W91QF518R0010_Amendment_0002.pdf
PDF 151 KB Posted
- Attached to
- Access Control Upgrade
- Solicitation number
- W91QF518R0010
About this file
W91QF518R0010 Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QF518R0010_Amend_0001.pdf | ||
| W91QF518R0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011224142
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide responses to vendors' questions. See attachment Questions & Answ ers.
2. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QF518R0010
X 9B. DATED (SEE ITEM 11)
23-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Sep-2018
CODE
MICC FORT LEE
1830 QUARTERMASTER ROAD, BLDG 7124
FORT LEE VA 23801 1606
W91QF5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91QF518R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS
QUESTIONS AND ANSWERS
Access Control Upgrade, Fort Lee, VA
Solicitation W91QF5-18-R-0010
Question 1. Can the Government provide the Dongle ID of the current BASIS access control system so the vendor can put together an accurate quotation?
Answer 1. The Dongle ID for the current BASIS system is 122070.
Question 2. Is the request for the Lenel OnGuard G Series software sole source justification or will you accept equivalents?
Answer 2. The Government request is for a Lenel OnGuard System. No substitutions are allowed.
Question 3. Vendor would like to request clarification as to why the Government is not complying with HSPD 12 (Homeland Security Presidential Directive 12) and FIPS 201-2 for this requirement as per OMB 11-11. The requirements for all Federal Access Control systems if updated/modified, or new should align with the Federal requirements under HSPD12/FIPS 201-2 which require using the Federal ID card (PIV card) that is a secure smartcard technology to gain access to any facility. All products must be on the approved product list (APL) located "Idmanagement.gov". Readers/locks must be able to read the 13.5 Smartcard technology.
Magnetic swipe is not approved. Could there be a noncompliance issue? Here is a cut from M- 11-11:
Effective immediately, all new systems under development must be enabled to use PIV credentials, in accordance with NIST guidelines, prior to being made operational.
Effective the beginning of FY2012, existing physical and logical access control systems must be upgraded to use PIV credentials, in accordance with NIST guidelines, prior to the agency using development and technology refresh funds to complete other activities.
Procurements for services and products involving facility or system access control must be in accordance with HSPD-12 policy and the Federal Acquisition Regulation. In order to ensure government-wide interoperability, OMB Memorandum 06-18, "Acquisition of Products and Services for Implementation of HSPD-12" requires agencies to acquire products and services that are approved as compliant with Federal policy, standards and supporting technical specifications.
W91QF518R0010
Answer 3. The software upgrades required under the proposed purchase description for B5020 Access Control upgrade complies with all the required Government standards, and will support current and future requirements for locks with or without the magnetic stripe technology. The current requirement is not replacing the existing locks. The current requirement for the Lenel OnGuard Software upgrade on the existing locks and will ensure that the Requiring Activity is prepared when the updated locks are procured to no longer use the magnetic strip.
(End of Summary of Changes)
File details come from the government source that posted it.