A02_Attachment1-1SOWNonWorkPlan0001.-Revision_2_Nov_16.pdf
PDF 2 MB Posted
- Attached to
- MA IDIQ GENERAL CONSTRUCTION
- Solicitation number
- W91QVN18R0004
About this file
A02 Attachment1-1SOWNonWorkPlan0001.-Revision 2 Nov 16
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
NON WORK PLAN (NWP #0001)
SMYU 18-6002
REPAIR AIRMEN DORMITORY, B1366
AT
OSAN AB, ROK
OCTOBER 2016
51ST CIVIL ENGINEER SQUADRON
TABLE OF CONTENTS
SMYU 18-6002
REPAIR AIRMEN DORMITORY, B1366
SECTION NO. TITLE PAGE NO.
Technical Provisions – I STATEMENT OF WORKS Page 3 - 9
Technical Provisions – II SPECIAL INSTRUCTIONS Page 10 - 11
APPENDIX “A” List of Drawings Page 12 - 15
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
SMYU 18-6002
1. DESCRIPTION: The work to be performed for completion of this project shall be as described in general below.
1.1. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.
1.2. All work shall be completed IAW drawings and specifications.
2. PRINCIPLE FEATURES: This project is K-work (Repair) and also includes the following principle features:
Project scopes in this document are general Scope of Work (SOW) by each discipline. Detail SOW and work requirements shall be referred and specified in the project drawings.
2.1. CIVIL WORK:
2.1.1. Replace existing fire water line from adjacent mechanical building to the dormitory.
2.1.2. Replace existing 3ea domestic water pipes from adjacent mechanical building to the dormitory.
2.1.3. Replace existing 2ea hot water supply and return pipes from adjacent mechanical building to the dormitory.
2.1.4. Replace existing 2ea chilled water supply and return pipes from adjacent mechanical building to the dormitory.
2.1.5. Remove existing concrete sidewalk and replace with new.
2.1.6. Remove existing fuel tank, pad and replace with new 30,284 Liter fuel oil storage tank.
2.1.7. Replace existing fuel oil supply and return pipes between fuel storage tank and mechanical building.
2.2. ARCHITECTURAL WORK:
Removal Work (Refer to the symbol of Removal Plan AD1012~AD1092)
2.2.1. Remove existing floor finishes.□1
2.2.2. Remove existing floor finish(es) at bathrooms including concrete slab (first floor only). □1a
2.2.3. Remove existing floor finish(es) at bathrooms including mortar bed and waterproofing membrane (second
& third floors only). existing concrete floor slab to remain.□1b
2.2.4. Saw-cut/remove existing concrete floor slab to accommodate plumbing work.□1c
2.2.5. Saw-cut/remove existing concrete floor slab. □1d
2.2.6. Remove existing interior wall finishes/covering including gypsum wall board affected by mechanical or electrical work (Cement Masonry Unit (CMU) wall to remain). □2
2.2.7. Remove portion of existing CMU wall. □2a
2.2.8. Remove existing wall base(s) and trims. □3
2.2.9. Remove existing window including accessories.□4
2.2.10. Remove existing interior door and frame including hardware. □5
2.2.11. Remove existing exterior door and frame including hardware. □6
2.2.12. Remove existing acoustical ceiling tiles including existing exposed grid and ceiling suspension system.
□7
2.2.13. Remove existing gypsum board ceiling (ceiling suspension system to remain) to accommodate mechanical/electrical work. □8
2.2.14. Remove existing fixed furnishings including kitchen cabinets in common areas. □9
2.2.15. Remove existing vanities in bathrooms. □10
2.2.16. Remove existing toilet & bathroom fixtures as indicated in the drawing. □11
2.2.17. Remove existing roof finish including roof insulation and accessories such as gutters, trims, downspout and metal flashing. □12
2.2.18. Remove existing plumbing fixtures and accessories. □13
2.2.19. Remove existing washer/dryer pipe/duct chase at laundry. 13a
2.2.20. Remove existing ceiling fan with light including switch at bedroom units as indicated in the drawing.
□14
2.2.21. Remove existing wooden ledge (cove lighting) at bedroom units. □15
Replace/Install Work (Refer to the symbol of Architectural Drawings AE1012~AE1092)
2.2.22. Bedroom (Typical) ◇1
i. Provide floor carpet finish
ii. Provide wall base Vinyl Straight Base (VSB)
iii. Provide gypsum wall board with paint to accommodate electrical and mechanical work
iv. Paint/repaint new and existing interior walls
v. Provide gypsum board ceiling with paint incl suspension system
vi. Provide ceiling fan with light including switch
vii. Provide energy efficient sliding aluminum/glass window including accessories
viii. Provide aluminum horizontal mini-blinds
ix. Provide wood curtain box
2.2.23. Dress (Typical) ◇2
i. Provide Vinyl Composition Tile (VCT) floor finish
ii. Provide wall base Vinyl Cove Base (VCB)
iii. Provide vanity cabinet including solid surface material countertop with integral lavatory including plumbing fixtures and accessories
iv. Provide bathroom fixtures as indicated in the drawing.
v. Provide gypsum wall board to accommodate electrical and mechanical work
vi. Provide gypsum board ceiling with paint incl suspension system
vii. Provide wood door and steel frame
2.2.24. Closet (Typical) ◇3
i. Provide vct floor finish
ii. Provide closet, doors and hardware including accessories
iii. Paint interior walls and repaint underside of exposed concrete floor slab
2.2.25. Toilet (Typical) ◇4
i. Provide Ceramic Mosaic Tile (CMT) floor finish on cement mortar including waterproofing
(waterproofing at second & third floors only)
ii. Provide 1200 Millimeter (mm) high GWCT (thin-set)
iii. Provide water resistant gypsum wall board with paint
iv. Provide water resistant gypsum board ceiling with paint incl suspension system
v. Provide toilet fixtures and accessories (tissue holder, water closet, towel bar, hand sanitizer, etc.)
vi. Provide wood door and frame including door hardware & accessories
2.2.26. Shower (Typical) ◇5
i. Provide cmt floor finish on cement mortar including floor waterproofing
ii. Provide full height GWCT (thin-set)
iii. Provide water resistant gypsum board ceiling with paint including suspension system
iv. Provide shower accessories as indicated in the drawing.
v. Provide shower rod and curtain
2.2.27. Lounge [153] [256] & Exercise Room [356] ◇6
i. Provide rubber tiles
ii. Provide rubber cove base (RCB)
iii. Repaint existing walls
iv. Provide 610 x 610 mm acoustical ceiling tiles
v. Provide signage
vi. Provide doors and frames including hardware and accessories
vii. Provide aluminum horizontal mini-blinds (at lounge 256 & exercise room 356 only)
viii. Provide kitchen counter with kitchen sink and cabinets including plumbing fixtures and accessories (at lounge 256 only)
ix. Provide energy efficient sliding aluminum/glass window including accessories (at lounge 256 & exercise rm 356 only)
2.2.28. Laundry [152] ◇7
i. Provide rubber tiles
ii. Provide rubber cove base (RCB)
iii. Repaint existing walls
iv. Provide water resistant gypsum board ceiling with paint
v. Provide steel door and frame including hardware & accessories
vi. Provide energy efficient sliding aluminum/glass window including accessories
vii. Provide aluminum horizontal mini-blinds
viii. Provide stainless steel laundry sink including plumbing fixtures and accessories
ix. Provide pipe/duct chase for washers & dryers
x. Provide signage
xi. Provide ironing board
2.2.29. Air Handling Unit (AHU) Room [151] [253] [353] ◇8
i. Apply floor concrete sealer
ii. Repaint wall base
iii. Repaint existing walls
iv. Provide steel door and frame including hardware & accessories
v. Repaint underside of exposed concrete floor slab
vi. Provide signage
vii. Block-up wall opening with 1-hr type x gypsum wall board. Paint to match adjacent wall at
Room No.151 only.
2.2.30. Janitor Room [113] [254] [354] ◇9
i. Apply floor concrete sealer
ii. Repaint existing walls and wall base
iii. Provide steel door and frame including hardware & accessories
iv. Provide water resistant gypsum board ceiling with paint incl suspension system
v. Provide plumbing fixtures and accessories
vi. Provide signage
2.2.31. Toilet [252] [352] ◇10
i. Provide cmt floor finish on cement mortar including waterproofing
ii. Provide painted water resistant gypsum wall board with 1300mm high gwct (thin-set)
iii. Provide water resistant gypsum board ceiling with paint
iv. Provide toilet fixtures and accessories as indicated in the drawing.
v. Provide door and frame including door hardware and accessories
vi. Provide signage
2.2.32. Toilet [149] 10aToilet [149] 10a
i. Convert toilet to be accessible
ii. Provide mortar bed with cmt floor finish on concrete floor slab
iii. Provide painted water resistant gypsum wall board with 1300mm high GWCT (thin-set) on cementitious backer board
iv. Provide water resistant gypsum board ceiling with paint incl suspension system
v. Provide handicap toilet fixtures and accessories (tissue holder, water closet, soap dispenser, tilting glass mirror, paper towel dispenser/waste receptacle, grab bars, hand sanitizer (GFGI), etc)
vi. Provide steel door and frame including door hardware and accessories
vii. Provide signage
2.2.33. Elec Closet [148] [255] [355] ◇11
i. Apply concrete sealer
ii. Repaint interior walls
iii. Repaint underside of exposed concrete floor slab
iv. Provide door and frame including door hardware and accessories
v. Provide signage
2.2.34. Lobby [146] ◇12
i. Provide rubber tiles
ii. Provide rubber cove base (RCB)
iii. Repaint existing walls
iv. Provide doors and frames including hardware and accessories
v. Provide energy efficient sliding aluminum/glass window including accessories
vi. Provide 610x610 mm acoustical ceiling tiles incl suspension system
vii. Provide signage
viii. Provide telephone booths
2.2.35. Corridor and Hall (Typical) ◇13
i. Provide rubber tiles
ii. Provide rubber cove base (RCB)
iii. Repaint existing walls
iv. Provide doors and frames including hardware and accessories
v. Provide 610x610 mm acoustical ceiling tiles incl suspension system
vi. Provide signage
vii. Provide semi-recessed fire extinguisher cabinets (see floor plan).
2.2.36. Stairs (Typical) ◇14
i. Provide rubber tiles (landing, tread, stringers, and risers)
ii. Repaint handrails and railings
iii. Repaint existing walls and wall base
iv. Provide doors and frames including hardware and accessories
v. Provide gypsum board ceiling including suspension system as indicated in the drawing.
vi. Provide energy efficient sliding aluminum/glass window including accessories
vii. Clean and repaint underside of existing concrete slab
viii. Provide signage
2.2.37. Exterior ◇15
i. Repaint building exterior (walls, columns/post, sheds, sunscreen) including building i.d. number
2.2.38. Roof and Canopies ◇16
i. Provide standing seam metal roof system (SSMRS) and accessories with insulation (metal roof liner and steel framing to remain. Additional steel purlins to match existing shall be provided if necessary to accommodate new SSMRS). Provide soffit, fascia, gutters, Downspouts and accessories.
2.2.39. Replace existing windows in dormitory building with new blast proof aluminum door with frames including insulating laminated glass panels and accessories to meet current force protection requirements.
2.3. MECHANICAL WORK:
2.3.1. Replace entire plumbing system for domestic hot water service, cold water service, sewer line, and vent piping including all necessary equipment, fixture, parts, pipes and accessories as shown on the drawings.
2.3.2. Replace entire Heating, Ventilating, and Air Conditioning (HVAC) system including all necessary equipment, devices, duct, pipes, parts, and accessories. New system shall be able to humidity control for reducing and eliminating mold/mildew growth as shown on the drawings.
2.3.3. Replace Direct Digital Control (DDC) and Energy Management & Control System (EMCS) systems including all necessary parts, equipment, parts, and accessories as shown on the drawings.
2.3.4. Provide new automatic fire extinguishing system including all necessary devices, equipment, pipes, parts, and accessories as shown on the drawings.
2.4. ELECTRICAL WORK:
2.4.1. Remove existing ceiling fan in each modular room.
2.4.2. Remove existing wire mold and receptacles on the bottom of wall.
2.4.3. Remove existing wooden ledge (cove lighting), conduit and wire at bedroom units.
2.4.4. Replace existing toggle switch in each modular room.
2.4.5. Replace existing power distribution panelboards “Main Distribution Panel (MDP)”, “Main Panel (MP)”, “MP2”, “MP3” shown on the drawing.
2.4.6. Replace existing panelboard A, B, C, D, and M1 as shown on the drawing.
2.4.7. Replace existing panelboard A2, B2, C2, D2, on second floor as shown on the drawing.
2.4.8. Replace existing panelboard A3, B3, C3, D3, M3 on the third floor as shown on the drawing.
2.4.9. Replace existing feeders from MDP to each panelboard as shown on the drawing.
2.4.10. Replace existing feeder from MDP to MP via National Electrical Manufactures Association (NEMA) 3R pull boxes on the exterior wall of building.
2.4.11. Replace existing watt hour meter with Lonworks compatible in NEMA 3R Encl.
2.4.12. Replace existing power feeder for mechanical equipment such as air cooled water chiller, air handling units etc. As shown on the drawing.
2.4.13. Install the conduit in the wall for the existing CATV cable to embed in each room.
2.4.14. Install the new quadruplex receptacles and duplex receptacle as shown on the drawing.
2.5. FIRE PROTECTION WORK:
2.5.1. Replace fire detection and alarm system.
2.5.2. Replace fire suppression system.
TECHNICAL PROVISIONS - II
SPECIAL INSTRUCTIONS
SMYU 18-6002
1. GENERAL: This project shall comply with the most current specifications (OMA Specification
2014, Revision-1) and hardcopies are available at the Engineering Flight, 51st Civil Engineer Squadron, Osan AB, Unit 2129, APO AP 96278-2129 and also are located on the Web Page at http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf?ver=2015-12-09-183339-697
2. SPECIAL REQUIREMENTS:
With the exception of the following Project Specifications stated below, all other sections are complied with the OMA Specifications, Republic of Korea, dated 24 January 2014, Revision-1.
The following Project Specification sections are complied with this project: (See Highlighted
Sections in Attachment 1-7, total 56 Pages)
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 61 13 Structural Standing Seam Metal Roof (SSSMR) System
DIVISION 08 OPENINGS
08 39 55 Blast resistant Glazed Aluminum Doors and Frames
08 56 55 Blast Resistant Aluminum Windows
DIVISION 09 FINISHES
09 06 90 Color Schedule
DIVISION 22 PLUMING
22 8 00 Commissioning of Pluming System
2.1. The contractor shall restore all improvements, damaged or removed as a result of construction to its original or better condition, unless otherwise noted. These items include, but are not limited to pavements, concrete sidewalks and curbs, trees, grass, electrical poles, transformers, and utilities.
2.2. The contractor shall be responsible for verifying the location, size and inverts of all existing utilities and shall protect all such utilities at all times, unless otherwise indicated. Existing utilities whether shown on the drawings or not which have been damaged as a result of the construction work, shall be restored immediately to their original or better condition and shall be paid for by the contractor.
2.3. Whenever connections to existing utilities or where new utilities cross existing utilities are shown, the contractor shall carefully expose the utility by hand excavation to verify their locations and depths prior to excavating trenches for the new utility lines.
2.4. Whenever any change in alignment or conditions for the contract works due to unforeseen conflict, the contractor shall inform the contracting officer immediately for remedial action.
2.5. Performance of Period (PoP) for this project is 330 days after the Notice to Proceed (NTP). This PoP includes base pass, military exercises, contractor’s mobilization, material procurement lead time, and submittals for government approval.
2.6. Site Orientation will be strongly recommended. The contractor acknowledges that it has taken steps necessary to ascertain the nature and location of the works, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost IAW FAR 52.236-3.
http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf?ver=2015-12-09-183339-697 http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf?ver=2015-12-09-183339-697
APPENDIX “A”
LIST OF DRAWINGS
SMYU 18-6002
1. GENERAL: The work shall conform to the following contract drawings, all of which form a part of the specifications.
Additional sets will be furnished to the contractor. Drawings are available at the 51 Civil Engineer Squadron, Osan AB.
File details come from the government source that posted it. Updated .