W91QVN-16-R-0038_Q A.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Maintenance and Repair of Elevators for Areas I and II, South Korea
Solicitation number
W91QVN16R0038
Issued by

About this file

Attachment for questions and answers.

View the file

Other files

File Type Posted
A21_W91QVN1600380005.pdf PDF
A21_FBO_Posting-16R0038-0004.pdf PDF
W91QVN16R0038-0003.pdf PDF
W91QVN16R0038-0002.pdf PDF
W91QVN16R0038-0001.pdf PDF
W91QVN-16-R-0038.pdf PDF
Attachment_III__Elevator_List _Area_II.pdf PDF
Attach_1-List_of_Elevators(R) _Area_I.xlsx XLSX spreadsheet
Qtrly_Safety_Inspection_List.pdf PDF
Contract_Data_Requirement_List.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Answer
Q: Will this award consist of a Phase in Period?No
Q: Clarify Preventative Maintenance: See vendors explanation. Item 0001 Preventive maintenance : Routine safety inspection "and" preventive maintenance service for elevators.

As I know, the preventive maintenance should be included during safety inspections,minor repair and major repair. Which means the laps of periodic safety inspection plus completion of identified minor and major repair make the preventive maintenance.

So I want to make sure what would be the preventive maintenance for Firm Fixed Price Portion?

only Include Minor Repair,not Major repair (See PWS 5.1.2)
Q: According to PWS Paragraph 5.1, the Firm Fixed Price Portion would be performed by quarterly with scheduled date.

I understand when minor repair is found during scheduled safety inspection,it has to be completed.

However, what if a dead light or minor repair happen with unscheduled which means we get a call for dead light or minor repair?

Does it cover under CLIN's 0002,on call minor repair?

Unscheduled minor repair will be covered by on-call minor repair (CLIN X002).

Unscheduled replacing dead light will be covered by DPW in-house employee.

Q: PWS Paragraph 5.2.2
Upon receipt of service order calls,the contract shall "respond" within 3 hours for Camp Casey… Define response time-Arrive at problem area within the reponse time to meet a COR (See PWS 1.6.6.2)
Q: . CLIN X003 Major Repair: X003AA, X003AB, X003AC:

Shall the Contractor propose (input) prices for CLINX003 Major Repair or shall the Contractor leave CLINX003 blank?

Leave CLINX003 blank (See PWS 5.3.4)
Q: . Sub-factor 2: Personnel Qualification (Page 69) a. Does Certificate of technical training for elevator maintenance (승강기 유지관리기술인력교육 수료증) mean elevator inspector safety training (승강기자체점검자 교육수료증) on page 52? b. Shall the CM have (3) Certificate of technical training for elevator maintenance (승강기 유지관리기술인력교육 수료증)?IAW research refering to certificate for elevator maintenance, require Certificate of technical trainings for low/middle speed elevator and wheel chair lift.

CM do not require certificate.

Q: Contractor asked why you additionally require 'Elevator Installation Works Business (승강기설치공사업면허증)'on this same requirement as required in the contract No. W91QVN-11-D-0064. Not required

CONTRACTOR QUESTIONS FOR ELEVATOR MAINTENANCE, AREA'S I & II (W91QVN-16-R-0038)