

E - 1

E - 2

E - 3

E - 4

MECHANICAL

M - 5

6 OF7

A - 5

A - 6

7 OF8 A - 7

8 OF9 A - 8

EXST./REMOVAL FLOOR PLAN(B#1380&1382)

NEW PROPOSED FLOOR PLAN(B#1380&1382)

11 OF

PWO. NO. 191633, YONGSAN

ENLARGED LATRINE LIGHTING PLAN(B#1380.1382)

LIGHTING PLAN(B#1380,1382)

BLDG. NO. S-1380,1382,1396 AND 1398

REPAIR BUILDING

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

GENERAL NOTES, SITE LOCATION PLAN AND SCOPE OF WORK

AND LAVATORY COUNTER DETAIL

LATRINE ENLARGED PLAN, TOILET ACCESSORIES SCHEDULE,

DOOR & WINDOW DESCRIPTIONS

SCOPE OF WORK AND GENERAL NOTE

LEGNED, GENERAL NOTES AND SCOPE OF WORK

LIGHTING PLAN (B#1398) AND LIGHTING FIXTURE DETAIL

1ST,2ND FLOOR LIGHTING PLAN (B#1396),

ARCHITECTURAL

ELECTRICAL

INTERIOR & EXTERIOR FINISH SCHEDULE

WALL SECTIONS AND SIGN DETAIL

A - 9

A - 10

9 OF

10 OF

FLOOR PLANS FOR B#1396

ENLARGED PLAN, TOILET ACCESSORIES SCHEDULE AND DETAIL

FLOOR PLAN FOR B#1398 AND ENLARGED FLOOR PLAN

E - 5

E - 6

B#1396 & B#1398 POWER PLAN

M - 6

M - 7

M - 8

M - 9

M - 10

12 OF

13 OF

14 OF

15 OF

16 OF

17 OF

18 OF

19 OF

20 OF

(B#1380 & 1382)

NEW ELECTRIC HEATER AND VENTILATION PLAN

21 OF

22 OF

23 OF

M - 11

M - 12

M - 13

24 OF

25 OF

26 OF

27 OF

28 OF

29 OF

29 B# 1396 (2ND FLOOR) POWER PLAN

(B#1380 & 1382)

NEW EQUIPMENT AND PLUMBING FIXTURE SCHEDULE

DOMESTIC HOT & COLD WATER PIPING PLAN (B#1380 & 1382)

NEW SEWER AND VENT PIPING PLAN (B#1380 & 1382)

VENTILATION AND ELECTRIC HEATER PLAN (B#1396, 1st.FL)

NEW DOMESTIC WATER PIPING, ELECTRIC HOT WATER HEATER,

(B#1396, 1st.FL))

NEW PLUMBING FIXTURES AND EQUIPMENT SCHEDULE

(B#1396, 2nd.FL)

NEW PLUMBING FIXTURES AND EQUIPMENT SCHEDULE

NEW SEWER AND VENT PIPING PLAN (B#1396, 2nd.FL)

VENTILATION AND ELECTRIC HEATER PLAN (B#1396, 2nd.FL)

NEW DOMESTIC WATER PIPING, ELECTRIC HOT WATER HEATER,

NEW EQUIPMENT AND PLUMBING FIXTURES SCHEDULES (B#1398)

VENTILATION AND NEW WALL HEATER PLAN (B#1398)

NEW DOMESTIC WATER PIPING, ELECTRIC HOT WATER HEATER,

NEW SEWER AND VENT PIPING PLAN (B#1396, 1st.FL)

191633

A-129

CONTRACTOR SHALL SUBMIT ALL MATERIAL & COLOR SAMPLES TO DPW FOR

APPROVAL.

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR IDENTIFICATION

A1

REPAIR/MAINTENANCE WORK

* B#1380 & 1382

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

NOT TO SCALE

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

1:100

YI, HS

81338

01382

GATE #16(was #1)

JOB SITE

PURPOSES ONLY, AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

MANUFACTURERS INDICATED. AN EXACT MATCH FOR MANUFACTURER COLOR IS NOT

REQUIRED. THE SELECTIONS SERVE ONLY TO INDICATE COLOR AND PATTERN WHICH

MANUFACTURERS STANDARD MUST APPROACH.

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT, THE GENERAL

CONTRACTOR SHALL NOTIFY IT TO THE CONTRACTING OFFICER.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL

DAMAGES TO EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION

TO ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER.

SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH WITH EXACT

FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE

CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE

CONTRACTING OFFICER FOR APPROVAL.

CUT, PATCH AND RESTORE OF WALLS, FLOORS AND CEILING TO MAKE WAY FOR THE

INSTALLING AND REPLACEMENT OF MECHANICAL, ELECTRICAL, TELEPHONE AND FIRE

ALARM SYSTEM COORDINATION OF THIS WORK MUST BE DONE TO INSURE ROUGH-IN

WORKS IS ACCOMPLISHED PRIOR TO FINISHING WORK.

ALL DOORS AND WINDOWS SHALL BE FABRICATED I.A.W. SPECIFICATIONS AND

MANUFACTURE R'S INSTRUCTIONS. THE CONTRACTOR SHALL PREPARE SHOP

DRAWINGS FOR ALL DOOR AND WINDOW DETAILS AND DRAWING SHALL BE

APPROVED BY THE COR BEFORE FABRICATION AND INSTALLATION.

THE ARCHITECTURAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL

DRAWINGS FOR O & MA PROJECTS, KOREA, 24 JANUARY 2014, DEPARTMENT OF THE

ARMY, INSTALLATION MANAGEMENT AGENCY, KOREA REGION OFFICE." FORM AS A

PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE

ARCHITECTURAL SCOPE OF WORK AT NO ADDITIONAL COST TO THE PROJECT

CONTRAC T.

1.

2.

3.

4.

5.

6.

7.

SCOPE OF WORK

GENERAL NOTES

SITE LOCATION PLAN1

AND LOCATION PLAN

GENERAL NOTES, SCOPE OF WORK

8.

9.

COMPOUND IN ACCORDANCE WITH LOCAL LAWS AND REGULATIONS.

12. REMOVE AND DISPOSE ALL CONSTRUCTION DEBRIS TO OUTSIDE

UNATTENDED.

3)POWER EQUIPMENT AND HAZARDOUS MATERIAL SHOULD NOT BE

2)NO HEAT IN AND AROUND CONSTRUCTION AREA.

1)ALL MATERIAL MUST BE SEPARATED BY FLAMMABLES.

11. KEEP SAFETY CONDITION UNDER CONSTRUCTION.

EVERY DAY.

10. COVER UP ALL THE JOB SITE WITH CLEAN VINYL SHEET DURING WORKING HOURS

ELECTRICAL DEVICES, ETC.) DURING CONSTRUCTION PERIOD.

* B#1396

* B#1398

6. CONTRACTOR SHALL MOVE AND REARRANGE FURNITURE(DESKS, CHAIRS AND

APPLIED WATERPROOFING SYSTEM ON EXISTING ENTIRE ROOF SURFACES.

3. REPAIR BY PATCHING AND APPLYING NEW 100% ACRYLIC FLUID

5. PAINT ON WHOLE STEEL STAIR SURFACES. (LEFT SIDE STAIR ONLY)

ELECTRICAL DEVICES, ETC.) DURING CONSTRUCTION PERIOD.

5. CONTRACTOR SHALL MOVE AND REARRANGE FURNITURE(DESKS, CHAIRS AND

4. PATCH AND PAINT ALL INTERIOR SURFACES.

AS SHOWN ON DWG.

2. REPLACE EXISTING DOOR WITH NEW INCLUDING HARDWARE

SYSTEM AND INSULATIONS AS SHOWN ON DWG.

INCLUDING WATERPROOF TYPE GWB.CEILING, CEILING SUSPENSION

TOILET PATITIONS, VANITY CABINET AND TOILET ACCESSORIES

1. REPAIR EXISTING LATRINE WITH FULL HEIGHT GWCT.,CMT.,

(REPLACEMENT OF FASCIA BOARD AND METAL FLASHING : APPROX. 40%)

APPLIED WATERPROOFING SYSTEM ON EXISTING ENTIRE ROOF SURFACES.

3. REPAIR BY PATCHING AND APPLYING NEW 100% ACRYLIC FLUID

4. PATCH AND PAINT ALL INTERIOR SURFACES.

AND INSULATIONS AS SHOWN ON DWG.

INCLUDING WATERPROOF TYPE GWB.CEILING, CEILING SUSPENSION SYSTEM

CMT.,TOILET PATITIONS, VANITY CABINET AND TOILET ACCESSORIES

1. REPAIR EXISTING FIRST & SECOND FLOOR LATRINE WITH FULL HEIGHT GWCT.,

AS SHOWN ON DWG.

2. REPLACE EXISTING DOORS WITH NEW INCLUDING HARDWARE

AS SHOWN ON DWG.(TEMPORARY LATRINE LOCATION : DETERMINED BY GOVERNMENT)

9. TEMPORARY LATRINE SHALL BE PROVIDED FOR CONSTRUCTION DURATION TEMPORARY LATRINE

* SEE DETAIL DESCRIPTIONS "A-6"

OFFICE AS SHOWN ON DWG.

8. RELOCATE EXISTING WALL MOUNTED A/C UNIT AT CONSTRUCTION BRANCH CHIEF

ELECTRICAL DEVICES, ETC.) DURING CONSTRUCTION PERIOD.

7. CONTRACTOR SHALL MOVE AND REARRANGE FURNITURE(DESKS, CHAIRS AND

6. PATCH AND PAINT ALL INTERIOR SURFACES.

5. REPAIR LATRINES AS SHOWN ON DRAWINGS

AS SHOWN ON DRAWINGS.

4. REPLACE EXISTING DOORS AND WINDOWS WITH NEW INCLUDING HARDWARES

INCLUDING VINYL COVE BASE OR WOODEN BASE AS SHOWN ON DRAWING.

3. REPLACE EXISITING FLOOR SURFACES WITH NEW VINYL DECORATIVE TILES

ON THE DRAWINGS.

2. REPLACE EXISTING WALL LININGS WITH NEW GWB. WALL LININGS AS SHOWN

SYSTEM AND INSULATIONS AS SHOWN ON THE DRAWINGS.

1. REPLACE CEILING SYSTEMS WITH NEW INCLUDING CEILING SUSPENSION

N

6"

191633

A-229

REPLACE DOOR AS OPPOSITE DIRECTION

EXST./REMOVAL FLOOR PLAN

(B#1380 &1382)

EXST./REMOVAL FLOOR PLAN

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

AND BLOCK-UP THE WALL

REMOVE EXST.VENTILATOR

BLOCK-UP THE WALL

REMOVE EXST.DOOR AND

BLOCK-UP THE WALL

REMOVE EXST.DOOR AND

BLOCK-UP THE WALL

REMOVE EXST.WINDOW AND

REMOVE EXST.PARTITION

REMAIN EXST.COLUMN

* ALL HATCHED AREA

SURFACES

REPLACE EXST.FLOOR REMOVE EXST.PARTITION

AND BLOCK-UP THE WALL

REMOVE EXST.DOOR/WINDOW

SCALE : 1 / 100 (B# 1380 & 1382)

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

1:100

YI, HS

A2-

REMOVE EXST.PARTITION

A/C UNIT

WALL MOUNTED

RELOCATE EXST.

6"

DESIGN BR. OFFICE

OFFICE

CHIEF

DESIGN BR.

191633

A-329

ESTIMATION OFFICE

WORK RECEPTION

SERVER ROOM

D1 D1

D1

D2

D1

D1

D2

D1

D1

D3

STORAGE#1

#1

DAYROOM

OFFICE

ENERGY BR.

OFFICE

ESD CHIEF

OFFICE

CONS BR.

CHIEF OFFICE

CONS BR.

D1

OFFICE

BOI CHIEF

OFFICE

PC.

D3

D5

DAY ROOM #2

DAY ROOM #3

STORAGE #2

STORAGE #3

LATRINE

FEMALE

LOUNGE

LADY

CHIEF OFFICE

MESS

CORRIDOR #2

CORRIDOR #4

C O

R R I

D O

R

ROOM

MECH.

OFFICE

MESS

DAY ROOM #4

OFFICE

ADMIN CHIEF

OFFICE #1

ADMIN

OFFICE #2

ADMIN

OFFICE

DIRECTOR

OFFICE

O&M CHIEF

ROOM

CONFERENCE

O&M

ROOM #1

CONFERENCE

ROOM #2

CONFERENCE

ROOM

CONFERENCE

ESD

N

BUDGET OFFICE

OFFICE

CHIEF

ENERGY

ROOM

CONFERENCE

BOI

ROOM #1

MAIL

ROOM #2

MAIL

W1 D2

D4L

D2

D1

HALL

W2

W2

WB

WB

W3

W3

W3

WB WB WB WB WB

W1 W1

W1

W2

WB

WB

W4

W4

A3

A5

A3

A5

OFFICE

ADMIN

PM & CONS.

OFFICE

O&M

SECTION

O&M TECH

NEW PROPOSED FLOOR PLAN

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

1:100

YI, HS

A3 SCALE : 1/100 (B# 1380 & 1382)

OF GWB.WALL LINING

REPAIR BY INSTALLATION

NEW DOOR & FRAME

LATRINE

MALE

NEW PARTITION

FOR HALLWAY

INCL.SOUNDPROOF

INSULATION

1,200

CHIEF OFFICE

SHALL MOVE TO DESIGN BRANCH

EXST. HEATPUMP SYSTEM

LINING

OF GYMSUM BOARD WALL

REPAIR BY INSTALLATION

TO STORAGE #1

EXST.A/C SHALL MOVE

W/NEW

REPLACE DOORS & FRAMES

6,230 6,520 6,200

18,950 780

3,200 2,000

5,200

4,550 3,800 1,520

9,870

3,700 2,520

6,220

41,020

2,600 1,920

4,520

4,900 5,120

10,020

INSULATION

SOUNDPROOF

LINING W/

NEW GWB WALL

1,220 3,060 5,105 4,845 1,410 7,180 6,705 4,540 3,910 6,250 3,810 4,330 1,450 4,025

13,61580043,005

(B#1380 & 1382)

NEW PROPOSED FLOOR PLAN

D2

L

L

VEST.#2

VEST.#3

VEST.#1

D2 D4

D5

AND FRAMES

PAINT DOOR

AND FRAMES

PAINT DOOR

L

AND FRAMES

PAINT DOOR

AND FRAMES

PAINT DOOR

A3A6

1A 1A

A3A6

1B

A3 A6

A3A6

1A

1A

A3A6

A3A6

1C

A3A6

1C

A3 A6

1D

OF GWB.WALL LINING

REPAIR BY INSTALLATION

PATCH AND PAINT ON

EXST.METAL SIDING WALL

MATCH TO EXST.

NEW CONC.STOOP

A/C UNIT

WALL MOUNTED

RELOCATE EXST.

C O

R R I

D O

R

WB WB

AS SHOWN

A-404

STORAGE #1

DAYROOM #1

DESIGN BR. OFFICE

DAY ROOM #2

ESD. CHIEF OFFICE

CONS BR. OFFICE

ESD CONFERENCE ROOM

STORAGE #2

DAY ROOM #3

ENERGY BR. OFFICE

ESTIMATION OFFICE

BUDGET OFFICE

ENERGY CHIEF OFFICE

WORK RECEPTION

PC. OFFICE

BOI CONFERENCE ROOM

MESS CHIEF OFFICE

MESS OFFICE

SERVER ROOM

MALE LATRINE

LADY LOUNGE

FEMALE LATRINE

O&M CONFERENCE ROOM

O&M CHIEF OFFICE

DIRECTOR OFFICE

STORAGE #3

CONFERENCE ROOM #1

CONFERENCE ROOM #2

ADMIN CHIEF OFFICE

DAY ROOM #4

ADMIN OFFICE #1

CORRIDOR #1

CORRIDOR #2

CORRIDOR #4

MAIL ROOM #1

MAIL ROOM #2

SURFACE MATERIAL FINISH COLOR REMARKS

EXTERIOR FINISH SCHEDULE

ALUMINUM

DOOR

WINDOW

METAL

F.F. BY USER

DETERMINED

PAINT DESIGNATION

SEE COLOR

STOOPSTOOP CONC. BROOM -

HALL

VESTIBULE #1

VESTIBULE #3

#138B

#138A

#137

#134

#139A

#139B

#132

#136

#122

ADMIN OFFICE #2

#101

#100

#102

O&M TECH SECTION#103

#104

#106 O&M OFFICE

#106A

#106B

#120

#121

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

YI, HS

NO.

ROOM

ROOM NAME

INTERIOR FINISH SCHEDULE

FLOOR BASE WAINSCOT WALL CEILING

MAT. FIN. COLOR MAT. FIN. COLOR MAT. FIN. COLOR MAT. FIN. COLOR MAT. FIN. COLOR HGT.HGT.

REMARKS

INTERIOR & EXTERIOR FINISH SCHEDULE

BOI CHIEF OFFICE

DESIGN BR.CHIEF

PM.& CONS.ADMIN.

CONS BR.CHIEF

EXST. - -

VDT. F.F.

EXST.

VDT. F.F.

EXST. - -

VDT.

F.F.

EXST.

VDT.

EXST.

VDT.

CMT.

EXST.

CORRIDOR #3

VESTIBULE #2

F.F.

F.F.

WOOD PAINT

BY USER

DETERMINED

BY USER

DETERMINED

BY USER

DETERMINED

BY USER

DETERMINED

BY USER

DETERMINED

DESIGNATION

SEE COLOR

WOOD

EXST.

WOOD

WOOD

EXST.

GCWT.

WOOD

EXST.

EXST.

F.F.

BY USER

DETERMINED

PAINT

DESIGNATION

SEE COLOR

WOOD

EXST.

WOOD

GWB.

EXST.

GWB.

EXST.

EXST.

GWB.

GWB.

EXST./

GWB.

EXST./

EXST.

GWB.

EXST.

GCWT. F.F.

BY USER

DETERMINED

EXST. PAINT

DESIGNATION

SEE COLOR

PAINT

DESIGNATION

SEE COLOR

EXST. PAINT

DESIGNATION

SEE COLOR

ACST.

EXST.

F.F.

BY USER

DETERMINED

ACST. F.F.

BY USER

DETERMINED

PAINT

DESIGNATION

SEE COLOR

EXST. PAINT

DESIGNATION

SEE COLOR

GWB.

EXST.

ACST.

EXST.

*GWB.

F.F.

BY USER

DETERMINED

PAINT

DESIGNATION

SEE COLOR

ACST.

EXST.

ACST. F.F.

BY USER

DETERMINED

PAINT

DESIGNATION

SEE COLOR

EXST.

GWB.:12.5mm THK.GYPSUM WALL BOARD

ACST.:15mm THK.ACOUSTICAL TILE

*GWB.:12.5mm THK.WATERPROOF TYPE

ACST. F.F.

BY USER

DETERMINED

GWB. PAINT

DESIGNATION

SEE COLOR

ACST.

EXST.

INSULATION REPLACEMENT.

* REPLACEMENT CEILING WORKS INCLUDE

EXST.

VDT. F.F.

BY USER

DETERMINED

WOOD

EXST.

WOOD

EXST./

EXST.

GWB.

EXST./

EXST.

ACST.

PAINT

F.F.

*GWB. *GWB.:12.5mm THK.WATERPROOF TYPE

SSM-1:

OR APPROVED EQUAL.

CORIAN, COUNTER TOP : BLACK QUARTS

SOLID SURFACE MATERIAL

SSM-2:

CORIAN, ECRU OR APPROVED EQUAL.

& REMOVABLE PANEL

TOILET PARTITION, URINAL SCREEN

SOLID SURFACE MATERIAL

TOILET ACCESSORIES SCHEDULE

ITEM REMARK

SMLD

TTD

SD SOAP DISH

SHELF METAL LIGHT DUTY

TOILET TISSUE DISPENSER * 2-ROLLTYPE

* SEE STD.DETAIL DWG.

PTD PAPER TOWEL DISPENSER

TOILET PARTITION

Q'TY

MIRROR GLASSMG 1

2RH

* FIT TO WALL WIDTH

FLOOR MATERIAL/COLOR

BASE MATERIAL/COLOR

WALL MATERIAL/COLOR

CEILING MATERIAL/COLOR

CMT

OR APPROVED EQUAL

NON-SLIP, 300 x 300 x 8 THK

FG 7L67-1, MARON

DONGSEO, INUS

NON-SLIP CERAMIC FLOOR TILE

OR APPROVED EQUAL

DARK BROWN, 100 HGT, 3THK

LG HAUSYS

VINYL COVE BASE

GCWT.

* GROUT COLOR FOR GCWT

OR APPROVED EQUAL

: MOLD & MILDEW RESISTANT, STAIN PROOF

ANTIQUE WHITE

OR APPROVED EQUAL

300 x 600 x 10 THK

LQR 1N92-1, GLOSS

DONGSEO, INUS

GLAZED CERAMIC WALL TILE

OR APPROVED EQUAL

LATEX/SEMIGLOSS

NOROO NR7066

PAINT COLOR

OR APPROVED EQUAL

LATEX/EGGSHELL

NOROO NR7066

PAINT COLOR

* GROUT COLOR FOR CMT

OR APPROVED EQUAL

: MOLD & MILDEW RESISTANT, STAIN PROOF

ANTIQUE WHITE

VDT.

VCB

PAINT

PAINT

OR APPROVED EQUAL

450MMx450MM, 3MM THK

KCC EXCELLENT (NON-ACM)

VINYL DECORATIVE TILE

FEMALEMALE

* W/RECEPTACLE TYPE

* SSM-1 (CORIAN)

* SSM-2 (CORIAN)

* SSM-2 (CORIAN)

25THK.WOOD

TUBE FRAME(TYP.)

-50x50x6 ST'L

GALV.

200 275 150

CMT

@600 O.C.

TOGGLE BOLT

3EA.-18DIA.

(SEE MECH.DWG.)

LAVATORY

TYP.LAVATORY COUNTER DETAIL

NOT TO SCALE

MIRROR

A5 A5

MET.STUD

ANCHOR TO

ST'L PLATE

400x2,400x4THK.

US

ROBE HOOK

URINAL SCREEN -

OVER 18THK.PLYWOOD

COUNTER TOP & SPLASH BACK

(SSM-1)

SOLID SURFACING MATERIAL

POST-FORMED 13THK

ON12THK.PLY WD.

SSM-2(6THK.)

REMOVABLE PANEL

INSULATION

INCL.SOUND PROOF

@300 O.C.

ON 90/150mmTHK.METAL STUD

ON 12mmTHK.CEMENT BOARD

ON W.P.MEMBRANE

ON METAL LATH

GCWT.ON CEMENT MORTAR

LAVATORY COUNTER

TTD

TTD

TTD

TTD

A3

SMLD

SD

SMLD

SD

SMLD

SD

SMLD

SD

SMLD

SD

US

US

US

LATRINES ENLARGED PLAN1

A5

191633

AS SHOWN

A-505

MALE LATRINE

FEMALE LATRINE

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

YI, HS

LAVATORY COUNTER DETAIL

TOILET ACCESSORIES SCHEDULE AND

LATRINE ENLARGED PLAN,

ACST.

OR APPROVED EQUAL

WHITE

MC 3102

"KCC MITONE"

603MM x 603MM x 15MM THK

ACOUSTICAL CEILING TILE

3,050

PTD

RH

RH

RH

RH

SAPCE

WINDOW OPENING

EXISTING

BLOCK-UP

800X500

WITH NEW

REPLACE WINDOW

PTD

TTD TTD

1,900

RH RH

SCLAE : 1 / 50

FULL HEIGHT

GCWT.

FULL HEIGHT

GCWT.

NOT TO SCALE

TOILET SIGN DETAILS

* SEE O & MA STANDARD DETAIL DRAWINGS, KOREA : A-1501 & 1502

DOOR

FL

EE

DOOR

FL

EE150

TOILET SIGN LOCATION

POLISH EDGES

ALL AROUND (TYP)

BRAILLE

BLACK BROWN

WHITE BORDER LINE

WHITE LETTER

WHITE

PICTOGRAPH

(25 CAP LETTER HGT)

BACK GROUND

BASE BOARD

Men

C A

P

C A

P

Women

EXST.FLOOR SLAB

C L

G

H G

T

CORRIDOR

C L

G

H G

T

THK.12.5mm GWB

PAINT ON

WOOD BASE

PAINT ON

WALL SECTIONS

SCALE : 1 / 20A3 A6

HANGER (TYP.)

FRAME W/ WIRE

SUSPENDED METAL

STUD @400 O.C.

THK.90mm MET.

INSULATIONS

SOUND PROOF

OFFICE

THK.12.5mm GWB

PAINT ON

EXST.CEILING

EXST.FLOOR SLAB

C L

G

H G

T

THK.12.5mm GWB

PAINT ON

HANGER (TYP.)

FRAME W/ WIRE

SUSPENDED METAL

STUD @400 O.C.

THK.90mm MET.

OFFICE

1B

A3 A6

1A

A3 A6

INSULATIONS

191633

AS SHOWN

A-606

A3 A6

GWB.CEILINGACST.CEILING

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

YI, HS

WALL SECTIONS AND SIGN DETAIL

VDT.

WOOD BASE

PAINT ON

VDT. VDT.

WOOD BASE

PAINT ON

CMT W/MORTAR BED

HANGER (TYP.)

FRAME W/ WIRE

SUSPENDED METAL

EXST.FLOOR SLABASPHALT FELT

2-PLY,30#

C L

G

H G

T

INSULATIONS

SOUND PROOF

1C

A3A6

(WATERPROOF TYPE)

GWB.CEILING

12.5THK.

PAINT ON

@300 O.C.

ON 90THK.METAL STUD

ON 12THK.CEMENT BD.

ON W.P.MEMBRANE

ON METAL LATH

GCWT.ON CEMENT MORTAR

EXST.CONC.FL.SLAB

50THK.DEPRESSED

EXST.FLOOR SLAB

C L

G

H G

T

C L

G

H G

T

THK.12.5mm GWB

PAINT ON

WOOD BASE

PAINT ON

STUD @400 O.C.

THK.90mm MET.

INSULATIONS

SOUND PROOF

THK.12.5mm GWB

PAINT ON

1D

A3 A6

VDT.

WOOD BASE

PAINT ON

SERVER ROOMBOI CONF.ROOM

HANGER (TYP.)

FRAME W/ WIRE

SUSPENDED METAL

ACST.CEILING EXST.CEILING

EXST.FLOOR

PATCH THE EXST.WALL

OPENING.

EXST.DOOR/WINDOW

* BLOCK-UP

TO PROTECT SERVER FROM DUST.

AT SERVER ROOM SIDE

DURING CONSTRUCTION PERIOD

* 100% PLASTIC COVER SHALL BE NEEDED

LATRINE

NOT TO SCALE

A1 A6

TEMPORARY LATRINE DESCRIPTION

WATER CLOSET

HEATER

WALL MOUNTED

VENTILATION

PARTITIONS

TOILET

URINALS

MUSICBOX

SOUNDPRROF

LAVATORY

DRYER

HAND

* TEMPORARY LATRINE SHALL BE PROVIDED FOR CONSTRUCTION DURATION.

* SEWER TANK SHALL BE CLEANING FOR 0NCE PER A WEEK.

- OR APPROVED EQUAL

. H.V.A.C. SYSTEM EQUIPPED.

. SIZE : ABT. 7,000x2,500x3,000(H)

. TANK CAPACITY : ABT. SEWER-5,000L, WATER-2,000L

. LAVATORY : MALE 1EA., FEMALE 1EA.

. URINAL : MALE 4EA.

. WATER CLOSET : MALE 2EA., FEMALE 5EA.

- MODEL : T6

- RENTAL COMPANY : JAEIL MOBILE CO.LTD.(031-766-1660)

* TEMPORARY LATRINE

OFFICE

WITH STEEL DOOR FRAME

* WOOD FLUSH, SOLID CORE, SINGLE DOOR

MALE/ FEMALE LATRINE

1 - ALUMINUM THRESHOLD J32180

1 - DOOR HOLDER, L01381

1 - DOOR STOP, L02161

1 - KICK PLATE, J102

1 - DOOR CLOSER CO2021

1 - PULL PLATE, J401

1 - PUSH PLATE, J301

3 - BUTT, HINGES TYPE A5112

HDW - MALE/ FEMALE LATRINE

* 19 mm UNDER CUT

W1

TRIM

OAK WOOD

STOOL

OAK WOOD

INSECT SCREEN

WEATHERSTRIPPING AND WINDOW FASTENER

THERMAL BREAK TYPE INCLUDING INSECT SCREEN,

WITH ALUM. FRAME, ANODIZED DARK BRONZE,

* ALUMINUM SASH SLIDING BLAST WINDOW

NOTES

AND INSTALLATION

BY THE CONTRACTING OFFICER BEFORE FABRICATION

ALL DOORS AND WINDOWS. THESE SHALL BE APPROVED

2. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR

"BEST-LOCK" OR APPROVED EQUAL.

4. ALL LOCKS SHALL UTILIZED INTERCHANGEABLE CORE

FRAME DESIGNED IN ACCORDANCE WITH ASTM F2248.

PROVIDE WINDOW PRODUCT INCLUDING GLAZING AND

5. SPECIAL NOTE FOR WINDOW GLAZING AND FRAMES :

D1 D3

WITH STEEL DOOR FRAME

* WOOD FLUSH, SOLID CORE SINGLE DOOR

PASSAGE DOOR

* WOODEN LOUVER : 400 x 300

D2

191633

AS SHOWN

A-707

W2 W3 W4

- INSULATING OPAQUE GLASS UNIT (8.75+12+6)

* W4 - SIZE : 900 x 500 x THK.130mm

INSULATING GLASS UNIT

* 18mmTHK. (6+6+6)

EXIT DOOR (EXTERIOR)

SINGLE BLAST DOOR WITH STEEL DOOR FRAME

* STEEL FLUSH, INSULATED HALF GLASS

D4

DOOR & WINDOW DESCRIPTIONS

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

YI, HS

WITH STEEL DOOR FRAME

* WOOD FLUSH, SOLID CORE SINGLE DOOR

NOT TO SCALEA3 A7

1 DOOR & WINDOW DESCRIPTIONS

1 - ALUMINUM THRESHOLD, J32300

1 - DOOR STOP, L02161

1 - KICK PLATE J102

1 - DOOR CLOSER CO2021

1 - LOCKSET, F82

HDW - OFFICE

1 - THRESHOLD, J32300

1 - DOOR HOLDER, L01381

1 - DOOR STOP L02161

1 - KICK PLATE, J102

1 - DOOR CLOSER, C02021

1 - LOCK SET, F75 LEVER TYPE

HDW - PASSAGE DOOR

* 600x800x6mm WIRED OPAQUE GLASS

* WOODEN LOUVER : 400 x 300

EXIT DOOR (EXTERIOR)D5

* 600x800x6mm WIRED OPAQUE GLASS

BLAST DOOR WITH STEEL DOOR FRAME

* STEEL FLUSH, INSULATED SINGLE

L REPLACE LOCKSET ONLY

TO EXISTING.

* CODDIDOR SIDE WOOD FLUSH DOOR COLOR MATCH

COATED NATURAL COLOR FINISH.

3. WOOD FLUSH DOORS SHALL BE FINISHED FACTORY

PRIOR TO COMMENCING WORK.

REQUIRE APPROVAL BY THE CONTRACTING OFFICER

SCHEDULE AND MANUFACTURES' INSTRUCTIONS

IN ACCORDANCE WITH SPECIFICATIONS, HARDWARE

1. ALL DOORS AND WINDOWS SHALL BE FABRICATED

ANTITERRORISM STANDARDS FOR BUILDING.

ACCORDANCE WITH UFC 4-010-01, DoD MINIMUM

6. WINDOW PRODUCT INSTALLATION SHALL BE IN

+ THK.6mm TINTED LOW-E TEMPERED GLASS

+ THK.12mm AIR SPACE

THK.8.75mm LAMINATED GLASS

(THK.25mm)

* REPLACE WINDOW BLINDS WITH NEW AT ALL NEW WINDOWS.

1 - WEATHER STRIPPING

1 - ALUMINUM THRESHOLD, J36190

1 - DOOR STOP & HOLDER L01371

1 - KICK PLATE, J102

1 - DOOR CLOSER, C02021

* LEVER HANDLE TYPE

DOOR HANDLES, (KABA SIMPLEX 1000)

1 - PUSH-BUTTON COMBINATION

(TYPE"3" AND FUNCTION "5")

1 - EXIT DEVICE (PUSH PAD TYPE)

3 - BUTT, HINGES TYPE A5112 (NRP)

HDW - EXIT DOOR (EXTERIOR)

1 - WEATHER STRIPPING

1 - ALUMINUM THRESHOLD, J36190

1 - DOOR STOP & HOLDER L01371

1 - KICK PLATE, J102

1 - DOOR CLOSER, C02021

* LEVER HANDLE TYPE

DOOR HANDLES, (KABA SIMPLEX 1000)

1 - PUSH-BUTTON COMBINATION

3 - BUTT, HINGES TYPE A5112 (NRP)

* LEVER HANDLE TYPE

DOOR HANDLES, (KABA SIMPLEX 1000)

1 - PUSH-BUTTON COMBINATION

- INSULATING CLEAR GLASS UNIT (8.75+12+6)

* W1 - SIZE : 1150 x 1050 x THK.130mm

- INSULATING CLEAR GLASS UNIT (8.75+12+6)

* W2 - SIZE : 1050 x 750 x THK.130mm

- INSULATING CLEAR GLASS UNIT (8.75+12+6)

* W3 - SIZE : 900 x 750 x THK.130mm

WB

* FIT TO EXISTING WINDOW SIZE.

REPLACE WINDOW BLIND ONLY. (THK.25mm)

WITH STEEL DOOR FRAME

* WOOD FLUSH, SOLID CORE, SINGLE DOOR

MALE/ FEMALE LATRINE

* 19 mm UNDER CUT

D6

* WOODEN LOUVER : 400 x 300

1 - ALUMINUM THRESHOLD J32180

1 - DOOR HOLDER, L01381

1 - DOOR STOP, L02161

1 - KICK PLATE, J102

1 - DOOR CLOSER CO2021

1 - LOCKSET, F76

HDW - MALE/ FEMALE LATRINE

- INSULATING CLEAR GLASS UNIT (8.75+12+6)

* W5 - SIZE : 1,050 x 850 x THK.130mm

WITH STEEL DOOR FRAME

* WOOD FLUSH, SOLID CORE, SINGLE DOOR

WOODEN LOUVER

300 x 250

* 300 x 250 WOODEN LOUVER

JANITOR ROOMD7

1 - ALUMINUM THRESHOLD J32180

1 - DOOR HOLDER, L01381

1 - DOOR STOP, L02161

1 - KICK PLATE J102

1 - DOOR CLOSER CO2011

1 - LOCKSET, F86

HDW - STORAGE/ JANITOR

- A6

EXST.FIRST FLOOR PLAN

(B#1396)

- A6 (B#1396)

191633

A-808

1:100

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

YI, HS

EXST.SECOND FLOOR PLAN

SCALE : 1/100 SCALE : 1/100

CH: 2,500 CH: 2,500

13,630 1,900 3,300

18,830

8,360 2,165

3,780 4,135

18,830

18,830

14,580 2,150 2,100

18,830

8,840 5,920 4,070

A6 A6 (B#1396)SCALE : 1/100

CH: 2,500

13,630 1,900 3,300

18,830

8,360 2,165

3,780 4,135

18,830

NEW PROPOSED FIRST FLOOR PLAN 4

A6 A6 (B#1396)SCALE : 1/100

NEW PROPOSED SECOND FLOOR PLAN

D3

D3

ROOM

MECH.

ROOM

PRINTER

MALE

FEMALE

JAN.

OFFICE

BR.CHIEF

OFFICE

STAIR SURFACES

WHOLE STEEL

PAINT ON

*THIS SIDE ONLY

STAIR SURFACES

WHOLE STEEL

PAINT ON

*THIS SIDE ONLY

A8

A9

* SEE ENLARGED PLAN

FLOOR PLANS FOR B#1396

D7

CH: 2,500

18,830

14,580 2,150 2,100

18,830

8,840 5,920 4,070

OFFICE

OFFICE OFFICE

JAN.

FEMALE

MALE

D7 D3

D3

* SEE ENLARGED PLAN

A8

A9

A-909

1:100

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

YI, HS

TOILET ACCESSORIES SCHEDULE

ITEM REMARK

TTD

SD SOAP DISH

TOILET TISSUE DISPENSER * 2-ROLLTYPE

* SEE STD.DETAIL DWG.

PTD PAPER TOWEL DISPENSER

TOILET PARTITION

Q'TY

MIRROR GLASSMG

RH

* FIT TO WALL WIDTH

* W/RECEPTACLE TYPE

* SSM-2 (CORIAN)

ROBE HOOK

LAVATORY CABINET 2

A8

A9 SCLAE : 1 / 50 (B#1396)

D3

D3

1,080 1,870

2,950

450 1,580 1,870

3,900

NOT TO SCALEA9 A9

VARI.

150MM HIGH BACKFLASH

VANITY TOP, TRIM AND

13mmTHK. MARBLE,(SSM-1)

TTD

TTD

RH

RH

SD

SD

PTD

PTD

* SSM-1(CORIAN) COUNTER TOP

B#1398

EACH VANITY DOOR & HARDWARE

HINGE B 01361

2-PAIR SEMICONCEALED

2-CABINET KNOBS B 02181

CATCHES B 03171

2-HEAVY DUTY MAGNETIC

DOOR PULL W/SCREW

2-CHROME COATED ALUM.

W/LAMINATED FINISH

VANITY AND SHELVES

19mmTHK. PLYWOOD

(VOID)

DRAWER

LAV. CHINA BOWL

OVAL HORIZON

EQUAL

MG

MG

VANITY CABINET DETAIL

SCHEDULE AND DETAIL (B#1396)

ENLARGED PLAN, TOILET ACCESSORIES

D7

D3

D3

D7

TTD

SD

MG

PTD

SD

MG

TTD

MR

MR

PTD

450 1,580 1,870

3,900

1,060865

1,925

1,100 1,065 1,885

4,050

MR MOP RACK

JAN.

FEMALE

MALE

JAN.

FEMALE

MALE

2 * JANITOR ROOM

(1&2 FL.)

MALE

(1&2 FL.)

FEMALE

LATRINES ENLARGED PLAN (1st.FL.)

A8

A9 SCLAE : 1 / 50 (B#1396)

LATRINES ENLARGED PLAN (2nd.FL.)

FULL HEIGHT

GCWT.

FULL HEIGHT

GCWT.

FULL HEIGHT

GCWT.

FULL HEIGHT

GCWT.

FULL HEIGHT

GCWT.

FULL HEIGHT

- (B#1398)

191633

A-1010

1:100

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

YI, HS

EXST.FLOOR PLAN

SCALE : 1/100

CH: 2,500

CH: 2,500

8,080 4,500 9,5009,5009,500 4,720

26,800

26,800

3,850 2,180 2,185 9,735 5,500 3,350

* NO PAINT NEEDED

ACST.CEILING AREA

D6

A10

LATRINES ENLARGED PLAN2

SCLAE : 1 / 50A10 A11

SD

PTD

A9 A9

9001,080

1,980

MG

TTD

CABINET DETAIL

SEE VANITY

ENLARGED FLOOR PLAN

FLOOR PLAN FOR B#1398 AND

D6 FULL HEIGHT

GENERAL NOTE

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

1:100

MECHANICAL

M-1

KIM TH

191633

GENERAL NOTE, SCOPE OF WORK

- MECHANICAL O&MA STANDARD TECHNICAL SPECIFICATIONS FOR MISCELLANEOUS.

CONTRACTOR IN STRICT ACCORDANCE WITH APPLICABLE SECTIONS OF DIVISION 23

16. ALL MECHANICAL SYSTEMS SHALL BE TESTED, ADJUSTED AND BALANCED BY THE

AS TAP WATER

REQUIREMENTS AND FLUSHED UNTIL ALL WATER BEING FLUSHED IS CLEAR

15. PIPING SYSTEMS SHALL BE FLUSHED, PURGED & CLEANED PER SPECS

14. RETURN AIR & EXHAUST AIR DUCT SHALL BE PRESSURE CLASS -50MM AQ.

13. ALL AIR DUCT DIMENSION SHOWN ARE INDICATED AS ACTUAL INSIDE DIMENSIONS.

DUCT CONNECTION TO FUNCTION AS ORIGINALLY INTENDED.

REMOVE THE EXIST DUCTWORK AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY

IF THE EXIST DUCT ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION,

WITH THE EXIST DUCTWORK AND PIPING ELEVATION/LOCATION.

12. PRIOR TO INSTALL NEW HVAC AND PLUMBING PIPING CONTRACTOR MUST COORDINATE

11. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY FIELD.

SUCH AS ANCHORS, HANGERS/SUPPORT, ETC.

10. ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL IT'S ACCESSORIES

SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREA.

9. ANY OPENING RESULT FROM THE REMOVAL WORK THAT'S NOT TO BE RE -USED

REQUIREMENTS OF SEAL CLASS C.

TO SMACNA STATIC PRESSURE CLASS 500PA AND DUCTWORK SHALL MEET THE

8. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING

DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREAS.

7. ALL WALL/FLOOR/ROOF OPENINGS RESULTED FROM THE REMOVAL OF PIPING AND

CONTRACT DRAWING.

DRAWINGS. SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE

6. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP

5. CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPEC.

SEALED PER SPEC.

4. ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/ NEW) SHALL BE

OR REPLACED BY THIS CONTRACTOR.

DAMAGED DUE TO THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED

THE EXISTING EQUIPMENT AND ANY EQUIPMENT SUCH AS DUCT WORK, PIPING ETC.

3. CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE

APPROXIMATE AND SHALL BE VERIFIED AT THE JOB SITE.

2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC.

FOR PROPER CORRECTIONS FOR CONTRACTING OFFICER'S APPROVAL.

THE CONTRACTING OFFICER'S REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS

OF WORK. IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO

THE EXISTING CONDITIONS, EQUIPMENT, FINISHES, ETC., PRIOR TO START

1. CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH

YONGSAN, KOREA

BLDG. NO. 1380, 1382, 1396 AND 1398

REPAIR BUILDING

FY18

SCOPE OF WORK (REPAIR/MAINTENANCE WORK)

6. ALL DUCT SYSTEMS SHALL BE TESTED, ADJUSTED, BALANCED AND SUBMIT THE TEST REPORT AS REQUIREMENTS.

CLEANING WORK.

CLEANING SYSTEM AND SUBMIT THE REPORT WITH PHOTOS AND VIDEO ELECTRONIC FILES FOR BEFORE AND AFTER

5. DO CLEANING AND REMOVING THE DUST IN THE EXISTING DUCTS ON THE CEILING OF TOILET BY REMOTE ROBOT

TOILET ROOM WITH NEW AS INDICATED ON THE PLAN.

4. REPLACE EXISTING PLUMBING FIXTURES INCLUDING WATER CLOSETS, LAVATORIES AND ASSOCIATED PIPING AT THE

PLAN.

3. REPLACE EXISTING ELECTRIC HOT WATER HEATER WITH NEW AT TOILET ROOM AS INDICATED AS INDICATED ON THE

PLAN.

2. REPLACE EXISTING DOMESTIC HOT AND COLD WATER PIPING AT TOILET ROOM WITH NEW AS INDICATED ON THE

ON THE PLAN.

1. REPAIR BY INSTALLATION OF NEW WALL HEATER AND THE THERMOSTATS IN THE TOILET ROOM AS INDICATED

BLDG# 1398

7. ALL DUCT SYSTEMS SHALL BE TESTED, ADJUSTED, BALANCED AND SUBMIT THE TEST REPORT AS REQUIREMENTS.

ASSOCIATED PIPING AT THE MALE & FEMALE TOILET ROOMS WITH NEW AS INDICATED ON THE PLAN.

6. REPLACE EXISTING PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINAL, LAVATORIES, SERVICE SINK AND

5. REPLACE EXISTING ELECTRIC HOT WATER HEATERS WITH NEW AT MALE TOILET ROOMS AS INDICATED ON THE PLAN.

INDICATED ON THE PLAN.

4. REPLACE EXISTING DOMESTIC HOT AND COLD WATER PIPING AT MALE & FEMALE TOILET ROOMS WITH NEW AS

3. REPLACE EXISTING SEWER LINE WITH NEW AS INDICATED ON THE PLAN.

TOILET ROOMS WITH NEW AS INDICATED ON THE PLAN.

2. REPLACE EXISTING WALL EXHAUST FAN, CONTROL SWITCH AND ASSOCIATED GRILLE & DUCT AT MALE & FEMALE

FEMALE TOILET ROOMS AS INDICATED ON THE PLAN.

1. REPLACE EXISTING RADIATORS WITH NEW ELECTRIC WALL HEATERS AND THE THERMOSTATS IN THE MALE &

BLDG# 1396

ASSOCIATED PIPING AT THE MALE & FEMALE TOILET ROOMS WITH NEW AS INDICATED ON THE PLANS.

6. REPLACE EXISTING PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS, LAVATORIES AND

5. REPLACE EXISTING SEWER AND VENT PIPE WITH NEW AS INDICATED ON THE PLAN.

ON THE PLAN.

4. REMOVE AND RE -INSTALL EXISTING ELECTRIC HOT WATER HEATER AT FEMALE TOILET ROOM AS INDICATED

AS INDICATED ON THE PLAN.

3. REPLACE EXISTING DOMESTIC HOT AND COLD WATER PIPING AT MALE & FEMALE TOILET ROOMS WITH NEW

TOILET ROOMS WITH NEW AS INDICATED ON THE PLAN.

2. REPLACE EXISTING EXHAUST FANS, CONTROL SWITCH AND ASSOCIATED GRILLE & DUCT AT MALE & FEMALE

AS INDICATED ON THE PLAN.

1. REPLACE EXISTING ELECTRIC CEILING AND WALL HEATER WITH NEW IN THE MALE & FEMALE TOILET ROOMS

BLDG# 1380 & 1382

MECHANICAL

1:100

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

KIM, TH

191633

M-2

ITEM DESCRIPTION QTY REMARKS

NEW EQUIPMENT SCHEDULE

NEW EQUIPMENT SCHEDULE

M-2

M-2

NEW PLUMBING FIXTURES SCHEDULE

A

REMARKS

CONNECTION

PIPE

RATING

FU

QTY

SYMBOL

P.D.I

1-11

12-32

PLUMBING FIXTURES SCHEDULE

PLUMBING FIXTURES QTY

COLD HOT TRAP VENT

REMARKS

- INTEG.15

20 - 50 40

LOCAL PIPE CONNECTION

SYMBOL

6 LITERS/FLUSH

WATER HAMMER ARRESTER SCHEDULE

WATER CLOSET, FLUSH TANK

PDI-WH 201 AND MANUFACTURER'S INSTRUCTIONS.

2. SIZE AND LOCATE WATER HAMMER ARRESTORS PER

CHAMBER W/EXPANSION BELLOWS.

1. COPPER CONSTRUCTION PRESSURIZED COMPRESSION

B

P-2

P-1

NEW PLUMBING FIXTURE SCHEDULE

5 15 15 50 40 W/ 0.16 LPS FAUCETLAVATORYP-2

URINAL 3.8 LITERS/FLUSH

BLDG#1380 & 1382

BLDG#1380 & 1382

BLDG# 1380

FOR TOILET

BLDG# 1380

ROOF FAN

EXISTING

REPLACE

BLDG# 1382

ROOF FAN

EXISTING

REPLACE

NEW EQUIPMENT AND PLUMBING

FIXTURES SCHEDULE

2 FOR TOILET

BLDG#1380 &

WALL HEATER

BLDG# 1382

FOR TOILET

YONGSAN, KOREA

BLDG. NO. 1380, 1382, 1396 AND 1398

REPAIR BUILDING

FY18

6"

N

WORK LOCATION

M-2

BLDG#1380 & 1382

WORK LOCATION

AS REQUIRED

7680 BTU/HR

2250-WATT, 1PH 208V 10.8A

WALL HEATER

AS REQUIRED

2560 BTU/HR

750-WATT, 1PH 208V 3.6A

WALL HEATER

AS REQUIRED

FAN MOTOR: 1/4 HP 115 V 1PH 60HZ

AIR CAPACITY: 481 CFM, 1/4" WG SP

ROOF VENTILATION

AS REQUIRED

FAN MOTOR: 1/6 HP 115 V 1PH 60HZ

AIR CAPACITY: 133 CFM, 1/4" WG SP

ROOF VENTILATION

AS REQUIRED

BASEBOARD/LINE VOLT THERMOSTAT

THERMOSTAT

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

1:100

MECHANICAL

KIM, TH

191633

M-3

WCO

65 VTR

FD

FD

WCO

WCO

EXISTING

SEWER LINE

TO

CONNECT

EXISTING

SEWER LINE

TOCONNECT

FD

SCALE = 1:50

NEW SEWER AND VENT PIPING PLAN

M-3

65 VTR

INCREASE

50x65

FCO

N

POC

INCREASE

50x65

NEW SEWER AND VENT PIPING PLAN

SEWER LINE WITH THE POC.

3.CONTRACTOR SHALL SUBMIT THE SHOP DRAWING OF

AND THE CONNECTION POINT AT THE SITE.

2.CONTRACTOR SHALL FIND OUT THE EXISTING LINE

FROM THE NEW PLAN.

1.EXISTING SEWER LINE CAN BE DIFFERENT

[POINT OF CONNECTION]

NOTE

6"

YONGSAN, KOREA

BLDG. NO. 1380, 1382, 1396 AND 1398

REPAIR BUILDING

FY18

BLDG#1382

BLDG#1380

(BLDG#1380&1382)

KIM, TH

191633

M-4

ELECTRIC WATER

HEATER 4 GAL

DRAIN PIPE

LAVATORY

VIEW OF A-A'

SCALE = 1:50M-4

LAVATORY CABINET

15.15

A

A'

25.40

40.20

(PDI:"B"TYPE)

P-2

P-1

WATER HAMMER

ARRESTOR

WATER HAMMER

ARRESTOR

(PDI:"B"TYPE)

WATER HAMMER

ARRESTOR

(PDI:"A"TYPE)

40.40

20.20

ELECTRICDOMESTIC

HOT WATER HEATER

15.15

N

B

P-1

P-3

P-3

B

A

POC

POC

NEW DOMESTIC HOT & COLD WATER PIPING PLAN

NEW DOMESTIC HOT & COLD

WATER PIPING PLAN

THE HOT & COLD LINE WITH THE POC.

3.CONTRACTOR SHALL SUBMIT THE SHOP DRAWING FOR

AND THE CONNECTION POINT AT THE SITE.

2.CONTRACTOR SHALL FIND OUT THE EXISTING LINE

FROM THE NEW PLAN.

1.EXISTING WATER LINE CAN BE DIFFERENT

[POC: POINT OF CONNECTION]

25.40

25.40

15.15

15.15

EXISTING

EXISTING

(RE-USE)

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

6"

YONGSAN, KOREA

BLDG. NO. 1380, 1382, 1396 AND 1398

REPAIR BUILDING

FY18

15.15

BLDG#1382 BLDG#1380

NOTE

(BLDG#1380&1382)

UNDER COUNTER TOP

(RE -USE)

ELECTRIC HOT WATER HEATER (RE -USE)

KIM, TH

191633

M-5

SCALE = 1:50

NEW ELECTRIC HEATER AND

VENTILATION PLAN

THERMOSTAT FOR WALL ELECTRIC HEATER

WALL ELECTRIC HEATER

WALL ELECTRIC HEATER

CEILING EXHAUST GRILLE

CONNECT TO ROOF FAN

THERMOSTAT FOR

WALL ELECTRIC HEATER

CEILING EXHAUST GRILLE

N

152MM X 152MM (133 CFM)

203MM X 203MM (240 CFM)

CONNECT TO ROOF FAN

ROOF EXHAUST DUCT

CONNECT TO ROOF FAN

203MM X 203MM (133 CFM)

ROOF EXHAUST DUCT

(481 CFM)

305MM X 305MM

VENTILATION PLAN

NEW ,ELECTRIC HEATER AND

M-5

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

6"

YONGSAN, KOREA

BLDG. NO. 1380, 1382, 1396 AND 1398

REPAIR BUILDING

FY18

BLDG#1382 BLDG#1380

(BLDG#1380&1382)

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

NEW EQUIPMENT SCHEDULE2

M-6

WORK LOCATION

M-6

M-6

NEW PLUMBING FIXTURES SCHEDULE

A

REMARKS

CONNECTION

PIPE

RATING

FU

QTY

SYMBOL

P.D.I

1-11 202

PLUMBING FIXTURES SCHEDULE

PLUMBING FIXTURES QTY

COLD HOT TRAP VENT

REMARKS

- INTEG.15

20 - 50 40

LOCAL PIPE CONNECTION

SYMBOL

6 LITERS/FLUSH

WATER HAMMER ARRESTER SCHEDULE

WATER CLOSET, FLUSH TANK

PDI-WH 201 AND MANUFACTURER'S INSTRUCTIONS.

2. SIZE AND LOCATE WATER HAMMER ARRESTORS PER

CHAMBER W/EXPANSION BELLOWS.

1. COPPER CONSTRUCTION PRESSURIZED COMPRESSION

P-2

P-1

NEW PLUMBING FIXTURE SCHEDULE

2 15 15 50 40 W/ 0.16 LPS FAUCETLAVATORYP-3

URINAL 3.8 LITERS/FLUSH

(1ST FLOOR)

(1ST FLOOR)

BLDG#1396

BLDG#1396

M-6

KIM, TH

MECHANICAL

16 29

1SERVICE SINK 15 80 40 8.3 LPM @ 60PSIP-4

(BLDG#1396, 1ST FLOOR)

EQUIPMENT SCHEDULES

NEW PLUMBING FIXTURES AND

CH: 2,500

MALE

FEMALE

JAN.

BLDG#1396

(1ST FLOOR)

WORK LOCATION

ITEM DESCRIPTION QTY REMARKS

NEW EQUIPMENT SCHEDULE

2 FOR TOILET

(1ST FLOOR)

FEMALE

FOR TOILET

MALE

FOR TOILET

TOILET

MALE/FEMALE

WALL HEATER

FOR TOILET

WALL FAN

EXISTING

REPLACE

FOR TOILET

(1ST FLOOR)

(1ST FLOOR)

(1ST FLOOR)

(1ST FLOOR)

AS REQUIRED

3413 BTU/HR

1000-WATT, 1PH 120V 8.4A

WALL HEATER

AS REQUIRED

2560 BTU/HR

750-WATT, 1PH 120V 6.25A

WALL HEATER

AS REQUIRED

BASEBOARD/LINE VOLT THERMOSTAT

THERMOSTAT

AS REQUIRED

FAN MOTOR: 1/6 HP 115 V 1PH 60HZ

AIR CAPACITY: 242 CFM, 1/5" WG SP

WALL VENTILATION

AS REQUIRED

120 VAC, 12 AMPS, 1440 WATT

CAPACITY: 4 GALLONS

ELECTRIC HOT WATER HEATER

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-7

KIM, TH

SCALE = 1:25

NEW SEWER AND VENT PIPING PLAN

M-7

IS REMAINED & RE -USE.

(POINT OF CONNECTION)

OUT OF WORK LOCATION

1. EXISTING SEWER LINE AT

2. NEW SEWER LINE SHALL BE

40.40

SCO

40.40

2"FD

2"FD

2"FD

4"

FCO4"

2"FD

FD

2"

0 1

POC

POC

LINE RISER

4" SEWER PIPE RISER

2" VENT

(BLDG#1396, 1ST FLOOR)

(BLDG#1396, 1ST FLOOR)

NEW SEWER AND VENT PIPING PLAN

CONNECTED AT THE POC

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

15.15

20.20

20.20

DRAIN

HOT WATER HEATER

WATER HAMMER

ARRESTOR

(PDI:"A"TYPE)

A

15.15

A A'

P-1

P-2

P-3

M-8

SCALE : 1/25

DRAIN PIPE

LAVATORY

LAVATORY CABINET

20.20.20

VIEW OF A-A' (SCALE: 1/25)

NEW VENTILATION AND ELECTRIC HEATER PLAN

ELECTRIC HOT WATER HEATER RE -LOCATION

SCALE = 1:25

M-8

HOT WATER HEATER

(1ST FLOOR)BLDG#1396

M-8

KIM, TH

NEW DOMESTIC HOT & COLD WATER PIPING AND

UNDER COUNTER TOP

POINT OF

CONNECTION

P-4

(1ST FLOOR)BLDG#1396

(BLDG#1396, 1ST FLOOR)

ELECTRIC HEATER PLAN

RE -LOCATION,VENTILATION AND

PIPING,ELECTRIC HOT WATER HEATER

NEW DOMESTIC HOT & COLD WATER

MECHANICAL

2" CW RISER

NEW

ELECTRIC HOT WATER HEATER PLAN

WALL ELECTRIC HEATER

THERMOSTAT FOR

WALL ELECTRIC HEATER

WALL ELECTRIC HEATER

THERMOSTAT FOR

WALL ELECTRIC HEATER

242 CFM

6"x6" GRILL

65CFM

6"x6" GRILL

WALL EXHAUST FAN

6"x6" GRILL

VD

VD

VD

(750W 120VAC)

(1000W 120VAC)

10" X 10" DUCT

(254 X 254)

10" x 6" DUCT

(254 x 152.4)

(152.5x152.4)

(65 CFM)

(65 CFM)

(152.5x152.4)

VD

6"x6" GRILL

(11 CFM)

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-7

M-9

KIM, TH

M-9

NEW PLUMBING FIXTURES SCHEDULE

(2ND FLOOR)BLDG#1396

ITEM DESCRIPTION QTY REMARKS

NEW EQUIPMENT SCHEDULE

NEW EQUIPMENT SCHEDULE2

M-9

2 FOR TOILET

(2ND FLOOR)

(2ND FLOOR)

(2ND FLOOR)

(2ND FLOOR)

(2ND FLOOR)

FEMALE

FOR TOILET

MALE

FOR TOILET

TOILET

MALE/FEMALE

WALL HEATER

FOR TOILET

WALL FAN

EXISTING

REPLACE

BLDG#1396

WORK LOCATION

SCALE = 1:100

A

REMARKS

CONNECTION

PIPE

RATING

FU

QTY

SYMBOL

P.D.I

1-11 202

PLUMBING FIXTURES SCHEDULE

PLUMBING FIXTURES QTY

COLD HOT TRAP VENT

REMARKS

- INTEG.15

20 - 50 40

LOCAL PIPE CONNECTION

SYMBOL

6 LITERS/FLUSH

WATER HAMMER ARRESTER SCHEDULE

WATER CLOSET, FLUSH TANK

PDI-WH 201 AND MANUFACTURER'S INSTRUCTIONS.

2. SIZE AND LOCATE WATER HAMMER ARRESTORS PER

CHAMBER W/EXPANSION BELLOWS.

1. COPPER CONSTRUCTION PRESSURIZED COMPRESSION

P-2

P-1

NEW PLUMBING FIXTURE SCHEDULE

2 15 15 50 40 W/ 0.16 LPS FAUCETLAVATORYP-3

URINAL 3.8 LITERS/FLUSH

1SERVICE SINK 15 80 40 8.3 LPM @ 60PSIP-4

(BLDG#1396, 2ND FLOOR)

EQUIPMENT SCHEDULES

NEW PLUMBING FIXTURES AND

MECHANICAL

CH: 2,500

JAN.

FEMALE

MALE

(2ND FLOOR)

BLDG#1396

WORK LOCATION

5 (2ND FLOOR)

FOR TOILET

AS REQUIRED

3413 BTU/HR

1000-WATT, 1PH 120V 8.4A

WALL HEATER

AS REQUIRED

2560 BTU/HR

750-WATT, 1PH 120V 6.25A

WALL HEATER

AS REQUIRED

BASEBOARD/LINE VOLT THERMOSTAT

THERMOSTAT

AS REQUIRED

FAN MOTOR: 1/6 HP 115 V 1PH 60HZ

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-10

KIM, TH

M-10 SCALE : 1/25

(2ND FLOOR)BLDG#1396

NEW SEWER AND VENT PIPING PLAN

(BLDG#1396, 2ND FLOOR)

NEW SEWER AND VENT PIPING PLAN

MECHANICAL

V T

R

4040.40

2"FD

2"FD

2"FD

4"WCO

FCO

4"

2"FD

4"

RISER

SEWER LINE

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

15.15

20.20

20.20

DRAIN

HOT WATER HEATER

WATER HAMMER

ARRESTOR

(PDI:"A"TYPE)

A

15.15

A A'

P-1

P-2

P-3

M-11

SCALE : 1/25

DRAIN PIPE

LAVATORY

LAVATORY CABINET

20.20.20

VIEW OF A-A' (SCALE: 1/25)

WALL ELECTRIC HEATER

THERMOSTAT FOR

WALL ELECTRIC HEATER

WALL ELECTRIC HEATER

THERMOSTAT FOR

WALL ELECTRIC HEATER

NEW VENTILATION AND ELECTRIC HEATER PLAN

242 CFM

6"x6" GRILLE

65CFM

6"x6" GRILLE

WALL EXHAUST FAN

6"x6" GRILLE

VD

VD

VD

SCALE = 1:25

M-11

HOT WATER HEATER

(750W 120VAC)

(1000W 120VAC)

(2ND FLOOR)BLDG#1396

(2ND FLOOR)BLDG#1396

M-11

KIM, TH

NEW DOMESTIC HOT & COLD WATER PIPING AND

10" X 10" DUCT

(254 X 254)

10" x 6" DUCT

(254 x 152.4)

(152.5x152.4)

(65 CFM)

(65 CFM)

(152.5x152.4)

UNDER COUNTER TOP

VD

6"x6" GRILLE

(11 CFM)

POINT OF

CONNECTION

P-4

(BLDG#1396, 2ND FLOOR)

ELECTRIC HEATER PLAN

RE -LOCATION,VENTILATION AND

PIPING,ELECTRIC HOT WATER HEATER

NEW DOMESTIC HOT & COLD WATER

MECHANICAL

2" CW RISER

ELECTRIC HOT WATER HEATER PLAN

NEW ELECTRIC HOT WATER HEATER

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

SCALE : 1/100

WORK LOCATION

M-12

NEW PLUMBING FIXTURES SCHEDULE

A

REMARKS

CONNECTION

PIPE

RATING

FU

QTY

SYMBOL

P.D.I

1-11 202

PLUMBING FIXTURES SCHEDULE

PLUMBING FIXTURES QTY

COLD HOT TRAP VENT

REMARKS

- INTEG.15

LOCAL PIPE CONNECTION

SYMBOL

6 LITERS/FLUSH

WATER HAMMER ARRESTER SCHEDULE

WATER CLOSET, FLUSH TANK

PDI-WH 201 AND MANUFACTURER'S INSTRUCTIONS.

2. SIZE AND LOCATE WATER HAMMER ARRESTORS PER

CHAMBER W/EXPANSION BELLOWS.

1. COPPER CONSTRUCTION PRESSURIZED COMPRESSION

P-1

NEW PLUMBING FIXTURE SCHEDULE

1 15 15 50 40 W/ 0.16 LPS FAUCETLAVATORYP-2

BLDG#1389

NEW EQUIPMENT SCHEDULE1

M-12

M-12

KIM, TH

M-12

WORK LOCATION

BLDG#1398

(BLDG#1398)

FIXTURES SCHEDULES

NEW EQUIPMENT AND PLUMBING

MECHANICAL

ITEM DESCRIPTION QTY REMARKS

NEW EQUIPMENT SCHEDULE

BLDG# 1398

FOR TOILET

HEATER

FOR WALL

FOR TOILET

AS REQUIRED

2560 BTU/HR

750-WATT, 1PH 120V 6.25A

WALL HEATER

AS REQUIRED

BASEBOARD/LINE VOLT THERMOSTAT

THERMOSTAT

CAPACITY: 2.7 GALLONS

YONGSAN, KOREA

BLDG. NO. 1380,1382,1396 AND 1398,

REPAIR BUILDING

FY18

RISER

REPLACE

20.20

WATER HAMMER

ARRESTOR

(PDI:"A"TYPE)

A

15.15 PIPE POC

ELECTRIC

HOT WATER HEATER

M-13

P-1 P-2

SPECIAL NOTE

GRILLE WITH NEW

EXISTING

WALL ELECTRIC HEATER

SCALE = 1:25

THERMOSTAT FOR

WALL ELECTRIC HEATER

A A'

DRAIN PIPE

LAVATORY

20.20.20

VIEW OF A-A' (SCALE: 1/25)

ELECTRIC HOT WATER HEATER RE -LOCATION

HOT WATER HEATER

SCALE = 1:25

M-13

NEW DOMESTIC HOT & COLD WATER PIPING AND

(NEW)

(NEW)

CLEAN EXISTING DUCT

M-13

KIM, TH

1. CONTRACTOR SHALL CLEAN OUT EXISTING DUCT SYSTEM BEFORE GRILLE REPLACEMENT.

2. CONTRACTOR SHALL CLEAN OUT EXISTING EXHAUST FAN.

DUCT AND FAN CLEANING

VENTILATION AND NEW WALL HEATER PLAN

RE-LOCATION PLAN (BLDG#1398)

PLAN AND ELECTRIC HOT WATER HEATER

DOMESTIC HOT & COLD WATER PIPING

VENTILATION, NEW WALL HEATER, NEW

MECHANICAL

(RE -USE)

(RE -USE)

CLEAN EXISTING WALL EXHAUST FAN

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

ENGINEERING DIVISON, DPW, USAG-YONGSAN

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

NEW ELECTRIC

NEW

ELECTRIC HOT WATER HEATER PLAN

UNDER COUNTER TOP

LAVATORY CABINET

GENERAL NOTES

1.

2.MOUNTING HEIGHTS ABOVE FLOOR SHALL BE AS FOLLOW UNLESS OTHERWISE

NOTED ON THE DRAWING.

LIGHTING FIXTURE SEE LIGHTING FIXTURE SCHEDULE

PANELBOARD SEE SPECIFICATION

SAFETY SWITCH 1524mm TO CENTER OF THE ENCL

RECEPTACLE,TELEPHONE OUTLET 305mm TO CENTER OF THE ENCL

MOTOR CONTROLLER 1524mm TO CENTER OF THE ENCL

1676mm TO CENTER OF THE ENCL

2286mm TO CENTER OF BELL

ON CEILINGDETECTOR

1372mm TO CENTER OF STATIONMANUAL PULL STATION

INDICATEDS 2 #12AWG IN 16C

INDICATEDS 3 #12AWG IN 16C

INDICATEDS 4 #12AWG IN 16C

A GREATER NUMBER OF WIRES ARE INDICATED AS FOLLOWS;

1219mm TO CENTER OF THE ENCLWALL SWTICH

SCOPE OF WORK

F/A &MNS CONTROL

COMBO. SPEAKER & STROBE

ANY CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES 2-#12AWG

WIRES IN 16C CONDUIT UNLESS OTHERWISE INDICATED.

L E G E N D

INTERIOR

SYMBOL DESCRIPTION DESCRIPTIONSYMBOL

CONVERTER AND ACCESSORIES AS REQUIRED(NS-12a)

DIODE(LED) FIXTURE, 1PH,120V,50W, UL LISTED,WITH

CEILING RECESSED MOUNTED LIGHT EMITING

AND EM UNIT (NS-12b)

CONVERTER AND ACCESSORIES AS REQUIRED

DIODE(LED) FIXTURE, 1PH,120V,50W, UL LISTED,WITH

CEILING RECESSED MOUNTED LIGHT EMITING

AND EM UNIT (NS-12b)

CONVERTER AND ACCESSORIES AS REQUIRED

DIODE(LED) FIXTURE, 1PH,120V,50W, UL LISTED,WITH

CEILING SURFACE/PENDANT MOUNTED LIGHT EMITING

AND EM UNIT (NS-12b)

CONVERTER AND ACCESSORIES AS REQUIRED

DIODE(LED) FIXTURE, 1PH,120V,45W, UL LISTED,WITH

CEILING RECESSED MOUNTED LIGHT EMITING

L

CONVERTER AND ACCESSORIES AS REQUIRED(NS-12a)

DIODE(LED) FIXTURE, 1PH,120V,50W,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.