Drawing_files___141384___MECH_1.pdf
PDF 9 MB Posted
- Attached to
- Repair bathrooms in various buildings, Cp Casey
- Solicitation number
- W91QVN17R0051
About this file
Drawing_Mech 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN17R0051_Released.docx | DOCX document | |
| Drawing_files___141384___ARCH.pdf | ||
| Drawing_files___141384___MECH_2.pdf | ||
| Submittal_Register___141384.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-1
MECHANICAL
CHONG,ST
NOTES :
1. QUANTITIES ARE SHOWN FOR ESTIMATION PURPOSE ONLY, THE CONTRACTOR SHALL BE
REQUIREMENTS.
RESPONSIBLE FOR VERIFYING ACTUAL QUANTITIES BASED IN THE CONTRACT DOCUMENTS
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREAS.
ACCORDING TO SMACNA STATIC PRESSURE CALSS 500PA AND DUCTWORK SHALL MEET
7. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED
THE REQUIREMENTS OF SEAL CLASS C.
3. CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
THE EXISTING EQUIPMENT ANY EQUIPMENT, DUCT WORK, PIPING ETC. DAMAGED DUE TO
THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY
1. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH
THE EXISTING CONDITIONS, EQUIPMENT, FINISHES, ETC., PRIOR TO START OF WORK.
IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING
OFFICER'S REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER
2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. APPROXIMATE
SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
5. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWINGS.
4. ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/ NEW) SHALL BE SEALED
6. ALL WALL/FLOOR/ROOF OPENINGS RESULTED FROM THE REMOVAL OF PIPING AND
CORRECTIONS FOR CONTRACTING OFFICER'S APPROVAL.
AND SHALL BE VERIFIED AT THE JOB SITE.
THIS CONTRACTOR.
PER SPEC.
GENERAL NOTES
SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREA.
8. ANY OPENING RESULT FROM THE REMOVAL WORK THAT'S NOT TO BE RE-USED
9. ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL IT'S ACCESSORIES
SUCH AS ANCHORS, HANGERS/SUPPORT, ETC.
10. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE
CONTRACTING OFFICER FOR APPROVAL.
REMOVE THE EXIST DUCTWORK AND INSTALL NEW DUCTWORK AND MAKE ALL
IF THE EXIST DUCT ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION,
COORDINATE WITH THE EXIST DUCTWORK AND PIPING ELEVATION/LOCATION.
11. PRIOR TO INSTALL NEW HVAC AND PLUMBING PIPING CONTRACTOR MUST
NECESSARY DUCT CONNECTION TO FUNCTION AS ORIGINALLY INTENDED.
13. CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPECIFICATION.
12.
CHANGES REQUIRED TO MAKE THIS
CONTRACTOR SHALL PROVIDE NECESSARY SHOP DRAWINGS FOR ANY
REQUIREMENT FOR GAS ONLY BURNERS MAY BE JUSTIFIABLE. THE
PACKAGE, PRIOR TO THE START OF CONSTRUCTION, THEREFORE THE
PROVIDE NATURAL GAS ACCESS TO THE BUILDING UNDER THIS DESIGN
CONCURRENT NATURAL GAS CONVERSION PROJECT PACKAGES MAY
HEATING SYSTEMS WITH DPW PRIOR TO THE START OF CONSTRUCTION.
AND OIL) BURNERS FOR HEATING HOT WATER AND DOMESTIC HOT WATER
THE CONTRACTOR SHALL COORDINATE THE USAGE OF DUAL FUEL (GAS
141384
CAMP CASEY
SCOPE OF WORK
1. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED SHOWERHEADS
2. REPAIR BY REPLACEMENT OF EXISTING DETERIORATE EXHAUST FANS
3. REPAIR BY REPLACEMENT OF EXISTING DETERIORATE EXHAUST RESISTERS
ASSOCIATED DUCTWORK AND CEILLING GYMSUM BOARD WITH MEW.
ASSOCIATED DUCTWORK AND CEILING GYMSUM BOARD WITN MEW.
CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE/RE-CONNECT ELECTRIC WIRING & CONDUIT.
AREA INCLUDING STRUCTURES, WALL, CEILGING, ETC. TO THEIR ORIGINAL CONDITION
AND OPERATION DURING AND AFTER INSTALLATION OF MECHANICAL SYSTEM.
IF REQUIRED.
EXHAUST FANS TO MEET SITE CONDITION WITH CONTRACTOR'S EXPENSE
14. CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPECIFICATION.
FIRE CODE AND SPECIFICATIONS.
THE NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE,
15. ALL ELECTRICAL WORK SHALL CONFORM TO THE CURRENT REQUIREMENTS OF
16. THE CONTRACTOR SHALL PROVIDE EXTEND CIRCUIT TO RE-CONNECT NEW
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
IN BATH ROOMS WITH NEW.(BLDG NO. S-134, S-162, S-473, S-715, S-811, S-823
S-827, S-1130, S-1146, S-1147, S-1834, S-1844, S-1854, S-2024, S-2025, S-2218, S-2361 AND S-2607)
(BLDG NO. S-134, S-473, S-811, S-1130, S-1146, S-1147, S-1834, S-1844, S-2024, S-2025, S-2361 AND S-2607)
(BLDG NO. S-162, S-715, S-823, S-827, S-1854 AND S-2218)
A. REPAIR AND MAINTENANCE(K-WORK)
VARIOUS BLDGS
REPAIR BATHROOMS,
AND NOTES
GENERAL NOTES, SCOPE OF WORK
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-2
MECHANICAL
CHONG,ST
65-A
12 CM
ST
STREAM
ST
S T
P V C
227.5
J-4
ST
36 CM
.5
.9
W A
L L
W A
L L
W A
L L
WALL
W A
L L
WALL
228.4
ST
GAL275
00-49341
01-49550
LAUNDRY
KSC
PEST
647667
UTIL
B&G
WH-1
WH-2
DPW HQ
A
B
629 685
651A
833T
715 726
A B
A
B
1149 1151
10291144
A
B
1918 1879
A
B
A
B
A
B
2372A
2373T
A C
2451 2400
A
B
A
B
2648 2605
2609T
2514 2540
8008T
2540T
2626 2607
26462645
1991 1963
A B
18331832
1962 1812
456A
CCTT
CCTT
SIMNET
463Z
SSSC
TSAK MILES 2000
549 546
8114T
560G
A B
86M
48T
A
B
39 55
186 192
202A
208 215 214
213 212
258252
249 262
1785 235
237 238
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
RAILHEAD
.8
.5
S T
R C
6 PVC
ST
T
C M
S T
268.6
STREAM
DISCHARGE TO
65-A
12 CM
ST
STREAM
447A
F
F
497A
497B
458Z
2372?
QA00894-0J
QA00893-0J
QA00892-0J
ADMIN
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54158 BUP 030104
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
01-QA00604 BUP
XX-QA00606 BUP 0310XX
4-184PN
96-QA00466 BUP
95-44066
95-44066
4-184PN
95-44066
4-184PN
01-55893 BUP
01-55894 BUP
99-51820
3-48PN
99-51682
4-200PN
01-55882 BUP
A
B
A B
2022(?)
VEH BR
VEH BR
472?
455?
1839T
1840T
BARRIER
1564 1566
635A
2002B
A B
48A
A
B
A B
A B
A
B
A
B
174 Z
GRAVES
GRAVES
B A
S K
E T
B A
L L
O
U R
T
T E
N N I
U R
T
706(707A)
(2298)
1071?
A B
1760?
VEH BR?
VEH BR?
BARRIER
BARRIER
FLAG
FO
TBALL FIELD
(SYN
TH
ETIC
TU
RF AREA)
1919LIFT STATION
CAMP CASEY
CAMP CASEY MAP & BUILDING LIST
: PROJECT BUILDING
BLDG NO.
USAGE
EM QTRS(100RMS)
FLOOR
HEAD
SHOWER
SHOWER HEAD
TYPE OF
EXHAUST FAN
CEILLING RECESS
REGISTER
2 162 4
3 473 4
4 715 EM QTRS(100RMS) 4 100 100
5 811 3
6 823 EM QTRS(100RMS) 4 100 100
7 827 4
8 1130 3
9 1146 4
10 1147 4
11 1834 EM QTRS(100RMS) 3
12 1844 EM QTRS(100RMS) 4
13 1854 EM QTRS(100RMS) 3 100
14 2024 EM QTRS(100RMS) 4
15 2025 EM QTRS(100RMS) 3
16 2218 EM QTRS(100RMS) 4 100 100
17 2361 EM QTRS(100RMS) 4
18 2607 EM QTRS(100RMS) 4
EM QTRS(92RMS) 92
FIXED MOUNT
FIXED MOUNT 92
EM QTRS(88RMS) 44 HAND-HELD 44
FIXED MOUNT
EM QTRS(93RMS) 47 HAND-HELD 47
FIXED MOUNT
EM QTRS(92RMS) FIXED MOUNT
EM QTRS(46RMS) 23 HAND-HELD 23
EM QTRS(54RMS) 54 FIXED MOUNT 54
EM QTRS(88RMS) 44 FIXED MOUNT 44
FIXED MOUNT
FIXED MOUNT
FIXED MOUNT
FIXED MOUNT
FIXED MOUNT
FIXED MOUNT
FIXED MOUNT
HAND-HELD
TOTAL 1,109 525 584
92 92
VARIOUS BLDGS
REPAIR BATHROOMS,
141384
M2 NOT TO SCALE
CAMP CASEY MAP
M2 NOT TO SCALE
BUILDING LIST
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-3
MECHANICAL
CHONG,ST
CAMP CASEY
BLDG# S-134, CP CASEY
M3 NOT TO SCALE
Q' TY D E S C R I P T I O NQ' TY D E S C R I P T I O NITEM
AIRJET SHOWERHEAD, FIXED MOUNT TYPE
JETCORE(2.7) AND AIR-HOLE FOR AIR-INTAKE
SURFACE(COLOR & PLATE) : BLACK, SIZE : 73mmDIA. X 135mmL
MATERIAL : ABS, PELD, RUBBER MATERIAL : EPDM
WATER FLOW RATE AT 80PSI : 1.7GPM
ADJUSTABLE WATER FLOW WITH JETCORE
AIR-INTAKE FROM AIR-HOLE INCREASE WATER SHOOT
E Q U I P M E N T S C H E D U L E
SCHEDULE AND NOTES
BLDG# S-134, CP CASEY, EQUIPMENT
1.
NOTES:
2.
OF EXHAUST FANS IN BATHROOMS(TYP)
3.
IN BATHROOM(TYP).
DISCONNECT SWITCH1
NOTE :
REMARKSVOLT/PH/HZHP
RPM
ESP FAN MOTOR
(CFM)
AIR CAP
TYPESERVICE
FANS
Q'TYITEM NO
EF
CEILING GRILLE
BATH RM AREA
CEILING MOUNTED DIRECT DRIVE
CENTRIFUGAL FAN
120 20.25 1,400 115/1/60 1
(INCH)
3 ISOLATION KIT345.6WATTS100
(TYP OF 100)
DETERIORATED EXHAUST FANS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
EF
RESTORE CEILING GYMSUM BOARD(TYP)
THE CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND CAPACITY
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EXHAUST FANS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
AREA INCLUDING CEILLING, DUCT, ETC. TO THEIR ORIGINAL CONDITION AND
OPERATION DURING AND AFTER INSTALLATION(TYP).
VARIOUS BLDGS
REPAIR BATHROOMS,
141384
OR APPROVED EQUAL
REFER TO "MODEL NO KSAJ-100, KOSDO INC(KOREA WATER MANAGEMENT)
(TYP OF 100)
DETERIORATED SHOWERHEADS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-4
MECHANICAL
CHONG,ST
CAMP CASEY
BLDG# S-162, CP CASEY
M4 NOT TO SCALE
Q' TY D E S C R I P T I O NQ' TY D E S C R I P T I O NITEM
AIRJET SHOWERHEAD, FIXED MOUNT TYPE
JETCORE(2.7) AND AIR-HOLE FOR AIR-INTAKE
SURFACE(COLOR & PLATE) : BLACK, SIZE : 73mmDIA. X 135mmL
MATERIAL : ABS, PELD, RUBBER MATERIAL : EPDM
WATER FLOW RATE AT 80PSI : 1.7GPM
ADJUSTABLE WATER FLOW WITH JETCORE
AIR-INTAKE FROM AIR-HOLE INCREASE WATER SHOOT
E Q U I P M E N T S C H E D U L E
(TYP OF 92)
DETERIORATED REGISTERS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
1.
NOTES:
2.
IN BATHROOM(TYP).
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
AREA INCLUDING CEILLING, DUCT, ETC. TO THEIR ORIGINAL CONDITION AND
OPERATION DURING AND AFTER INSTALLATION(TYP).
THE CONTRACTOR SHALL VERIFY EXACT LOCATION AND SIZE
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EXHAUST EXHAUST REGISTER
RESTORE CEILING GYMSUM BOARD(TYP)
VARIOUS BLDGS
REPAIR BATHROOMS,
141384
SCHEDULE AND NOTES
BLDG# S-162, CP CASEY, EQUIPMENT
OF EXHAUST REGISTER IN BATHROOM(TYP)
OR APPROVED EQUAL
REFER TO "MODEL NO KSAJ-100, KOSDO INC(KOREA WATER MANAGEMENT)
(TYP OF 92)
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-5
MECHANICAL
CHONG,ST
CAMP CASEY
BLDG# S-473, CP CASEY
M5 NOT TO SCALE
Q' TY D E S C R I P T I O N
ITEM
Q' TY D E S C R I P T I O N
ITEM
AIRJET SHOWERHEAD, HAND-HELD TYPE
JETCORE(2.7) AND AIR-HOLE FOR AIR-INTAKE
SURFACE(COLOR & PLATE) : WHITE, SIZE : 73mmDIA. X 165mmL
MATERIAL : ABS, PELD, RUBBER MATERIAL : EPDM
WATER FLOW RATE AT 80PSI : 1.7GPM
ADJUSTABLE WATER FLOW WITH JETCORE
AIR-INTAKE FROM AIR-HOLE INCREASE WATER SHOOT
EF
DISCONNECT SWITCH1
NOTE :
REMARKSVOLT/PH/HZHP
RPM
ESP FAN MOTOR
(CFM)
AIR CAP
TYPESERVICE
FANS
Q'TYITEM NO
EF
CEILING GRILLE
BATH RM AREA
CEILING MOUNTED DIRECT DRIVE
CENTRIFUGAL FAN
44 120 20.25 1,400 115/1/60 1
E Q U I P M E N T S C H E D U L E
1.
NOTES:
2.
OF EXHAUST FANS IN BATHROOMS(TYP)
IN BATHROOM(TYP).
(TYP OF 44)
DETERIORATED EXHAUST FANS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
(INCH)
3 ISOLATION KIT345.6WATTS
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
AREA INCLUDING CEILLING, DUCT, ETC. TO THEIR ORIGINAL CONDITION AND
OPERATION DURING AND AFTER INSTALLATION(TYP).
THE CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND CAPACITY
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EXHAUST FANS
RESTORE CEILING GYMSUM BOARD(TYP)
VARIOUS BLDGS
REPAIR BATHROOMS,
141384
SCHEDULE AND NOTES
BLDG# S-473, CP CASEY, EQUIPMENT
OR APPROVED EQUAL
REFER TO "MODEL NO KSAJ-200, KOSDO INC(KOREA WATER MANAGEMENT)
(TYP OF 44)
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-6
MECHANICAL
CHONG,ST
CAMP CASEY
BLDG# S-715, CP CASEY
M6 NOT TO SCALE
Q' TY D E S C R I P T I O NQ' TY D E S C R I P T I O NITEM
AIRJET SHOWERHEAD, FIXED MOUNT TYPE
JETCORE(2.7) AND AIR-HOLE FOR AIR-INTAKE
SURFACE(COLOR & PLATE) : BLACK, SIZE : 73mmDIA. X 135mmL
MATERIAL : ABS, PELD, RUBBER MATERIAL : EPDM
WATER FLOW RATE AT 80PSI : 1.7GPM
ADJUSTABLE WATER FLOW WITH JETCORE
AIR-INTAKE FROM AIR-HOLE INCREASE WATER SHOOT
E Q U I P M E N T S C H E D U L E
(TYP OF 100)
DETERIORATED REGISTERS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
1.
NOTES:
2.
OF EXHAUST REGISTERS IN BATHROOM(TYP)
IN BATHROOM(TYP).
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
AREA INCLUDING CEILLING, DUCT, ETC. TO THEIR ORIGINAL CONDITION AND
OPERATION DURING AND AFTER INSTALLATION(TYP).
THE CONTRACTOR SHALL VERIFY EXACT LOCATION AND SIZE
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EXHAUST EXHAUST REGISTERS
RESTORE CEILING GYMSUM BOARD(TYP)
VARIOUS BLDGS
REPAIR BATHROOMS,
141384
SCHEDULE AND NOTES
BLDG# S-715, CP CASEY, EQUIPMENT
OR APPROVED EQUAL
REFER TO "MODEL NO KSAJ-100, KOSDO INC(KOREA WATER MANAGEMENT)
(TYP OF 100)
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-7
MECHANICAL
CHONG,ST
CAMP CASEY
BLDG# S-811, CP CASEY
M7 NOT TO SCALE
Q' TY D E S C R I P T I O N
ITEM
Q' TY D E S C R I P T I O N
ITEM
AIRJET SHOWERHEAD, HAND-HELD TYPE
JETCORE(2.7) AND AIR-HOLE FOR AIR-INTAKE
SURFACE(COLOR & PLATE) : WHITE, SIZE : 73mmDIA. X 165mmL
MATERIAL : ABS, PELD, RUBBER MATERIAL : EPDM
WATER FLOW RATE AT 80PSI : 1.7GPM
ADJUSTABLE WATER FLOW WITH JETCORE
AIR-INTAKE FROM AIR-HOLE INCREASE WATER SHOOT
EF
DISCONNECT SWITCH1
NOTE :
REMARKSVOLT/PH/HZHP
RPM
ESP FAN MOTOR
(CFM)
AIR CAP
TYPESERVICE
FANS
Q'TYITEM NO
EF
CEILING GRILLE
BATH RM AREA
CEILING MOUNTED DIRECT DRIVE
CENTRIFUGAL FAN
47 20.25 115/1/60 1
E Q U I P M E N T S C H E D U L E
(INCH)
1.
NOTES:
2.
OF EXHAUST FANS IN BATHROOMS(TYP)
IN BATHROOM(TYP).
(TYP OF 47)
DETERIORATED EXHAUST FANS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
950 17.2WATTS 3 3 ISOLATION KIT
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
AREA INCLUDING CEILLING, DUCT, ETC. TO THEIR ORIGINAL CONDITION AND
OPERATION DURING AND AFTER INSTALLATION(TYP).
THE CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND CAPACITY
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EXHAUST FANS
RESTORE CEILING GYMSUM BOARD(TYP)
VARIOUS BLDGS
REPAIR BATHROOMS,
141384
SCHEDULE AND NOTES
BLDG# S-811, CP CASEY, EQUIPMENT
(TYP OF 47)
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-8
MECHANICAL
CHONG,ST
CAMP CASEY
BLDG# S-823, CP CASEY
M8 NOT TO SCALE
Q' TYQ' TY D E S C R I P T I O NITEM
AIRJET SHOWERHEAD, FIXED MOUNT TYPE
JETCORE(2.7) AND AIR-HOLE FOR AIR-INTAKE
SURFACE(COLOR & PLATE) : BLACK, SIZE : 73mmDIA. X 135mmL
MATERIAL : ABS, PELD, RUBBER MATERIAL : EPDM
WATER FLOW RATE AT 80PSI : 1.7GPM
ADJUSTABLE WATER FLOW WITH JETCORE
AIR-INTAKE FROM AIR-HOLE INCREASE WATER SHOOT
E Q U I P M E N T S C H E D U L E
(TYP OF 100)
DETERIORATED REGISTERS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
1.
NOTES:
2.
OF EXHAUST REGISTERS IN BATHROOM(TYP)
IN BATHROOM(TYP).
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
AREA INCLUDING CEILLING, DUCT, ETC. TO THEIR ORIGINAL CONDITION AND
OPERATION DURING AND AFTER INSTALLATION(TYP).
THE CONTRACTOR SHALL VERIFY EXACT LOCATION AND SIZE
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EXHAUST EXHAUST REGISTERS
RESTORE CEILING GYMSUM BOARD(TYP)
VARIOUS BLDGS
REPAIR BATHROOMS,
141384
SCHEDULE AND NOTES
BLDG# S-823, CP CASEY, EQUIPMENT
OR APPROVED EQUAL
REFER TO "MODEL NO KSAJ-100, KOSDO INC(KOREA WATER MANAGEMENT)
(TYP OF 100)
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-9
MECHANICAL
CHONG,ST
CAMP CASEY
BLDG# S-827, CP CASEY
M9 NOT TO SCALE
Q' TYQ' TY D E S C R I P T I O NITEM
AIRJET SHOWERHEAD, FIXED MOUNT TYPE
JETCORE(2.7) AND AIR-HOLE FOR AIR-INTAKE
SURFACE(COLOR & PLATE) : BLACK, SIZE : 73mmDIA. X 135mmL
MATERIAL : ABS, PELD, RUBBER MATERIAL : EPDM
WATER FLOW RATE AT 80PSI : 1.7GPM
ADJUSTABLE WATER FLOW WITH JETCORE
AIR-INTAKE FROM AIR-HOLE INCREASE WATER SHOOT
E Q U I P M E N T S C H E D U L E
(TYP OF 92)
DETERIORATED REGISTERS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
1.
NOTES:
2.
OF EXHAUST REGISTERS IN BATHROOM(TYP)
IN BATHROOM(TYP).
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
AREA INCLUDING CEILLING, DUCT, ETC. TO THEIR ORIGINAL CONDITION AND
OPERATION DURING AND AFTER INSTALLATION(TYP).
THE CONTRACTOR SHALL VERIFY EXACT LOCATION AND SIZE
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EXHAUST EXHAUST REGISTERS
RESTORE CEILING GYMSUM BOARD(TYP)
141384
SCHEDULE AND NOTES
BLDG# S-827, CP CASEY, EQUIPMENT
VARIOUS BLDGS
REPAIR BATHROOMS,
OR APPROVED EQUAL
REFER TO "MODEL NO KSAJ-100, KOSDO INC(KOREA WATER MANAGEMENT)
(TYP OF 92)
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
M-10
MECHANICAL
CHONG,ST
CAMP CASEY
BLDG# S-1130, CP CASEY
NOT TO SCALE
Q' TY D E S C R I P T I O N
ITEM
Q' TY D E S C R I P T I O N
ITEM
AIRJET SHOWERHEAD, HAND-HELD TYPE
JETCORE(2.7) AND AIR-HOLE FOR AIR-INTAKE
SURFACE(COLOR & PLATE) : WHITE, SIZE : 73mmDIA. X 165mmL
MATERIAL : ABS, PELD, RUBBER MATERIAL : EPDM
WATER FLOW RATE AT 80PSI : 1.7GPM
ADJUSTABLE WATER FLOW WITH JETCORE
AIR-INTAKE FROM AIR-HOLE INCREASE WATER SHOOT
EF
DISCONNECT SWITCH1
NOTE :
REMARKSVOLT/PH/HZHP
RPM
ESP FAN MOTOR
(CFM)
AIR CAP
TYPESERVICE
FANS
Q'TYITEM NO
EF
CEILING GRILLE
BATH RM AREA
CEILING MOUNTED DIRECT DRIVE
CENTRIFUGAL FAN
23 20.5 115/1/60 1
E Q U I P M E N T S C H E D U L E
(INCH)
M10
1.
NOTES:
2.
OF EXHAUST FANS IN BATHROOMS(TYP)
IN BATHROOM(TYP).
(TYP OF 18)
DETERIORATED EXHAUST FANS WITH NEW.
REPAIR BY REPLACEMENT OF EXISTING
900 44.9WATTS 3 3 ISOLATION KIT
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGED
AREA INCLUDING CEILLING, DUCT, ETC. TO THEIR ORIGINAL CONDITION AND
OPERATION DURING AND AFTER INSTALLATION(TYP).
THE CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND CAPACITY
THE CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EXHAUST FANS
RESTORE CEILING GYMSUM BOARD(TYP)
VARIOUS BLDGS
REPAIR BATHROOMS,
141384
SCHEDULE AND NOTES
BLDG# S-1130, CP CASEY, EQUIPMENT
(TYP OF 23)
| Repair exhaust fan, shower head(FINAL)-M1-1 |
| Repair exhaust fan, shower head(FINAL)-M2-1 |
| Repair exhaust fan, shower head(FINAL)-M3-1 |
| Repair exhaust fan, shower head(FINAL)-M4-1 |
| Repair exhaust fan, shower head(FINAL)-M5-1 |
| Repair exhaust fan, shower head(FINAL)-M6-1 |
| Repair exhaust fan, shower head(FINAL)-M7-1 |
| Repair exhaust fan, shower head(FINAL)-M8-1 |
| Repair exhaust fan, shower head(FINAL)-M9-1 |
| Repair exhaust fan, shower head(FINAL)-M10-1 |
| Repair exhaust fan, shower head(FINAL)-M11-1 |
| Repair exhaust fan, shower head(FINAL)-M12-1 |
| Repair exhaust fan, shower head(FINAL)-M13-1 |
| Repair exhaust fan, shower head(FINAL)-M14-1 |
| Repair exhaust fan, shower head(FINAL)-M15-1 |
| Repair exhaust fan, shower head(FINAL)-M16-1 |
| Repair exhaust fan, shower head(FINAL)-M17-1 |
| Repair exhaust fan, shower head(FINAL)-M18-1 |
| Repair exhaust fan, shower head(FINAL)-M19-1 |
| Repair exhaust fan, shower head(FINAL)-M20-1 |
File details come from the government source that posted it. Updated .