W91QVN-17-T-0003.pdf
PDF 887 KB Posted
- Solicitation number
- W91QVN17T0003
About this file
Removal and Disposal of Sewage Sludge Human Waste and Grease for Western Corridor Area
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix_A_(Revised).xls | XLS spreadsheet | |
| W91QVN-17-T-0003-0002.docx | DOCX document | |
| W91QVN-17-T-0003-0001.pdf | ||
| Appendix_A.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN-17-T-0003 06-Oct-2016
b. TELEPHONE NUMBER
02-7914-6400
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 07 Nov 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. YI, KYONG-AE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0010886022
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CSB, KOREA - IMB
UNIT#15289
APO AP 96205
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 724-6977
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF72
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN-17-T-0003
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 26 Each
Septic tank
FFP
Removal/disposal of sewage and other deposit from septic tank IAW PWS.
Base Period: 1 December 2016 through 30 November 2017
FOB: Destination
PURCHASE REQUEST NUMBER: 0010886022
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 192 Each
Portable latrine
FFP
Cleaning of portable latrine IAW PWS.
Base Period: 1 December 2016 through 30 November 2017
FOB: Destination
PURCHASE REQUEST NUMBER: 0010886022
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 26 Each
Grease trap
FFP
Removal/disposal of grease and greasy sludge from grease trap IAW PWS.
Base Period: 1 December 2016 through 30 November 2017
FOB: Destination
PURCHASE REQUEST NUMBER: 0010886022
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 12 Each
Solid grease
FFP
Removal/disposal of float solid grease from lift Station and sewage plant IAW
PWS.
Base Period: 1 December 2016 through 30 November 2017 .
FOB: Destination
PURCHASE REQUEST NUMBER: 0010886022
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 224,000 Liter
Wet sludge
FFP
Removal/disposal of wet sludge from sewage treatment plant IAW PWS.
Base Period: 1 December 2016 through 30 November 2017
FOB: Destination
PURCHASE REQUEST NUMBER: 0010886022
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 14. of PWS for CMR requirement herein. NOTE: Not to exceed 20 Man hours for data collection and report.endar year.
Base Period: 1 December 2016 through 30 November 2017
FOB: Destination
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
War Hazard Losses
FFP
Estimated Costs For War Hazard Losses is Zero (0).
Base Period: 1 December 2016 through 30 November 2017
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1001 26 Each OPTION Septic tank
FFP
Removal/disposal of sewage and other deposit from septic tank IAW PWS.
1st Opt Period: 1 December 2017 through 30 November 2018
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1002 192 Each OPTION Portable latrine
FFP
Cleaning of portable latrine IAW PWS.
1st Opt Period: 1 December 2017 through 30 November 2018
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1003 26 Each OPTION Grease trap
FFP
Removal/disposal of grease and greasy sludge from grease trap IAW PWS.
1st Opt Period: 1 December 2017 through 30 November 2018
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1004 12 Each OPTION Solid grease
FFP
Removal/disposal of float solid grease from lift Station and sewage plant IAW
PWS.
1st Opt Period: 1 December 2017 through 30 November 2018 .
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1005 224,000 Liter OPTION Wet sludge
FFP
Removal/disposal of wet sludge from sewage treatment plant IAW PWS.
1st Opt Period: 1 December 2017 through 30 November 2018
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 14. of PWS for CMR requirement herein. NOTE: Not to exceed 20 Man hours for data collection and report.endar year.
1st Opt Period: 1 December 2017 through 30 November 2018
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION War Hazard Losses
FFP
Estimated Costs For War Hazard Losses is Zero (0).
1st Opt Period: 1 December 2017 through 30 November 2018
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2001 26 Each OPTION Septic tank
FFP
Removal/disposal of sewage and other deposit from septic tank IAW PWS.
2nd Opt Period: 1 December 2018 through 30 November 2019
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2002 192 Each OPTION Portable latrine
FFP
Cleaning of portable latrine IAW PWS.
2nd Opt Period: 1 December 2018 through 30 November 2019
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2003 26 Each OPTION Grease trap
FFP
Removal/disposal of grease and greasy sludge from grease trap IAW PWS.
2nd Opt Period: 1 December 2018 through 30 November 2019
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2004 12 Each OPTION Solid grease
FFP
Removal/disposal of float solid grease from lift Station and sewage plant IAW
PWS.
2nd Opt Period: 1 December 2018 through 30 November 2019
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2005 224,000 Liter OPTION Wet sludge
FFP
Removal/disposal of wet sludge from sewage treatment plant IAW PWS.
2nd Opt Period: 1 December 2018 through 30 November 2019
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 14. of PWS for CMR requirement herein. NOTE: Not to exceed 20 Man hours for data collection and report.endar year.
2nd Opt Period: 1 December 2018 through 30 November 2019
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION War Hazard Losses
FFP
Estimated Costs For War Hazard Losses is Zero (0).
2nd Opt Period: 1 December 2018 through 30 November 2019
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
3001 26 Each OPTION Septic tank
FFP
Removal/disposal of sewage and other deposit from septic tank IAW PWS.
3rd Opt Period: 1 December 2019 through 30 November 2020
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
3002 192 Each OPTION Portable latrine
FFP
Cleaning of portable latrine IAW PWS.
3rd Opt Period: 1 December 2019 through 30 November 2020
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
3003 26 Each OPTION Grease trap
FFP
Removal/disposal of grease and greasy sludge from grease trap IAW PWS.
3rd Opt Period: 1 December 2019 through 30 November 2020
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
3004 12 Each OPTION Solid grease
FFP
Removal/disposal of float solid grease from lift Station and sewage plant IAW
PWS.
3rd Opt Period: 1 December 2019 through 30 November 2020
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
3005 224,000 Liter OPTION Wet sludge
FFP
Removal/disposal of wet sludge from sewage treatment plant IAW PWS.
3rd Opt Period: 1 December 2019 through 30 November 2020
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 14. of PWS for CMR requirement herein. NOTE: Not to exceed 20 Man hours for data collection and report.endar year.
3rd Opt Period: 1 December 2019 through 30 November 2020
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION War Hazard Losses
FFP
Estimated Costs For War Hazard Losses is Zero (0).
3rd Opt Period: 1 December 2019 through 30 November 2020
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
4001 26 Each OPTION Septic tank
FFP
Removal/disposal of sewage and other deposit from septic tank IAW PWS.
4th Opt Period: 1 December 2020 through 30 November 2021
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
4002 192 Each OPTION Portable latrine
FFP
Cleaning of portable latrine IAW PWS.
4th Opt Period: 1 December 2020 through 30 November 2021
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
4003 26 Each OPTION Grease trap
FFP
Removal/disposal of grease and greasy sludge from grease trap IAW PWS.
4th Opt Period: 1 December 2020 through 30 November 2021
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
4004 12 Each OPTION Solid grease
FFP
Removal/disposal of float solid grease from lift Station and sewage plant IAW
PWS.
4th Opt Period: 1 December 2020 through 30 November 2021
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
4005 224,000 Liter OPTION Wet sludge
FFP
Removal/disposal of wet sludge from sewage treatment plant IAW PWS.
4th Opt Period: 1 December 2020 through 30 November 2021
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 14. of PWS for CMR requirement herein. NOTE: Not to exceed 20 Man hours for data collection and report.endar year.
4th Opt Period: 1 December 2020 through 30 November 2021
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION War Hazard Losses
FFP
Estimated Costs For War Hazard Losses is Zero (0).
4th Opt Period: 1 December 2020 through 30 November 2021
FOB: Destination
NET AMT
NOTICE TO OFFERORS
All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States
(U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or
Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the
ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement, and to perform the contract. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies shall be determined by the Contracting Officer. All offeror(s) interested in competing for this requirement are required to submit their price proposal, as applicable, in Korean won only. A proposal submitted in currency other than Korean won will not be considered for award.
SCHEDULE OF SERVICE
1. GENERAL:
The contractor shall furnish all labor, supervision, tools, equipment, transportation, materials,and perform all work for removal and disposal of sewage, sludge, human waste and grease, services for the items specified in the PWS in accordance with all the provisions specified herein.
2. PERIOD OF PERFORMANCE:
Period of Performance CLINs
Base Period 1 Dec 2016 – 30 Nov 2017 0001 – 0007
1st Opt Period 1 Dec 2017 – 30 Nov 2018 1001 – 1007
2nd Opt Period 1 Dec 2018 – 30 Nov 2019 2001 – 2007
3rd Opt Period 1 Dec 2019 – 30 Nov 2020 3001 –3007
4th Opt Period 1 Dec 2020 – 30 Nov 2021 4001 – 4007
PWS
PERFORMANCE WORK STATEMENT (PWS)
FOR REMOVAL AND DISPOSAL OF SEWAGE, SLUDGE, HUMAN WASTE AND
GREASE, WESTERN CORRIDOR AREA
1. General: The purpose of this contract is to remove and dispose of human waste, waste grease, sewage, sludge, and other deposits from portable latrines, septic tanks, grease traps, lift stations and sewage treatment plant in Western Corridor area in strict accordance with the applicable laws and regulations. The contract requirement is for US Army Garrison-Warrior
Base, Bonifas, Swiss-Swede, Mexico Range and Panmunjom area.
1.1. Scope of Work:
The Contractor shall provide all personnel, equipment, labor, supplies, tools, transportation, materials, supervision and any other resources necessary to remove and dispose of human waste, waste grease, sewage, sludge, and other deposits from portable latrines, septic tanks, grease traps, lift stations and sewage treatment plant listed in the attached Appendix “A” and dispose all of the waste in strictly accordance with the applicable laws and regulations as well as stipulated in documents listed in Para 6.
1.2. Contractor’s Qualification
1.2.1. The Contractor shall maintain the local license for pick up and transport human waste
(분뇨수집 운반업 허가증) issued by Republic of Korea (ROK) with disposal registration authorized by Paju City Government Office that is necessary for the pick-up and disposal of liquid type wastes identified in Paragraph 1., IAW ROK laws and regulations.
1.2.2. The Contractor shall be responsible for obtaining permits and paying fees associated with the use of off-base disposal facility.
1.2.3. Contract Manager: The contractor shall provide an on-site Contract Manager (CM) who shall be physically present during normal duty hours to resolve any problems, or complaints that may occur. The CM shall be able to read, write, speak and understand English and shall fully understand the requirements of this contract
1.2.4. Contractor’s Employees: The contractor shall provide skilled personnel in picking up, cleaning and disposing of sludge and human waste as required under this contract.
1.2.5. All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the Government installation, shall abide by all regulations of the installation in effect during the contract period.
1.3. Work Schedule: The contractor shall prepare and submit a work schedule to the COR for review and acceptance within 3 working days after receipt of each delivery order.
1.4. Quality Control: The contractor shall perform all the inspections in accordance with his quality control plan related to all requirements of this contract.
1.5. Quality Assurance: The Government will evaluate the Contractor’s performance IAW the
Performance Requirements Summary (PRS) table in paragraph 7 and Quality Assurance
Surveillance Plan (QASP).
1.5.1. The contractor shall submit his Quality Control Plan within 15 days of contract award to the COR for review and acceptance.
1.5.2. The COR will review, comment, and accept the contractor’s quality control plan before field work start.
1.6. Hours of Operation: The contractor shall perform services, when ordered by delivery order, from 0800 through 1700 hours, Monday through Friday, excluding U.S. and Korean legal holidays.
1.7. Safety: The contractor shall exercise safety precautions as necessary to prevent and eliminate safety hazards to personnel, materials and equipment. All contractor equipment will be subject to function and safety inspections by the Government. Unsafe or non-functioning equipment shall be removed from the job site. The contractor shall take all safety measures as specified in EM-385-1-1K, Safety and Health Requirements Manual.
1.8. Inspections: For requirements for off-base disposal, the Contractor’s method used for disposal of grease, sewage and sludge as stated in PWS shall be verified with authenticated copy of disposal certificate issued by ROK authorized disposal facility. For requirements other than off-base disposal, the Contractor shall notify the COR upon the completion of work of all areas in which pick-up and removal work has been accomplished and is ready for inspection by the
COR. If the work has not been performed, or has not been performed satisfactorily, the COR will notify the Contractor of that fact within one (1) working day of the inspection. In accordance with FAR 52.246-4 (a) Inspection of Services-Fixed-Price, work may be performed or corrections made within one (1) working day of notice of non-performance or unsatisfactory performance. If the Contractor fails to perform or to correct work within one (1) working day of notice of non-performance or unsatisfactory performance, or the defects cannot be corrected, then the Contractor shall be deemed as failing to comply with contract requirements and the
COR will notify the Contracting Officer for action.
1.9. Physical Security: The Contractor shall be responsible for complying with all security requirements imposed by the local installation commander at all times while performing the requirements of this contract.
1.10. Environmental Control: The Contractor shall perform all work under this contract in manner that precludes detrimental impacts to the environment. All Contractor’s performance shall be IAW current US and Korean environmental laws and regulations.
1.11. Condition for Exceeding Estimated Quantities. The Government quantity is an estimate and the Government will only pay for actual quantity.
1.12. Estimated Quantity. The quantities identified are reasonable estimates the Government anticipates ordering during each contract period, but due to conditions, such as military exercises, the Government may increase the quantity via a contract modification.
2. DEFINITIONS
2.1. Contract Specialist: The official Government representative delegated authority by the contracting officer to administer a contract. This individual, normally working in an appropriate contracting or procurement career field, advises on all technical contractual matters.
2.2. Contracting Officer. A person duly appointed with the authority to enter into and administer contracts on behalf of the Government.
2.3. Contracting Officer’s Representative (COR) and Alternate Contracting Officer’s
Representative (ACOR). An individual designated IAW subsection 201.602.2 of the Defense
Federal Acquisition Regulation Supplement and authorized in writing by the Contracting Officer to perform specific technical or administrative functions.
2.4. Contractor: The contractor, its subsidiaries and affiliates, joint ventures, involving the contractor, or any entity which the contractor may have merged or any individual or entity that assisted or advised the contractor in the preparation of a proposal under this solicitation.
2.5. Customer Complaint. A means of documenting certain kinds of contract service complaints. A Government program which is explained to every organization that receives service under this contract which is used to evaluate a Contractor’s performance.
2.6. Defective Service. A service output that does not meet the standard of performance associated with it in the PRS.
2.7. Performance Requirements Summary (PRS, table at paragraph 7). Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.
2.8. Quality Assurance. Those actions taken by the Government to assure services meet the requirements of the PRS and all other service outputs.
2.9. Quality Assurance Surveillance Plan (QASP). An organized written document used for quality assurance surveillance. The document contains specific methods to perform surveillance of the Contractor.
2.10. Quality Control. Those actions taken by the Contractor to control the performance of services so that they meet the requirements of the performance work statement.
3. Government Furnished Property and Utilities: None
4. Contractor Furnished Property, Equipment and or Materials: The contractor shall furnish all property, equipment, materials and services are necessary to perform the requirements of this contract.
4.1. Transportation and Equipment: The Contractor shall provide an adequate number of qualified personnel and equipment in performance of this contract.
4.2. Minimum Quality Standard: The quality of this service contract shall meet or exceed the requirements of this contract.
5. Specific Tasks:
5.1. Contractor’s Responsibilities and Procedure:
5.1.1. The Contractor shall provide Business permission and Registration authorized by Paju
City Government Office to remove, transport and dispose of the sludge and human waste. The
Contractor shall throughout the contract period, obtain and maintain the required licenses to perform the service of sludge removal and disposal. The Contractor shall notify the Government immediately of any change relating to the status of the Business permission and Registration.
5.1.2. Work Plan and Site Survey: The Contractor shall survey each job site before start of work and prepare work schedule on the basis of the Task Order issued by the Government. The work plan may be changed IAW the operational conditions of DPW waste water treatment plant and units’ activities. The work plan shall be submitted to the COR for review and concurrence.
5.2. Requirements: The Contractor shall perform services when ordered by the delivery order, specific requirements are as follow:
5.2.1. Removal/Disposal of Sewage and Other Deposit from Septic Tank: The Contractor shall evacuate the sewage, sludge and other deposit out of the septic tank. The Contractor shall transport the waste to City sewage treatment plant for disposal. The location and frequency of this service is delineated in attached Appendix “A”. The Contractor shall ensure the service area is disinfected and free of waste. The volume of waste in the septic tank per a service is approximately 8,000 liters. Upon completion, the septic tank shall be inspected and accepted by the COR.
5.2.2. Cleaning of Portable Latrine: The Contractor shall clean up the portable latrines and remove the accumulated sewage in the toilets. The portable latrines shall be cleaned-up weekly to keep good hygienic condition and prevent the spreading of disease. The sewage shall be duly disposed of in the City sewage treatment plant. The portable latrines shall be listed in Appendix
“A”.
5.2.3. Removal/Disposal of Grease and Greasy Sludge from Grease Trap: The location and frequency of this service is delineated in attached Appendix “A”. The Contractor shall pump up all of the water, greasy sludge and other pumpable liquid, except unpumpable floating solid grease, shall be transferred from grease trap to contractor’s tank lorry by pumping. The transferred liquid shall be held in the tank lorry for settling while contractor engages in removal of the solid grease and grease contaminated deposit, and cleans the concrete wall by scraping.
The Contractor shall containerize the removed solid grease and the grease mixed deposit for safe transportation and disposal.
After completion of grease trap cleaning, the contractor shall gravitationally drain (not by forced drainage) into the grease trap only the settled/segregated water in the tank lorry. The contractor shall transport and dispose of the remained greasy sludge in the tank lorry. Upon completion of the work, the grease trap will be inspected and accepted by the using agency or
COR.
The contractor shall dispose of all solid grease and greasy sludge picked up from grease traps in compliance with the Korean Environmental Laws and Regulations. The contractor shall submit a disposal certificate which is issued by a disposal facility licensed by Korean
Government Authorities to COR.
5.2.4. Removal/Disposal of Float Solid Grease from Lift station and Sewage treatment plant.
The Contractor shall remove floating grease and deposits mixed with the grease from the lift station and sewage lift stations listed in attached Appendix “A”. The removed waste grease shall be containerized in drums equipped with couplings to prevent spills for safe transportation and disposal. The removed grease shall be disposed of by the Contractor IAW Korean environmental laws and regulations.
The Contractor shall record the quantities of removed grease. This record shall be verified by the representative of sewage treatment plant or COR. Prior to leaving each work site, the representative of sewage treatment plant or COR and the Contractor shall mutually agree upon and document the quantities of the waste grease removed.
5.2.5. Removal/Disposal of Wet Sludge from Sewage Treatment Plant: The Contractor shall remove and dispose of accumulated sewage, sludge and other deposits (hereinafter referred to waste) from the sewage treatment plant as listed in attached Appendix “A”. The Contractor shall transport the waste to the City sewage treatment plant authorized by Korean Government for
Disposal. The frequency of this service is delineated in the attached Appendix “A”. The
Government representative at the sewage treatment plant or COR will estimate the volume of the waste to be removed. Upon issuance of delivery order, the Government will order the contractor to remove the estimated volume of sludge.
The Contractor shall record the quantity of waste removed by reading a transparent level gage mounted on the tank lorry. This record shall be verified by the representative at sewage treatment plant or COR. Prior to leaving each work site, the representative of sewage treatment plant or
COR and the contractor shall mutually agree upon and document the quantities of the waste removed.
5.2.6. Quantity Verification: The contractor shall ensure that prior to departing any service location all quantities of sewage and sludge removed are inspected, verified and accepted by the either the using agency, the Chief of the sewage treatment facility or the COR.
5.2.7. Disposal of Waste: The contractor shall ensure that all disposals of grease, sludge and human waste are in strict compliance with US and Republic of Korea laws and regulations. The contractor shall ensure that after each disposal to the treatment facility a disposal certificate is issued to the contractor and the contractor shall submit each certificate to the COR within 15 business days of certificate issuance.
5.3. Leave Spills:
5.3.1. Spill Reporting: The contractor shall ensure that the COR is notified of all spills immediately whether the spill occurred during removal or transportation and regardless of the quantity involved.
5.3.2. Contractor’s Responsibility: The contractor shall ensure that any area where a spill occurs is restored to the condition it was prior to the spill. The contractor shall ensure the area is free of waste, dirt, debris, sludge and sewage and shall be accomplished within 2 days of spill occurrence and with no detrimental impacts to the environment. The contractor shall notify the
COR when the area is free of the spill for inspection in accordance with Chapter 18, Environment Governing Standards(USFK Reg. 201-1).
5.3.3. Contractor’s Failure to cleanup Spill: In the event the affected area where a spill occurred is not completely free of dirt, debris, waste, sludge and sewage within 2 days of spill occurrence, and accomplished in accordance with Chapter 18, Environment Governing Standards
(USFK Reg. 201-1), a reduction in payment to the Contractor may result, at the Contracting
Officer's discretion, in the amount equal to the cost incurred by the government to restore the area to it's condition prior to the spill.
6. Applicable Documents:
EM 385-1-1K, Safety and Health Requirements Manual.
Current ROK Ministry of Environment Laws and Regulations.
AR 200-1, Environmental Protection and Enhancement.
AR 420-47, Solid and hazardous waste management.
USFK Reg. 201-1, Environment Governing Standards.
The applicable documents can be found through internet search or will be provided to the contactor upon their request.
7. Performance Requirements Summary (PRS).
The Government will evaluate the Contractor’s performance IAW the Performance
Requirements Summary (PRS) table.
Para
Performance
Objectives
Standard
Acceptabl e Quality
Level
Method of
Surveillance
Remedy of
Failure
5.2.1 Removal/disposal of
sewage and other deposit from septic tank
Removal/disposal shall be completed
IAW environmental laws and regulations of ROK and US
Less than 3% defects per rating period
Random Inspections shall be performed for all work completed. Customer
Complaints.
Additional performance should be conducted to fix non-performed work within 24 hours of notification
5.2.2
Cleaning of portable latrine
Cleaning shall be completed IAW environmental laws and regulations of
ROK and US
Less than 3% defects per rating period
Random Inspections shall be performed for all work completed. Customer
Complaints.
Additional performance should be conducted to fix non-performed work within 24 hours of notification
5.2.3
Removal/disposal of grease and greasy sludge from grease trap
Removal/disposal shall be completed IAW environmental laws and regulations of ROK and US
Less than 3% defects per rating period
Random Inspections shall be performed for all work completed. Customer
Complaints.
Additional performance should be conducted to fix non-performed work within 24 hours of notification
5.2.4
Removal/disposal of float solid grease from lift station and sewage treatment plant
Removal/disposal shall be completed IAW environmental laws and regulations of ROK and US
Less than 3% defects per rating period
Random Inspections shall be performed for all work completed. Customer
Complaints.
Additional performance should be conducted to fix non-performed work within 24 hours of notification
5.2.5
Removal/disposal of wet sludge from sewage treatment plant
Removal/disposal shall be completed IAW environmental laws and regulations of ROK and US
Less than 3% defects per rating period
Random Inspections shall be performed for all work completed. Customer
Complaints.
Additional performance should be conducted to fix non-performed work within 24 hours of notification
8. Environmental Management System (EMS) Requirements
8.1. The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management
W9QVN-17-T-0003
Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required
Environmental training.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental
Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the
EMS Manager to arrange Environmental training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
The responsibilities of all contractor personnel include, but are not limited to:
(1) Comply with all applicable environmental laws, regulations and installation environmental policies.
(2) Control and prevent spills or hazardous substances releases IAW installation Spill
Prevention Plan.
(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.
(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.
(6) Open burning is prohibited on the Government premises IAW installation environmental policy.
(7) Participate in installation’s recycling program.
(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off
Government property and dispose of it in compliance with National, Provincial, and/or
Local requirements for solid waste disposal.
(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling.
Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks.
Continuous conservation of our natural resources is a must.
(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.
(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.
(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.
9. ANTITERRORISM AT AND OPERATIONS SECURITY:
9.1. AT Level I Training: All Contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT
Level I awareness training within 14 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR, within 14 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html.
9.2. Access: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or http://jko.jten.mil/courses/atl1/launch.html
Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
9.2.1. General Protection/Security Policy and Procedures: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the
National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist
Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
9.2.2. The contractor will provide to the COR, fourteen days in advance of the event, names and
Social Security numbers (or equivalent identification numbers for non-U.S. citizens) of all employees who will be entering Army-controlled installations or facilities. The contractor will ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.
9.2.3. The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the sponsoring agency (COR) at the earliest of any of the following, unless otherwise determined by the Government:
(1) When no longer needed for contract performance.
(2) Upon completion of the Contractor employee’s employment.
(3) Upon contract completion or termination.
(c) The Contracting Officer may delay final payment under a contract if the
Contractor fails to comply with these requirements.
9.2.4 The Contractor shall insert the substance of this clause, including this paragraph (9), in all subcontracts when the subcontractor’s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.
9.3. iWATCH Training: The Contractor and all associated sub-Contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity
Anti-Terrorism Officer). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.
This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance. Contractor must submit the results to the COR NLT 5 calendar days after completion of training.
10. ACCOUNTING FOR CONTRACT SERVICES (Contract Manpower Reporting (CMR)
Requirement)
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor will report ALL Contractor manpower data (including subcontractor manpower) required for performance of this contract.
This CMR reporting requirement must be performed by the Contractor by 31 October AFTER
EACH performance year of the contract. The Contractor is required to completely fill in all the requested CMR information in the following web address: https://cmra.army.mil. The information provided by the Contractor should pertain to performance of the preceding performance year or performance period, regardless of length of performance. In other words, even if the period of performance was for only one (1) week in July, the Contractor is required by Department of Army directive to submit into the CMR website by 31 October of that calendar year, the CMR data pertaining to the one week period of performance.
However, before the Contractor can begin reporting CMR data in this website, he must first register as a User. In order to register, the Contractor must have a Cage Code and a DUNS number.
Cage Code
If you are a Korean company needing a Cage Code, contact Ms. Cho, Soonim at Telephone #82-
2-2079-4639, FAX 82-2-773-7587, EMAIL CAGEKR@dapa.go.kr , Address: The Standard
Planning Team of the Standard Management Bureau Defense Acquisition Program Division (23
Yongsangogyogil), #2-15 Yongsan 2 ga dong, Yongsan-gu, Seoul (140-841), Republic of Korea.
If you are a U.S. company needing a Cage Code, you must register with the Central Contractor
Registration (CCR) at www.ccr.gov. Once your company registration is activated in CCR, a
Cage Code notification will be mailed to your company address via the U.S. Postal Service.
DUNS Number
For a DUNS number, go to the following web link and follow the instructions therein:
http://fedgov.dnb.com/webform/displayHomePage.do;jsessionid=A091BDB64B5CFE18399D72
9B16476DCD. As stated on this webpage, “D-U-N-S Number assignment is FREE for all businesses required to register with the US Federal Government for contracts or grants.”
Contractors should not have to pay for their DUNS number if they are using the DUNS number for U.S. Government contracts.
CMR Reporting
The information required to be reported in the CMR website includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or Contracting
Officer’s Representative (COR); (2) Contract Number, including Task and Delivery Order
Number(s); (3) Beginning and Ending dates covered by reporting period; (4) Contractor Name, https://cmra.army.mil/ mailto:CAGEKR@dapa.go.kr http://www.ccr.gov/ http://fedgov.dnb.com/webform/displayHomePage.do;jsessionid=A091BDB64B5CFE18399D729B16476DCD http://fedgov.dnb.com/webform/displayHomePage.do;jsessionid=A091BDB64B5CFE18399D729B16476DCD
Address, Phone Number, E-Mail Address, Identity of Contractor Employee entering data; (5)
Estimated Direct Labor Hours (including sub-contractors’ hours); (7) Total Payments (including sub-contractors’ payments); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate Predominant FSC for each sub-contractor if different); (9)
Estimated data collection cost; (10) Organizational Title associated with the Unit Identification
Code (UIC) for the Army Requiring Activity reporting this information (the Army Requiring
Activity (RA) is responsible for providing the contractor with its UIC for purposes of reporting this information); (11) Locations where Contractor and sub-contractors perform the work
(specified by zip code in the United States and nearest City and Country when in an overseas location, using standardized nomenclature provided on website); (12) Presence of Deployment or
Contingency Contract language; and (13) Number of Contractor and sub-contractor employees deployed in theater this reporting period (by Country).
As part of its submission in response to a solicitation or a modification request which includes a contract line item number (CLIN) for this CMR reporting requirement, the Contractor shall also provide the estimated total cost (if any) incurred to comply with this reporting requirement on the associated CMR CLIN. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each Government fiscal year and must be reported by 31
October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
CMR reporting is a requirement mandated by the Department of Army. Failure of the Contractor to comply with this requirement will be noted as Past Performance information about the
Contractor to be used on future procurements for the same or similar services.
CAGE CODE – What it is and How to Obtain One
A CAGE Code is a five-position code that identifies contractors doing business with the U.S.
Federal Government, NATO member nations, and other foreign governments. The CAGE Code is used to support a variety of mechanized systems throughout the Government and provides for a standardized method of identifying a given facility at a specific location. The Code may be used for a Facility Clearance, a Pre-award survey, automated Bidders Lists, identification of
Debarred Contractors, fast pay processes, etc. (http://www.dlis.dla.mil/cageserv.asp.)
FOR U.S. COMPANIES
The CAGE Code request process is now incorporated in the Central Contractor Registration
(CCR) process. A U.S. company is assigned a Cage Code by registering in CCR at the following website: www.ccr.gov. Upon activation in CCR, the U.S. Company will be mailed the CAGE
Code notification via the US Postal Service. The CAGE notification is sent to the person listed under the "Registrant Name" in the registration documentation. In addition, once the registration is active, the CAGE code may be viewed on Internet Web by searching the active registrations at www.dlis.dla.mil/CAGESearch/.
FOR NON-U.S. COMPANIES
Non-U.S. companies are issued NATO Cage Codes (NCAGE) by contacting the designated
Point of Contact (POC) at the National Codification Bureau (NCB) of the country where the http://www.dlis.dla.mil/cageserv.asp http://www.ccr.gov/ http://www.dlis.dla.mil/CAGESearch/ company is located. For a list of addresses and POCs, go to http://www.dlis.dla.mil/nato_poc.asp .
Please note: Organizations with an address containing APO, FPO or AE do not need an NCAGE assigned by an Allied Nation or NATO-sponsored NCB. Instead, these companies must register in the CCR to receive a U.S. Cage Code.
The POC for South Korea is:
The Standard Planning Team
Of the Standard
Management Bureau Defense
Acquisition Program Division
(23 Yongsangogyogil)
#2-15 Yongsan 2 ga dong
Yongsan-gu
SEOUL (140-841)
Republic of Korea
Ms. Soonim CHO
TEL: +82-2-2079-4639
FAX: +82-2-773-7587
E-MAIL: CAGEKR@dapa.go.kr
Depending on Ms. Cho’s schedule, she may be able to provide a NATO Cage Code to the
Korean contractor within a few days.
NATO Cage Code 신청 및 주의 사항 (Instruction on Registering for NATO Cage Code)
신청 절차
1. 방위사업청 국방전자조달 홈페이지(www.d2b.go.kr)에 접속 합니다.
2. 방위사업청 국방전자조달 홈페이지 메인화면의 민원서비스 - 나토생산자(Ncage)부호
신청을 클릭 합니다. 로긴(Login) 없이 접속 가능
3. 신청서식(NATO FORM AC/135-NO2)을 다운 받아 작성 합니다.
4. 사업자등록 증명원(발행일 3 개월이내) 1 부와 신청서식을 E-mail / Fax 로 발송 합니다.
5. 담당자가 접수 후 통보서식에 의해 결과를 E-MAIL / Fax 등으로 통보합니다
작성 지침
1 ‘*’ 로 표시된 부분은 필수사항으로 입력 합니다. (1 번 부터 8 번은 제외)
2. 요청업체의 작업을 촉진시키기 위해 생산품 대한 가용한 어떠한 정보라도 10 번 항목에
입력 합니다.
예) 지사, 공장, 연락소 등
업무 담당자
1. 담당부서 : 방위사업청 표준관리부 목록체계팀
① 생산자부호 담당 전화번호 : 02)-2079-4639 http://www.dlis.dla.mil/nato_poc.asp mailto:CAGEKR@dapa.go.kr
② 표준관리부 FAX : 02)-2079-4629
③ 목록체계팀 E-mail : cagekr@dapa.go.kr
Since the CAGE code is essential for CMR registration, the attached CAGE code application form must be completed and sent to ROK…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .