A21_ATTACHMENT02_Schedule.pdf
PDF 64 KB Posted
- Attached to
- Custodial Service for Yongsan and Area II
- Solicitation number
- W91QVN-18-R-0003
About this file
ATTACHMENT02_Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C10_W91QVN-18-D-0014.pdf | ||
| ATTACHMENT01_FFP_BLDG-LIST-Amendment02.xlsx | XLSX spreadsheet | |
| Amendment02_W91QVN-18-R-0003.pdf | ||
| ATTACHMENT01_BLDG_LIST_Amend01.xlsx | XLSX spreadsheet | |
| ATTACHMENT01_BLDG_LIST_Amend01.xlsx | XLSX spreadsheet | |
| A21_Amendment_01_18-R-0003-01.pdf | ||
| A21_18-R-0003_Area_II_Custodial_Service.doc.docx | DOCX document | |
| A21_ATTACHMENT07_Historical_Data_of_Requirement_Portion.pdf | ||
| A21_ATTACHMENT01_Building_List_FFP_Portion.pdf | ||
| A21_ATTACHMENT06_BLDG-LIST-Requirement.xlsx | XLSX spreadsheet | |
| A21_18-R-0003_Area_II_Custodial_Service.doc | DOC document | |
| A21_ATTACHMENT03_Floor_Plan.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF CUSTODIAL WORK
SCHEDULE 01
Child Care/Youth Monday thru Friday
FREQUENCY CODE:
D - Daily 2M - 2 Times a month
W - Weekly 4Y - 4 Times a Year
2W - 2times a week 2Y - 2 Times a Year
M - Monthly Y - Yealy
Clean Kitchen & Breakrooms D D
Clean/Supply Restroom D
D
D D
D D
D D
Y Y
As Require As Require
D D
D D
M M
2Y 2Y
D D
W W
Y Y
D D
2Y 2Y
2Y 2Y
D D
D D
D D
W W
W W
2Y 2Y
Spot Cleaning
Sweep Floor
Wet Mop
Vacuum Cleaning
Cleaning Window Treatments.
High Dusting
Cleaning Furniture
Carpet Cleaning
Regular Dusting
Wash Interior Glass
Wash Exterior Glass
Stripping/Finishing Tile
Dry Buff or Spray Buff
Rest room
Routine Work
Clean Drinking Fountains
Remove Trash
Classroom Activity Rm.
Multi Purpose Rm.
Common Areas
Disinfect Toilets/Urinal
Clean Upholstered Furniture
Highchairs, Cribs, Playpens
Food Service Areas
Clean Doors, Doorframes
Scrub Walls, Woodwork
Dust Ledges, Window Sills
Attachment 2-1
SCHEDULE 02
Child Care/Youth Monday thru Saturday
FREQUENCY CODE:
D - Daily 2M - 2 Times a month
W - Weekly 4Y - 4 Times a Year
2W - 2times a week 2Y - 2 Times a Year
M - Monthly Y - Yealy
Clean Kitchen & Breakrooms D D
Clean/Supply Restroom D
D
D D
D D
D D
Y Y
As Require As Require
D D
D D
M M
2Y 2Y
D D
W W
Y Y
D D
2Y 2Y
2Y 2Y
D D
D D
D D
W W
W W
2Y 2Y
Clean Drinking Fountains
Classroom Activity Rm.
Multi Purpose Rm.
Common Areas
Rest room
Routine Work
Disinfect Toilets/Urinal
Wash Interior Glass
Remove Trash
Vacuum Cleaning
Carpet Cleaning
Spot Cleaning
Sweep Floor
Wet Mop
Dry Buff or Spray Buff
Stripping/Finishing Tile
Regular Dusting
High Dusting
Cleaning Furniture
Dust Ledges, Window Sills
Clean Upholstered Furniture
Wash Exterior Glass
Cleaning Window Treatments.
Highchairs, Cribs, Playpens
Food Service Areas
Clean Doors, Doorframes
Scrub Walls, Woodwork
Attachment 2-2
SCHEDULE 03
Monday thru Friday
FREQUENCY CODE:
D - Daily 2M - 2 Times a month
W - Weekly 4Y - 4 Times a Year
2W - 2times a week 2Y - 2 Times a Year
M - Monthly Y - Yealy
Clean Kitchen & Breakrooms Every Other Work Day
Except Korean
Holidays *1
Clean/Supply Restroom Every Other Work Day Except Korean Holidays
*1
Every Other Work Day Except Korean Holidays
*1
3W
W
M
As Require
2M
M
Clean Drinking Fountains
Installation Administrative, Community offices, training/education
Common Areas Rest room
Routine Work
Disinfect Toilets/Urinal
Stripping/Finishing Tile Y
Remove Trash
Vacuum Cleaning
Spot Cleaning
Sweep Floor
Wet Mop
Requirement Work
Note : Facility Mananger is required to submit Work request (DA Form 4283) when below listed work is needed
Dry Buff or Spray Buff 4Y
Carpet Cleaning Y
Regular Dusting 2Y
High Dusting Y
Cleaning Furniture As Request
Wash Interior Glass As Request
Wash Exterior Glass As Request
Cleaning Window Treatments. As Request
Attachment 2-3
* Example of Restroom Cleaning Schedule.
*1 Holiday (No Custodial Service) New Year’s Day (01 Jan) Lunar New Year's Day (31 Dec, 1&2 Jan on Lunar Calender) Independence Movement Day(01 Mar) Labor Day (01 May) Children's Day(05 May) Buddha's Birthday (8 April on the Lunar calendar) Memorial Day(06 June) Liberation Day(15 Aug) Chu-Suk (14, l5 and 16 Aug on the Lunar Calendar) National Foundation Day(03 Oct) Hangul Day(09 Oct) Christmas Day(25 Dec)
Mon Tue Wed Thu Fri
Clean Clean Clean
Clean Clean
Clean Clean
Clean Holiday Clean
Clean Clean
Holiday Clean Clean
Clean Clean Clean
Holiday Clean Clean
Example #1
(No Holiday on week)
Example #2
(Holiday on week)
Example #3
(Holiday on week)
Example #4
(Holiday on week)
Attachment 2-3
SCHEDULE 04
Fitness Centers Monday thru Friday
FREQUENCY CODE:
D - Daily 2M - 2 Times a month
W - Weekly 4Y - 4 Times a Year
2W - 2times a week 2Y - 2 Times a Year
M - Monthly Y - Yealy
Clean Kitchen & Breakrooms D
Clean/Supply Restroom D
D
D
2W
M
As Require
D
D
Wash Interior Glass As Request
Wash Exterior Glass As Request
Cleaning Window Treatments. As Request
Regular Dusting 2Y
High Dusting Y
Cleaning Furniture As Request
Stripping/Finishing Tile Y
Vacuum Cleaning
Spot Cleaning
Sweep Floor
Wet Mop
Requirement Work
Note : Building User is required to submit Work request (DA Form 4283) When below listed work is needed
Dry Buff or Spray Buff M
Carpet Cleaning Y
Remove Trash
Common Areas Rest room
Routine Work
Disinfect Toilets/Urinal
Clean Drinking Fountains
Attachment 2-4
Cafeteria (School) Monday Thru Friday Frequency Codes:
5D - 5 times daily W - Weekly Dining Area REST RMS.
3D - 3 times daily M - Monthly
2D - Twice daily M3 - Every 3 month
7W - Daily M4 - Every 4 month
5W - 5 times weekly M6 - Every 6 month
Vacuum Carpet / Nomad carpets 5W
Clean up spills / Wipe Tables(Anti-bacteria) As Require
Wet Mop (Before & After Lunch time) 2D
Sweep Floor 5W
Remove Trash / Change Vinyl Trash Bag As Require
Regular Dusting W
Spot Clean / Clean Drinking F. As Require
Clean Door's Glass M
Clean & Supply Restroom 3D
Disinfect Toilets/Urinal 3D
SCHEDULE 05
Note : Building User is required to submit Work Request (DA Form 4283) When below listed work is needed
* Facility manager can reguest as below frequecy.
High Dusting 1Y
Stripping/Finishing Tile 2Y
Clean Window Treatment 2Y
Wash Interior Glass 2Y
Wash Exterior Glass 2Y
Attachment 2-5
SCHEDULE 06
For Reimbursable Units #1 Monday thru Friday
FREQUENCY CODE:
D - Daily 2M - 2 Times a month Office Restroom W - Weekly 4Y - 4 Times a Year Shower Rm 2W - 2times a week 2Y - 2 Times a Year Locker Rm M - Monthly Y - Yealy
Clean/Supply Restroom D
Clean Drinking Fountains/Water Dispenser D D
Disinfect Toilets/Urinal D
2W 2W
2W 2W
W W
M M
M M
2W 2W
W W
* Cleaning in office area is only for reimbursable Unit
Wet Mop
Regular Dusting
Requirement Work
Note : Building User is required to submit Work Request (DA Form 4283) When below listed work is needed
Routine Work
Remove Trash
Sweep Floors
Vacuum Cleaning
Spot Clean Carpets - Floors
Common Areas
Carpet Cleaning As Request
Clean Window Treatment As Request
Clean Furniture As Request
Wash Interior Glass As Request
Wash Exterior Glass As Request
High Dusting As Request
Stripping/Finishing Tile As Request
Spray Buff/Polishing floor
Attachment 2-6
For Reimbursable Units #2
FREQUENCY CODE:
D - Daily 2M - 2 Times a month Office Restroom W - Weekly 4Y - 4 Times a Year Shower Rm 2W - 2times a week 2Y - 2 Times a Year Locker Rm M - Monthly Y - Yealy
D
D D
D
D D
D D
W W
2W 2W
M M
W W
W W
* Cleaning in office area is only for reimbursable Unit
SCHEDULE 07
Routine Work
Clean/Supply Restroom
Clean Drinking Fountains
Disinfect Toilets/Urinal
Common Areas
High Dusting As Request
Remove Trash
Sweep Floors
Vacuum Cleaning
Spot Clean
Spray Buff/Polishing floor
Wet Mop
Regular Dusting
Requirement Work
Note : Building User is required to submit Work Request (DA Form 4283) When below listed work is needed
Stripping/Finishing Tile As Request
Carpet Cleaning As Request
Clean Furniture As Request
Wash Interior Glass As Request
Wash Exterior Glass As Request
Clean Window Treatment As Request
Attachment 2-7
SCHEDULE 08
For Reimbursable Units #3 Monday thru Friday
FREQUENCY CODE:
D - Daily 2M - 2 Times a month Office Restroom W - Weekly 4Y - 4 Times a Year Patient Care Shower Rm 2W - 2times a week 2Y - 2 Times a Year Area Locker Rm M - Monthly Y - Yealy
Clean/Supply Restroom D
Clean Drinking Fountains/Water Dispenser D D
Disinfect Toilets/Urinal D
D D
2W 2W
D D
M M
M M
D D
W W
* Cleaning in office area is only for reimbursable Unit
As Request
Clean Window Treatment As Request
Clean Furniture As Request
Wash Interior Glass As Request
Wash Exterior Glass As Request
Carpet Cleaning As Request
Stripping/Finishing Tile
Common Areas
High Dusting As Request
Routine Work
Remove Trash
Sweep Floors
Vacuum Cleaning
Spot Clean Carpets - Floors
Spray Buff/Polishing floor
Wet Mop
Regular Dusting
Requirement Work
Note : Building User is required to submit Work Request (DA Form 4283) When below listed work is needed
Attachment 2-8
SCHEDULE 09
COMMISSARY (Reimbursable) Sun thru Sat
FREQUENCY CODE:
D - Daily M - Monthly Store Entrance Main Restroom 2D - Twice daily M2- Every two months Corridor Sidewalk Office Shower & W - Weekly M3- Every three months Locker 5W - 5 times per week M6 - Every six months Work finish Work finish Work starts Room W2 - Every two week Y - Yearly before 0900 before 0900 before 1700
Clean/Supply Restroom D
Disinfect Toilet/Urinal D
Vacuum Carpet 2W 2W
Sweep floor D D D
Spray Buff D W
Wet Mop D W
Remove Trash D D D
Spot Cleaning (Included glass clean) D
Regular Dusting W W
Carpet Shampoo
Strip & Refinishing Asphalt Tile Floor
High Dusting
Wash Interior Glass
Wash Exterior Glass
Clean Window Treatment As Request
Requirement Work
Note : Building User is required to submit Work Request (DA Form 4283) When below listed work is needed
As Request
As Request
As Request
As Request
As Request
Attachment 2-9
Schedule #10 for Camp Yongin (Reimbursable) _Bldg S-10 HQ Bldgs & S-11 GYM
W - Weekly Restroom
Shower Rm Locker Rm
W W
W W
Sweep Floors
SCHEDULE 10
Common Areas
Routine Work Clean/Supply Restroom Disinfect Toilets/Urinal
Wet Mop Requirement Work
Note : Building User is required to submit Work Request (DA Form 4283) Stripping/Finishing Tile As Request
Attachment 2-10
Schedule #11 for Camp Yongin (Reimbursable) - Bldg S-4 Barracks for exercise only
M - Monthly Restroom AR - As Required Shower Rm
Locker Rm
M M
M M M M
Stripping/Finishing Tile As Request
SCHEDULE 11
Common Areas
Routine Work Clean/Supply Restroom Disinfect Toilets/Urinal Sweep Floors Wet Mop Regular Dusting Clean and Wipe Refrigerator and Microwave
Requirement Work Note : Building User is required to submit Work Request (DA Form 4283)
Attachment 2-11
Schedule of Work
SCHEDULE 12
For Exercise 24 Hour Services
FREQUENCY CODE: Corridor D - Daily M - Monthly Lobby Outdoor Restroom 3D - Three daily M2- Every two months Bedroom Shower Rm W - Weekly M3- Every three months Common Area Locker Rm 5W - 5 times per week M6 - Every six months
W2 - Every two week Y - Yearly
Clean/Supply Restroom 3D 3D
Disinfect Toilets/Urinal 3D 3D
Vacuum Carpet 3D
Wet Mop / Clean up spills 3D
Remove Trash 3D 80% Full
Regular Dusting D
Spot Cleaning D
Empty Public Ashtray 80% Full
Carpet Shampoo Before and after exercise
Strip and refinishing asphalt tile floor Before and after exercise
Attachment 2-12
File details come from the government source that posted it.