About this file

Material List (SCADA) W91QVN-16-R-0036

View the file

Other files

File Type Posted
W91QVN-16-R-0036_(Released).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location Item No Description QTY UNIT Unit Price Amount Life Cycle 1 Turbidity Lamp 4 EA 1 Year 2 Relay 10 EA 1 Year 3 Hard Disk for Server 4 SET 2 Years 4 Monitor 24" 2 SET 3 Years 5 Radar Level 7 EA 3 Years 6 Ultra Sonic Level 4 EA 3 Years 7 Electrical Valve 20 EA 3 Years 8 DSU(Communication unit) 14 SET 3 Years 9 Flow Meter (Small) 4 EA 5 Years

10 Flow Meter (Large) 1 EA 5 Years 11 PLC(programmale logic controller) 11 SET 5 Years 12 Main Server 2 SET 5 Years

1 Turbidity Lamp 4 EA 1 Year 2 Relay 10 EA 1 Year 3 PH sensor 1 EA 1 Year 4 Residual CL Sensor 1 EA 1 Year 5 Monitor 24" 2 SET 3 Years 6 Radar Level 3 EA 3 Years 7 Ultra Sonic Level 1 EA 3 Years 8 Pneumatic Valve 35 EA 3 Years 9 Operation PC 2 SET 3 Years

10 Pressure Level 2 EA 3 Years 11 Flow Meter (Small) 7 EA 5 Years 12 PLC(programmale logic controller) 10 SET 5 Years

-$ Grand-Total:

MATERIAL LIST FOR MAINTENANCE OF SCADA SYSTEM

Camp Casey

Sub-Total:

Sub-Total:

Rodriguez Range

Sheet1

File details come from the government source that posted it. Updated .