SOW_Install_Flow_Meter_Rev1.pdf

PDF 227 KB Posted

Attached to
Install Flow Meter
Solicitation number
W91QV119R0015
Issued by

About this file

Statement of Work.

View the file

Other files

File Type Posted
Site_Visit_Sign-In_Sheet.pdf PDF
W91QV119R0115_Questions__Answers_081419.pdf PDF
Existing-Sanitary-Sewer.pdf PDF
F-93-1-10267.pdf PDF
DP043429J_Images.pptx PPTX presentation
Wage_Determination_072219.pdf PDF
W91QV119R0115.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

(SOW)

Install Flow Meter at Manhole #5 and Remote Reader at Building 200

Fort Detrick, Maryland

Work order#: DP-04342-9-J Project Manager: Directorate of Public Works (DPW) Prepared by: Pierre, 301-619-3365, pierre.j.seide.civ@mail.mil Date: 06-13-2019 Revision 1

1. Background:

Sewage flows through a gravity sluice towards a sluice gate at Manhole #5 which diverts the sewage to the building 200 Grit Chamber which then flows to the building 101 Sewage Lift Station. The sewage is pumped from the Sewage Lift Station to the Fort Detrick Wastewater Treatment Plant in Area C where it is processed. The City of Frederick has raised concern that untreated sewage may be overflowing the sluice gate and flowing to the Frederick City Treatment Plant.

2. Objective:

The objective of this SOW is to install a wastewater flow meter downstream (Frederick City side) of the sluice gate in Manhole #5 (see drawing F-93-1-10267.pdf). Electric power and data lines shall be run from building 200 to the flow meter via new conduit. The meter shall be connected to the existing smart meter system installed in building 200 (PLC200) through the existing CompactLogix L32E controller and connected to the server with a Cat 6 Ethernet cable.

3. General Requirements:

3.1. Scope of Work:

The Contractor shall provide all labor, materials, equipment and supervision necessary to perform the following repair tasks:

3.1.1. Site Preparation:

The contractor shall notify the Contracting Officer in writing at least 21 calendar days in advance of the date on which work is to begin of any utility/plant disruptions/outage that will occur and the required period of the disruption. The contractor shall obtain all necessary permits prior to the date on which work is to begin. The contractor shall contact Miss Utility prior to the date on which work is to begin.

mailto:pierre.j.seide.civ@mail.mil

3.1.2. Installation:

The contractor shall install an appropriate wastewater flow meter with a minimum range of 0-1000 gpm, along with any additional required plumbing, conduit and wiring. The selected wastewater flow meter shall be approved by the Contracting Officer prior to installation. The contractor shall install the necessary conduits between Manhole #5 and building 200 which requires trenching a distance of approximately 100 feet. One conduit shall be installed for the meter electric power supply and a separate conduit for the meter data wires. The contractor shall install and seal appropriate fittings in the concrete block wall of building 200 to feed the wiring from the meter conduit into the structure. The contractor shall connect the meter to an existing smart meter system in building 200 which includes installing any additional required conduit and hardware to the interior of building

200. The contractor shall program the existing meter controller to display the new meter reading on the existing panel display.

The finished product should operate as intended and require no follow on work to perform its function.

3.1.3. Testing:

The contractor shall verify that all meters and remote systems perform as required.

3.1.4. Final Inspection:

The Contracting Officer or COR will conduct the final inspection of the project; with at least the Contractor, the building tenant, and a Safety Inspector.

3.1.4.1.

Listed deficiencies on the punch list should have been corrected at this point. However, deficiencies that cannot be corrected due to operation or seasonal weather can be rectified in dates approved by the Contracting Officer. All debris management shall be complete.

3.1.5. Equipment:

The contractor shall provide any and all ancillary equipment, manpower and support, to design demolish and install components mentioned within this summary of work.

Contractor shall be responsible for obtaining all dimensions and measurements of areas and components to be installed prior to installation of components.

3.1.6. Technical:

The requirements contained herein are the minimum necessary and should be supplemented by the Contractors own design and quality control requirements as may be applicable. The Contractor shall coordinate, design, develop, demolish, fabricate, assemble, and install new components as requested in the SOW and drawings provided for this contract.

The Contractor shall field verify conditions, elevations and dimensions prior to initiating work. The Contractor shall notify the Contracting Officer of any discrepancies, interferences or contradictions between contract documentation and field conditions by submitting a request for clarification. Affected phases of work shall not be initiated until all requests for clarifications have been answered.

3.1.7. EXISTING WORK:

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

3.1.7.1. Removal:

Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

3.1.7.2. Repair and Replace:

Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

3.1.7. Codes:

Contractor shall abide by all State, Federal and local construction regulations and/or codes for the duration of this project in regards to construction and safety procedures and methods used while performing this project.

All materials shall be installed in accordance with the approved recommendations of the manufacturer as well as conform to the contract documents. The installation shall be neat in appearance, free from defects and shall be accomplished by workman skilled in this type of work.

3.1.8. Clean Up:

The contractor shall be responsible for the daily clean up and disposal of any debris with the performance of this project. Work areas should remain clean and safe to the furthest extent possible in an effort to reduce safety concerns. It is the contractor’s responsibility to ensure all debris is disposed of at an off-post landfill in accordance with all local, state and federal regulations.

3.1.9 Occupied Facilities:

The facility in which the contractor will be installing the equipment will not be occupied during the duration of the contract.

When performing work in occupied buildings, the facility and contents shall be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

During the installation, the area adjacent to the construction zone will be occupied with building personal. The contractor is required to prevent the spread of any debris and dust.

3.1.10. Delivery Schedule:

The Contractor shall notify the Contracting Officer in writing at least 14 calendar days in advance of the date on which materials and equipment are required and shall pick-up materials and equipment no later than 30 calendar days after such date.

If required by contract, materials and equipment will be available on or after 14 calendar days after the award of the contract.

3.1.11. AS-BUILTS:

At the time of the final inspection or earlier the contractor shall provide As-Built drawings to the Contracting Officer, and the Contracting Officer’s Representative.

3.1.12. WARRANTY:

The Contractor shall warranty all work for minimum of one (1) year after Government acceptance. Under this warranty, the Contractor shall remedy any nonconformities or defects at the Contractor’s expense. The Contractor shall also identify, complete and deliver manufacturer warranty documents for any materials with manufacturer warranties longer that one (1) year.

3.2. Period of Performance:

The Contractor shall complete work within 60 days after KO issues the Notice to Proceed

(NTP).

3.3. Place of Performance:

Place of performance shall be at Manhole #5 (Rosemont Avenue side of the fence) near Building 200, Fort Detrick, Maryland 21702.

3.4. Technical Point of Contact:

Pierre Seide, Fort Detrick, MD 301-619-3365.

3.5. Hours of Operation:

The hours of operation for this project are between the hours of 7:00 am and 5:00 pm. If weekend work is required for project completion alternate work hours can be coordinated with the COR.

3.6. Project Tracking:

The contractor shall provide project submittals that give a clear overview of project progress.

3.6.1 Project Schedule:

The project schedule shall be provided to the COR in Microsoft Projects, or an approved equal, format.

3.6.2. Schedule of Values:

The schedule of values shall show a minimum of the cost delineation for the materials and construction divisions.

3.7. Safety:

The Contractor is solely liable for ensuring safe work and otherwise safe actions, behavior, and conduct while on site. It is understood the Contractor is solely responsible for following all applicable Federal and State of Maryland mandates and guidelines.

3.7.1. Violations:

All safety violations identified by the Fort Detrick Safety Office shall be reported to the COR for the Contractor Superintendent’s disposition. In cases of life safety, the Fort Detrick Safety Office may act independently to mitigate the safety hazard and report to the COR when practical. In all cases of life safety issues, the Contractor Superintendent must report actions taken by the Contractor to the COR within one (1) hour; the COR must subsequently report the issue to the Department of Public Works Director, IAW critical incident report procedures and the Fort Detrick Safety Office. In all other cases, the Contractor Superintendent must report the safety issue to the Fort Detrick Safety Office within eight (8) hours of the incident. Initial reporting may be done telephonically.

Subsequently, all reports must be provided in writing within a time period to be determined by the Fort Detrick Safety Office IAW Army regulation.

3.7.2. HEALTH AND SAFETY:

The Contractor shall be fully responsible for and shall assume all liability for compliance with all applicable regulations pertaining to the health and safety of personnel during execution of work. The Contractor shall hold the Government harmless for any action on its part or that of its employees, subcontractors or Contractor’s representatives, which results in illness, injury, or death to anyone on the Fort Detrick grounds. All rules of safety which are or may be imposed upon the Contractor by federal, state or municipal code, and the applicable regulations shall be effectively carried out in the performance of this contract.

3.7.3. HEALTH AND SAFETY PLAN:

The contractor shall complete an Accident Prevention Plan and a Hazard Risk Analysis for all work to be performed on the project.

3.7.4 FIRE SAFETY:

Provide product data for review for any fire stopping products to be used. All penetrations made in fire rated assemblies shall be filled with the proper fire rated material that either meets or exceeds the current rating of that assembly. All penetrations made and subsequently filled with the appropriate fire stopping shall be inspected by a Ft. Detrick Fire & Emergency Services, Fire Prevention Division representative before concealing, painting, etc.

If any Hot Work Operations are to be performed, i.e. Torch applied membranes, Tar pot, Soldering, welding, or cutting, than a Hot Work Permit shall be required prior to the commencement of work. To obtain a Hot Work Permit contact the Fire Department at 301-619-2528.

3.8. SECURITY REQUIREMENTS:

Contractor personnel or any representative of the Contractor entering Fort Detrick shall abide by all security rules and regulations. The Contractor shall carry passes issued by Fort Detrick for all vehicles entering the base, whether company-owned or employees’ private vehicles.

3.8.1. Physical Security:

The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

3.8.2. Gate Access Requirements:

IAW Army Directive 2014-05 all personnel desiring unescorted access to Fort Detrick will enter the installation through an authorized Access Control Point (ACP) and be vetted using the National Crime Information Center (NCIC) interstate Identification Index (III).

The Installation Commander will, in the absence of a waiver deny uncleared contractor, subcontractor and visitors unescorted access to the installation based on the results of the NCIC-III check that contains credible derogatory information. Such derogatory information includes, but is not limited to the following:

3.8.2.1.

The NCIC III contains criminal arrest information about the individual that causes the installation Commander to determine that individual present a potential threat to the good order, discipline, or health and safety on the installation.

3.8.2.2.

The Installation is unable to verify the individual’s claimed identity in the attempt to gain access.

3.8.2.3.

The individual has a current arrest warrant in NCIC, regardless of the offense or violation.

3.8.2.4.

The individual is currently barred from entry or access to a federal installation or facility.

3.8.2.5.

The individual has been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography trafficking in humans, drug possession with the intent to sell or drug distribution.

3.8.2.6.

The individual has a US conviction for espionage, sabotage, treason, terrorism or murder.

3.8.2.7.

The individual is a registered sex offender.

3.8.2.8.

The individual has a felony conviction within the past 10 years, regardless of the offense or violation.

3.8.2.9.

The individual has been convicted of a felony firearms or explosives violation.

3.8.2.10.

The individual has engaged in acts or activities designed to overthrow the U.S.

Government by force.

3.8.2.11.

The individual is identified in the Terrorist Screening Database (TSDB) as known to be or suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

3.8.2.12.

Individual is barred from Fort Detrick.

3.8.3. Access Denial Waiver Process:

In case where unclear contractor, subcontractor is denied access based on derogatory information obtained from an NCIC or NCIC III check, the Installation Commander shall offer an Access Denial Wavier Application packet only if the individual request a waiver.

3.8.4. Anti-terrorism Security Requirements:

The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Directorate of Operations Protection Branch Visitor Center and Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The COR is responsible to make sure items selected on this sheet are complied with. All access control requirements are to be adhered to. All contractors and sub-contractors need to be vetted through the visitor center, and obtain visitor passes to work on post. COR needs to conduct spot checks at work sites to make sure contractors are in compliance with visitor requirements and responsibilities. AT Level 1 and iWatch Awareness training assist in informing the contractor that at some times Random Antiterrorism Measures (RAM) may be in effect, where their vehicle may be checked, ID cards validated, security checks done by COR and Police. Gate operations could be affected based on the FPCON or RAM. COR is responsible depending on the length of this contract with signing at least one contractor up for AtHoc messages for weather or incident alerts, that POC will be responsible for notifying the other contractors by phone tree or other means. The COR is also responsible for ensuring if any blueprints that show information outside of the scope of work that they are either collected back at the end of the job, or destroyed.

3.8.4.1.

Anti-Terrorism Level (1) One Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. All contractor employees must complete annual AT Level 1 awareness training. Annual training is to be conducted in the anniversary month it was initially completed. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level I training is now conducted on the Joint Knowledge Online (JKO) site. For those that have a CAC, AT Level I can be accessed via https://jkodirect.jten.mil. For those personnel that do not have a CAC they can utilize the below instructions to complete, i.e. contractors etc.… Google JKO and begin the process from there. http://jko.jten.mil Clicks:

2. No DOD CAC.

3. I am a US mil, government civil servant or contract employee.

4. I've been directed to take required training on JKO.

5. Courses.

6. I do not have a .MIL, .GOV, or .NDU.EDU address or I am a Multi-National Student.

7. Fill out the contact sheet and email to sponsor (In my opinion this is the COR) 8.

Sponsor will email to the JKO help desk. (Again in my opinion this is the COR) Approval

1) Help desk sends non-CAC user an email with User ID.

2) Help desk will send a separate email with an electronic token to register a new password (token is good for 24 hours).

3) New User follows the instructions in the email and enters a new password.

4) User will need to enroll in Course # JS-US007-14 (User has up to 1 year to complete the course) (Contractors need to follow the requirements outlined in the AT/OPSEC cover sheet and complete it in 30 days).

If training is required in a non-English language, please contact Fort Detrick ATO at usarmy.detrick.usag.mbx.dptms-antiterrorism@mail.mil.

3.8.4.2.

iWatch Awareness Training. The contractor and all associated subcontractors shall brief all employees on the local iWatch program (training standards provided in this PWS by the Fort Detrick ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report on suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees’ commencing performance, with the results reported to the COR no later than 5 calendar days after completion. All training materials can be found at AT Awareness Information: iWatch: http://www.detrick.army.mil/ready/iwatch.cfm and iSalute:

http://www.detrick.army.mil/ready/iSALUTE.cfm

3.8.5. Operational Security (OPSEC) Requirements:

Personal information or information considered critical to the installation's operations released intentionally or unintentionally could have direct consequences for military and government personnel as well as our critical operations. Therefore, the contractor shall be responsible for safeguarding personal information and information considered critical to the Fort Detrick's operations. Per AR 530-1, Operations Security (OPSEC), new contractor employees must complete Annual OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. All contractor employees shall adhere to USAG Fort Detrick OPSEC policies, regulations and guidance. OPSEC awareness training is required when working with personal information (Social Security Number, date of birth, etc.) or on government systems that are considered critical to the installation's operations. Contractor personnel shall not release any personal or operational information (No photography) to the general public, press, or any other personnel or organizations without prior approval from the USAG Command.

3.8.5.1. OPSEC Awareness Training:

New contractor employees and subcontractor employees must complete Level I OPSEC awareness training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. Annual training is to be conducted in the anniversary month it was initially completed. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 15 calendar days after completion of training by all employees and subcontractor personnel.

http://www.detrick.army.mil/dptms/pdf/OPSECTrainingContractors.pdf

3.8.5.2. OPSEC Standing Operating Procedure:

The contractor shall follow the Fort Detrick OPSEC SOP while performing work on Fort Detrick.

http://www.detrick.army.mil/dptms/pdf/OPSECTrainingContractors.pdf

3.8.5.3. Industrial Personnel Security:

IAW AR 380-67, AR 380-49 and DOD 5200.2-R, all contracts, classified, sensitive but unclassified and unclassified are required to contain a security clause. : IAW Army Regulations 380-67, 380-5 and 380-49, the Contractor shall ensure all personnel performing under this contract have a completed National Agency Check with Local Checks (NACLC) or Unclassified contracts require a NACI and that it contain no unfavorable information and has been completed by Office of Personnel Management and/or adjudicated by Defense Industrial Security Clearance Office (DISCO) prior to the start of the contract. The security requirements must be maintained for the life of the contract, and citizenship will be verified by presenting an original birth certificate or a valid US Passport or the original Naturalization Certificate to the USAG Security Office at the time of in processing for all contract personnel assigned to the contract. In order to maintain the security requirements any derogatory information, to include law enforcement issues, mental health issues, or alcohol/drug related issues discovered during the performance of this contract must be reported to the USAG Security Office.

3.9. SEARCH AND SEIZURE:

Contractor personnel and property shall be subject to search and seizure upon entering the confines of Fort Detrick and upon leaving the confines of Fort Detrick.

3.10. Environmental Protection:

The Contractor and Contractor representative shall manage all waste generated by any work performed under this contract in accordance with all applicable Federal (Clean Air Act; Toxic Substances Control Act; Solid Waste Disposal Act; Resource Conservation Recovery Act;

Clean Water Act; Safe Drinking Water Act) and State laws and regulations; Executive Orders, or other types of rulings having the effect of the law. In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply.

3.10.1. Environmental Management System:

Fort Detrick has implemented an Environmental Management System (EMS) to address the environmental impacts of its activities. All Contractors performing work at Fort Detrick must be aware of and understand Fort Detrick's Environmental Policy.

Contractors are responsible for ensuring environmental practices conform to Fort Detrick’s EMS.

3.10.2. Solid Waste and Recycling:

The Contractor shall recycle materials; such as, cardboard, paper, aluminum/metal cans, plastic, and glass jars/bottles, scrap metal, concrete, asphalt, and manage solid waste generated during the project in accordance with Federal and State laws and regulations.

The Contractor shall provide the Government with records of the type, weight, and disposal/recycling location for all recyclable materials and solid waste sent offsite for recycling and/or disposal.

3.10.3. Hazardous Waste:

The Contractor shall manage hazardous waste in accordance with Federal and State laws and regulations. The contractor may not sign waste profiles or manifests on behalf of Fort Detrick. Contractor must follow Fort Detrick’s Manifest SOP.

3.10.4. Hazardous Material:

The Contractor shall furnish and store all hazardous materials in a storage container or other secondary containment system. Maintenance of on-site equipment is not authorized.

3.10.5. Storm Water Pollution Prevention:

The Contractor shall implement measures to prevent storm water pollution in accordance with Federal and State laws and regulations. The Contractor shall furnish, install, maintain and operate erosion and sediment control measures, such as silt fences, storm drain protection, soil retention blankets, etc., prior to the start of any work that could cause pollution to state waters. The Contractor shall keep paved roads, parking lots and walkways clear of dirt, debris, and other materials. The Contractor shall remove immediately any dirt, debris, or materials deposited onto these surfaces. The Contractor shall furnish and use drip pans under equipment oil and fuel tanks, and cover equipment when not in use and during rain events.

It is the responsibility of the contractor to provide all design, approval and installation of stormwater management requirements for the project. Regulatory stormwater requirements include construction erosion & sediment control and post-construction quantity and quality stormwater runoff management. If project disturbance exceeds 5,000 square feet (sf) or more than 100 cubic yards then an erosion and sediment control permit must be approved by the Maryland Department of the Environment (MDE) before groundbreaking can occur pursuant to Code of Maryland Regulations (COMAR)

26.17.01. If project disturbance exceeds 5,000 sf then a stormwater management permit must be approved by the MDE before groundbreaking can occur pursuant to COMAR

26.17.02. Projects disturbing one acre or more must obtain a National Pollutant Discharge Elimination System (NPDES) permit pursuant to the General Permit for Construction Activities. It is the responsibility of the contractor to maintain all erosion & sediment control devices during construction to ensure minimal impacts to the environment. The contractor must conduct all required inspections of erosion & sediment control devices to ensure they are maintained and properly functioning. Once construction is complete, the contractor must provide the MDE with as-builts of all post-construction quantity and quality stormwater management devices for compliance permit termination.

3.10.6. Air Quality:

The Contractor shall take all necessary reasonable control measures to reduce air pollution by any material or equipment used to carry out the requirements of this contract.

This includes, but is not limited to, wetting down dry materials as necessary to prevent blowing dust, and keeping waste and materials in covered containers.

3.11. Damage To Government Owned Property:

The Contractor shall be held liable for damage or destruction of Government property (e.g.

buildings, vehicles, sidewalks, headstones, etc.) caused by the Contractor, Contractor personnel or representatives of the Contractor in the performance of services in this contract.

The Contractor shall take corrective action in a reasonable amount of time to repair damages or replace destroyed property. If the Contractor fails to take the required corrective action, the Government retains the right to exercise other rights or remedies available to the Contracting Officer.

3.12. Damage To Contractor Owned Property:

The Contractor shall be held liable for damage or destruction of privately owned property (e.g. privately owned vehicles), as defined in this SOW, caused by the Contractor, Contractor personnel or representatives of the Contractor in the performance of services in this contract.

The Contractor shall take corrective action in a reasonable amount of time to repair damages or replace destroyed property.

3.13. Damage Reports:

The Contractor shall submit a damage report to the Contracting Officer and designated representative within two (2) workdays of damage or destruction to Government property or privately owned property caused by the Contractor, Contractor personnel or representatives of the Contractor. The damage report shall detail the facts and the extent of damages or destruction and the corrective action taken by the Contractor to repair damages or replace destroyed property.

4. Government Furnished Property, Equipment, & Services:

4.1. Utilities:

Government supplied water, electricity and other utilities will be available for this contract needs. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities to accomplish work performed under this contract.

5. Contractor Furnished Property, Equipment, & Services:

5.1. General:

With the exception of items specifically identified as Government furnished in Part 4, the Contractor shall furnish all supplies, equipment, supervision, materials and services necessary to perform the requirements of this contract.

5.2. Permits, Taxes, Licenses, Ordinances, and Regulations:

The Contractor shall, at his own expense, obtain all necessary permits, give all notices, pay all license fees and applicable taxes, comply with municipal, state, and Federal laws, ordinances, rules and regulations applicable to the business carried on under this contract.

5.3. Equipment Staging and Security:

The Contractor shall take full responsibility for equipment stored or left onsite. The Government does not take responsibility for the security of Contractor’s equipment or project material while the contract/project is being performed. The Government is neither responsible nor liable for any of the Contractor’s material, equipment stored either inside or outside the work area.

6. ATTACHMENTS:

Attachment 1 – Definitions and Acronyms Attachment 2 – References

Attachment 1

1. DEFINITIONS AND ACRONYMS

• ACCIDENT PREVENTION PLAN (APP). A document that outlines the safety precautions, management, and qualifications for a project.

• CONTRACTING OFFICER’S REPRESENTATIVES (COR). Means a representative from the requiring activity appointed by the Contracting Officer to perform surveillance and to act as liaison to the contractor.

• PRIVATELY OWNED PROPERTY. For the purposes of this PWS, means property ownership by a non-governmental organization (e.g. privately owned vehicles).

• SOW: Statement of Work

Attachment 2

REFERENCES

Whole building design guide Unified Facilities Guide Specifications (UFGS) Website https://www.wbdg.org

• UFGS 00 22 14-----------Supplementary Instructions

• UFGS 01 14 00-----------Work Restrictions

• UFGS 01 32 16-----------Progress Documentation

• UFGS 01 33 00-----------Submittal Procedures

• UFGS 01 35 26-----------Governmental Safety Requirements

• UFGS 01 57 19-----------Temporary Environmental Controls

• UFGS 01 78 00-----------Closeout Submittals

• UFGS 02 41 00-----------[Demolition] [and] [Deconstruction]

• UFGS 33 30 00-----------Sanitary Sewerage

• UFGS 33 32 13 13-------Packaged Sewage Lift Stations, Wet Well Type

• Occupational Safety and Health Administration (OSHA) regulations

• UFC 1-200-01 DoD Building Code (General Building Requirements)

― End of SOW ― https://www.wbdg.org/

1. Background:
Sewage flows through a gravity sluice towards a sluice gate at Manhole #5 which diverts the sewage to the building 200 Grit Chamber which then flows to the building 101 Sewage Lift Station. The sewage is pumped from the Sewage Lift Station to the Fort...
2. Objective:
The objective of this SOW is to install a wastewater flow meter downstream (Frederick City side) of the sluice gate in Manhole #5 (see drawing F-93-1-10267.pdf). Electric power and data lines shall be run from building 200 to the flow meter via new co...
3. General Requirements:
3.1. Scope of Work:
The Contractor shall provide all labor, materials, equipment and supervision necessary to perform the following repair tasks:
3.1.1. Site Preparation:
3.1.2. Installation:
3.1.3. Testing:
3.1.4. Final Inspection:
3.1.4.1.
3.1.5. Equipment:
3.1.6. Technical:
3.1.7. EXISTING WORK:
3.1.7.1. Removal:
3.1.7.2. Repair and Replace:
3.1.7. Codes:
3.1.8. Clean Up:
3.1.9 Occupied Facilities:
3.1.10. Delivery Schedule:
3.1.11. AS-BUILTS:
3.1.12. WARRANTY:
3.2. Period of Performance:
3.3. Place of Performance:
3.4. Technical Point of Contact:
3.5. Hours of Operation:
3.6. Project Tracking:
3.6.1 Project Schedule:
3.6.2. Schedule of Values:
3.7. Safety:
3.7.1. Violations:
3.7.2. HEALTH AND SAFETY:
3.7.3. HEALTH AND SAFETY PLAN:
3.7.4 FIRE SAFETY:
3.8. SECURITY REQUIREMENTS:
3.8.1. Physical Security:
3.8.2. Gate Access Requirements:
3.8.2.1.
3.8.2.2.
3.8.2.3.
3.8.2.4.
3.8.2.5.
3.8.2.6.
3.8.2.7.
3.8.2.8.
3.8.2.9.
3.8.2.10.
3.8.2.11.
3.8.2.12.
3.8.4. Anti-terrorism Security Requirements:
3.8.4.1.
3.8.4.2.
3.8.5. Operational Security (OPSEC) Requirements:
3.8.5.1. OPSEC Awareness Training:
3.8.5.2. OPSEC Standing Operating Procedure:
3.8.5.3. Industrial Personnel Security:
3.9. SEARCH AND SEIZURE:
3.10. Environmental Protection:
3.10.1. Environmental Management System:
3.10.2. Solid Waste and Recycling:
3.10.3. Hazardous Waste:
3.10.4. Hazardous Material:
3.10.5. Storm Water Pollution Prevention:
3.10.6. Air Quality:
3.11. Damage To Government Owned Property:
3.12. Damage To Contractor Owned Property:
3.13. Damage Reports:
4. Government Furnished Property, Equipment, & Services:
4.1. Utilities:
5. Contractor Furnished Property, Equipment, & Services:
5.1. General:
5.2. Permits, Taxes, Licenses, Ordinances, and Regulations:
5.3. Equipment Staging and Security: