ITEMMODELDESCRIPTIONQUANTITY
0001Take Down Existing Wall
between the roomGypsum Board w/ stud,
wall thk : 140mm1LOT
0002Take Down Existing Wall

between the room and the hallway

and ceilingGypsum Board w/ stud,
wall thk : 140mm1LOT
0003Extend the ceiling1LOT
0004New Wall
at the entrance CWMD Center1EA
0005New Wall
at the Server RoomLength : 3260 x 2300(h) mm1LOT
0006Making Hole to put the outbound door1EA
0007Door & Door Frame InstallationOne for the CWMD Center,

One for the Outbound Door

One for the Server Room3EA
0008Cypher Lock on the door3EA
0009Disposal of Bldg waste matter1LOT
0010PaintingAREA : 1134 ft² = 32pyong1LOT
0011Block the windowSize : 1200 x 1200mm1LOT
0012Take down power outlet21 ea on the wall
, fluorescent light switch(3ea)1LOT
0013Electric Wire#12 AWG162M
0014Electric Wire#6 AWG20M
0015Electric Wire#1/0 AWG80M
0016PANEL BOARDMCB : 2P-125AT-125AF 1EA

BCB : 2P-100AT-30AF 2EA

2P-100AT-20AF 2EA

1P-100AT-20AF 12EA1SET
0017"WP" Pull Box2EA
0018RECEPTACLE, 120V5EA
0019Regid Steel Conduit_PDS PipeSize : 16C54M
0020Regid Steel Conduit_PDS PipeSize : 53C25M
0021Steel Normal BendSize : 53C2EA
0022Flexible Steel Conduit22mm1LOT
0023Steel Square BoxSize : 92x92x44D mm32EA
0024Encased Circle Type LED5EA
0025TRANS. & EQUIP. Cost1TRIP
0026MISC1L/S
0027Labor Cost27M/D
0028System Box32EA
0029110 V Receptacle32EA
0030Raised Access Floor
(conductive)AREA : 1134 ft² = 32pyong
floor loss rate : 15%1LOT
0031AC ConditionerRelocation : new brass pipe Installation and Gas Refill2EA