This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the U.S. Army Corps of Engineers (USACE), Fort Leavenworth, Kansas on August 24, 2026. The amendment modifies solicitation W91QF426BA008, originally dated July 30, 2026, under amendment number 0001. The contracting officer is Felipe D. Zaragoza, and questions and answers are being added to Section J with a revised bid opening date of September 1, 2026 at 2pm.

The primary change expands the construction project scope from "Replace Doors and Trim at B635" to "Replace Doors and Trim at B635 and B636." This modification affects CLIN 0001 and updates the project requirements accordingly. Supporting documentation includes a Statement of Work (SOW B635 - Doors Repair Project Rev5, expanded from 15 to 16 pages), three attachments containing drawings and door counts for both buildings, and questions and answers from a site visit. The amendment deletes the previous revision (Rev4) of the SOW and adds newly referenced contract documents providing specifications and technical details for the expanded scope covering both B635 and B636 exterior door replacement work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Construction Project Title

Doors and Trim B635 Doors and Trim B635 and B636

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description Replace Doors and Trim at B635 Replace Doors and Trim at B635 and B636

Section C - Description/Specifications/Statement of Work

The Requirements text has been modified to:

Replace Doors and Trim at B635 and B636

Section J - List of Attachments

W91QF426BA0080001

The attachments table has changed from:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 SOW B635 -

Doors Repair Project Rev5

Statement of Work 21 Aug

15 Attach ment

No

0003 Attach A - B635 and B636 Ext Door Counts

Drawings 21 Aug

Attach ment

No

0004 Attach B - B635 As-Built

Drawings 21 Aug

Attach ment

No

0005 Answers2Ques tions_W91QF4

26FA008_B635

Doors

Questions and Answers from Site Visit

21 Aug

Attach ment

No

To:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 SOW B635 -

Doors Repair Project Rev5

Statement of Work 21 Aug

16 Attach ment

No

0003 Attach A - B635 and B636 Ext Door Counts

Drawings 21 Aug

3 Attach ment

No

0004 Attach B - B635 As-Built

Drawings 21 Aug

6 Attach ment

No

0005 Answers2Ques tions_W91QF4

26FA008_B635

Doors

Questions and Answers from Site Visit

21 Aug

6 Attach ment

No

The following contract documents were added:

Answers2Questions_W91QF426FA008_B635 Doors Attach A - B635 and B636 Ext Door Counts Attach B - B635 As-Built SOW B635 - Doors Repair Project Rev5

The following contract documents were deleted:

SOW B635 - Doors Repair Project Rev4

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

SOW B635 - Doors Repair Project Rev5 15 16

Attach A - B635 and B636 Ext Door Counts none 3

Attach B - B635 As-Built none 6

Answers2Questions_W91QF426FA008_B635 Doors none 6

IDCode: J
Page: 1
Pages: 4
AmendNo: 0001
EffDate: 24 AUG 2026
ReqNo:
ProjNo: W91QF426B635DOORSANDWINDOWS
IssCode: W91QF4
AdmCode:
IssuedBy: W6QM MICC-FT LEAVENWORTH

731 MCCLELLAN AVENUE, FORT LEAVENWORTH KS 66027-0000

FORT LEAVENWORTH, KS 66027-0000

UNITED STATES

JENNIFER WALKER, EMAIL: JENNIFER.S.WALKER12.CIV@ARMY.MIL TELEPHONE: (520) 945-9613 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W91QF426BA008
SolDate: 30 JUL 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: To Add Questions and Answers to Section "J". Bid Opening Remains 1 September 2026 at 2pm.
ContNameTitle:
CoNameTitle: FELIPE D. ZARAGOZA
ContDate:
CODate: 24 AUG 2026