A2_Drawing_files___58479___Title.pdf
PDF 395 KB Posted
- Attached to
- Repair Bldg 2308, Camp Casey
- Solicitation number
- W91QVN-17-R-0065
About this file
Schedule of Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A2_Drawing_files___58479___MECH.pdf | ||
| A2_Drawing_files___58479___CIVIL.pdf | ||
| A2_Drawing_files___58479___ARCH.pdf | ||
| A2_Drawing_files___58479___ELEC.pdf | ||
| Submittal_Register___58479.xls | XLS spreadsheet | |
| W91QVN-17-R-0065_Repair_Bldg_2308,_Camp_Casey.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO.
CIVIL
C - 1
M - 1
M - 2
M - 3
MECHANICAL
ELECTRICALA - 1
A - 2
A - 3
ARCHITECTURAL
DESCRIPTION OF DRAWINGS
TITLE SHEET
DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
TITLE SHEET
T-1
A - 4
A - 5
A - 6
A - 7
A - 8
A - 9
M - 4
M - 5
M - 6
M - 7
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
C - 2
LOCATION PLAN AND GENERAL NOTES
E - 1
E - 2
E - 3
E - 4
E - 5
E - 6
E - 7
E - 8
E - 9
E - 10
E - 11
E - 12
E - 13
E - 14
M - 8
M - 9
M - 10
M - 11
M - 12
M - 13
M - 14
M - 15
M - 16
M - 17
M - 18
M - 19
M - 20
M - 21
M - 22
M - 23
M - 24
M - 25
M - 26
FEWR NO. 58479, CAMP CASEY
GENERAL NOTES AND SCOPE OF WORK
MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS
LEGEND, GENERAL NOTES AND SCOPE OF WORKS
TYPICAL & PARTIAL PLANS AND ELEVATIONS
CABINET DETAILS AND NOTES
HARDWARE SCHEDULE AND DETAILS
SIGNAGES SCHEDULE
1ST FLOOR PLAN & GENERAL NOTES
2ND-4TH FLOOR PLAN & SCOPE OF WORKS
INTERIOR, EXTERIOR FINISH SCHEDULE AND MATERIAL & COLOR SCHEDULE
DOOR / WINDOW SCHEDULE, ELEVATIONS AND NOTES
MECHANICAL EQUIPMENT SCHEDULE-1
MECHANICAL EQUIPMENT SCHEDULE-2
CONTROL AND CHILLED/HOT WATER PIPING SYSTEM DIAGRAM
1ST & 2ND FL PLUMBING PIPING PLAN, SPECIFIC NOTES AND NOTES
3RD & 4TH FL PLUMBING PIPING PLAN, SPECIFIC NOTES AND NOTES
MECH ROOM PLUMBING PARTIAL PLAN AND NOTES
TYP MODULE PLUMBING PARTIAL PLANS-1 AND 2 AND NOTES
LAUNDRY PLUMBING PARTIAL PLANS AND NOTES
1ST FLOOR FIRE PROTECTION PIPING PLAN
2ND FLOOR FIRE PROTECTION PIPING PLAN
3RD FLOOR FIRE PROTECTION PIPING PLAN
4TH FLOOR FIRE PROTECTION PIPING PLAN
EF-4 AND EF-1 CONTROL CIRCUIT(TYP FOR EF-5) AND CO DETECTION SYSTEM
VENT SYS CONTROL DIA, DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM,
AND GENERAL NOTES
FIRE PROTECTION LEGEND & ABBREVIATION SPRINKLER Q'TY LIST
1ST, 2ND, 3RD AND 4TH FLOOR LIGHTING PLAN
LIGHTING FIXTURE DETAILS
LIGHTING FIXTURE SCHEDULE
1ST, 2ND, 3RD & 4TH FLOOR POWER PLAN
PANELBOARD "P" & LOAD CENTER "L1","L2","L3 &"L4" LOAD SCHEDULE
1ST, 2ND, 3RD & 4TH FLOOR LAN/TEL PLAN
TELECOMMUNICATION SYSTEM DIAGRAM
1ST, 2ND, 3RD AND 4TH FLOOR CATV PLAN
CATV SYSTEM DIAGRAM
POWER PLAN
TYPICAL BEDROOM ELECTRICAL MODULE PLAN & MECH. RM PARTIAL
SYSTEM PLAN
1ST, 2ND, 3RD & 4TH FLOOR FIRE ALARM AND MASS NOTIFICATION
EXT / INTERIOR WALL SECTIONS AND DETAILS
FIRE ALARM / MASS NOTIFICATION SYSTEM DIAGRAM
AND NOTES
MECH RM HVAC PARTIAL PLAN, EXHAUST DUCT ISOMETRIC DIAGRAM (TYP)
SCHEDULE AND NOTES
TOILET PLUMBING PARTIAL PLANS, PLUMBING FIXTURE
DETAILS
SITE LAYOUT PLAN, NOTE AND SCOPE OF WORK
4 C - 3 MICS DETAILS - 1
5 C - 4 MICS DETAILS - 2
REPAIR BUILDING S-2308
REPAIR BUILDING S-2308
CAMP CASEYYI, SC
58479
EXIST/NEW EXTERIOR TELECOMM DISTRIBUTION PLAN-1
EXIST/NEW EXTERIOR TELECOMM DISTRIBUTION PLAN-2
E - 15551ST FL HVAC PLAN
2ND FL HVAC PLAN
3RD FL HVAC PLAN
4TH FL HVAC PLAN
(1ST THRU 4TH FL), ISOMETRIC DIAGRAM AND SPECIFIC NOTES
LAUNDRY RM HVAC PARTIAL PLAN(TYP), TYP MODULE HVAC PARTIAL PLAN
MULTIZONE AND UNIT-ADMIN AREA(AHU-1)
OUTSIDE AIR SUPPLY UNIT SINGLE ZONE, FCU CONTROL DIAGRAM AND
FIRE PROTECTION REQUIREMENTS
MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN AND
File details come from the government source that posted it. Updated .