Solicitation Amendment 01_W91QF426BA0080001 SF 30.pdf
PDF 4 MB Posted
- Attached to
- Amendment 01_Questions and Answers
- Solicitation number
- W91QF4-26-B-A008_B635_Doors
About this file
This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the U.S. Army Corps of Engineers (USACE), Fort Leavenworth, Kansas on August 24, 2026. The amendment modifies solicitation W91QF426BA008, originally dated July 30, 2026, under amendment number 0001. The contracting officer is Felipe D. Zaragoza, and questions and answers are being added to Section J with a revised bid opening date of September 1, 2026 at 2pm.
The primary change expands the construction project scope from "Replace Doors and Trim at B635" to "Replace Doors and Trim at B635 and B636." This modification affects CLIN 0001 and updates the project requirements accordingly. Supporting documentation includes a Statement of Work (SOW B635 - Doors Repair Project Rev5, expanded from 15 to 16 pages), three attachments containing drawings and door counts for both buildings, and questions and answers from a site visit. The amendment deletes the previous revision (Rev4) of the SOW and adds newly referenced contract documents providing specifications and technical details for the expanded scope covering both B635 and B636 exterior door replacement work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Construction Project Title
Doors and Trim B635 Doors and Trim B635 and B636
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Description Replace Doors and Trim at B635 Replace Doors and Trim at B635 and B636
Section C - Description/Specifications/Statement of Work
The Requirements text has been modified to:
Replace Doors and Trim at B635 and B636
Section J - List of Attachments
W91QF426BA0080001
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 SOW B635 -
Doors Repair Project Rev5
Statement of Work 21 Aug
15 Attach ment
No
0003 Attach A - B635 and B636 Ext Door Counts
Drawings 21 Aug
Attach ment
No
0004 Attach B - B635 As-Built
Drawings 21 Aug
Attach ment
No
0005 Answers2Ques tions_W91QF4
26FA008_B635
Doors
Questions and Answers from Site Visit
21 Aug
Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 SOW B635 -
Doors Repair Project Rev5
Statement of Work 21 Aug
16 Attach ment
No
0003 Attach A - B635 and B636 Ext Door Counts
Drawings 21 Aug
3 Attach ment
No
0004 Attach B - B635 As-Built
Drawings 21 Aug
6 Attach ment
No
0005 Answers2Ques tions_W91QF4
26FA008_B635
Doors
Questions and Answers from Site Visit
21 Aug
6 Attach ment
No
The following contract documents were added:
Answers2Questions_W91QF426FA008_B635 Doors Attach A - B635 and B636 Ext Door Counts Attach B - B635 As-Built SOW B635 - Doors Repair Project Rev5
The following contract documents were deleted:
SOW B635 - Doors Repair Project Rev4
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
SOW B635 - Doors Repair Project Rev5 15 16
Attach A - B635 and B636 Ext Door Counts none 3
Attach B - B635 As-Built none 6
Answers2Questions_W91QF426FA008_B635 Doors none 6
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0001 |
| EffDate: 24 AUG 2026 |
| ReqNo: |
| ProjNo: W91QF426B635DOORSANDWINDOWS |
| IssCode: W91QF4 |
| AdmCode: |
| IssuedBy: W6QM MICC-FT LEAVENWORTH |
731 MCCLELLAN AVENUE, FORT LEAVENWORTH KS 66027-0000
FORT LEAVENWORTH, KS 66027-0000
UNITED STATES
JENNIFER WALKER, EMAIL: JENNIFER.S.WALKER12.CIV@ARMY.MIL TELEPHONE: (520) 945-9613 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W91QF426BA008 |
| SolDate: 30 JUL 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: To Add Questions and Answers to Section "J". Bid Opening Remains 1 September 2026 at 2pm. |
| ContNameTitle: |
| CoNameTitle: FELIPE D. ZARAGOZA |
| ContDate: |
| CODate: 24 AUG 2026 |