Drawing_files___99528___CIVIL.pdf
PDF 5 MB Posted
- Attached to
- Repair Building #2299, Camp Casey
- Solicitation number
- W91QVN16R0225
About this file
Drawing_Civil
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing_files___99528___STRU.pdf | ||
| Drawing_files___99528___ELEC.pdf | ||
| Drawing_files___99528___ARCH.pdf | ||
| Drawing_files___99528___TITLE.pdf | ||
| Drawing_files___99528___MECH.pdf | ||
| W91QVN16R0225_Final.docx | DOCX document | |
| Submittal_Register___99528.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C I V I L A B B R E V I A T I O N S
C I V I L L E G E N D
SEWER LINE W/SCO
SEWER LINE W/SMH
SEWER LINE W/SEPTIC TANK
GREASE TRAP
WATER LINE W/VALVE & VALVE BOX AND MANHOLE
WATER LINE W/GATE VALVE, GATE VALVE BOX
WATER LINE W/FIRE HYDRANT
POST INDICATOR VALVE
RAW WATER LINE
WATER LINE W/AIR & VACUUM RELIEF VALVE
CHECK VALVE
CMU WALL FENCE W/BARBED WIRE
CHAIN-LINK FENCE
WOODEN FENCE
PORTLAND CEMENT CONCRETE
EXST
ASPHALTIC CONC PAVED ROAD W/CURB
CULVERT W/HEADWALL & ENDWALL
DIRT ROAD
GROUTED STONE OPEN DITCH
W/DIRECTION OF FLOW
CONC OPEN DITCH
CONC DITCH, CONC COVERED
DRAIN LINE W/DMH
DRAIN LINE W/SURFACE INLET,
D
D
D D
SD
SD
SD
BUILDING
CONC SLAB & CONC SIDEWALK
CONC STEPS W/HANDRAILS
REMOVAL NEW
W W
RW
W A
RW
W
W
W
W
W
W
W
W
A
RW
W A
W
W
W
REMOVAL
S
EXST
S
S
S
S
S
SS
SS
NEW
SS
CRM
BOT,B
CMS
CLR
CONSTR
CW
CV
CTRJ
C TO C
CTG
CRV
CP
CORR
COR
CONT
CONN
CONC
COL
CMU
CMP
CLKG
CLJ
CL OR C
CJ
CI-CIP
CHAN
CAP
C
BS
BRK
ACM
BO
BLK
BLDG(S)
BKS
BH
BCE
BARR
AVG
AUTO
AT/FP
ASPH
ASAP
ARCH
APPROX
ALT
AL
AKR
A/G
ADJ
ADH
ADD
AD
ACS
ACP
ACFT
AC
AB
MATERIALMATL
PROPERTY (MATERIAL)
HEXAGON
HARDWARE
HOSE BIBB
HIGH, HEAD, HORIZONTAL
GALVANIZED
GREASE TRAP
GATE VALVE
GALVANIZED STEEL PIPE
GRADE LINE
GOVERNMENT FURNISHED
GENERATOR
FLOOR DRAIN
FOUNDATION
FIRE HYDRANT
FLOOR LEVEL
FUEL OIL RETURN
FUEL OIL SUPPLY
FIRE WATER
EACH WAY
ENTERING, ENTRANCE
ESTIMATE
ETCETERA
EXPANSION JOINT
EXISTING
EXTERIOR
CONCRETE RUBBLE MASONRY
COATING, CUTTING
CLEARANCE
CONSTRUCTION
COLD WATER
CHECK VALVE
CONTRACTION JOINT
CENTER TO CENTER
CONCRETE PIPE
CORRUGATED
CONTINUOUS
CONNECTION
CONCRETE
CORNER
COLUMN
CURVE GALV
HDW
HGT
HEX
H
HB
HEIGHT
GS-GSP
GND
GR
GT
GV
GEN
GFP(M)
GL
GROUND
GRADE
CUBIC METER PER SECOND
CEMENT MASONRY UNIT
CORRUGATED METAL PIPE
CONTROL JOINT
CENTER LINE
CONSTRUCTION JOINT
CAST IRON PIPE
CAULKING
CHANNEL
L
BOTTOM
BOTH SIDES
CAPACITY
CONDUIT
BLOW-OFF
BUILDING(S)
BRICK
BLOCK
FD
FIN OR FNSH
FOR
FW
FOS
FL
FHY
FDN
FINISH
EXST
EW
EXT
ENT
EST
ETC
EXP JT
NOT TO SCALENTS
O TO O
PC
PCC
P
PAV
OUT
OD
ORIG
O/H
OPNG
OPTL
OC
OA
OUT TO OUT
POINT OF CURVATURE
POLE
PAVEMENT
OUTLET
OUTSIDE DIAMETER
ON CENTER
ORIGINAL
OVERHEAD
OPENING
OPTIONAL
OVERALL
NOMEN
NO OR #
MTG
NIC
MJ
N
NFSM
mm
MISC
MIN
MLD
MET
MAX
MDL
MECH
MOUNTING
NOMENCLATURE
MECHANICAL JOINT
NON FROST SUSCEPTIBLE
NOT IN CONTRACT
MATERIAL
NUMBER
NORTH
MILLIMETERS
MISCELLANEOUS
MILLION LITERS PER DAY
MECHANICAL
MINIMUM
METAL
MAXIMUM
MIDDLE
PUBLIC WORKS
DRAINAGE MANHOLE
U/G ELECTRICAL CABLE LINE
ELEVATION
ELECTRICAL
ELECTRICAL MANHOLE
ENCLOSURE
ENGINEERING
DETAIL(S)
DRINKING FOUNTAIN
DIAMETER
DIMENSION
DUCTILE IRON PIPE
DISTRIBUTION
DROP MANHOLE
DRAIN OR DOOR
DWELLING
DRAWING(S)
DIRECTORATE OF
DRAIN LINE
ADHESIVE
DMH
AVERAGE
AS SOON AS POSSIBLE
ASPHALT
BARRACKS
BOILER HOUSE
BASE CIVIL ENGINEER
ANTITERRORISM/FORCE PROTECTION
BARRIER
AUTOMATIC
ARCHITECTURAL
APPROXIMATE
ALUMINUM
ABOVEGROUND
ALTITUDE
ANCHOR
ADJACENT
EL
ELEC
EMH
ENCL
ENGRG
E
EA
ECL
EAST
EACH
DSGN
DWEL
DWG(S)
DPW
DN
DP
DR
DESIGN
DOWN
DROP
ASBESTOS CONTAINING
ASBESTOS CEMENT PIPE
MATERIAL
AREA DRAIN
ASPHALTIC CONCRETE
ANCHOR BOLT
ADDITION
ACCESS
AIRCRAFT
DIAG
DIM
DI-DIP
DISTR
DL
D
DET(S)
DF
DIA
DIAGRAM
DEPTH
IJ ISOLATION JOINT
KSC
L
M
LONG
LYT
LG
L
INVT
KPH
JT
IS
INTR
INSUL
INSTL
INL
KILOGRAMS PER SQUARE
CENTIMETER
LONGITUDINAL
LITERS
METERS
LAYOUT
LENGTH
LONG
KILOMETERS PER HOUR
INSECT SCREEN
INSTALLATION
INVERT
JOINT
INTERIOR
INSULATION
INLET
HORIZ
HWL
IE
ID
HW
HP
HM
INVERT ELEVATION
INSIDE DIAMETER
HIGH WATER LEVEL
HEADWALL, HOT WATER
HORSEPOWER, HIGH POINT
HORIZONTAL
HOLLOW METAL
EVERGREEN OR DECIDUOUS TREE
A/G & U/G FUEL OIL STORAGE TANK
N
NORTH DIRECTIONAL ARROW
REMOVAL
W
(X 23.60)
A/G U/G
EXST
23.60 SPOT ELEVATION
GRAVE & CEMETERY
CONTOUR LINE
DRY FARM
WATER LEVEL
NEW
RICE PADDY
RD ROAD
WOOD,
OR DITTO
WIRE MESH
WELDED
WELDED WIRE MESH
WATER
WEIGHT
WOODEN POLE
WITHOUT
TRANSFORMER
PERCENT
AND
AT
EQUAL
NUMBER
PLATE
PLUS OR MINUS
SAME AS ABOVE
WALL HYDRANT
WASTE DRAIN
WEST, WIDTH
WIND LOAD, WATER LINE
VERTICAL
VELOCITY
VALVE BOX
VARIOUS
STAINLESS STEEL
SPECIFICATION(S)
POWERLINE, STATIC PRESSURE
STEEL PIPE, OVERHEAD SECONDARY
SOLENOID VALVE
SEWER MANHOLE
SPEC(S)
SURFACE INLET
SEPTIC TANK
STATION
SQUARE
SI
ST
STA
SST
SQ
SQUARE METER
SLOPE
SIMILAR
SHEET
SEWER LINE
SM, M2
SP
SOLV
SMH
SLP,S
SIM
SHT
SL
L
P
XFMR
SURFACE CLEANOUT
REINFORCING BAR
SHOULDER
SOUTH
SCALE
SADDLE
SECTION
RAW WATER, RETAINING WALL
SC
SHLDR
SCO
SDL
SECT
RW
S
REPLACE
REQUIRED
REVIEW,REVISE
ROOM
REPAIR
RECTANGULAR
REFERENCE
RELOCATED
REPL
REQ’D
REV
RM
RPR
RE-BAR
RECT
REF
RELOC
W/O
WWM
WTR
WT
WP
WM
WLD
WH
WL
WD
W/
W
WITH
VERT
VEL
VB
VAR
CABLE LINE
TELEPHONE
TELEPHONE MANHOLE
TOTAL
TOP OF STEEL
STAIRWAY
STRUCTURAL
STORAGE
STEEL
STANDARD
SUSPEND(ED)
SWITCH
SYSTEM
TYPICAL
THROUGH
THICK
TITLE BLOCK
UNDERGROUND
TELEPHONE
TEMPORARY
THREAD
UNDERGROUND
UNIFORM
PERFORATED STEEL PLATE
REINFORCED CONCRETE PIPE
REINFORCED CONCRETE
POINT OF VERTICAL TANGENCY
POINT OF VERTICAL INTERSECTION
POLYVINYL CHLORIDE
POINT OF TANGENT
RUBBER
RADIUS
RIGHT
RCP
RC
RBR
RAD,R
R
PARTITION
POWER
QUANTITY
PWR
PT
Q
PSP
PVT
PVI
PVC
PTN
TMH
UNIF
U/G
TOS
TOT
TYP
THD
THRU
TEMP
THK
TEL
T/B
TCL
PRESSURE REDUCING VALVE
POINT OF INTERSECTION
OVERHEAD PRIMARY POWER LINE
PROJECT
PRESSURE
PREFABRICATED
PERMANENT
PRESSURE GATE
PAINT
PP
PRV
PROJ
PRESS
PREFAB
PERM
PG
PNT
PI
STWY
SUSP
SW
SYS
STRL
STOR
STL
STD
SUB DRAINSD
AIR VACUUM RELIEF VALVEAVRV
ACU AIR CONDITIONING UNIT
GENERAL NOTES
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AS SHOWN ON THE
DRAWINGS PRIOR TO THE START OF CONSTRUCTION. ANY
DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION
OF THE CONTRACTING OFFICER.
2. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL
NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES
AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY
PRECAUTIONS FOR THE PROTECTION AND SAFETY OF THE PUBLIC
AND/OR MILITARY TRAFFIC AND OPERATIONS.
3. THE TOPOGRAPHIC INFORMATION SHOWN ON THE DRAWINGS IS FROM A
TOPORAPHIC SURVEY PERFORMED SEVERAL YEARS AGO AND MAY NOT
ACCURATELY REFLECT EXISTING CONDITIONS AT CAMP CASEY.
THE CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS BASED ON
FIELD VERIFIED CONDITIONS, AND SHOP DRAWINGS AS REQUIRED TO MAKE
ADJUSTMENTS TO FIELD CONDITIONS.
MAJOR DISCREPANCIES SHALL BE BROUGH TO THE ATTENTION OF THE
CONTRACTING OFFICER.
4. THE CONTRACTOR SHALL RESTORE ALL IMPROVEMENTS, DAMAGED OR
REMOVED AS A RESULT OF CONSTRUCTION TO ITS ORIGINAL OR BETTER
CONDITION, UNLESS OTHERWISE NOTED. THESE ITEMS INCLUDE, BUT
ARE NOT LIMITED TO PAVEMENTS, CONCRETE SIDEWALKS AND CURBS,
AND UTILITIES.
5. THE CONTRACTOR SHALL COORDINATE ALL PHASES OF WORK WITH THE
CONTRACTING OFFICER.
UTILITY NOTES
1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES,
APPURTENANCES AND STRUCTURES SHOWN ARE BASED ON AVAILABLE
RECORDS, AND APPLICABLE UTILITY MAPS, VERIFIED WHENEVER
POSSIBLE BY FIELD SURVEYS. HOWEVER THIS INFORMATION MAY NOT BE
COMPLETE AND ACCURATE.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
SIZE AND INVERTS OF ALL EXISTING UTILITIES AND SHALL PROTECT
ALL SUCH UTILITIES AT ALL TIMES, UNLESS OTHERWISE INDICATED.
EXISTING UTILITIES DAMAGED AS A RESULT OF THE CONSTRUCTION WORK,
WHETHER SHOWN ON THE DRAWINGS OR NOT,
SHALL BE RESTORED IMMEDIATELY TO THEIR ORIGINAL OR BETTER
CONDITION AND SHALL BE PAID FOR BY THE CONTRACTOR.
2. WHENEVER CONNECTIONS TO EXISTING UTILITIES OR WHERE NEW
UTILITIES CROSS EXISTING UTILITIES ARE SHOWN, THE CONTRACTOR
SHALL CAREFULLY EXPOSE THE UTILITY BY HAND EXCAVATION TO
VERIFY THEIR LOCATIONS AND DEPTHS PRIOR TO EXCAVATING
TRENCHES FOR THE NEW UTILITY LINES.
3. WHENEVER ANY CHANGE IN ALIGNMENT OR GRADE FOR THE PROPOSED
UTILITIES ARE REQUIRED DUE TO UNFORESEEN CONFLICT WITH OTHER
UTILITIES, THE CONTRACTOR SHALL INFORM THE CONTRACTING
OFFICER IMMEDIATELY FOR REMEDIAL ACTION.
4. INTERRUPTION OF UTILITY SERVICE AND/OR OPERATIONS OF ADJACENT
FACILITIES WILL BE KEPT TO A MINIMUM. ANY INTERRUPTION OF
UTILITY SERVICE AND/OR OPERATIONS WILL BE COORDINATED WITH
THE CONTRACTING OFFICER AND THE AFFECTED USING AGENCIES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF
ALL WATER LINES DURING CONSTRUCTION. THE CONTRACTOR SHALL
BE ESPECIALLY CAREFUL WHEN EXCAVATING BEHIND WATER LINES,
TEES AND BENDS WHEREVER THERE IS A POSSIBILITY OF WATER LINE
MOVEMENT DUE TO REMOVAL OF THE SUPPORTING EARTH BEYOND THE
EXISTING REACTION BLOCKS. THE CONTRACTOR SHALL TAKE
WHATEVER MEASURES IS NECESSARY TO PROTECT THE WATER LINES,
SUCH AS CONSTRUCTING SPECIAL REACTION BLOCKS AND/OR
MODIFYING HIS/HER CONSTRUCTION METHOD, WITH THE APPROVAL
OF THE CONTRACTING OFFICER.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SEWAGE SPILLS
CAUSED DURING CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY
THE CONTRACTING OFFICER AND UTILIZE APPROPRIATE MEASURES TO
CONTAIN AND ADEQUATELY CLEANUP THE SPILL. THE CONTRACTING
OFFICER SHALL OVERSEE THE CLEANUP EFFORT AND RENDER THE SITE
CLEAN. ALL COSTS INCURRED FOR SPILL CONTAINMENT AND CLEANUP
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
7. FIRELINES SHALL BE PLACED BELOW THE FROST LINE WITH TOP OF
PIPE 1.5M BELOW FINISH GRADE.
8. USE 1.2M FOR THE FROST DEPTH AT CAMP CASEY PER FED
DIRECTION.
PROJECT LIMIT
1. THE PROJECT LIMIT IS GENERALLY DEFINED BY THE GRADING LIMITS
SHOWN ON THE GRADING PLAN BUT ALSO INCLUDES WORK IN THE
INTERIOR OF THE BUILDING AS INDICATED ON THE ARCHITECTURAL
PLANS. FOR THE PURPOSES OF DEFINING THE PROJECT LIMIT TO
DETERMINE LOCATIONS OF TEMPORARY FENCING OR BARRICADES THE
CONTRACTOR SHALL PREPARE A WORK PLAN SHOWING THE PROPOSED
PROJECT LIMIT FOR APPROVAL BY THE CONTRACTING OFFICER AND
THE USING AGENCY.
GRADING NOTES
1. THE FINISH GROUND ELEVATION AT THE BUILDING LINE SHALL BE A
MINIMUM OF 150mm (6 INCHES) BELOW FINISH FLOOR ELEVATION, UNLESS OTHERWISE SHOWN.
2. ALL EXPOSED AREA SHALL BE SOLID SODDED. SODDING SHALL BE
PLACED WITH NO GAPS, AS SOON AS FINAL GRADES HAVE BEEN
ESTABLISHED. SODDING SHALL NOT BE DELAYED UNTIL ALL GRADING
WORK HAS BEEN COMPLETED. GRADING TO FINAL GRADE SHALL BE
CONTINUOUS, AND ANY AREA WITHIN WHICH WORK HAS BEEN
INTERRUPTED OR DELAYED, SHALL BE SODDED.
ALL NEWLY GRADED AREAS SHALL BE TOP SOILED 100mm (4 INCHES)
THICK PRIOR TO SODDING.
3. FINISH GRADES ALONG PAVED AREAS AS SHOWN ON THE DRAWINGS
ARE TOP OF PAVEMENT ELEVATIONS, UNLESS OTHERWISE INDICATED.
ADJUSTMENTS MAY BE REQUIRED AT CONNECTION OF NEW WORK TO
EXISTING PAVED OR UNPAVED AREAS TO PROVIDE A SMOOTH RIDING
CONNECTION.
4. TOPS OF MANHOLES TO BE RETAINED SHALL BE ADJUSTED TO MATCH
FINISH GRADE ELEVATION.
5. THE CONTRACTOR SHALL REMOVE ALL SILT AND DEBRIS RESULTING
FROM HIS WORK AND DEPOSITED IN DRAINAGE FACILITIES, ROADWAYS
AND OTHER AREAS. THE COSTS INCURRED FOR ANY NECESSARY
REMEDIAL ACTION BY THE CONTRACTING OFFICER SHALL BE PAYABLE
BY THE CONTRACTOR.
DEMOLITION NOTES
1. ALL DEMOLITION WORK SHALL BE CONFINED WITHIN THE PROJECT
LIMITS INDICATED, UNLESS OTHERWISE NOTED.
2. PROJECT LIMITS SHOWN ARE APPROXIMATE. EXISTING GROUND
FEATURES AND ROADWAYS SHALL BE USED AS A DEMARCATION
FOR THE PROJECT LIMITS, I.E. EDGE OF PAVEMENT, EDGE OF
ROADWAY, EXISTING CHAIN-LINK FENCE, ETC.
3. ALL TREES, SHRUBBERY, AND ORNAMENTAL PLANTING NOT
SPECIFICALLY SCHEDULED TO BE RETAINED AND/OR TRANSPLANTED
SHALL BE CLEARED, GRUBBED AND REMOVED FROM THE SITE.
TREES, SHRUBBERY AND ORNAMENTAL PLANTINGS TO BE RETAINED
SHALL BE CAREFULLY REMOVED AND TRANSPLANTED AT LOCATIONS
ON CAMP CASEY DETERMINED BY THE CONTRACTING OFFICER.
4. ALL STRUCTURES WITHIN THE PROJECT BOUNDARY SHALL BE
DEMOLISHED AND REMOVED, UNLESS OTHERWISE INDICATED.
5. EXISTING ASPHALTIC CONCRETE PAVEMENT WITHIN THE PROJECT
LIMITS SHALL BE DEMOLISHED AND REMOVED, UNLESS OTHERWISE
INDICATED.
6. SIDEWALKS, CONCRETE PADS, CURBING AND OTHER ITEMS WITHIN
THE PROJECT LIMITS SHALL BE DEMOLISHED AND REMOVED,
UNLESS OTHERWISE INDICATED.
7. WATER AND SEWER LINES WITHIN THE PROJECT LIMITS SHALL BE
REMOVED, UNLESS OTHERWISE INDICATED. MANHOLES AND PITS MAY
BE ABANDONED AND SHALL BE FILLED WITH STRUCTURAL BACKFILL.
THE BOTTOM OF MANHOLES AND PITS SHALL BE CRACKED TO
ALLOW SEEPAGE OF WATER THROUGH THE ABANDONED MANHOLE.
TOP OF MANHOLES AND PITS SHALL BE DEMOLISHED WITHIN
900mm (3 FEET) OF THE FINAL GRADE.
8. EXISTING DRAIN LINES AND DRAINAGE STRUCTURES WITHIN THE
PROJECT LIMITS SHALL BE REMOVED, UNLESS OTHERWISE INDICATED.
9. ALL UTILITIES, STRUCTURES AND/OR IMPROVEMENTS IDENTIFIED
AS TO REMAIN SHALL BE MAINTAINED IN GOOD CONDITION TO
RECEIVE THE PROPOSED UTILITIES, STRUCTURES AND/OR IMPROVEMENTS.
SHOULD THESE ITEMS BECOME DAMAGED DUE TO CONTRACTOR’S
NEGLIGENCE OR CONSTRUCTION OPERATIONS, THE CONTRACTOR
SHALL RESTORE THESE ITEMS TO THEIR ORIGINAL OR BETTER
CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT AND TO
THE SATISFACTION OF THE CONTRACTING OFFICER.
10. ALL DISPOSAL WORK, SHALL BE IN ACCORDANCE WITH
APPLICABLE KOREAN ENVIRONMENTAL LAWS AND THE
ENVIRONMENTAL GOVERNING STANDARDS FOR KOREA, USFK
REG 201-1.
11. PRIOR TO DEMOLITION WORK THE CONTRACTOR SHALL PROVIDE
A LIST OF SALVAGEABLE MATERIALS IN COORDINATION WITH DPW.
SCOPE OF WORK:
REPAIR & MAINTENANCE WORK:
D
CB
SSTGTWWW X
X
FIRE PROTECTION WATER LINEF F F
XX
EXST TREE AREA
X
CURB INLET
AT/FP SETBACK
EXST WATER LINE
TO BE ABANDONED
W
AT/FP CLEAR ZONE LINE
REPAIR BY REPLACING ASPHALT CONCRETE PAVEMENT AT THE
WEST SIDE OF BUILDING 2299.
REPAIR BY REPLACING CONCRETE DITCH W/STEEL GRATING AT THE
WEST SIDE OF BUILDING 2299. ROOF DRAINS SHALL CONNECT TO
THIS CONCRETE DITCH.
REPAIR BY REPLACING CONCRETE CURBS AT THE SOUTHWEST AND
EAST SIDES OF BUILDING 2299.
REPAIR BY REPLACING CONCRETE SWALE AT THE EAST CORNER OF
BUILDING 2299.
REPAIR BY REPLACING UNPAVED AREA WITHIN THE GRADING LIMIT
WITH SOLID SOD.
REPAIR BY REPLACING CONCRETE SIDEWALK AND STEPS AT THE
SOUTHWEST CORNER OF BUILDING 2299.
REPAIR BY REPLACING CONCRETE PAD FOR EQUIPMENTS.
NEW WORK:
PROVIDE A NEW 80mm WATER LINE AT THE WEST SIDE OF
BUILDING 2299.
PROVIDE A NEW 200mm SEWER LINE WITH A NEW SEWER MANHOLE
AND A NEW OIL/WATER SEPARATOR UNIT AT THE SOUTHWEST
CORNER OF BUILDING 2299, RESTORE AC PAVEMENT ALONG THE
PATH OF THIS 200mm SEWER LINE.
PROVIDE A NEW 63mm GAS LINE AND CHAIN LINK FENCE
ENCLOSURE AT THE SOUTHWEST CORNER OF BUILDING 2299,
RESTORE AC PAVEMENT ALONG THE PATH OF THIS 63mm GAS LINE
S E
T
ID
C O
P E
O F
W O
R K
C
IV
IL
A
B B
R E
V
IA
T
IO
N S
N
O T
E S
L
E G
E N
C-001
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
S E
T
ID
S c a le
A p p ro v e d b y
D w n b y
C k d b y
D e s ig n e d b y
D a te
P ro je c t n o
S u b m it te d b y
D ra w in g n o
J
U L
F E
W R
R E
P A
IR
A
N D
E X
P A
N D
R e v ie w e d b y D
A T
E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
U s in g A g e n c y
S a fe ty O ff ic e r
B ld g s
G ro u n d s
U ti li ti e s
F ir e P re v
P ro t
In s p e c ti o n
O th e rs
R e v
D a te
IN
S
T A
L L
A T
IO
N
M A
N A
G E
M E
N T
C O
M M
A N
D -P
A C
IF
IC
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
E N
G
IN
E E
R
IN
G D
IV
IS
IO
N
U N
IT
A
P O
A P
-5
U S
A R
M Y
G A
R R
IS
O
N R
E D
C L
O U
D
F
IR
E S
T A
T
IO
N
C
P C
A S
E Y
D P
W U
S A
G -R
E D
C L
O U
D A
N D
A R
E A
I
C H
O E
M
SCALE: 1:200
0 2 4 8
REMOVAL PLAN
SCALE: 1 : 200
GENERAL NOTES:
1. A DETAILED TOPOGRAPHIC SURVEY INDICATING ACCURATE PAVEMENT ELEVATIONS
AND UTILITY INVERT ELEVATIONS WAS NOT AVAILABLE FOR DESIGN DEVELOPMENT.
THE CONTRACTOR’S PROPOSAL SHALL INCLUDE VERIFICATION OF EXISTING SITE
CONDITIONS, DESIGN OF UTILITY PROFILES BASED ON FIELD VERIFIED CONDITIONS,
AND SHOP DRAWINGS AS REQUIRED TO MAKE ADJUSTMENTS TO FIELD CONDITIONS.
NO ADDITIONAL AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
NOTES:
1. QUANTITIES SHOWN ARE APPROXIMATE AND ARE FOR BID PURPOSES ONLY, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ACTUAL QUANTITIES BASED
ON THE CONTRACT DOCUMENTS REQUIREMENTS.
2. FOR GENERAL NOTES & LEGEND SEE SHEET C-001.
3. THE CONTRACTOR MUST VISIT THE JOB SITE PRIOR TO SUBMITTING HIS PROPOSAL.
4. FOR ELECTRICAL REMOVAL PLAN, SEE SHEET ES101.
5. TREES WITH TRUNK DIAMETERS < 200mm SHALL BE
REMOVED/TRANSPLANTED BY CONTRACTOR TO LOCATIONS APPROVED BY
DPW BEFORE CONSTRUCTION.
THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF TRANSPLANTED
TREES AFTER TRANSPLANTING TO THE DESIGNATED LOCATION(S) FOR
THE DURATION OF CONSTRUCTION.
DESCRIPTIONS R E M A R K SITEM NOS
R E M O V A L S C H E D U L E
QUANTITIES
1 660 SM T = 0.05 M
24 SM
10 LM
3.2 LM
40 LM
55 LM H = 0.4M
8 1 EA
CONCRETE DITCH
STEEL CABLE BARRIER
CONCRETE PAD
CONCRETE PAVEMENT
AC PAVEMENT
63mm GAS LINE
CONCRETE CURB
CHAIN LINK FENCE & GATE
9 1 EATRASH ENCLOSURE (2.5M X3.7M)
9 EATREES10
H = 2.9M
H = 2.1M
1 EA
SEE ARCHITECTURAL PLANS FOR
REMOVAL OF EXISTING BUILDING AREAS
11 5 LMWOOD CURB
H = 0.3M
CD101
EXIST FE MAINT STORAGE
TO BE RELOCATED
SEE SHEET CS102.
FY15 OMA SRM PROJECTS, PACKAGE #1
FEWR #109823 REQUEST TO REPAIR BUILDING
#2262, #2263, CAMP CASEY
(UNDER CONSTRUCTION - BY OTHERS)
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
����������SS
SDSDSDSDSD
4.70
SCALE: 1:200
0 2 4 8
SITE LAYOUT PLAN
SCALE: 1 : 200
CONC PAD FOR ACCU7
CONC PAD FOR
RELOCATED EXIST FE MAINT STORAGE
TRASH ENCLOSURE
SEE ARCH DWG AE701
TOP EL 67.00
RESTORE EXIST AC PAVEMENT
A=360 M2
GENERAL NOTES:
1. A DETAILED TOPOGRAPHIC SURVEY INDICATING ACCURATE PAVEMENT ELEVATIONS
AND UTILITY INVERT ELEVATIONS WERE NOT AVAILABLE FOR DESIGN DEVELOPMENT.
THE CONTRACTOR’S PROPOSAL SHALL INCLUDE VERIFICATION OF EXISTING SITE
CONDITIONS, DESIGN OF UTILITY PROFILES BASED ON FIELD VERIFIED CONDITIONS,
AND SHOP DRAWINGS AS REQUIRED TO MAKE ADJUSTMENTS TO FIELD CONDITIONS.
NO ADDITIONAL AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
2. FOR GENERAL NOTES & LEGEND, SEE SHEET C-001.
CS102
CONC CURB
L=22 M
CONC CURB
L=8 M
AC PAVEMENT JOINT
(EXIST TO NEW)
1.2M WIDE CONC SIDEWALK6
1.2M WIDE CONC SIDEWALK AND STEPS6
2.1M H CHAIN LINK FENCE
W/1.2M W SINGLE SWING GATE
FY15 OMA SRM PROJECTS, PACKAGE #1
FEWR #109823 REQUEST TO REPAIR BUILDING
#2262, #2263, CAMP CASEY
(UNDER CONSTRUCTION - BY OTHERS)
FY15 OMA SRM PROJECTS, PACKAGE #1
FEWR #109823 REQUEST TO REPAIR BUILDING
#2262, #2263, CAMP CASEY
(UNDER CONSTRUCTION - BY OTHERS)
CONC PAD FOR HPU7
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
SDSD
67.42T
67.27B
SCALE: 1:200
0 2 4 8
GRADING & DRAINAGE PLAN
SCALE: 1 : 200
STA 0+00 DL "A"
CONN TO EXIST CONC COVERED DITCH
TOP EL 66.72%%p(EXIST-ASSUME)
INVT EL 66.25%%p (EXIST-ASSUME)
STA 0+26.5 DL "A"
TOP EL 67.25
INVT EL 66.68
STA 0+31.7 DL "A"
CONN TO 150mm DL
TOP EL 67.26
INVT EL 66.83(150mm DL)
INVT EL 66.73
STA 0+48.2 DL "A"
CONN TO DOWNSPOUT DRAIN
TOP EL 67.26
INVT EL 66.96 ( DOWNSPOUT DRAIN)
INVT EL 66.90
GENERAL NOTES:
1. A DETAILED TOPOGRAPHIC SURVEY INDICATING ACCURATE PAVEMENT ELEVATIONS
AND UTILITY INVERT ELEVATIONS WERE NOT AVAILABLE FOR DESIGN DEVELOPMENT.
THE CONTRACTOR’S PROPOSAL SHALL INCLUDE VERIFICATION OF EXISTING SITE
CONDITIONS, DESIGN OF UTILITY PROFILES BASED ON FIELD VERIFIED CONDITIONS,
AND SHOP DRAWINGS AS REQUIRED TO MAKE ADJUSTMENTS TO FIELD CONDITIONS.
NO ADDITIONAL AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
2. FOR GENERAL NOTES & LEGEND, SEE SHEET C-001.
3. FOR ELECTRICAL PLAN, SEE SHEET ES102.
CG103
CONN TO DOWNSPOUT DRAIN
TOP EL 67.26
INVT EL 66.96 ( DOWNSPOUT DRAIN)
STA 0+19.5 DL "A"
TOP EL 67.15
INVT EL 66.60
CONC PAD FOR ACCU
TOP EL 67.80
CONC PAD FOR
RELOCATED EXIST FE MAINT STORAGE
TRASH ENCLOSURE
SEE ARCH DWG AE701
TOP EL 67.00
APPROXIMATE GRADING LIMITS
SOLID SOD5
SOLID SOD5
APPROXIMATE
GRADING LIMITS
CONC SWALE
MIN SLOPE 0.5%
STA 0+09.8 DL "A-1"
CONN TO CONC OPEN TRENCH
TOP EL 67.27
INVT EL 66.97
CONC STEPS6
CONC PAD FOR HPU
TOP EL 67.90
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
����������SS
SDSDSDSDSD
SCALE: 1:200
0 2 4 8
UTILITY PLAN
SCALE: 1 : 200
STA 0+08.7 SL "A-1"
OIL/WATER SEPARATOR #A-2
TOP EL 67.60
INL INVT EL 65.71
OUTL INVT EL 65.63
BOT EL 64.23
STA 0+00 SL "A"
CONN TO EXIST SMH
TOP EL 68.17%%p(EXST-ASSUME)
INL INVT EL 64.50 (SL "A")
INL INVT EL 64.15%%p(EXST-ASSUME)
OUTL INVT EL 64.13%%p(EXST-ASSUME)
STA 0+00 NGL "A"
CONN TO EXIST GAS MH
TOP EL 68.50%%p(EXIST-ASSUME)
STA 0+10.8 NGL "A"
1-63mmX1/4 BEND
STA 0+17.9 NGL "A"
1-63mmX1/8 BEND
GENERAL NOTES:
1. A DETAILED TOPOGRAPHIC SURVEY INDICATING ACCURATE PAVEMENT ELEVATIONS
AND UTILITY INVERT ELEVATIONS WERE NOT AVAILABLE FOR DESIGN DEVELOPMENT.
THE CONTRACTOR’S PROPOSAL SHALL INCLUDE VERIFICATION OF EXISTING SITE
CONDITIONS, DESIGN OF UTILITY PROFILES BASED ON FIELD VERIFIED CONDITIONS,
AND SHOP DRAWINGS AS REQUIRED TO MAKE ADJUSTMENTS TO FIELD CONDITIONS.
NO ADDITIONAL AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
2. ALL WATER LINES (INCLUDING FIRE SERVICE LINE) COVERING DEPTH SHALL BE AT
LEAST 0.305 METERS BELOW FROST DEPTH.
3. SEWER LINES SHALL BE PLACED AT OR BELOW THE FROST DEPTH.
4. USE 1.52 METERS FOR FROST DEPTH AT CAMP CASEY.
5. FOR GENERAL NOTES & LEGEND, SEE SHEET C-001.
6. FOR ELECTRICAL AND COMMUNICATION DISTRIBUTION PLAN,
SEE SHEETS ES102 TO ES108.
7. FOR DETAIL OF OIL/WATER SEPARATOR, SEE SHEET CU501.
STA 0+00 WL "A"
CONN TO EXIST 250mm WL(EXIST-ASSUME)
1-250X250X80mm TAPPING SLEEVE
1-80mm TAPPING VALVE W/BOX
STA 0+22 SL "A"
STA 0+00 SL "A-1"
SMH #A-1
TOP EL 67.50
INL INVT EL 65.70
INL INVT EL 65.50 (SL "A-1")
OUTL INVT EL 65.45
STA 0+14.4 SL "A-1"
1-150mmX1/8 BEND
CU104
STA 0+26.5 SL "A"
1-SCO (TYPE I)
TOP EL 67.25
1-150X150X100mm WYE
1-100mmX1/8 BEND
SL "A-1"
STA 0+03 WL "A"
1-80mmX1/8 BEND
RESTORE EXIST AC PAVEMENT
A= 9M2
INVT
EL 65.87
RESTORE EXIST AC PAVEMENT
A= 23M2
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
LIQUID LEVEL
HOLDING TANK
SLUDGE LEVEL
STL PLATE COVER
1600250 250
50mm CLR
OIL /WATER SEPARATOR DETAILS (GRAVITY TYPE)
NOT TO SCALE
WELDED TO ANGLE SPACED @ 450mm OC
DET EDGE OF PLATE LIFTING HANDLE
NOT TO SCALE
C O V E R D E T A I L S
TYPICAL CORNER REINFORCEMENT LAPPING
HORIZONTAL BARS
LIFTING HANDLE W/22mmDIA HOLES
STL CHECKERED PLATE COVER
16mmDIA LIFTING HANDLE
SEE DET
1D
1E
1E3
16mmDIA GALV STL BAR
& 22mmDIA HOLES
LIFTING HANDLE
6mm THK GALV
16mmDIA GALV STL BAR
1E2
L 38mmx38mmx5mm ANGLE
EDGES OF EACH STEEL PLATE
STIFFENER AROUND ALL
1E1
STL PLATE COVER
& FROM EACH END
W/ 13mmDIAx150mmLONG ANCHORBOLT
L 63mmx63mmx6mm STILL
38mm
200(TYP)
3mm STL COVER
41mm OPENING
6mm THK GALV
STL CHECKERED PLATE COVER
TYP
2-18
OPENING 25
WELDED TO L
25mmx6mm BAR
2. C.I. (CAST IRON) PIPE AND FITTINGS SHALL BE FLANGED
A FLEXIBLE JOINT (SLIP, MECH JT OR COUPLING) SHALL
BE PROVIDED WITHIN 0.6M (2’) OUTSIDE OF CONCRETE
150 PSI (10KGF/CM ) AWWA STD.
HOLDING TANK WALL.
ASTM A615 DEFORMED OR Fy = 40,000 PSI(28KGF/MM )
CLASS "AA" Fc = 4,000 PSI(280KGF/CM ) AT 28 DAYS
GENERAL NOTES:
B. REINFORCING STEEL
1. MATERIALS
A. CONCRETE
1B S E C T I O N
D16 @ 200mm OC
EACH WAY (TYP)
1C S E C T I O N
1E2
6mm THK GALV STL CHECKERED
PLATE COVERS
D16 @ 200mm OC
EACH WAY (TYP)
D13 @ 200mm OC EW
AT BOTTOM
75mm CLR TYPICAL
EFFLUENT
EFFLUENT
FOR WALL
50mm CLR TYP
FNSH GRADE
TOP AND BOTTOM
FLANGED CI TEES
SLUDGE LEVEL
2EA PER PANEL
LIFTING HANDLE
16mmDIAx150mmL COVER
HOLDING TANK
1200 1200
INFLUENT
D16 @ 200mmOC EW
@ PERIMETER WALLS
WATERSTOP TYPICAL
CI 200mmDIA PIPE INFLUENT
STL PLATE COVERS
SEE DET
LIFTING HANDLE
SEE DET
D16 @ 200mm OC EW (TYP)
600x100 OPEN SPACE
AT MIDDLE OF WALL
1B
1A P L A N
1C
1E2
1E3
1D
D16 @ 200mmOC EW
FNSH GRADE
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
NUMBER
Sheet of
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION
IMCOM-Pacific
UNIT 15742, APO AP 96205-5742
76 8
CU501
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
File details come from the government source that posted it. Updated .