W91QVN-16-R-0076.pdf
PDF 1 MB Posted
- Attached to
- ITM Services for Fire Alarm, Detection, and Suppression Systems for US Army Garrison-Daegu
- Solicitation number
- W91QVN16R0076
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN-16-R-0076-0001.pdf | ||
| Attachment_C._Bldg_List_(SRM Housing Suslak).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN-16-R-0076 23-May-2016
b. TELEPHONE NUMBER
724-6546
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 24 Jun 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. PAK, HYON CHON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCC YONGSAN, UNIT #15289
APO AP 96205-5289
UNITED STATES OF AMERICA (THE)
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
922160
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN-16-R-0076
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Inspection, Testing, and Maintenance SVC
FFP
for USAG-DAEGU. Total number of quantity identified under SubCLIN 0001AA thru 0001AQ is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 0001AA thru 0001AQ in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(Base Year: 1 September 2016 - 31 August 2017)
FOB: Destination
NET AMT
0001AA 12 Months Wet Chemical System
FFP
Wet Chemical System (79EA Bldgs, 234 EA)
0001AB 12 Months Dry Chemical System
FFP
Dry Chemical System (12EA Bldgs, 25 EA)
0001AC 12 Months Clean Agent System
FFP
Clean Agent System (2EA Bldgs, 2EA)
0001AD 12 Months Fire Pump System
FFP
Fire Pump System (12EA Bldgs, 17EA)
0001AE 12 Months Wet Pipe Sprinkler System
FFP
Wet Pipe Sprinkler System (118EA Bldgs, 2,405,715 SF)
0001AF 12 Months Pre-Action Sprinkler System
FFP
Pre-Action Sprinkler System (15EA Bldgs, 517,679 SF)
0001AG 12 Months Dry Pipe Sprinkler System
FFP
Dry Pipe Sprinkler System (30EA Bldgs, 824,478 SF)
0001AH 12 Months Standpipe System
FFP
Standpipe System (30EA Bldgs, 36 EA)
0001AJ 12 Months Fire Alarm and Detection System
FFP
Fire Alarm and Detection System (397EA Bldgs, 5,745,908 SF)
0001AK 12 Months D-500/D-21 Fire Alarm Receiver
FFP
D-500/D-21 Fire Alarm Receiver (1EA Bldg, 1 EA)
0001AL 12 Months Building Transceiver
FFP
Building Transceiver (253EA Bldgs, 253 EA)
0001AM 12 Months Total Pac Type Sprinkler System
FFP
Total Pac Type Sprinkler System (3EA Bldgs, 4 EA)
0001AN 12 Months Fire Pump System
FFP
Fire Pump System (1EA Bldg, 2 EA) for Cp George Family Housing Apt
0001AP 12 Months Fire Alarm and Detection System
FFP
Fire Alarm and Detection System (10EA Bldgs, 238,350 SF) for Cp George Family Housing Apt
0001AQ 12 Months Building Transceiver
FFP
Building Transceiver (1EA Bldg, 1 EA) for Cp George Family Housing Apt
Inspection, Testing, and Maintenance SVC
FFP
for SUSLAK. Total number of quantity identified under SubCLIN 0002AA thru 0002AD is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 0002AA thru 0002AD in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(Base Year: 1 September 2016 - 31 August 2017)
0002AA 12 Months Fire Pump System
FFP
Fire Pump System (1EA BLDG, 2EA) for SUSLAK
0002AB 12 Months Wet Pipe Sprinkler System
FFP
Wet Pipe Sprinkler System (1EA BLDG, 5,250SF) for SUSLAK
0002AC 12 Months Dry Pipe Sprinkler System
FFP
Dry Pipe Sprinkler System (1EA BLDG, 5,250SF) for SUSLAK
0002AD 12 Months Fire Alarm and Detection System
FFP
Fire Alarm and Detection System (3EA Bldgs, 15,424 SF) for SUSLAK
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Service Calls and Minor Repair
FFP
for USAG Daegu (Requirement) in accordance with the paragraph 5.3.3. and 5.5 of
PWS
ESTIMATED
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AA 300 Job Service Calls on Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AB 80 Job Service Calls on After Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AC 20 Job Service Calls on Holiday/Weekend
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AD 40 Job Service Calls on Duty Hour
FFP
for Cp George Family Housing Apt
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AE 40 Job Service Calls on After Duty Hour
FFP
Cp George Family Housing Apt
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AF 20 Job Service Calls on Holiday/Weekend
FFP
Cp George Family Housing Apt
UNIT UNIT PRICE ESTIMATED AMOUNT
Service Calls and Minor Repair
FFP
for SUSLAK (Requirement)
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AA 20 Job Service Calls on Duty Hour for SUSLAK
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AB 10 Job Service Calls on After Duty Hour
FFP
for SUSLAK
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AC 5 Job Service Calls on Holiday/ Weekend
FFP
0005 1 Job Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 5.13. of PWS for CMR requirement herein. NOTE:
Not to exceed 20 Man hours for data collection and report.
Estimated cost for war hazard losses is
FFP
Zero (0).
OPTION Inspection, Testing, and Maintenance SVC
FFP
for USAG-DAEGU. Total number of quantity identified under SubCLIN 0001AA thru 0001AQ is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 0001AA thru 0001AQ in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(1st Option Year: 1 September 2017 - 31 August 2018)
1001AA 12 Months OPTION Wet Chemical System
FFP
Wet Chemical System (79EA Bldgs, 231 EA)
1001AB 12 Months OPTION Dry Chemical System
FFP
1001AC 12 Months OPTION Clean Agent System
FFP
Clean Agent System (2 EA Bldgs, 2 EA)
1001AD 12 Months OPTION Fire Pump System
FFP
Fire Pump System (12EA Bldgs, 17 EA)
1001AE 12 Months OPTION Wet Pipe Sprinkler System
FFP
1001AF 12 Months OPTION Pre-Action Sprinkler System
FFP
1001AG 12 Months OPTION Dry Pipe Sprinkler System
FFP
1001AH 12 Months OPTION Standpipe System
FFP
1001AJ 12 Months OPTION Fire Alarm and Detection System
FFP
1001AK 12 Months OPTION D-500/D-21 Fire Alarm Receiver
FFP
1001AL 12 Months OPTION Building Transceiver
FFP
1001AM 12 Months OPTION Total Pac Type Sprinkler System
FFP
1001AN 12 Months OPTION Fire Pump System
FFP
1001AP 12 Months OPTION Fire Alarm and Detection System
FFP
Fire Alarm and Detection System (10EA Bldgs, 238,350 SF) for Cp George
1001AQ 12 Months OPTION Building Transceiver
FFP
OPTION Inspection, Testing, and Maintenance SVC
FFP
for SUSLAK. Total number of quantity identified under SubCLIN 1002AA thru 1002AD is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 1002AA thru 1002AD in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(1st Option Year: 1 September 2017 - 31 August 2018)
1002AA 12 Months OPTION Fire Pump System
FFP
1002AB 12 Months OPTION Wet Pipe Sprinkler System
FFP
Wet Pipe Sprinkler System (1EA BLDG, 5,250 SF) for SUSLAK
1002AC 12 Months OPTION Dry Pipe Sprinkler System
FFP
Dry Pipe Sprinkler System (1EA BLDG, 5,250 SF) for SUSLAK
1002AD 12 Months OPTION Fire Alarm and Detection System
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Service Calls and Minor Repair
FFP
for USAG Daegu (Requirement) in accordance with the paragraph 5.3.3. and 5.5 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AA 300 Job OPTION Service Calls on Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AB 80 Job OPTION Service Calls on After Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AC 20 Job OPTION Service Calls on Holiday/Weekend
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AD 40 Job OPTION Service Calls on Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AE 40 Job OPTION Service Calls on After Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AF 20 Job OPTION Service Calls on Holiday/Weekend
FFP
OPTION Service Calls and Minor Repair
FFP
1004AA 20 Job OPTION Service Calls on Duty Hour for SUSLAK
1004AB 10 Job OPTION Service Calls on After Duty Hour
FFP
1004AC 5 Job OPTION Service Calls on Holiday/ Weekend
FFP
1005 1 Job OPTION Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 5.13. of PWS for CMR requirement herein. NOTE:
OPTION Estimated cost for war hazard losses is
FFP
OPTION Inspection, Testing, and Maintenance SVC
FFP
for USAG-DAEGU. Total number of quantity identified under SubCLIN 0001AA thru 0001AQ is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 0001AA thru 0001AQ in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(2nd Option Year: 1 September 2018 - 31 August 2019)
2001AA 12 Months OPTION Wet Chemical System
FFP
Wet Chemical System (79EA Bldgs, 231 EA)
2001AB 12 Months OPTION Dry Chemical System
FFP
2001AC 12 Months OPTION Clean Agent System
FFP
2001AD 12 Months OPTION Fire Pump System
FFP
2001AE 12 Months OPTION Wet Pipe Sprinkler System
FFP
2001AF 12 Months OPTION Pre-Action Sprinkler System
FFP
2001AG 12 Months OPTION Dry Pipe Sprinkler System
FFP
2001AH 12 Months OPTION Standpipe System
FFP
2001AJ 12 Months OPTION Fire Alarm and Detection System
FFP
2001AK 12 Months OPTION D-500/D-21 Fire Alarm Receiver
FFP
2001AL 12 Months OPTION Building Transceiver
FFP
2001AM 12 Months OPTION Total Pac Type Sprinkler System
FFP
2001AN 12 Months OPTION Fire Pump System
FFP
2001AP 12 Months OPTION Fire Alarm and Detection System
FFP
Fire Alarm and Detection System (10EA Bldgs, 238,350 SF) for Cp George
2001AQ 12 Months OPTION Building Transceiver
FFP
OPTION Inspection, Testing, and Maintenance SVC
FFP
for SUSLAK. Total number of quantity identified under SubCLIN 2002AA thru 2002AD is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 2002AA thru 2002AD in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(2nd Option Year: 1 September 2018 - 31 August 2019)
2002AA 12 Months OPTION Fire Pump System
FFP
2002AB 12 Months OPTION Wet Pipe Sprinkler System
FFP
2002AC 12 Months OPTION Dry Pipe Sprinkler System
FFP
2002AD 12 Months OPTION Fire Alarm and Detection System
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Service Calls and Minor Repair
FFP
for USAG Daegu (Requirement) in accordance with the paragraph 5.3.3. and 5.5 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AA 300 Job OPTION Service Calls on Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AB 80 Job OPTION Service Calls on After Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AC 20 Job OPTION Service Calls on Holiday/Weekend
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AD 40 Job OPTION Service Calls on Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AE 40 Job OPTION Service Calls on After Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AF 20 Job OPTION Service Calls on Holiday/Weekend
FFP
OPTION Service Calls and Minor Repair
FFP
2004AA 20 Job OPTION Service Calls on Duty Hour for SUSLAK
2004AB 10 Job OPTION Service Calls on After Duty Hour
FFP
2004AC 5 Job OPTION Service Calls on Holiday/ Weekend
FFP
2005 1 Job OPTION Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 5.13. of PWS for CMR requirement herein. NOTE:
OPTION Estimated cost for war hazard losses is
FFP
OPTION Inspection, Testing, and Maintenance SVC
FFP
for USAG-DAEGU. Total number of quantity identified under SubCLIN 0001AA thru 0001AQ is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 0001AA thru 0001AQ in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(3rd Option Year: 1 September 2019 - 31 August 2020)
3001AA 12 Months OPTION Wet Chemical System
FFP
3001AB 12 Months OPTION Dry Chemical System
FFP
3001AC 12 Months OPTION Clean Agent System
FFP
3001AD 12 Months OPTION Fire Pump System
FFP
3001AE 12 Months OPTION Wet Pipe Sprinkler System
FFP
3001AF 12 Months OPTION Pre-Action Sprinkler System
FFP
3001AG 12 Months OPTION Dry Pipe Sprinkler System
FFP
3001AH 12 Months OPTION Standpipe System
FFP
3001AJ 12 Months OPTION Fire Alarm and Detection System
FFP
3001AK 12 Months OPTION D-500/D-21 Fire Alarm Receiver
FFP
3001AL 12 Months OPTION Building Transceiver
FFP
3001AM 12 Months OPTION Total Pac Type Sprinkler System
FFP
3001AN 12 Months OPTION Fire Pump System
FFP
3001AP 12 Months OPTION Fire Alarm and Detection System
FFP
Fire Alarm and Detection System (10EA Bldgs, 238,350 SF) for Cp George
3001AQ 12 Months OPTION Building Transceiver
FFP
OPTION Inspection, Testing, and Maintenance SVC
FFP
1for SUSLAK. Total number of quantity identified under SubCLIN 3002AA thru 3002AD is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 3002AA thru 3002AD in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(3rd Option Year: 1 September 2019 - 31 August 2020)
3002AA 12 Months OPTION Fire Pump System
FFP
3002AB 12 Months OPTION Wet Pipe Sprinkler System
FFP
3002AC 12 Months OPTION Dry Pipe Sprinkler System
FFP
3002AD 12 Months OPTION Fire Alarm and Detection System
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Service Calls and Minor Repair
FFP
for USAG Daegu (Requirement) in accordance with the paragraph 5.3.3. and 5.5 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AA 300 Job OPTION Service Calls on Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AB 80 Job OPTION Service Calls on After Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AC 20 Job OPTION Service Calls on Holiday/Weekend
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AD 40 Job OPTION Service Calls on Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AE 40 Job OPTION Service Calls on After Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3003AF 20 Job OPTION Service Calls on Holiday/Weekend
FFP
OPTION Service Calls and Minor Repair
FFP
3004AA 20 Job OPTION Service Calls on Duty Hour for SUSLAK
3004AB 10 Job OPTION Service Calls on After Duty Hour
FFP
3004AC 5 Job OPTION Service Calls on Holiday/ Weekend
FFP
3005 1 Job OPTION Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 5.13. of PWS for CMR requirement herein. NOTE:
OPTION Estimated cost for war hazard losses is
FFP
OPTION Inspection, Testing, and Maintenance SVC
FFP
for USAG-DAEGU. Total number of quantity identified under SubCLIN 0001AA thru 0001AQ is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 0001AA thru 0001AQ in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(4th Option Year: 1 September 2020 - 31 August 2021)
4001AA 12 Months OPTION Wet Chemical System
FFP
4001AB 12 Months OPTION Dry Chemical System
FFP
4001AC 12 Months OPTION Clean Agent System
FFP
4001AD 12 Months OPTION Fire Pump System
FFP
4001AE 12 Months OPTION Wet Pipe Sprinkler System
FFP
4001AF 12 Months OPTION Pre-Action Sprinkler System
FFP
4001AG 12 Months OPTION Dry Pipe Sprinkler System
FFP
4001AH 12 Months OPTION Standpipe System
FFP
4001AJ 12 Months OPTION Fire Alarm and Detection System
FFP
4001AK 12 Months OPTION D-500/D-21 Fire Alarm Receiver
FFP
4001AL 12 Months OPTION Building Transceiver
FFP
4001AM 12 Months OPTION Total Pac Type Sprinkler System
FFP
4001AN 12 Months OPTION Fire Pump System
FFP
4001AP 12 Months OPTION Fire Alarm and Detection System
FFP
Fire Alarm and Detection System (10EA Bldgs, 238,350 SF) for Cp George
4001AQ 12 Months OPTION Building Transceiver
FFP
OPTION Inspection, Testing, and Maintenance SVC
FFP
for SUSLAK. Total number of quantity identified under SubCLIN 4002AA thru 4002AD is for 12 months period. The Inspection, Testing, and Maintenance Services shall include all frequencies for the various systems of SubCLIN 4002AA thru 4002AD in accordance with the UFC 3-601-2 (Unified Facilities Criteria) standard. The Building List is attached in Attachment C (The attached list provide the projected level of effort for ITM).
(4th Option Year: 1 September 2020 - 31 August 2021)
4002AA 12 Months OPTION Fire Pump System
FFP
4002AB 12 Months OPTION Wet Pipe Sprinkler System
FFP
4002AC 12 Months OPTION Dry Pipe Sprinkler System
FFP
4002AD 12 Months OPTION Fire Alarm and Detection System
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Service Calls and Minor Repair
FFP
for USAG Daegu (Requirement) in accordance with the paragraph 5.3.3. and 5.5 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AA 300 Job OPTION Service Calls on Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AB 80 Job OPTION Service Calls on After Duty Hour
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AC 20 Job OPTION Service Calls on Holiday/Weekend
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AD 40 Job OPTION Service Calls on Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AE 40 Job OPTION Service Calls on After Duty Hour
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4003AF 20 Job OPTION Service Calls on Holiday/Weekend
FFP
OPTION Service Calls and Minor Repair
FFP
4004AA 20 Job OPTION Service Calls on Duty Hour for SUSLAK
4004AB 10 Job OPTION Service Calls on After Duty Hour
FFP
4004AC 5 Job OPTION Service Calls on Holiday/ Weekend
FFP
4005 1 Job OPTION Accounting For Contract Service
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 5.13. of PWS for CMR requirement herein. NOTE:
OPTION Estimated cost for war hazard losses is
FFP
NOTICE TO OFFERORS
All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement, and to perform the contract. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies shall be determined by the Contracting Officer. All offeror(s) interested in competing for this requirement are required to submit their price proposal, as applicable, in Korean won only. A proposal submitted in currency other than Korean won will not be considered for award.
PERFORMANCE WORK STATEMENT (PWS)
FOR
Inspection, Testing, and Maintenance (ITM) Services for Fire Alarm, Detection, and Suppression Systems for US Army Garrison-Daegu
PART 1
GENERAL INFORMATION
1. GENERAL: This is non-personal service contract to provide inspection, testing, and maintenance (ITM) services for fire alarm, detection, and suppression systems for US Army Garrison Daegu. The Government will not exercise any supervision or control over the Contractor’s performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1. Description of Services/Introduction: The Contractor shall furnish all the necessary labor, management, supervision, tools, materials, equipment, and transportation necessary to provide inspection, testing and maintenance (ITM) services for fire protection systems (fire alarm, detection and suppression systems) in accordance with all other terms and conditions contained herein.
1.2. Background
1.2.1. This service will be performed in various facilities, which shall include officer quarters, enlisted quarters, retail outlets, recreation facilities, offices, warehouses, and aircraft shelters, or any other facility at USAG-Daegu in the Republic of Korea (ROK).
1.2.2. All services shall be provided in accordance with established standards, principles, and ethics of the profession and applicable professional specialty organizations, National Fire Protection Association (NFPA) standards, and Unified Facilities Criteria (UFC) 3-601-02, latest edition.
1.3. Objectives: Provide inspection, testing, and maintenance services for the existing fire protection systems (fire alarm detection and suppression system) installed in the facilities of US Army installations, to protect all residing personnel and properties from possible fire hazards.
1.4. Scope: The Contractor shall furnish all the necessary labor, management, supervision, tools, materials, equipment, and transportation necessary to provide inspection, testing and maintenance (ITM) services for fire protection systems (fire alarm, detection and suppression systems) in accordance with all other terms and conditions contained herein
1.5. Period of Performance: The period of performance shall be one (1) Base Year and four (4) Option Years. The Period of Performance will be as follows:
CLINs Period of Performance 0001 – 0006 Base Year 1 September 2016 – 31 August 2017 1001 – 1006 1st Option Year 1 September 2017 – 31 August 2018 2001 – 2006 2nd Option Year 1 September 2018 – 31 August 2019 3001 – 3006 3rd Option Year 1 September 2019 – 31 August 2020 4001 – 4006 4th Option Year 1 September 2020 – 31 August 2021
1.6. General Information
1.6.1. Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0800-1700 hrs Monday through Friday except Korean holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must maintain an adequate workforce at all times for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.2. Place of Performance: The work to be performed under this contract will be performed at USAG Daegu (Camp Henry/George/Walker/Carroll/Busan Storage Facility/Pier 8 and other remote sites).
1.6.3. Quality Control Program (QCP): The Contractor shall provide to the COR prior to contract performance a detailed QCP that at a minimum covers procedures identified in the paragraph 1.6.3.1. The QCP shall be used throughout the life of this contract and shall be updated by the Contractor when the changes impact the QCP.
1.6.3.1. The program shall include:
1.6.3.1.1. A description of the inspection and testing system to cover all services. The description shall specify the areas to be inspected on both a scheduled and unscheduled basis, frequency of inspection, and the title and organizational placement of the inspectors.
1.6.3.1.2. A description of the methods to be used to identify and prevent defects in the quality of service performed.
1.6.3.1.3. A description of the records to maintain the inspection and testing documents and corrective or preventive actions taken.
1.6.3.2. The records of inspections shall be kept and made available to the Government throughout the contract period and until the final settlement of any claims after contract completion.
1.6.4. Quality Assurance (QA):
1.6.4.1. The Government will evaluate the Contractor’s performance IAW the QA Surveillance Plan (QASP) for those tasks listed in the performance requirements summary (PRS, Attachment/Technical Exhibit A). For those tasks listed on the Performance Requirements Summary (PRS), the COR will follow the methods of surveillance in this contract. Government personnel will record all surveillance observations. When an observation indicates defective performance, the COR will require CM to initial the observation. Initiating of the observation does not necessarily constitute concurrence with the observation, only acknowledgement that they have been made aware of defective performance. Government surveillance of tasks not listed in the PRS by methods other than those listed in the PRS may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the KO as a result of surveillance will be IAW the terms of this contract.
1.6.4.2. Performance Evaluation Meetings: The Contracting Officer may require the CM to meet with the COR, and other Government personnel as deemed necessary. The Contractor may request a meeting with the KO when they believe such a meeting is necessary. Written minutes of any such meeting shall be recorded in the contract file and signed by the contract managers and the COR or contract administrator. If the Contractor does not concur with any portion of the minutes, such non-concurrence shall be provided in writing to the COR within 10 calendar days following receipt of the minutes.
1.6.5. Type of Contract: The Government will award a Firm-Fixed-Price with Requirement type contract.
1.6.6. Security Requirements: The Contractor and employees shall comply with all security requirements imposed by local installation commanders at all times while performing work under this contract.
1.6.6.1. Physical Security: The Contractor shall be responsible for safeguarding all Government property provided for Contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
1.6.6.2. Key Control. The Contractor shall establish and implement methods of ensuring all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The Contractor shall not duplicate any keys issued by the Government.
1.6.6.3. The Contractor shall immediately report to the COR any occurrences of lost or duplicated keys.
1.6.6.4. In the event keys are lost or duplicated, other than master keys, the Contractor may be required, upon written direction of the KO, to re-key the affected lock or locks without cost to the Government. The Government may, however, at its option, replace the affected lock or locks or perform re-keying, and deduct the cost from the monthly payment due the Contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system and the KO will determine what is deducted and when from the monthly payment due the Contractor.
1.6.6.5. The Contractor shall prohibit the use of keys issued by the Government by any persons other than the Contractor's employees and the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in performance of contract work requirements in those areas.
1.6.6.6. Lock Combinations: The Contractor shall control access to all Government provided lock combinations to prevent unauthorized individuals from gaining access to Government facilities.
1.6.7. Special Qualifications: The Contractor shall maintain all required ROK or US licenses and qualifications for the inspection/test/maintenance of fire protection system within the PWS of this contact. The Contractor shall employ personnel who are knowledgeable of all relevant fire and emergency services. The Contractor shall provide all documentation for licensing and certification when submitting proposal to 411th CSB.
1.6.7.1. Technical Staff:
1.6.7.1.1. Engineering Supervisor: The contractor shall provide one (1) Engineering Supervisor for each of the areas in para 1.6.2. who shall be responsible for supervision for performance of work.
1.6.7.1.2. Electrical/Mechanic Fire Engineering Technicians: The Contractor shall provide minimum two (2) Electrical/Mechanic Fire Engineering Technicians for each of the areas in para 1.6.2. who shall be responsible for inspection, testing, and maintenance (ITM) work.
1.6.7.2. License Requirements:
1.6.7.2.1. The Prime Contractor shall have a Fire Protection Facilities Management Business Registration (소방시설관리 유지업 등록증) to perform Inspection, Testing, and Maintenance of Fire Protection Systems issued by Republic of Korea (ROK).
1.6.7.2.2. Engineering Supervisor: The Engineering Supervisor shall be a registered Professional Engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES).
1.6.7.2.3. Electrical Fire Engineering Technician: The Electrical Fire Engineering Technician shall have valid and current certificate/license in Fire Detection, Alarm and Notification, National Institute for Certification in Engineering Technologies (NICET) Level II.
1.6.7.2.4. Mechanic Fire Engineering Technician: The Mechanic Fire Engineering Technician shall have valid and current certificate/license in Water Based Fire Protection System, National Institute for Certification in Engineering Technologies (NICET) Level II.
1.6.7.3. Prior Experience: The Contractor Engineering Supervisor and Electrical/Mechanic Fire Engineering Technicians shall have at least two (2) years of consecutive experience within the last five (5) years of fire protection system related works..
1.6.7.4. Personnel Requirement: The Contractor shall ensure that all employees have knowledge to perform the work in this PWS. The following personnel are considered key personnel by the Government: Contract Manager (CM), Engineering Supervisor, and Electrical Fire Engineering Technicians. The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person shall be designated in writing to the contracting officer. The CM shall have a full authority to act for the Contractor on all contract matters relating to operation of this contract. The CM shall be available between 08:00 hours to 17:00 hours, Monday through Saturday except Federal holidays or when the Government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
1.6.7.4.1. The Government has the right to restrict the employment under the contract of any Contractor employee, or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, or general well being of the installation and its population.
1.6.7.4.2. Contractor personnel, personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the Government installation shall abide by all the regulations of the installation, which may be in effect during the contract period.
1.6.7.4.3. The Contractor shall employ only personnel skilled and qualified in performing fire alarm system related work. The Contractor shall ensure that his employees operate equipment only if they have been trained to do so safely.
1.6.7.4.4. The Contractor shall maintain full control over all of his employees at all times. The Contractor shall ensure that employees do not enter base facilities unless in the performance of work under this contract. Employees found in unauthorized areas or facilities will be removed from the installation.
1.6.7.4.5. Contractor personnel, personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the Government installation are allowed to perform work only for this contract while on the Government installation. Contract personnel, personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Government installation performing work not related to this contract on the Government installation shall be reported to the installation military police to enforce the regulations of the installation.
1.6.7.4.6. The Contractor shall be responsible for safeguarding all government furnished facilities and materials provided for Contractor use. At the close of each work period, government facilities and materials shall be secured.
1.6.7.5 Key Personnel: The Contractor shall provide a CM, Engineering Supervisor, and Electrical/Mechanic Technicians as key personnel.
1.6.7.5.1 Contract Manager (CM)
1.6.7.5.1.1 The CM shall be a full-time CM and physically present at a central site of the Contractor’s choosing during normal duty hours to handle any problems/complaints that may occur, conduct overall management, coordination, and furnish liaison with the Government and shall be responsible for the overall performance of inspection/test/maintenance services for fire protection system under this Contract. The CM shall have at least two
(2) years of satisfactory experience within the past five (5) years as CM in managing fire alarm system related projects. The historical work evidence of the Contractor and resume/qualification of the CM shall be submitted as a part of the contractor’s technical proposal. The CM shall be given authority to make on-site decisions on behalf of the Contractor on contractual matters.
1.6.7.5.1.2 The CM shall be available during normal duty hours (0800–1700, Monday thru Friday) and shall respond within two (2) hours to any requested meetings to discuss performance of this contract with the COR and/or the KO. After normal duty hours, the CM shall be available within four (4) hours of notice. The Contractor shall ensure that communications between the CM and Contractor employees are established within 30 minutes of any notification delivered to CM by the COR during the work hours.
1.6.7.5.1.3 The CM shall be able to read, write, speak and understand English efficiently.
1.6.7.5.1.4 The CM shall have full authority to act or make decisions for the Contractor on all contract matters pertaining to the operations of this inspection/test/maintenance of fire protection system service contract.
1.6.7.5.1.5 The CM shall fully understand the requirements of this contract and shall report to the COR any problems encountered in any of the facilities covered by this contract. The CM shall demonstrate adequate knowledge of equipment, tools and techniques, and shall be able to recognize situations or circumstances under defined in this PWS that may be hazardous to the facilities or to personnel. Immediately upon recognition of such situations and/or circumstances, the CM shall notify the KO and/or the COR.
1.6.7.5.1.6 Upon the request of the KO or COR, the CM shall make himself/herself present to discuss contract performance at a date and time specified in the request.
1.6.7.5.2 Engineering Supervisor: The Engineering Supervisor shall be a registered Professional Engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES).
1.6.7.5.3 Electrical Fire Engineering Technician: The Electrical Fire Engineering Technician shall have valid and current certificate/license in Fire Detection, Alarm and Notification, National Institute for Certification in Engineering Technologies (NICET) Level II. The Electrical Fire Engineering Technician shall have at least two (2) years of consecutive experience within the last five (5) years in Inspection, Test, Maintenance (ITM) and Repair of Fire Protection System.
1.6.7.5.4 Mechanic Fire Engineering Technician: The Mechanic Fire Engineering Technician shall have valid and current certificate/license in Water Based Fire Protection System, National Institute for Certification in Engineering Technologies (NICET) Level II. The Mechanic Fire Engineering Technician shall have at least two (2) years of consecutive experience within the last five (5) years in Inspection, Test, Maintenance (ITM) and Repair of Fire Protection System.
1.6.8. Base Passes and Vehicle Permits
1.6.8.1. Contractor employees and representatives shall be required to have proper identification prior to entering each Government installation. Such identification shall be controlled as prescribed by the Security Section, Provost Marshal, or equivalent security control authority at the installation concerned.
1.6.8.1.1. Base Pass: Upon notice of award, the Contractor shall obtain all passes and necessary vehicle permits required for entry by authorized Contractor personnel IAW base policy, and the point of contact information for this action will be provided upon contract award.
1.6.8.1.2. Escort Privilege: The CM shall be authorized escort privilege for 3 persons & 1 vehicle. This privilege is only for employees working on this contract or those providing supporting roles under emergency conditions and only during hours stated under this contract for fire protection system related work. It is the escort’s responsibility to ensure he/she maintains full control of all escorted individuals at all times.
1.6.8.1.3. Military Restricted Areas: The Contractor shall have a military escort in all restricted areas. This individual will be provided by the using agency, arranged through the COR, and shall perform escort duties.
1.6.8.2. All Contractor employees and representatives shall have in their possession of a Korean Citizen Identification Card during performance under this contract.
1.6.8.3. The COR will not be responsible for providing escorts for the Contractor.
1.6.9. Safety
1.6.9.1. Safety Requirements: The contractor shall insure that safety precautions are taken during the performance of this contract to protect the lives of contractor personnel, the property of the U.S. Government, the Republic of Korea, as well as the private individuals and firms who may be exposed to or endangered by the contractor’s actions to maintain minimal accidents/incident, zero loss of life and minimal damage to property. The contractor shall submit safety plan to the COR for review 14 days prior to the start of performance under this contract. The safety plan shall be confirmed by Contracting Officer’s Representative (COR) then accepted by KO within 5 working days if there is any changes after award. The safety program shall comply with EM 385-1-1, the US Army Corps of Engineers Safety and Health Requirements Manual and the Korean Occupational Safety and Health Act (KOSHA).
The Contractor agrees to comply with its written program for the life of the contract. Any changes or modification to its safety program will be coordinated and reviewed by the COR, or his/her duly authorized representative.
1.6.9.1.1. Risk Management Process. The safety plan shall include detailed job related hazards and controls for each work activity. The plan shall include an Activity Hazard Analysis (AHA) for each work activity. The AHA shall include at a minimum the name of the activity/job, the job steps, the job hazards, the tools or equipment required to perform the job, control measures to eliminate or reduce the hazard(s), and a Risk Assessment Code (Risk Assessment Code is an assessment of the probability of the hazard occurring and its potential impact). The contractor shall assure that the safety control measures are implemented. The contractor may use the sample AHA forms in http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx or develop their own.
1.6.9.1.2. Accident investigations, reports, and logs: The safety plan shall include a copy of the contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 30 minutes of accident occurrence to the Contracting Officer/Representative (KO/COR). The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum:
(1) Contract number and contract name/description.
(2) Name of contractor
(3) Date/time of accident
(4) Date report was completed
(5) Detail description of events that lead to the accident
(6) Root cause of accident
(7) Contributing factors
(8) Corrective action(s) to prevent recurrence
1.6.9.1.3. The following require immediate accident notification and written accident report:
(1) A fatality;
(2) A permanent total or permanent partial disability;
(3) The hospitalization of three or more people resulting from a single occurrence;
(4) Property damage of $200 or more.
1.6.9.2. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the Contracting Officer’s Representative (COR)/Alternate Contracting Officer’s Representative (ACOR)/Quality Assurance Representative (QAR), and shall notify the COR of the corrective action to be taken.
1.6.9.3. Fire Prevention: The Contractor shall comply with the provisions of the installations’ Fire Protection Program.
1.6.10. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and Contracting Officer’s Representative (COR) shall meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
1.6.11. Contracting Officer’s Representative (COR): The COR Tool (CORT) is in WAWF (https://wawf.eb.mil) for nomination, tracking, documentation, and management of CORs will be used. The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.12. Identification of Contractor Employees: The Contractor shall employ only personnel skilled and qualified in performing fire alarm system related work. Contractor personnel shall present a professional appearance and shall be easily recognizable by wearing a uniform and identification badge. All Contractor personnel shall be http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx https://wawf.eb.mil/ identified by wearing Contractor furnished identification badges made of durable material and shall include the Contactor’s company name, employee’s name and current photo of Contractor personnel. The Contractor shall be accountable for all badges and shall provide a list of badge numbers and personnel to the COR/Contracting Officer (KO) no later than 30 calendar days after contract award and shall be updated as changes occur.
1.6.13. Contractor Travel: Contractor will be required to travel throughout Camps Henry, George, Walker, Carroll, Busan Storage Facility and Pier #8 during the performance of this contract.
1.6.14. Other Direct Costs: All fees associated with disposal are the responsibility of the Contractor.
1.6.15. Antiterrorism (AT) and Operations Security (OPSEC)
1.6.15.1. AT Level I Training: This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility, or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 14 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the KO, if a COR is not assigned within 14 calendar days after completion of training by all employees and subcontractor personnel.
1.6.15.2. Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility, or area.
Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.15.3. iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.