W91QVN16R0225_Final.docx

DOCX document 81 KB Posted

Attached to
Repair Building #2299, Camp Casey
Solicitation number
W91QVN16R0225
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Drawing_files___99528___STRU.pdf PDF
Drawing_files___99528___ELEC.pdf PDF
Drawing_files___99528___ARCH.pdf PDF
Drawing_files___99528___TITLE.pdf PDF
Drawing_files___99528___CIVIL.pdf PDF
Drawing_files___99528___MECH.pdf PDF
Submittal_Register___99528.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91QVN-16-R-0225

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Work Class: K

FFP

Repair Building #2299, Camp Casey, FEWR #99528 FOB: Destination

PURCHASE REQUEST NUMBER: 0010896955-0001

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Work Class: L

Repair Building #2299, Camp Casey, FEWR #99528

PURCHASE REQUEST NUMBER: 0010896955-0001

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Estimated Cost for Work Hazard Losses is Zero (0).

NET AMT

Section C - Descriptions and Specifications

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

99528 Repair building No. 2299 Camp Casey

DESCRIPTION: The work to be performed to repair building No. 2299 is described below and executed by one or more of the groups.

a. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

b. Work by In-House Labor: Not applicable to this project.

c. Work by Troop Labor: Not applicable to this project.

PRINCIPAL FEATURES: This project includes the following principal features:

Schedule #I, Repair (K):

All work shall be in accordance with the attached drawings and specifications.

A. Civil Work

1. Replace asphalt concrete pavement at the west side of building No. 2299.

2. Replace concrete ditch with steel grating at the west side of building No. 2299. Roof drains shall connect to this concrete ditch.

3. Replace concrete curbs at the southwest and east sides of building No. 2299.

4. Replace concrete swale at the east corner of building No. 2299.

5. Replace unpaved area within the grading limit with solid sod.

6. Replace concrete sidewalk and steps at the southwest corner of building No. 2299.

7. Replace concrete pad for equipment.

B. Architectural Work

1. Replace existing concrete slab and interior finishes including walls and ceilings of gear storage and SCBA room.

2. Demolish existing storage and mechanical enclosures including slab, walls and roofs and chain link fence.

3. Replace existing roof, insulation, waterproofing membrane, gutter, downspout, and roof liner of gear storage.

4. Relocate existing ice machine to the new apparatus bay.

5. Replace existing gear lockers and personal lockers in apparatus bay.

6. Replace existing signage, shelves and fire extinguisher cabinets where applicable in gear storage and SCBA room.

C. Structural Work

1. Replace steel frame roof, standing seam metal roofing, concrete footing, and Portland Cement Concrete (PCC) slab for storage room.

D. Mechanical Work

HVAC

1. Replace existing warm air furnace with Direct Expansion (DX) coil, air cooled condensing unit, controls and associated ductwork and piping with new air handling unit, air cooled condensing unit, controls and associated ductwork and piping.

2. Replace existing heating and ventilation unit, controls and associated ductwork and piping servicing existing Engine Room (106) with new.

3. Replace existing window type air conditioning unit servicing Storage Room #1 (103) with new split type air conditioning unit.

4. Replace existing window type air conditioning unit servicing Storage Room #2 (103a) with new split type heat pump unit.

5. All Mechanical systems shall be tested, adjusted, and balanced by the contractor in strict accordance with applicable sections of Division 23 - Mechanical O&MA Standard Technical Specifications for Miscellaneous Projects, Korea. The HVAC Testing, Adjusting, and Balancing (TAB) report shall be submitted to the project COR for government review and approval.

Plumbing

1. Replace existing domestic hot water supply system with new electric hot water heater, recirculation pump and associated piping.

2. Replace existing domestic hot and cold water and sewer and vent piping with new.

3. Replace existing gas meter, cabinet, and associated appurtenances.

E. Electrical Work

Power

1. Replace existing power connection wires, safety switch, and motor starter with new associated mechanical work such as air handling unit and air cooled condensing unit.

2. Replace existing power connection wires, safety switch, and motor starter with new associated mechanical work such as electrical hot water heater and recirculation pump.

Exterior Electrical Distribution

1. Replace existing exterior electrical distribution system with new.

Exterior Telephone Distribution

1. Replace existing exterior electrical distribution system with new.

Schedule #II, New Construction (L):

All work shall be in accordance with the attached drawings and specifications.

A. Civil Work

1. Provide a new 80mm water line at the west side of building No. 2299.

2. Provide a new 200mm sewer line with a new sewer manhole and a new oil/water separator unit at the southwest corner of building No. 2299, restore asphalt concrete pavement along the path of this 200mm sewer line.

3. Provide a new 63mm gas line and chain link fence at the southwest corner of building No. 2299. Restore asphalt concrete pavement along the path of this 63mm gas line.

B. Architectural Work

1. Install concrete slab and finish for the expansion of the new apparatus bay and mechanical room.

2. Install Exterior Insulation and Finish System (EIFS) wall finish with metal studs and girts system in the new apparatus bay and mechanical room.

3. Install mezzanine with steel grating, steel guardrail and access ladder over the gear storage.

4. Install sectional doors and door tracks in the new apparatus bay.

5. Install metal roof liner in the new apparatus bay and mechanical room.

6. Install standing seam metal roof, insulation, waterproofing membrane, gutter, downspout and roof liner in the new apparatus bay and mechanical room.

7. Install aluminum clerestory windows over the apparatus bays.

C. Structural Work

1. Expand engine room and mechanical room with steel frame roof, standing seam metal roofing, concrete footing, and PCC slab.

2. Install new mezzanine with steel frame and bar grating.

D. Mechanical Work

HVAC

1. Install gas fired, condensing hot water boiler, circulation pump, expansion tank, air separator, and associated piping.

2. Install heating and ventilation unit and associated ductwork and piping servicing Engine Room (101).

3. Install rooftop mounted exhaust fans and associated ductwork servicing Mechanical Room (102) and Engine Room (101).

4. Install fire truck exhaust fans and associated ductwork servicing Engine Room (101).

5. Install vertical discharge, hot water unit heaters and associated piping servicing the Engine Room (101).

6. Install new horizontal discharge, hot water unit heaters and associated piping servicing the Mechanical Room (102).

Plumbing

1. Install new domestic cold water piping and appurtenances in Engine Room (101) and Mechanical Room (102).

2. Install new sewer and vent piping in Engine Room (101) and Mechanical Room (102).

3. Install new emergency eyewash shower and associated piping in Engine Room (101).

E. Electrical Work

Lighting system

1. Install light fixtures in the Engine Room, Mechanical Room, storage and mezzanine.

2. Install emergency light fixtures in the Engine Room, Mechanical Room, storage and mezzanine.

3. Install light switches in the Engine Room, Mechanical Room, storage and mezzanine.

Power system

1. Install new power connection wires, safety switch and motor starter associated mechanical work in the Engine Room, Mechanical Room, storage and mezzanine.

2. Install new panelboard “EM” and panelboard “PD” in the Engine Room.

3. Install new receptacles and associated wiring in the Engine Room, Mechanical Room, storage and mezzanine.

Public Address (PA) system

1. Install speaker, horn and associated wiring in the Engine Room, Mechanical Room and storage.

Fire Alarm/Mass Notification

1. Install fire alarm notification audio/visual strobe, smoke detector, heat detector, manual pull station, and associated wiring in the Engine Room, Mechanical Room, storage and mezzanine.

Telephone

1. Install telephone outlets, telephone/data outlets and associated wiring in the Engine Room and Mechanical Room.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

PROJECT NO TITLE LOCATION

99528 Repair building No. 2299 Camp Casey

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

Changes to the Standard Technical Detail Specifications: None

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

PROJECT NO TITLE LOCATION

99528 Repair building No. 2299 Camp Casey

1. The contractor shall have personnel on site for the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificate in Korea is the following which is issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have personnel who are certified for (1) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

2. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

3. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

B. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

D. Requirement for OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days including 90 days for procurement of US origin materials after notice to proceed (NTP) is issued. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

LIST OF APPLICABLE CONTRACT DRAWINGS

PROJECT NO TITLE LOCATION

99528 Repair building No. 2299 Camp Casey

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No.
Sheet No.
Description
Date
1
G-001
TITLE SHEET, SCHEDULE OF DRAWINGS & CROSS
29 JUN 16

REFERENCING CONVENTIONS

2
G-002
PROJECT LOCATION PLAN
29 JUN 16

CIVIL

3
C-001
CIVIL ABBREVIATIONS, NOTES, LEGEND & SCOPE OF WORK
29 JUN 16
4
CD101
REMOVAL PLAN
29 JUN 16
5
CS102
SITE LAYOUT PLAN
29 JUN 16
6
CG103
GRADING & DRAINAGE PLAN
29 JUN 16
7
CU104
UTILITY PLAN
29 JUN 16
8
CU501
OIL/WATER SEPARATOR DETAILS
29 JUN 16

ARCHITECTURAL

9
AE001
ABBREVIATION, MATERIAL INDICATIONS & SYMBOLS
29 JUN 16
10
AE002
GENERAL NOTES & SCOPE OF WORK
29 JUN 16
11
AE101
EXISTING/REMOVAL FLOOR PLAN
29 JUN 16
12
AE102
NEW FLOOR PLAN
29 JUN 16
13
AE103
NEW MEZZANINE LEVEL PLAN
29 JUN 16
14
AE104
NEW ROOF PLAN
29 JUN 16
15
AE105
NEW GROUND FLOOR REFLECTED CEILING PLAN
29 JUN 16
16
AE106
NEW MEZZANINE LEVEL REFLECTED CEILING PLAN
29 JUN 16
17
AE201
ELEVATIONS-1
29 JUN 16
18
AE202
ELEVATIONS-2
29 JUN 16
19
AE301
CROSS SECTIONS-1
29 JUN 16
20
AE302
CROSS SECTIONS-2
29 JUN 16
21
AE303
CROSS SECTIONS-3
29 JUN 16
22
AE401
EXTERIOR WALL SECTIONS-1
29 JUN 16
23
AE402
EXTERIOR WALL SECTIONS-2
29 JUN 16
24
AE403
EXTERIOR WALL SECTIONS-3
29 JUN 16
25
AE404
EXTERIOR WALL SECTIONS-4
29 JUN 16
26
AE601
INTERIOR FINISH SCHEDULE
29 JUN 16
27
AE602
EXTERIOR MATERIAL/ COLOR SCHEDULE
29 JUN 16
28
AE603
SIGNAGE NUMBERING PLAN, SCHEDULE, TYPES & DETAIL
29 JUN 16
29
AE604
DOOR/ WINDOW/ LOUVER NUMBERING PLAN
29 JUN 16
30
AE605
DOOR/ WINDOW/ LOUVER SCHEDULE, TYPES & DOOR HARDWARE SCHEDULE
29 JUN 16
31
AE701
TRASH ENCLOSURE FLOOR/ ROOF PLANS & ELEVATIONS
29 JUN 16
32
AE702
TRASH ENCLOSURE CROSS SECTIONS
29 JUN 16

STRUCTURAL

33
SF001
GENERAL NOTES, DESIGN DATA & TYPICAL DETAILS
29 JUN 16
34
SF101
FOUNDATION/1ST FLOOR FRAMING PLAN
29 JUN 16
35
SF102
MEZZANINE STEEL FRAMING PLAN
29 JUN 16
36
SF103
ROOF FRAMING PLAN
29 JUN 16
37
SF301
SECTIONS-1
29 JUN 16
38
SF302
SECTIONS-2
29 JUN 16
39
SF501
MEMBER SCHEDULES
29 JUN 16

MECHANICAL

40
MH001
LEGEND & ABBREVIATION
29 JUN 16
41
MH002
GENERAL NOTES & SCOPE OF WORK
29 JUN 16
42
MD101
EXIST/REMOVAL GROUND FLOOR HVAC DUCT PLAN
29 JUN 16
43
MH101
NEW GROUND FL HVAC DUCT PLAN
29 JUN 16
44
MH102
NEW GROUND FL HVAC PIPING PLAN
29 JUN 16

MH301

MH401

SECTION PLANS

NEW MECH ROOM & MEZZANINE FL HVAC PARTIAL PLAN

29 JUN 16

29 JUN 16

47
MH601
EQUIPMENT SCHEDULE-1
29 JUN 16
48
MH602
EQUIPMENT SCHEDULE-2
29 JUN 16
49
MH603
SYSTEM CONTROL DIAGRAM-1
29 JUN 16
50
MH604
SYSTEM CONTROL DIAGRAM-2
29 JUN 16
51
MH605
SYSTEM CONTROL DIAGRAM-3
29 JUN 16

MH606

PP101

SYSTEM CONTROL DIAGRAM-4

NEW GROUND FLOOR PLUMBING PIPING PLAN

29 JUN 16

54
PP401
EXIST/REMOVAL & NEW HEATER/MECH ROOM PLUMBING PIPING PARTIAL PLANS
29 JUN 16

ELECTRICAL

55
E-001
LEGEND AND ABBREVIATIONS
29 JUN 16
56
E-002
GENERAL NOTES-1
29 JUN 16
57
E-003
GENERAL NOTES-2 AND SCOPE OF WORK
29 JUN 16
58
ES101
REMOVAL/EXIST EXTERIOR ELECTRICAL DISTRIBUTION PLAN
29 JUN 16
59
ES102
NEW EXTERIOR ELECTRICAL DISTRIBUTION PLAN
29 JUN 16

ES103

NEW EXTERIOR COMMUNICATION DISTRIBUTION PLAN-1

61
ES104
NEW EXTERIOR COMMUNICATION DISTRIBUTION PLAN-2
29 JUN 16
62
ES105
NEW EXTERIOR COMMUNICATION DISTRIBUTION PLAN-3
29 JUN 16
63
ES106
NEW EXTERIOR COMMUNICATION DISTRIBUTION PLAN-4
29 JUN 16
64
ES107
NEW EXTERIOR COMMUNICATION DISTRIBUTION PLAN-5
29 JUN 16
65
ES108
NEW EXTERIOR COMMUNICATION DISTRIBUTION PLAN-6
29 JUN 16
66
ED101
REMOVAL/EXISTING GROUND FL LIGHTING/FA/PA SYSTEM PLAN
29 JUN 16
67
ED102
REMOVAL/EXISTING GROUND FL POWER/TEL/CATV SYSTEM PLAN
29 JUN 16
68
EL101
NEW GROUND FLOOR LIGHTING PLANS
29 JUN 16
69
EL501
NON-STANDARD LIGHT FIXTURE DETAILS AND SCHEDULE
29 JUN 16
70
EP101
NEW GROUND FLOOR POWER PLAN
29 JUN 16
71
EP102
NEW GROUND FLOOR MECH POWER PLAN
29 JUN 16
72
EP103
NEW MEZZANINE/MECH ROOM PARTIAL POWER PLANS
29 JUN 16
73
EP601
MODIFY POWER ONE-LINE DIAGRAM
29 JUN 16
74
EY101
NEW GROUIND FLOOR PA SYSTEM PLAN
29 JUN 16
75
FA101
NEW GROUND FLOOR FA/MNS SYSTEM PLAN
29 JUN 16
76
TT101
NEW GROUND FLOOR TELEPHONE SYSTEM PLAN
29 JUN 16

SUBMITTAL REGISTER

Note 1. See the uploaded document in Federal Business Opportunities (FBO) website (https://www.fbo.gov/).

Note 2. The Submittal Register in Section J, identifies the documentation that will be made available for approval and review by the Government in the performance of this task order. It is the contractor's responsibility that this data is in compliance with the corresponding OMA specification revision 1 that is referenced.

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

252.209-7999 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILTIY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-00004) (JAN 2012)

1. In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012, (Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that-

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

1. The Offeror represents that –

(1) It is ( ) is not ( ) a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with authority responsible for collecting the tax liability,

(2) It is ( ) is not ( ) a corporation that was convicted of a felony criminal violation under a federal law within the preceding 24 months.

(End of provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation. The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTION TO OFFEROR

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).

b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION OF PROPOSAL:

a. Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to suok.yun.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to ONLY FBO server problem not individual failure/problem. All questions should be emailed to suok.yun.ln@mail.mil within five (5) days after the solicitation is issued. The electronic offer shall be submitted by the closing date & time of RFP.

b. The PRICING PROPOSAL with the detailed cost breakdown shall be submitted by the closing date & time of RFP through https://www.fbo.gov/. The cost breakdown should clearly identify all the significant costs associated with the level of effort prescribed in the statement of work. Any omission of such data may result in the offeror not being considered for award.

c. Section K : Offerors must complete all portions of Section K and submit it through https://www.fbo.gov/ by the closing date & time of RFP. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, any proposed exemption of a specific ROK tax shall be legitimate, attributable to the contract, and authorized by the applicable stated references.

Failure to submit the above requirements may be grounds for determining the proposal to be non-compliant and not eligible to be considered for award.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

a. Date & Time: 4 Aug 2016 at 0900 hours
b. POC: Kim, Tae Chong, DSN: 730-3716
c. Location: Bldg#617, Camp Casey.

(End of provision)

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $ 500,000 and $ 1,000,000.

Section M - Evaluation Factors for Award

BASIS OF AWARD

Award shall be made to the responsible offeror submitting the lowest priced, technically acceptable offer and completed Section K that satisfies all terms and conditions of this solicitation. The Government reserves the right to make a technical acceptability determination without any discussion with the offeror. The tax exemptions stated in Section K will be reviewed by the contracting officer for reasonableness and necessity to complete the Task Order. The contracting officer may reject a proposal if the offeror appears to improperly overstate any proposed tax exemptions.