LPTA Evaluation Criteria Language.docx
DOCX document 14 KB Posted
- Attached to
- Maintain EIFS Skirting
- Solicitation number
- W91QV124R0079
About this file
This document appears to be a description of the selection criteria and basis for award for a Lowest Price Technically Acceptable (LPTA) federal contract opportunity. The key details are:
The Government will accept the offer that represents the lowest price, provided the offer is deemed technically acceptable. Technical acceptability is based on the Offeror's ability to meet all requirements of the solicitation and Statement of Work (SOW). Evaluation factors include Technical Capability and Price. Award will be made to the Offeror with the lowest evaluated price that meets the acceptable technical standards.
The related federal contract opportunity is for "Maintain EIFS Skirting" to repair Exterior Insulation Finish System (EIFS) at Fort Walker, VA. The solicitation number is W91QV124R0079 and the Contracting Agency is the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston. The award will be made on a Lowest Price Technically Acceptable basis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Warrior Camp EIFS Repairs_SOW_REVISED.pdf | ||
| Warrior Camp EIFS Repairs_SOW_REVISED.docx | DOCX document | |
| W91QV1324R0079 Maintain EIFS Skirting.pdf | ||
| Warrior Camp EIFS Repairs_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SELECTION CRITERIA
The Government will accept the offer that represents the lowest price technically acceptable. An offer that is technically acceptable conforms to all aspects of the solicitation and contains sufficient information to show the Offeror understands the requirement and can meet deliverables listed in the statement of work (SOW).
BASIS FOR AWARD
Offeror must be registered in SAM, financially responsible, and have no active exclusions.
Offeror's proposal must be deemed technically acceptable.
Evaluation Factors.
The following factors will be evaluated:
Factor 1. Technical Capability reflects the Government’s confidence in each Offeror’s ability, as demonstrated in its proposal, to provide the requirement stated in the solicitation / statement of work (SOW).
Factor 2. Price. Lowest Price Technically Acceptable. Basis of Award – Award is based on lowest price technically acceptable (LPTA). Award will be based on the lowest evaluated price of proposals received that meet, or exceed, the acceptable standards of the non-price factors identified in the solicitation IAW FAR 15.101-2(b)(3).
File details come from the government source that posted it. Updated .