Encl__9 _Building_List_Appendix_A.xls

XLS spreadsheet 41 KB Posted

Attached to
Removal of Accumulated Sludge
Solicitation number
W91QVN-16-R-0099
Issued by

About this file

Appendix A

View the file

Other files

File Type Posted
W91QVN-16-R-0099-SLUDGE.FBO.pdf PDF
Encl__8 _Location_Map_Sludge_Daegu.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mod-Bldg List

APPENDIX "A"
SCHEDULE OF REMOVAL SERVICE FOR DPW, USAG DAEGU
Performance Period : 19 Aug 16 Thru 18 Aug 21
1. Septic Tanks: Removal/disposal of sludge and other deposits at septic tanks
Estimate
AreaBldgUnitQtyFrequency
Camp HenryS1001Gallon400Yearly
"S1103"1,720"
"S1109"3,000"
"S1115"13,000"
"S1118"1,000"
"S1121"1,700"
"S1131"3,000"
"S1208"720"
"T1217"4,500"
"T1222"800"
"S1225"1,720"
"S1241"7,000"
"T1254"700"
"S1307"3,500"
"T1311"320"
"T1318"500"
"S1325"2,000"
"T1410"450"
"T1415"1,500"
"T1420"1,720"
"T1425AS"1,250"
"T1425BS"500"
"S1501"19,000"
"S1505"1,000"
"S1521"1,250"
"S1530"700"
"T1570"500"
"S1600"4,500"
"S1611"35,000"
"S1621"15,000"
"S1639"2,000"
"S1650"8,000"
"S1664"2,000"
"T1669"400"
"S1685"4,500"
"T1701"1,000"
AreaBldgUnitEst QtyFrequency
Camp HenryT1706Gallon160Yearly
"S1712"2,400"
"T1715"450"
"S1805"700"
"S1810"300"
"S1814"1,000"
"S1815"1,720"
"S1835"2,000"
"S1844"700"
"T1845"700"
Camp GeorgeS3210"1,000"
Sub Total:156,980Gal (594,170 Lit)
Camp WalkerS20Gallon2,500Yearly
"S22"450"
"S32"1,500"
"S36"1,480"
"S153"11,000"
"S207"500"
"S207"10,000"
"S341"2,800"
"S342"1,000"
"S348"1,000"
"S349"3,600"
"S353"1,000"
"S357"1,500"
"S372"1,000"
"S409"520"
"S410"1,250"
"S414"1,000"
"S420"1,200"
"S430"3,000"
"S440"1,000"
"S457"1,000"
"S468"500"
"S571"550"
"S706"2,300"
Sub Total:51,650Gal (195,495 Lit)
Total:208,630Gal (789,665 Lit)
2. Grease Traps: Removal/disposal of grease water at grease traps
AnnualQuantities
AreaBldg NoUnitWaterFrequency
Camp HenryT1241GGal717Once every two mo
T1669G"1,621Once every two mo
T1225G"3,795Once every two mo
S1610 (DFAC)"5,424Once every two mo
Camp GeorgeS3000G"1,420Once every two mo
Camp Walker
S230"4,214Once every two mo
S310"1,272Once every two mo
S320G"1,387Once every two mo
S338GA"3,666Once every two mo
S338GB"1,822Once every two mo
S370G"985Once every two mo
S376"2,121Once every two mo
Total:28,444Gal (107,661 Lit)
3. Grease Traps: Removal/disposal of floated solid grease at grease traps
AreaBldg NoUnitOilFrequency
Camp HenryT1241GGal531Once every two mo
T1669G"799Once every two mo
T1225G"1,869Once every two mo
S1610 (DFAC)"2,672Once every two mo
Camp GeorgeS3000G"700Once every two mo
Camp WalkerS230"1,805Once every two mo
S310"636Once every two mo
S320G"683Once every two mo
S338GA"1,806Once every two mo
S338GB"898Once every two mo
S370G"485Once every two mo
S376"908Once every two mo
Total:13,792Gal (52,203 Lit)
4. Sewage Treatment Plant and (Main Septic Tank): Removal/disposal
of wet sludge other deposits at sewage treatment plants, main septic tank
AreaBldgUnitEst QtyFrequency
Camp WalkerS325Gal260,000(Main Septic Tank)Quarterly
Camp GeorgeS3006"48,000"
Total:308,000Gal (1,165,780 Lit)
5. Sand/soil at Sewage Lift Station: Removal/disposal of sand/soil
at sewage lift station
Camp WalkerS363CM12Twice a year
Total:12CM

File details come from the government source that posted it. Updated .